HomeMy WebLinkAbout20051606 Ver 1_Complete File_20050829oFc ??'
Certificate of Completion
gNps gTFR t76 U
01
DWQ Project No. U CX0 County: H Ie-Xcto t r Re'?,?,cy
Applicant: NCb oT
Project Name: 12 3 FS 5-
Date of Issuance of 401 Water Quality Certification: AuQuS4- 29, zoos
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh,
NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized
agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I !N L. 14t t d tr- , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
CU Date:
A j-
Signature:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: Registration No.: Date:
?oFWAT?90
?O G
r
o -c
Mr. Mike Holder, P.E.
NCDOT Division 12
P.O. Box 47
Shelby, NC 28151
Michael F. Easley, Governor
William G. Ross Jr., Secretary
@ fj North Carolina Department of Environment and Natural Resources
sF? !l Alan W. Klimek, P.E. Director
O O f Division of Water Quality
?,ynrgo rgT .9
AP August 29, 2005
01Alexander DWQ# 606
County
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Holder:
You have our approval, in accordance with the attached conditions and those listed below, to permanently
impact 120 linear feet (If) (60 If for culvert installation, 50 If for floodplain bench creation, and 10 If for
inlet/outlet stabilization using riprap) and temporarily impact 40 If (temporary cofferdam installation) of
Robinette Creek, a perennial stream. The impacts are proposed in order to replace a deteriorating bridge with
a double barrel concrete culvert as described in your application received by the Division of Water Quality
(DWQ) on August 22, 2005. The location of the project is State Road 1310 (Robinette Road) in Alexander
County. After reviewing your application, we have determined that this project is covered by Water Quality
General Certification Number 3404. This certification corresponds to Regional General Permit 198200031
issued by the U.S. Army Corps of Engineers (USACE). Please note that you should get any other federal,
state or local permits before proceeding with your project, including those required by (but not limited to)
Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations.
This approval is valid solely for the purpose and design that you described in your application (unless modified
below) and will expire with the associated USACE 404 permit unless otherwise specified in the Water Quality
Certification. Should your project change, you must notify the DWQ in writing and you may be required to
submit a new application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project
(now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear
feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this
approval to remain valid, you must adhere to the conditions listed in the attached certification and those listed
below:
Due to the streambed elevation at the inlet end of the proposed culvert, DWQ will not require the burial of the
culvert in the streambed at the inlet end of the pipe. The outlet end of the pipe must be placed below the
elevation of the streambed by one foot to allow for low flow passage of water and aquatic life. All structures
shall -be installed in such a manner that the original stream profiles are not altered (i.e., the depth of the
channel must not be reduced by a widening of the streambed). Design and placement of culverts and other
structures including temporary erosion control measures shall be installed in such a manner that the original
stream profiles are not altered (i.e., the depth of the channel must not be reduced by a widening of the
streambed). Existing stream dimensions (including pattern and profile) are to be maintained above and
below locations of each culvert. The applicant may be required to provide evidence that the equilibrium has
been maintained, if requested in writing by the DWQ.
North Carolina Division of Water Quality 610 East Center Avenue, Suite 301
Intemet: h2o.enr.state.nc.us Mooresville, NC 28115
Phone (704) 663-1699
Fax (704) 663-6040
N e hCarolina
Noaturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper
Page 2
2. Riprap must not interfere with thalweg performance and aquatic life passage during low flow conditions.
3. Disposal of old bridge material into surface waters is not allowed. Strict adherence to the USACE guidelines
for bridge demolition will be required.
4. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full
compliance with all specifications governing the proper design, installation, and operation and maintenance of
such BMP in order to protect surface water standards:
a. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of
the North Carolina Sediment and Erosion Control Manual.
The devices shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil)
projects, including contractor-owned or leased borrow pits associated with the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina Surface
Mining Manual.
c. The reclamation measures and implementation of these measures must be in accordance with the
requirements of the Sedimentation Pollution Control Act.
5. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in
order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
6. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic
conditions can be provided.
7. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened.
8. The dimension, pattern and profile of the stream above and below the crossing should not be modified.
Disturbed floodplains and streams should be restored to natural geomorphic conditions.
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
10. All work shall be performed during low or normal flow conditions.
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to
surface waters is prohibited.
12. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has
released the project.
13. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not
excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this
project within waters and/or wetlands, except as authorized by this Certification, or any modification to this
Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall
be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this
Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it
is a direct impact from road construction activities.
Page.3
14. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please
include photographs upstream and downstream of the structure to document correct installation.
15. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state
water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act]
and any other appropriate requirements of state and federal law. If DWQ determines that such standards or
laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal
law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate
and modify this certification to include conditions appropriate to assure compliance with such standards and
requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify
NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide
opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall
be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant
to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663-
1699.
Sincerely,
for Alan W. Klimek, P.E.
Attachments
cc: Steve Lund, USACE Asheville Field Office
Rob Ridings, DWQ Wetlands Unit
Central Files
File Copy
e.,.sugEv
STATE of NORTH CAROLINA
o?
4o
G
BOO
Nps gPRQ? f
?ph
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT
GOVERNOR . SECRETARY
August 16, 2005
Mr. Steve Lund - NCDOT Projects
US Army Corp of Engineers 051606
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, N. C. 28801-5006
SUBJECT: Bridge #85 replacement, SR 1310 (Robinette Rd), Alexander County
Dear W. Lund:
The North Carolina Department of Transportation requests authorization to replace a deteriorating bridge
on SR 1310 (Robinette Rd) in Alexander County. NCDOT proposes to replace the existing 20' x 20'
bridge with a 60-foot long, double CMPA. The main flow pipe dimensions are 142" x 91" and the
flood flow pipe dimensions are 117" x 79". Although, the stream in the immediate vicinity of the
bridge is not a steep gradient section, the project site is located in the Brushy Mountain area of northern
Alexander County and there is a steeper gradient section upstream of the bridge that appears to have a
definite riffle/pool sequence (see attached upstream photo). The scope of work will result in permanent
fill impacts to Robinette Creek, which is classified as Class B waters by the Division of Water Quality.
A thalweg profile was conducted to determine the streambed elevations on which to base the one-foot
pipe burial. It was discovered that the proposed pipe inlet invert, if placed one foot below the existing
streambed elevation would be lower than the proposed pipe outlet invert elevation. (See enclosed sketch
sheet 4 with thalweg and proposed pipe elevations). Therefore, based upon the existing streambed
elevations, it is proposed that the main flow pipe inlet be placed on streambed grade and the pipe outlet be
buried one foot below the existing streambed elevation. The flood flow pipe will be placed - one foot
higher than the main flow pipe. Riprap faced bankfull benches will be constructed upstream and
downstream of the flood flow pipe to maintain normal channel dimensions and direct flow through the
main flow pipe. Stream destabilization does not appear to be an issue based upon the calculated slopes of
the existing stream and the proposed pipe.
Temporary cofferdams will be necessary for the staged construction of the double pipe. Upon
construction completion, areas impacted by the cofferdams will be restored to pre project conditions.
SR 1310, Bridge #85
Page 2
August 16, 2005
This office has conducted a GIS and field survey for this project and is recommending a finding of "no
effect" for T&E species and historical structures. The project is not located within % mile of a critical
watershed area; therefore, hazardous spill basins are not required. Enclosed is the hazardous spill basin
checklist.
Enclosed is a pre-construction notification for NW 14 and 33, stream dimension reference cross-section,
sketches of planned activities, and location maps relative to the project. If you have any questions or
concerns, please feel free to contact me at (704) 480-9044. Thank you for your time and consideration
to this matter.
Respectfully yours,
M.L. Holder, P.E.
Division Engineer
Twelfth Division
BY: X/ k 4
Trish Simon
Division 12 Environmental Supervisor
Enclosures
CC: John Hennessy, DWQ, 401fTransporation Permitting Unit Q Copies)
Polly Lespinasse, DWQ, Mooresville Regional Office
Ron Linville, Wildlife Resources Commission (Courtesy Copy)
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No. 20051606
(!t any particular item is not applicable to this project, please enter "Not Applicable" or "NA".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ?Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW 14 & 33.
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Mike Holder, N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704-480-9020 Fax Number: 704-480-5401
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Trish Simon
Company Affiliation: N.C. Department of Transportation
Mailing Address: P.O. Box 47
Shelby, North Carolina 28151
Telephone Number: 704480-9044 Fax Number: 704-480-5401
E-mail Address: tsimon@dot.state.nc.us
Page 1 of 9
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1310. Bridge #85 Replacement
2. T.I.P. Project Number or State Project Number (NCDOT Only): 12B.200221
3. Property Identification Number (Tax PIN): NA
4. Location
County: Alexander Nearest Town: Taylorsville
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers, landmarks, etc.): Hwy 16 north from Taylorsville
for - 3 miles turn left on SR 1331 right on SR 1334, left on SR 1310 to site.
5. Site coordinates, if available (UTM or Lat/Long): 36°00'02" N/81°15'00"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): 0.20 acre (NCDOT right of wav).
7. Nearest body of water (stream/river/sound/ocean/lake): Robinette Creek Class B Waters
(from source to Lower Little River).
8. River Basin: Catawba
(Note - this must be one of North Carolina.'s seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/mUs/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project at
the time of this application:Existing Conditions -pipe on unpaved secondary road. General
Use- wooded and residential
Page 2 of 9
10. Describe the overall project in detail, including the type of equipment to be used: Replacement
of a functionally obsolete 20' X 20' timber bridge with a 60-foot double CMPA. The main
flow vine dimensions are 142" x 91" and the flood flow pipe dimensions are 11T' x 79". Inlet
headwall will be constructed Benches will be constructed upstream and downstream of the
proposed flood flow pipe to maintain low flow channel conditions. Work will be done using a
trackhoe.
11. Explain the purpose of the proposed work: The purpose of the proposed work is to replace
a deteriorating bridge.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
NA.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
No future permit Muuests at this site are anticipated There are no immediate plans to grade and
pave SR 1310 However, there are other stream crossings on this road which will require permit
requests at a later date.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable.on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included.at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Permanent impacts from pipe fill and
dprap placement.
Page 3 of 9
2. Individually list wetland impacts below: NO WETLAND RVIPACTS
Wetland Impact Type of Area of Located within Distance to
***
Site Number Impact* Impact 100 year Floodplain** Nearest Stream Type of Wetland
indicate on ma (acres) es/no) Oinear feet
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized
clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both
structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service
Center at 1-800-358-9616, or online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver
pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 0
Total area of wetland impact proposed: 0
3. Individuallv list all intermittent and perennial stream impacts below:
Stream Impact Length of Impact Perennial or
Site Number Type of Impact* (linear feet) Stream Name** Average Width of Intermittent?
(indicate on Stream Before (please specify)
ma Impact
1 Pipe Fill 60 feet Robinette Creek 12 feet Perennial
Riprap faced floodplain 20-25 feet upstream
1 bench to maintain and downstream of "
channel dimensions proposed pipe
Riprap for structure
1 stabilization (within 5 feet (inlet) « « «
bench impacts) 5 feet (outlet)
Temporary
1 Cofferdam/Pipe around 40 feet "
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated
rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after,
and net loss/gam), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation,
ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the
original and relocated streams must be included
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the
nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616,
or online at www.usgs.gov. Several in ternet sites also allow direct download and printing of USGS maps (e.g.,
www.topozone.com, www.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site:Pine fill impacts = 60 ft;
Rinrap Impacts = 40-50 feet; Temporary Impacts = 40 feet.
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: 0
Open Water Impact Area of
Name of
ody Type of Waterbody
Site Number Type of Impact* Impact icable)
(if applicable (lake, pond, estuary, sound,
indicate on map) acres ba , ocean, etc.)
• List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fiU, excavation,
dredging, flooding, drainage, bulkheads, etc.
Page 4 of 9
Pond Creation: NO POND IMPACTS
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):-
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):.
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Due to the financial considerations, the lower cost alternative of the double pipe is proposed for
this bridge replacement A bottomless arched culvert was also considered for this location;
however, borings of the site indicated that the bedrock in the area was too deep. A stream survey
was conducted (thalwegprofile and upstream/downstream cross-sections) to determine adequate
pine sizes to carry normal stream flow and bankfull flow. The "normal" stream width was
determined to be -12 feet' therefore a 142" wide pipe will be installed for the main flow
channel Bankfull width was determined to be -20 feet; therefore, the second flood flow Ripe
will 11 T' wide which will provide a 21 foot bankfull width.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
Page 5 of 9
If mitigation is required for this project, a copy of the. mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmaide.htmi.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
NCDOT proposes to provide My mitigation required by USACE in accordance with
guidelines outlined in the USACE letter of 9/1/04 from Mr. Ken Jolly to Dr. Gregory
Thorpe.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http:Hh2o enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
Page 6 of 9
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify - )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
*
Zone Impact
(square feet
Multiplier Required
Mitigation
1 3
2 1.5
Total
Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260. NA
XL Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
There will be a minor increase (-20 ft) in impervious acreage resultina from replacing the 20-
foot wide bridge with a 60-foot double pipes. Appropriate erosion and sedimentation control
measures will be in place during the pipe replacement.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
NA
Page 7 of 9
XUL Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 9
C O U N T Y
E 5 ?
KILBY BALD
GAP 'I COVE 18GAP 8 MTN.
160 _ ELEV. 50 ?'?•'• \
RUSSELL 1e35 ?•/ \
GAP /?•? 1336 6 l?? 269 '. _•_._
! S _ _ 100
BOONE /. .. lye 1436
0297 9 1?
GAP .
\ Rx y .
,lf"-'•?' ' ; 1357 C295 1433 1.5
288
9
' 289 ,) ? 13y'L '' ,400 C298 1434 4 14A0 .•-.- 1443
t 1336 1401 1571 1 . , 1403 ; N 1461. 9
L3 A
:1 /? \. 270 i 75 335 0 C299' / :S 3S _
_ 1432 p •O 6 ,
- 174 - 'a 1433 'pt '.2 -
1439 _ 14x1 1
142232
353 '6 3 2 455
/ • 1 1310 1400 v h 1521 'E' .7 1403 1001,
r _
/ ra:ecl'. m 2 ` I. 87 403 1 \
[' \ ?fM N
34° 00' m ALiIUT (Psl4c ?-O 1351 .L 'S ><M! 1300 3 '.,C,.1 . 1402 1403 143 V-Mi 3 1.6 A
' KNOB 307 1412 40 •8
85 83 841 PEARSON KNOB j 1 1°30 S 515
?•' - 158 ELEV.1850 0133] ?9( 1.5 1423
1 ( - /
_ 29 \ ! i X29 423
HICKORY KNOB 130.7 's82 i ?'?310 ?•- 'S•
_ 0 _
\ 1305 f: 1__ ,..'b 1311 4' 1339 ?,s I 1360 ,428 1403 - 1513L- .
1 .q 41 t'SD Dn9 1J 1 I. m 1 .t ,N 0 y 1403 , 2.2 ` _ C2 67 (LlnneYs
Ch. 7 274 S •5'--: 'y 1338- -.> y Ki1by ROCKY GCE --?- 'I Grove-h
1 1306 1 \ 130
1 1331 , 1331 I . /1404 - \ - Lh!
i 71J I I .5 '• 1423 FLEV.ldia 184 '6 p281'
'P A 1302.-' 16 ' ' 548 1516 r ff 1556 _
1 \ \ 1306 \ ! 1312 1^11 ;
1329 70 1406 0 100, p 11457
\ 1359) 1 i3 13 3 1232 b •3'? it 1524, 5()' b N I I4I2 41 \ 7 '4 1
•..4 , .2 ,427 z 26
??q\ 131 • 1 ? W 1341 ?i \ 1331 ' 3 I/ b b 0.euM ToP\ 1427f 1626 14 b 'F 3
1303 81 -'1 • ' 1, I.1 v 1.3 YY / -? ROUND TOP v 1.1 , 2 Rockv `a y?7 n,
i 282 186 J ,, a 403 407 I 14-°5 4,6 i 5 SDring
-? - ?• 1314 .7 •N ?t C b 7 /1330/ •2 Ch. 1.4
1 , -R- W 1 it L- . 1404 , 1412 \ - 0. b
1302 95 •a UV--?.- 1315 {' J`.. 1326 ILL'-f?d .] W 1417 157 4
1423 .'i.4
?l . • t30 _ N 1317 / 1327 y 1616 .6 .3 • 3' 1 3 J ?/
'?•:' J• S W 1313 3 m 1.0 1328 1 DoGh r S`.I R, 1367 304 N. cr. 92 \200
C44
i gaJSH ?lv,' / 16 f \ £ 1461
,t E ??• , .\ 164'
1 M •'? 'iAYLORSVILLE
-j
6
cr J.
i Q All H-11W ' =ty , 121 • C•\
l / fiPrings %- yyLL \ \ J A
O ?.. 1 1491
81e1d01e yl ?, q /- ?
1 \ 3.7 - e l
4.3
:.r m J --\ `. `In
55' 1 O 1 - - - '( I 14]6
® Sd ?J f r4
?OV - (? - - I `914\,./ I Ill \ v \ Hidaenll. 1510
1,1 - i - I I / ? ? ? \ f % Lilod4pn °°\ ; 3\
16 S I 1477
an
.^ Unle xi- BALD KNOB
v' ELEV. 1887
.002 !' (• ?.- 4!e
1 \
^? . 9 C? / ' • \I ... ,? - _ 1671 1618 1005 , \
11]01 / \?-• -
MTN,
I1160 \ / BARRETT 50
ELEV. 1950 N 144 1633:
7 1159 ( ? ? 1 1669 \ ? ? \ v
117 - i N
-
(? 1619 a' 1631 1644
Stero
X62 1599 m / ' ._\ g \ . _ ... - . . _ • r \ )---' J. . 3
' t 1144 T / '.2 ? ? , 1630 .
.1 Oi Q i r '/ /O
• B Pt / / \ / 1..V(TIF ! Millernille \ 1.1[h eD
. I ' ` - \ T _ -- \? - W \ 1 1663
? 7 1
1226 1 13°, '. \. •?? I '?- ? _.. ,1 1°,! 'y. 14
1664
1255 ? ? i" • +? ( l •` \ ... Z j \ ? i 9 ? o
1664 ->\ 1630 1 ':
_ IT1? N;
BNhleham ? ! ? 1136 ? ? 1 t?? .] t,5 "--
1145 ?- ... \ 1 1186 118] \ 1614... '. R, 0
.2 1135
50' 1 N 11 - ?; I _ - 1605 •u .o J\
uN
11263 27
r- _ - 1665 •
_ ST 6z632, i 1
- :W 11 5 ?„a t- - - - - 1?- - - 1136 C
1 1 X44.'1 1 ? ?' ? .. .,T I ? ? N L00K0 129-
DO Q
'\ 1141A?-.?a ... f 12 / 16M 1
543 , - ra to q 130,
•?3 1 1 Ham." % J?J / /- I 1 - - 1638
N ). !W
, . 1220 I •... -/ .' \.(?
?1 I N I \ . i ?V CIt , J / 1623 ' 6 3 "Ics b (OJ
127 V`? V{'(x mI '' s\ 1624 P 66
•1 M vin, 1625'
1654
1.3
\N 6 A U N T Y
d Jr i
J ry. a y +
+ € z T' ?E s s dtr?r -»A
k-` `? tit s r
} ?s [ °? ?. 5 1+ k
"?,ti Lz- `ti"-•?. '? "s-?. ?`c ."" ? ?5 v 4a l t, .. i ? t _ ? 1;?v I 1
*j Bridge #85 ---
f' Replacement y
- v! Y . 5rd r S " n ? -
?h, ap?ry?,
?0.,l W. e rr M K
tG ]{( 2.. ?2*e f. ,mr-hi,+p?2 ?l 5- ti, ?' 7.
.10
1 ?i.?xi ?Sl :dJ 1 , -.r" ,i'' y?'••'°°? 3 j r'! a°.. ?
-?'?r.-``1y? t^?.-• '"-.-??r'1`.?. '5,.. §
l a ?5y _ ?
a ?- i?4 f SF 'ky r1 I
µ?5
Name: BOOMER Location: 036° 00'02.58" N 081 ° 15'00.99' W
Date: 8/12/2005 Caption: Bridge #85 Replacement, SR 1310 (Robinette Rd), Class B
Scale: 1 inch equals 1000 feet Waters, Catawba River Basin
Cooyfiaht (C) 1M. Wotech. Inc-
SHEET NO. 2
SOIL SURVEY OF ALEXANDER COUNTY, NORTH CAROLINA
o,ois'nn"
00"
v e
77
F; Gtd
S.R,1310
PMfCft6 Flood Plcacci??r1
L GY,Ct., --? ? ~ p, /
Nq?? 1?+ Ttel°
Wssu?.e 00..°0?
zs-
C?I Qrd eY,
Class Z R?pR?ic all 4
Corneas t ?IG?qq?4*+eface a?
'Flo Qlair .Q5ene4. 8
? A5p?,,?+I
klood s
t??s1;h9 'bridge A-M Y4-- rC-V\o%je8
Reposed ?1'1'?X'lct" ?t faQ?,CMAP
\ IZv"j
L \ \
I 1
I
?- Asphnl?-?
eanpaue.at 2
Pruposect
crl w P
Proposed r-tnod Pla;? benc.?,
. .,- b iq l
e
Cre?.
0006.5
lh., Ltau. 4tg?, 4ipe.- rill
Lo.a P;Pe -tY2, y ,
f6?Q e d Cone, Dead w 4 11.
nj n a i
?.Rcl S.R.131o
Proposed Fi'h?sh Grad, 102.x'
? ln? EIeJ . l"liyh Pipe. 43,5
L0.3 P?,Qc. 4z.s'
Pad j a%, zaa zzl
S?;CTI G? N
Scale ; ('1=2c),
N GDoT
?tv, t2, Qridgc hr?ain?ehahc,e
5R, 1310 13r?d9e ? 8S
Replac,ing gndge ?? Pi(?e
a -
t xl
-0-0 U
N fi;
:0?D
J
N ?
1
0p_
9QQ
9
?9-
y
d
? A N
_
(_.O p
n
Q R D
C-D
a Q
+
S 1* 7
??
3
A
.? 3
(a
Q
N
0
0
N
I
0
O ?
,.3 0-
o
m
_. N W (n
C, vi
n
N
4 n
-? F
O;
e ' is
S
w o
?\Slz
?
SA2 S
O Erec,+ Si I{" \ S-r,Y-
Fence -L'"' \ W 1& 'Area
OZ ConS"Er?c.'E'
C?{--Fcr dam
I(' Reh,u?e ?x;sh'
Br?'dse
1-1
4 A Ih51?11 S+i VY.'s basin dt bi 1} $c19
0 RamoUe Re??a;nin9 ASphal
® Irs?all ll?"x'1qxl?C) CM Ap
Q lrs?all '?i?ersfnh 1?;,p?
i Cons-4ruc,?" Go?fcrclar,
Rdoi"nt
Crt.e k
PHASE 7-
@ e,,,\sAruc.+ Ohe. Lane Rd, ?-u I iaBC.
?? Install Coc,onu+ F,bre i-Fv)eeded,
?? O Reroute. ?iverSion .P?pe.
19 placJe. Gass ? R? RajP
\ ? Q?du?d o?r?t? ? rd-of
® OGc -Ci l l P? ? e
10 RemO?Je Remo,
ASphcl -?
?tAASt M:
aa\e ; 1'`- 30,
Co.?.?rol Plan
? 'Prd? 1Z?3.20C> 2Z 1
fJ CDpT
?jl? ?Z - ?C'i?c3e 1`r(a?v,-\c?nance
Ale,cc?nder Cou-+q
5R 1310
Re?laci? (3r?:d9 e ? c a?Pe
Z
t4 co s4r A& Co r c,
?,Qa Vaa\\ e 1r.??}
End \-?
15 ReMOve co K(
E ?t?ferSlCr?
(Isle+ £ OH+1
Iq (?i?c.e Gass 2
?d.?all
lane w? f??C. S-?o?e
21 Seed E w,ul c.?
cok ?ts`iurbed
Areas
1'1 .5 14- gaS ka Be Rew+u ?d
I(o erect' St \ ?- Fevtce . 16
ev?G? InIe?E OKI Imo}
err, becl Class 2 R;P R`'P
44je uxflr-f Floes
' sand 6 A r-
K
-Y-- Pre.(;w, narj Erosion cori'6ov
NC??T
?I?.IZ - e?;d5e. Ma;..?rhahce.
{kleXar?er C,o .
p ?, S,nR .?3` 1u
rCP?GC?hQ tiL7ftp9G WI??t?G./;?
Ohtl9e?$S ?
FiY, a? `,OY) gAWC; ion
Scale 1= 30'
Elevation
c jo w ctn -4 m o ?o
0
N
A
O
co
(n -4
.Y
0
N
A
O
O
N
0
N
N
C N
R A
7 O
N
co
w
O
W
N
w
A
CO)
rn
w
co
A
0
A
N
A
40-
41
W
A
OD
CA
?I
(D '
Q.'
T
N
CD
co
C
(?D
c
C
?D
A?
C
N
rt
pt
n
r Q
i N
I M
rt
I t
E*4
L
IL
P
1 Q
3
? CD
? x
I
I y
IL r+
3
ff
M
CL
CD
O
NCDOT
HAZARDOUS SPILL BASIN CHECKLIST
Division: I2 County: 19 1eXQ4del Project ID:
River Basin: Oda ibQ Bridge No: 13 s
Route: S1Z 1310 Stream: tll?oL
Water Quality Criteria:
Yes No
Stream Crossing Blue Line On USGS ry-,' r
ORW r r_?
WSI r F?,
WS II,III OR IV, Crossing Within 0.5mi of W. S. Critical Area r rif
Roadway Criteria:
Route Designation-
Additional Site Information:
Yes No
Arterial Urban F
Arterial Rural F C?
Is a Hazardous Spill Basin Required?
Yes No
F F7
Criteria Based Upon NCDOT "Best Management Practices for the
Protection of Surface Waters" (March, 1997).
a'%
4?lr
?' wFr?NO q? , war 2 , Opf
l a
? asr0 Mw??'n
Cy
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
051606
MEMO TO: John Hennessy, DENR/DWQ/401/Transportation Permitting Unit
FROM: Trish Simon, Division 12 Environmental Supervisor
DATE: August 16, 2005
SUBJECT: Pre-Construction Notification/401 Automated Payment
Enclosed are seven copies of a pre-construction notification modification for a NCDOT project in
Alexander County for your review.
Project information for the 401 Automated Payment Procedure is as follows:
• Work order number: 150465-55120005-12B.200221-5665
• TIP #: NA
• Project Category $200.00 Fee
is
UDAID
CK. NO.
p?aT?
Post Office Box 47 Shelby, North Carolina 28151-0047