Loading...
HomeMy WebLinkAbout20061851 Ver 1_Meeting Minutes_20070425`"` ...... v .r.. (1/(f ~} (lam !~~ ~. ~ , ~ ~ J 1 Agenda -State stormwater Con istenc Meetin DWQ Wilmington Regional Office Wilmington, NC April 25, 2007 Scheduled Time: 10:00 am - 3:00 pm 10:00-10:15 Ken to open meeting, set agenda, seek agreement as to lunch plans. • 10:15-10:25 Ken to seek approval to complete and publish internally the wet pond sheet. Ken to seek directions on the next such sheet -which topic? • 10:25-10:55 Mike Lawyer with several miscellaneous questions on the permitting process. • 10:55-11:55 Annette Lucas to present three items for group input/group update. o Seeking comment on proposed interactive application form to reduce incomplete/erroneous submittals. Potentially to be used in both 401 and state stormwater programs. o Seeking comment on proposed O&M agreement for bioretention areas, potentially to be used by both 401 and state stormwater programs. o Update on stormwater provisions contained in draft General Certifications from the 401 Unit. • 11:55-12:451unch • 12:45-1:15 Linda Lewis to seek comments on proposed processing guidelines on permitting permeable pavements on new projects and existing projects. • 1:15-1:45 Linda Lewis seeking review comments on the proposed Sand Filter Supplement Sheet. • 1:45-2:05 Paul Bartlett seeking comments on wet detention basins constructed with retaining walls to increase volume in a given footprint. 2:05-2:35 Boyd DeVane seeking comments for the BMP manual on regional practice wrt infiltration BMP design elements. • 2:35-3:00 Open Agenda Item 1, if time permits. Ken to seek group consensus on how to fill this time. • 3:00 Adjourn. Our next meeting is in Raleigh, May 30, 2007. END kbp