HomeMy WebLinkAbout20050333 Ver 1_Complete File_20050223o
I'A
050333
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
February 18, 2005
Ms. Beth Barnes
Wetlands/401 Unit
NC DENR Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
(Seven Copies) Written Authorization Required
Mr. John Thomas
US Army Corps of Engineers
6508 Falls of the Neuse Suite 120
Raleigh, NC 27615-6814
(Two Copies)
0
? s O
LYNDO X PP=
SECRETARY
Subject: Alamance County, Pipe Replacement on 3RD Street Extension (SR 1962) crossing UT to Back
Creek
Project Number # 7B.200114.7
To Whom It May Concern:
The North Carolina Department of Transportation (NCDOT) proposes to replace a. pipe with a new
aluminum box culvert with concrete footings on 3RD Street Extension (SR 1962) in Mebane in
Alamance County. The aluminum box culvert will span the stream and no bents or pilings will be
placed in the stream. The only impacts to the stream should be the temporary placement of
cofferdams along the edge of the stream for dewatering purposes. An offsite detour will be utilized
during the construction of the bridge. The proposed work is being done in order to reduce future
maintenance needs and increase traffic safety. The NCDOT anticipates that the bridge replacement
can be permitted under the Nationwide Permit numbers 3, 13 and 33 from the Army Corps of
Engineers. This application is also intended as a courtesy notification to the North Carolina Division
of Water Quality as according to the General Water Quality Certification. The following information is
being provided to satisfy condition I of General Water Quality Certificates #3376, #3399 and 43366.
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
PROJECT INFORMATION
Road Name SR Number Project Length
(miles) Classification
3Rd Street Ext SR 1962 N/A Rural
River Basin: DWQ
ID Water Quality
Designation % Impervious
Surface
Cape Fear 16-18-(6) QNSW N/A
Buffer Rulesa Buffer Rule Conditions (where applicable)
No Request Exemption
Protected Species
Presentb Mapped Historic
Properties CAMA
AEC Essential Fishery
Habitat
No No No No
a Separate documentation attached as needed: b See the attached Endangered
Species Review Sheet for further information: e When Applicable - See the attached
Historic Review Letter for further information
BRIDGE REPLACEMENT INFORMATION
Site 3RD Street Extension Stream Type Perennial
(Station)
Existing 60' Length X 103" X 71" Proposed 54' Length X 16'4" Width
Pipe Culvert
Construction Pipe to Aluminum Box Culvert Dewatering Cofferdams/Pump Around
Method Device*
Burial Depth N/A E/C Plan See Attached
Date
Construction As soon as practicable Duration Four weeks
Date
Impacts (ft.) 0 ft-enclosure; 20 linear ft-rip rap; 80 if -temporary cofferdams to allow pouring
of concrete footings
Special
Conditions
Restoration Within 15 working days of the bridge replacement the natural stream contours will
Plan be restored and seeded. Temporary silt screens will be cleaned and removed
following vegetation establishment.
RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; E/C = Erosion
control. *A less intrusive dewatering device may be used in lieu of the one proposed.
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
MINIMIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the protection of
surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of
the US, and coordination (including a pre-construction meeting) with the Division Environmental
Officer.
MITIGATION INFORMATION
Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet
Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not occur
in a unique natural wetland.
APPLICATION INFORMATION
Enclosed please find the Pre-construction Notification Form and supporting documentation for the
above referenced project. If you have any questions or need any additional information, please
contact Jerry Parker at (336) 256-2063. Your time and effort are appreciated.
Sincerely,
J. AVP
ivisio Engineer, Division 7
Enclosures
CC: Jerry Parker. NCDOT
Lane Hall, NCDOT
Barry Harrington, NCDOT
Dennis Johnson, NCDOT
Sue Homewood, NCDWQ
Jeremy DeLapp, NCDOT
P. O. Box 14996 Greensboro, NC 27415-4996 telephone No. (336) 334-3192 Fax No. (336) 334-3637
Office Use Only: 05033 Form Version May 2002
USACE Action ID No. DWQ No.
(if any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWPs 3, 13 & 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
Owner/Applicant Information
Name: Mr. J.M. Mills, RE, Division Engineer - Division 7
Mailing Address: P.O. Box 14996
Greensboro NC 27415-4996
Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673
E-mail Address: mmills@dot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the . Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Jerry A. Parker
Company Affiliation: NCDOT
Mailing Address: P.O. Box 14996
Greensboro, NC 27415-4996
Telephone Number: (336) 256-2063 Fax Number: (336) 334-4149
E-mail Address: jparker@dot.state.nc.us
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers . full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project 3rd Street Extension (SR 1962) Pipe Replacement
2. T.I.P. Project Number or State Project Number (NCDOT Only): 7B.200114.7
3. Property Identification Number (Tax PIN): Not Applicable
4. Location
County: Alamance Nearest Town: Mebane
Subdivision name (include phase/lot number): Not Applicable
Directions to site (include road numbers, landmarks, etc.):
The project is located in Mebane, in Alamance County. From 140 West; Take exit 153 and
turn right (northeast) on 5th Street for 2/10 of a mile to Holmes Road. Turn left onto Holmes
Road and proceed north until Holmes Road intersects with 3rd Street Extension: Turn right
and proceed east on 3rd Street Extension for approximately three-quarters of a mile to the
pipe replacement site (near Stoneham Road).
5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS Mo.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): Not Applicable
7. Nearest body of water (stream/river/sound/ocean/lake): UT to Back Creek
8. River Basin: Cape Fear
Page 2 of 8
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http:/%h2o.enr.state.ne.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
. at the time of this application: Residential
10. Describe the overall project in detail, including the type of equipment to be used: The
project will involve replacing a structurally deficient pipe and replace with a new aluminum
box culvert on concrete footings to improve traffic safety, reduce flooding and bring the road
up to current construction standards. Best Management Practices will utilized for the
demolition of the existing bridge and cofferdams will allow construction of the bride bents
in the dry. Equipment used will be standard bridge construction equipment (trackhoe grader,
backhoe, and bulldozer). An offsite detour will be utilized during the construction of the
bridge.
11. Explain the purpose of the proposed work: To maintain traffic safety and to reduce future
maintenance costs.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Not Applicable
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Not Applicable
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 3 of 8
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Provide a written description of the proposed impacts: No permanent impacts to the stream will
result from this project. Temporary stream impacts will result from placement of cofferdams.
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) . Located within
100-year Floodplain**
(es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at hn://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: Not Applicable
Total area of wetland impact proposed: Not Applicable
1. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Intermittent?
(indicate on ma) (linear feet Before Impact ( leases eci )
(en) 0 if
3RD Street Ext Pipe
Replacement (trop) 801f
(rp) 201f UT to Back Creek 6-8 feet Intermittent
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.toaozone.com,
www.mapquest.com, etc.).
*Cumulative impacts (linear distance in feet) to all streams on site:
Project should involve no permanent stream impacts - temporary(y tmp) cofferdams and
siltscreens---approximately 80 If-, riprap (0) permanent placement of riprap for bank
stabilization ---approximately 201f total, 0 ft - impacts from enclosure
2. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Page 4 of 8
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
(if Name p Waterbody
applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
3. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): Not Applicable
Proposed use or purpose of pond (e.g., livestock watering; irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): Not Applicable
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Pipe replacement activities are necessary to maintain travel safety. Impacts will be minimized
by strict enforcement of Best Management Practices for the protection of wetland and surface
waters, restrictions against the staging of equipment in or adjacent to waters of the US and
coordination (including a pre-construction meeting) with the Division Environmental Officer.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
Page 5 of 8
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
A finding of insignificant impact is anticipated; therefore, a mitigation plan is not provided.
Cumulative impacts are less than 150 feet. The maximum amount of impact to a single
stream is 0 linear feet. No Outstanding Resource Waters, federally protected species or their
habitats, or essential fishery habitats occur in the project area. The project is not located in a
High uality Water.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet):_ Not Applicable
Amount of buffer mitigation requested (square feet): Not Applicable
Amount of Riparian wetland mitigation requested (acres): Not Applicable
Amount of Non-riparian wetland mitigation requested (acres): Not Applicable
Amount of Coastal wetland mitigation requested (acres): Not Applicable
IX. Environmental Documentation (required by DWQ)
Page 6 of 8
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call::. the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes No
X.. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* . Impact
(square feet) Multiplier Required
Mitigation
1 N/A 3
2 N/A . 1.5
Total N/A
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
Page 7 of 8
Not Applicable
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus 'total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Not Applicable
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Not Applicable
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes No X
Is this an after-the-fact permit application?
Yes_ No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
?lzr i ?S
'Agent's Signature J Dite
is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
N.C. D.O.T.
BRIDGE MAINT. DEPT.
EROSION CONTROL SEQUENCE
COUNTY Alamance
PIPE NO. NA
S.R. No. 1962 3 rd Street
Br. No. NA
PROJECT No.
DESCRIPTION: REMOVAL of EXISTING CM PIPE IQ 103" X 71 X 60' LONG
and REPLACE With ALUMINUM BOX CULVERT STRUCTURE 1@ 16'4!' X 5' 11" X 64' LONG
Note:
All Erosion Control devices & proper installation plus maintenance of erosion control will be performed
b using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual
1 EXCAVATE SITE to REMOVE EXISTING PIPE
2 ISOLATE WORK AREA FROM STREAM USING SANDBAGS AND COFFERDAMS.
3 DEWATER WORK AREA & PUMP WATER INTO SILT BAG
4 INSTALL SILT FENCE AS SITE CONDITION REQUIRE
S EXCAVATE SOIL TO REQUIRED DEPTH FOR FOOTINGS #1 & #2
6 POUR CONCRETE LEVELING PAD.
7 CONSTRUCT FORMS FOR FOOTINGS 01 & #2 AND POUR CONCRETE.
8 REMOVE SANDBAGS AND COFFERDAMS
9 ASSEMBLE ALUMINUM BOX CULVERT.
10 BACKFILL CULVERT AND SHOULDERS.
11 PLACE FILTER FABRIC AND RIP RAP AS NEEDED.
12 SEED EXPOSED AREAS AFTER PAVING.
13 REMOVE ALL EROSION CONTROL DEVICES AFTER VEGETATION is ESTABLISHED
APPROXIMATE PROJECT START DATE to - I b >4- D 5
PREPARED BY Tim Powers TT III. DATE 12/13104
APPROVAL
TRANSPORTATION SUPERVISOR I! J L C&- ' DATE I2/l 3 I O y
DIV. BRIDGE ENG. DATE 12.11.04
SEQUENCE1
COUNTY Alamance
PIPE NO. NA
S.R. No. 1962 3 rd Street
Br. No. NA
PROJECT No.
1 EXCAVATE SITE to REMOVE EXISTING PIPE
2 ISOLATE WORK AREA FROM STREAM USING SANDBAGS AND COFFERDAMS.
3 DEWATER WORK AREA & PUMP WATER INTO SILT BAG
4 INSTALL SILT FENCE AS SITE CONDITION REQUIRE
SILT FED
AS NEE[
W
LA- T FENCE
NEEDED
PIPE r_
STREAM FLOW
SILT FENCE
AS NEEDED
0
I 'ABC AGGREGATE
(underlain & wrapped with Filter Fabric)
?ILT FENCE
AS NEEDED
SEQUENCE2
COUNTY Alamance
PIPE NO. NA
S.R. No. 1962 3 rd Street
1 EXCAVATE SOIL TO REQUIRED DEPTH FOR FOOTINGS #1 & #2
2 POUR CONCRETE LEVELING PAD.
3 CONSTRUCT FORMS FOR FOOTINGS #1 & #2 AND POUR CONCRETE.
0
f
1W
SILT
SILT As N
LA- T FENCE
41 NEEDED
STREAM FLOW
SILT
II B
AG II
`ABC AGGREGATE
(underlain & wrapped with Filter Fabric)
31L FENCE ?ILT FENCE
AS NEEDED AS NEEDED
0
r?
SEQUENCE3
COUNTY Alamance
PIPE NO. NA
S.R. No. 1962 3 rd Street
1 REMOVE SANDBAGS AND COFFERDAMS
2 ASSEMBLE ALUMINUM BOX CULVERT.
3 BACKFILL CULVERT AND SHOULDERS.
4 PLACE FILTER FABRIC AND RIP RAP AS NEEDED.
5 SEED EXPOSED AREAS AFTER PAVING.
6 REMOVE ALL EROSION CONTROL DEVICES
AFTER VEGETATION is ESTABLISHED
.----- 25' 4i ;i T 54'-- ,. V A STREAM FLOW
`FILTER FABRIC
UNDER RIP RAP
AVr
pp v'noom "p rap
O Oc-
,
r
E sy p rirx.?r
I THIRD STREET EXT. - SR 1962 - DOWNSTREAM VIEW FROM SHOULDER
THIRD STREET EXT. - SR 1962 - INLET PIPE
I THIRD STREET EXTENSION - SR 1962 - OUTLET PIPE