Loading...
HomeMy WebLinkAbout310467_30 day poa_20210114PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-467 County: Duplin Facility Name: King Farm K-4 & K-5 Certified Operator Name: Vincent Craig King Operator Number: AWA16376 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name1lD: Spillway(Y or N): Level(inches): 2. Check all applicable items 16 17 Liquid level is within the designed structural freeboard elevations of one or more structures, Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation }if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste. as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Craig King Phone Facility Owner/Manager (print) _ (2- Date: Facility Owner/Manager (sig ture) 910-293-3434 1 /13/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANWOR 25 YR.l24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lag 4 line m = 96.1 lb PAN 2. Structure ID: Lag 5 line m = 93.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = fb PAN n.lines 1+2+3+4+5+6= 189.3lbPAN III_ TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIR 17S Tn WWII-14 PAti r'AtitinT Qc Aoni fern ni -riAo^ r. o. tract # P. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t:. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' T3471 3 Small Grain 2.57 43.00 110.5 Sept -April T3471 4 Small Grain 4.19 41.50 173.9 Sept -April T3471 5 Small Grain 3.41 42.00 143.2 Sept -April T3471 T3471 6 7 Small Grain Small Grain 2.58 1.81 44.00 50.00 113.5 90.5 Sept -April Sept -April oiaie L;uirUni (;[Up enaing application sate or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 631.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 189.3 lb. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = 631.6 lb. PAN y. Overall PAN balance (w - x) = -442 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lag 4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr_ storm & structural freeboard 20.Q inches c, line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) �ft2 e. line c/12 x line d x 7.48 gallons/113 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 73917 ft3 h. current herd # 2632 certified herd #1 2632 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/2/2020 m. ((lines e + k)I1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 73917 ft'j 0W 34689 ft3 135395 gallons 0.71 Ibs/1000 gal. 96.1 lbs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (1D):[Lag 5 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural froeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1. 17.0 inches 20.3 inches 3.3 inches 38948 ft2 79630 gallons 180 days g. volume of waste produced according to structural design 42199 ft3 h. current herd # 1280 certified herd #1 1280 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 dayslline f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 10 020 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE, (Click on the next Structure tab shown below) 42199 ft3 �ft3 22720 ft3 80932 gallons 0.58 lbs11000 gal. 93.1 lbs. PAN PoA (30 Day) 2/21100