Loading...
HomeMy WebLinkAbout20100253 Ver 1_Site Inspection_20100401NODE ITR North Carolina Department of Environment and Beverly Eaves Perdue Governor Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Division of Water Quality Coleen H. Sullins Director May 24, 2011 0 M4y2 Naturaal S0/i f; osT q? R Dee Freeman Secretary Subject: Inspection-US Highway 19-74 TIP No. B-4286 DWQ Project No. 20100253 Swain County Dear Mr. Seltzer: On May 10, 2011, 1 inspected the construction work for the new bridge over the Nantahala River on US Highway 19-74 in Swain County. Construction is underway on the temporary bridge and approaches. Sediment and erosion control structures have also been installed and appear to be working properly. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect State surface waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Attachment cc: Trent Anderson, PE Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office setzer) US Highway I9-74 B4286 Inspection Letter May 2011 Sincerely,, /J Michael R. Parker Environmental Senior Specialist SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-29615001 FAX 828-2997043 One Customer Service: 1-877-623-6748 NOrthCaroll na Internet: wwvi nmatemuality.oro An Equal Opportunity 1 Affirmative Action Employer Naturally y DWQ Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: Mav 10, 2011 County: Swain Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20100253 NW Permit #: 23 & 33. IP #: 0 Project Name: Location of Project: B-4286 Over Nantahala River US 19-74 in Nantahala Gorge approximately 8 miles east of Andrews, NC Project Complete: ?Yes X No Bridge Culvert Bottomless Culvert Bottomless Arch Lf Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion: Water Ouality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: I Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Nantahala River Basin/ Subbasin: Little Tennessee 040403 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: X?Class B ?303d Listed ?WS-II ?WS-V ?SB []Class C ?ORW X?Trout ?WS-III []NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: []Culvert []Bottomless Culvert X?Bridge []Bottomless Arch ?Riprap Inlet/Outlet Stabilization []Fill Authorized Wetland Impacts: Authorized Stream Impacts: Additional comments: ?0 - 1/10th acre ? UP to 1.0 acre ?< 150 linear feet ?1/11th to UP acre ?> 1.0 acre ?> 150 linear feet Work is underway on the project with the temporary bridge with approaches being constructed. Sediment and erosion control structures have been installed. Continue to maintain erosion control devices and continue with seeding, matting and mulching as required to protect State surface waters. US Highway 19-74(B4286) Nantahala River Inspection Report May 2011