HomeMy WebLinkAbout20110424 Ver 1_Approval Letter_20110520PKAJ NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary May 20, 2011 Clay County TIP No. R-4416 D WQ Project 201 10424 US Highway 64 Climbing Lane Approval of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer P.E. Division 14 Engineer North Carolina Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer. You have our approval, in accordance with the conditions listed below, for the following impacts in an unnamed tributary to Thompson Creek for the purpose of constructing a climbing lane on Chunky Gal Mountain on US Highway 64 in Clay County: Stream Impacts in the Hiwassee River Basin Site Permanent Fill Stream Permanent Temporary Total Stream in Intermittent Relocation in Fill in Impacts in Stream Impacts Stream (linear Perennial Perennial Perennial Impact Requiring ft) Stream Stream Stream (linear ft) Mitigation linear ft) linear ft linear ft linear ft Site 1 0 278 0 300 300 278 Total 0 278 0 300 300 278 Total Permanent Stream Impacts for Project: 278 linear ft. Total Temporary Stream Impacts for Project: 300 lin. ft. The project should be constructed in accordance with your application dated May 3, 2011 (received May 5, 2011), including the environmental commitments made in the application letter. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification No. 3820, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now SURFACE WATER PROTECTION SECTION - ASHEVILLE REGIONAL OFFICE Location: 2090 U.S. Highway 70, S oa, North Carolina 28778 One NorthCarollna Phone: 828 FAX: 828-2999-7043-70431 Customer Service: 1-877-623.6748 ?tatmrally Internet: www,ncvv ncwato terquality.org ??/ !- An Equal Opportunity 1 Affirmative Action Employer Mr. J. B. Setzer, P.E. May 20, 2011 Page Two or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7).. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Condition(s) of Certification: 1. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 2. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 4. NCDOT will need to adhere to all appropriate in-water work moratoria prescribed by the NC Wildlife Resources Commission. 5. Compensatory mitigation for impacts 278 linear feet of streams at a replacement ratio of 1:1 is required. Compensatory mitigation for impacts to jurisdictional streams shall be provided by onsite stream relocations of 278 linear feet of an unnamed tributary of Thompson Creek. The onsite stream relocation shall be constructed in accordance with the design submitted in your May 3, 2011 application. All on-site mitigation sites shall be protected in perpetuity by a conservation easement or through NCDOT fee simple acquisition and recorded in the NCDOT Natural Environment Unit mitigation geodatabase. Please be reminded that as- builts for the completed streams shall be submitted to the North Carolina Division of Water Quality 401 Wetlands Unit with the as-builts for the rest of the project. If the parameters of this condition are not met, then the permittee shall supply additional stream mitigation for the 278 linear feet of impacts. All channel relocations will be constructed in a dry work area, will be completed and stabilized, and must be approved on site by DWQ staff, prior to diverting water into the new channel. Whenever possible, channel relocations shall be allowed to stabilize for an entire growing season. All stream relocations shall have a 50-foot wide native wooded buffer planted on both sides of the stream unless otherwise authorized by this Certification. A transitional phase incorporating rolled erosion control product (RECP) and appropriate temporary ground cover is allowable. 6. Unless otherwise approved in this certification, placement of culverts and other structures in open waters, streams and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or Mr. J. B. Setzer, P.E. May 20, 2011 Page Three banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide . evidence that the equilibrium is being maintained if requested in writing by NCDWQ., If this condition is unable to be "met due to bedrock or other limiting features encountered during construction, please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 8. Channel relocations shall be completed and stabilized, and approved on-site by DWQ staff, prior to diverting water into the new channel. Stream banks shall be mated with coir-fiber matting. Vegetations used for bank stabilization shall be limited to native riparian vegetation, and should include establishment of a vegetated buffer on both sides of the relocated channel to the maximum extent practical. Also rip-rap may be allowed if necessary to maintain the physical integrity of the stream, but the applicant must provide written justification and any calculations used to determine the extent of rip-rap coverage requested. Once the stream has been turned into the new channel, it may be necessary to relocate stranded fish to the new channel to prevent fish kills. 9. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 10. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 11. Rip-rap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 12. Heavy equipment shall be operated from, the banks. rather than in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 14. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. IS. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 16. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 17. No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this certification. 18. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 19. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. 20. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 21. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 22. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from. compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If NCDWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State of Federal law is being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification. Mr. J. B. Setzer, P.E. May 20, 2011 Page Four 23. The issuance of this certification does not exempt the Permittee form complying with any and all statutes, rules, regulations or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. . 24. The Permittee shall report any violations of this certification to the Division of Water Quality within 24-hours of discovery. 25. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. If this Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. Sincerely, / - n Q <Jc% 1Z' Coleco H. Sullins, Director Division of Water Quality cc: Lori Beckwith, USACE, Asheville Field Office Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Dave McHenry, NCWRC Transportation Permitting Unit Asheville Regional Office 11-0424 (Selzer) R-4416 US Highway 64 Climbing Lane