HomeMy WebLinkAbout20081754 Ver 1_Site Inspection_20110517
North Carolina
Beverly Eaves Perdue
Governor
4?0,% 0`1
NCDENR a ?'ll
Department of Environment and Natural Resource I ?
Division of Water Quality kx, of d 20/
Coleen H. Sullins s 4i 4e??Dee?reeman
Director 'wq g/?-Secretary
"`ty
May 17, 2011
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection
US Highway 25
DWQ Project 08-1754
TIP No. R-505
Henderson County
Dear Mr. Setzer:
On May 5, 2011, I inspected the construction work on US Highway 25 between Interstate 26 and NC Highway
225 in Henderson County. Construction is taking place all along the project but most of the work is located at
or near the new bridge over US Highway 176.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect downstream waters. Please refer to the attached copy of the inspection report
for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
US 25 Inspection Letter May 2011
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Hghway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX: 828-299-7043
Customer Service: 1-877.623-6748
Internet: www.nmateraualityoro
An Equal Opportunity 1 Affirmative Action Employer
One
thCarolina
Nor
Nahtrall (
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: May 5, 2011
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 08-1754 NW Permit # IP #:
Project Name: Fu S Highway 25-I-26 Connector R-505
Location of Project: US Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County
Project Complete: ?Yes X No If no, estimated date of completion:
Bridge
] Culvert
Bottomless Culvert
Bottomless Arch
XU Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
Water Ouality Concerns (DWQ):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited
-
Name of Waterway(s)
DWQ Site Visits for DOT Projects
Background Info
Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek,
Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch,
Jones Creek
Basin/ Subbasin: Broad 030501
Wetland Type: []Isolated x[]Non-Isolated (Waters of US)
Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB
X?Class C ?ORW X?Trout ?WS-III []NSW
X[1HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert []Bottomless Culvert
[]Bridge []Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts: X?0 - 1/10'h acre ?1/I I'h to 1/3`1 acre
?1/3`d to 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 1,346 linear feet
Additional comments:
1. Construction work is proceeding all along the project.
2. Seed, mulch and/or matt all disturbed areas on the project.
3. Continue to maintain all sediment and erosion control devices and seed, mulch and matt all disturbed areas to
protect State surface waters.
US Highway 25 Inspection May 2011