Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20110517^i'r 'A r NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 17, 2011 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: Natural R? q r X011 ?osT?N'e' e Freeman Secretary Subject: Inspection NCSR 1783 Upward Road DWQ Project 08-1327 TIP No. R-4430 Henderson County On May 5, 2011, I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County. Construction work is underway all along Upward Road between Howard Gap Road and US Highway 176. Please ensure that all sediment and erosion control structures are being maintained as required and that seeding and mulching are being performed as needed, to protect State surface waters. Please refer to the attached copy of the inspection report for additional comments regarding the inspection. If you have questions, please call me at 828-296-4500. Sincerely, / ;? azo&z 'z - ate/ Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office Upward Road R-4430 Inspection Letter May 2011 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 826-296-45001 FAX : 828.299-7043 Customer Service: 1-877623.6748 Internet: wavw.ncwater uali .oty An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Nat"ally DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: Mav 5, 2011 County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 08-1327 NW Permit #: 13, 12, 14 IP #: Project Name: Location of Project: Upward Road Widening Proiect R4430 Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone 1 Est Acres I.? ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone l: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited