HomeMy WebLinkAbout20090281 Ver 1_Certification of Completion_20110520C R I S E R
TROUTMAN
T A N N E R
TRANSMITTAL LETTER
TO: FROM:
IAN MCMILLAN Mark T. Arcuri, PE
COMPANY: DATE:
NC Division of Water Quality May 18, 2011
401 Oversight/ Express Permitting Unit
ADDRESS: CTT'S PROJECT NUMBER:
1650 Mail Service Center 5818 Morehead City
Raleigh, NC 27699 -1650 DENR Water Quality
PHONE NUMBER: CLIENT'S REFERENCE NUMBER:
919-791-4200
RE:
Morehead City Boating Access
Area Improvements
WE TRANSMIT: Ll ATTACHED LJ UNDER SEPARATE COVER U HAND CARRIED BY U UPS/FEDEx
THEFOLLOWING: ? TRACINGS ? PRINTS ? INSPECTION REPORT ? SHOPDRAWINGS ? SPECIFICATIONS ? OTHER
COPIES DATE SHEET NO. DESCRIPTION REMARKS
1 ORIG 5-18-11 CERTIFICATE OF COMPLETION
NOTES/COMMENTS:
If you have any questions, give me a call at 397-2929! Thanks.
Cc: CTT File
by: /
CRISER TROUTMAN TANNER CONSULTING ENGINEERS
WILMINGTON, NC RALEIGH, NC
P.O. Box 3727 Wilmington, NC 28406 1 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 t 910.397.2971 cttengineering.com
Certification of Completion
DWQ Project No.: O q ' Q Z County: CP4ZT1E-:RET
Applicant: l?C, W 11_V L I SCS C ES C OMM 1% 1 o
Project Name: (?p?F I Arp G?'?`E 'FjDt mtrir exeo56 AM& I &tPZo lEA4& 0'r;;F
Date of Issuance of Wetland Permit: APOL 201,1009
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature
Agent's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
1, T. AA4A *!1 ,F?E_, as a duly registered Professional Engineer,
Landscape Architect, Surveyor, etc.) m the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
?Wl and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other su porti g materials.
Signature: - Registration No. N Cr Z-44-1 q Date AaAm 1%, 2011
hereby sta;f th'? E the best of my abilities, due care and diligence was
construction sucV, hat the , o Mort. was observed to be built substantial
Water Qualityrtrr+?tion and'Buffr Mules, the approved pla ' rcations,
Date:
hereby state that, to the best of my abilities, due care and n was
construction such that the construction was observed to be built within stantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,