Loading...
HomeMy WebLinkAbout20090281 Ver 1_Certification of Completion_20110520C R I S E R TROUTMAN T A N N E R TRANSMITTAL LETTER TO: FROM: IAN MCMILLAN Mark T. Arcuri, PE COMPANY: DATE: NC Division of Water Quality May 18, 2011 401 Oversight/ Express Permitting Unit ADDRESS: CTT'S PROJECT NUMBER: 1650 Mail Service Center 5818 Morehead City Raleigh, NC 27699 -1650 DENR Water Quality PHONE NUMBER: CLIENT'S REFERENCE NUMBER: 919-791-4200 RE: Morehead City Boating Access Area Improvements WE TRANSMIT: Ll ATTACHED LJ UNDER SEPARATE COVER U HAND CARRIED BY U UPS/FEDEx THEFOLLOWING: ? TRACINGS ? PRINTS ? INSPECTION REPORT ? SHOPDRAWINGS ? SPECIFICATIONS ? OTHER COPIES DATE SHEET NO. DESCRIPTION REMARKS 1 ORIG 5-18-11 CERTIFICATE OF COMPLETION NOTES/COMMENTS: If you have any questions, give me a call at 397-2929! Thanks. Cc: CTT File by: / CRISER TROUTMAN TANNER CONSULTING ENGINEERS WILMINGTON, NC RALEIGH, NC P.O. Box 3727 Wilmington, NC 28406 1 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 t 910.397.2971 cttengineering.com Certification of Completion DWQ Project No.: O q ' Q Z County: CP4ZT1E-:RET Applicant: l?C, W 11_V L I SCS C ES C OMM 1% 1 o Project Name: (?p?F I Arp G?'?`E 'FjDt mtrir exeo56 AM& I &tPZo lEA4& 0'r;;F Date of Issuance of Wetland Permit: APOL 201,1009 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature Agent's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, T. AA4A *!1 ,F?E_, as a duly registered Professional Engineer, Landscape Architect, Surveyor, etc.) m the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care ?Wl and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other su porti g materials. Signature: - Registration No. N Cr Z-44-1 q Date AaAm 1%, 2011 hereby sta;f th'? E the best of my abilities, due care and diligence was construction sucV, hat the , o Mort. was observed to be built substantial Water Qualityrtrr+?tion and'Buffr Mules, the approved pla ' rcations, Date: hereby state that, to the best of my abilities, due care and n was construction such that the construction was observed to be built within stantial Water Quality Certification and Buffer Rules, the approved plans and specifications,