FW: B-4533 stormwater management plan
Ward, Garcy
sent: Tuesday, April 05, 2011 2:39 PM
To: Carrillo, Sonia
Sonia,
This e-mail thread contains additional information I requested for 11-1026. Please
place with your files for the project. I will update BIMS. Thanks - Carey
E-mail correspondence to and form this address may be subject to the North Carolina
Public Records Law and may be disclosed to third parties.
-----Original Message-----
From: James, Amy E
Sent: Tuesday, April 05, 2011 1:32 PM
To: Ward, Garcy
Subject: FW: B-4533 stormwater management plan
Hi Garcy,
See below for hydraulics response to your questions regarding the stormwater
management plan for B-4533 in Greene County. Let me know if you need more/different
information than what is presented below.
Thanks!
Amy
*Please Note New Phone Number*
Amy E. James
Biologist, Project Management
NCDOT, Natural Environment Unit
Direct 919.707-6129
aejames@ncdot.gov
-----Original Message-----
From: Nottingham, Andrew T
Sent: Tuesday, April 05, 2011 1:20 PM
To: James, Amy E
Cc: Morgan, Stephen R; Paschal, Keith
Subject: RE: B-4533 stormwater management plan
Amy,
The bridge deck drainage pipe drains into a proposed roadway ditch with 4:1 front
slopes and 3:1 back slopes that runs parallel to the roadway and will be graded to
drain into the wetlands southeast of the bridge. We will adjust the rip rap pad so
it is in line with the roadway ditch. Right now it looks like it is draining into
the buffer but it is not.
Our bridge report design calls for no deck drains on the bridge.
Keith,
https:Hmail.ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W 2TJH14°/u2bm... 4/11/2011
F W: B-4533 stormwater management plan Page 2 of 2
Please verify that the bridge design calls for no deck drains on the bridge.
Let me know if you have any questions or need anything else
Andrew
-----original Message-----
From: James, Amy E
Sent: Wednesday, March 30, 2011 3:17 PM
To: Nottingham, Andrew T
Subject: B-9533 stormwater management plan
Hi Andrew,
I just had a call from Garcy Ward at DWQ regarding the permit application for B-
4533, specifically the stormwater management plan. DWQ has two concerns:
1) The bridge deck drainage pipe that releases into buffer zone 2--while DWQ doesn't
object to this IF the water drains away from Wheat Swamp Creek, Garcy was not
convinced the water would drain away given current conditions on the ground (he
visited the site). He said no grass swale exists now, and unless some grading was
done he wasn't sure the water wouldn't find its way back to the creek. Do you know
how this drainage will be accomplished more specifically?
and
2) No deck drains--Garcy just wanted to make sure there weren't going to be deck
drains over the buffer, which he has seen before (even when it was stated that the
bridge would have no deck drains).
Thanks for looking into this,
Amy
*Please Note New Phone Number*
Amy E. James
Biologist, Project Management
NCDOT, Natural Environment Unit
Direct 919.707-6129
aejames@ncdot.gov
Email correspondence to and from this sender is subject to the N.C. Public Records
Law and may be disclosed to third parties.
https:Hmail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9W2TJH14°/u2bm... 4/11/2011