Loading...
HomeMy WebLinkAbout20072160 Ver 1_Notice of Violation_20110511?-jPILaak_?A QAA Lo 1) NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary Mr. Larry Scantlin Smith Reynolds Airport Authority PO Box 4457 Winston-Salem NC 27115-4457 May 10, 2011 Subject: Failure of Restoration Activities NOV #2010-SS-0014 0 19 ? U DWQ Certification #07-2160 R 0 Smith Reynolds Airport Runway Extension Forsyth County MAY 2 DENR - WAT EF? t2ltAL Ty Dear Mr. Scantlin: Weden? $ f ))Water R.a On August 3, 2010 the Division of Water Quality (Division) issued a final inspection letter for the restored areas of your project referenced above. At that time the Division determined that the work within the failed relocated stream channels had been completed as approved and considered the previously issued violation closed at that time. The restoration approval and completion required that "The permittee shall visually monitor the restoration of Stream 1 monthly for 4 months and then quarterly for a total of 1 year of monitoring after construction completion." In addition, the approval required that you report any problems with the site to the Division's attention immediately. On May 6, 2011, Sue Homewood from this Division conducted a routine inspection of the restored stream and stormwater management system (as required by DWQ Certification 07-2160). The stormwater management system was determined to be in compliance with DWQ Certification #07-2160. However, during this inspection it was noted that Stream 1 has eroded and de-stabilized to a point that requires significant repairs. David Shoaf, Airport Commission Maintenance Supervisor, and Chris Weezorak, AVCON Engineering, explained that a stream restoration consultant had already been contracted to repair the damage to the stream and that work on the repair was to begin the following week. Please note that the failure to contact the Division upon discovery of the stream failure is a violation of the restoration approval terms. The Division encourages the Airport Authority to re-evaluate the causes of the repeated stream failures and consider re- design of the stream relocation. Should you choose to repair the stream as designed, please notify Sue Homewood upon completion of the repairs. If you choose to redesign the stream, you must provide plans to the Division for review and approval prior to conducting the redesign/repair. In additiona, the Division requires that monitoring be restarted upon completion of the repairs. Therefore the permittee shall visually monitor the restoration of Stream 1 monthlv for 4 months and then quarterly for a total of 1 year of monitoring from the completion of the May 2011 repair. The Division shall be notified immediately upon discovery of any failure of the stream stability during the monitoring period. Upon completion of the monitoring period the Division shall be contacted for a final closeout inspection. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer North Carolina Naturally Mr. Scantlin May 10, 2011 Page 2 of 2 Thank you for your attention to this matter. Should you have any questions regarding these matters, please contact this Office at (336) 771-5000. Sincerely, W. Corey Basinger Water Quality Regional Supervisor Winston Salem Regional Office cc: John Thomas, US Army Corps of Engineers - Raleigh Regulatory Field Office (via email) David Shoaf, SRA (via email) Chris Weezorak, AVCON (via email) DWQ 401 Wetlands Unit (file 07-2160) DWQ WSRO - 401/Wetlands