Loading...
HomeMy WebLinkAbout20110221 Ver 1_Approval Letter_20110518A?A NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director May 18, 2011 Natural Resources Dee Freeman Secretarv DWQ Project # 1 1-0221 Craven County Wayne O. Hauck III 102 Bridgepoint Drive New Bern NC 28562 Subject Property: Lot #18 Bridgepoint Harbour Trent River [NEU10, 27-101-(39); SB, Sw, NSW] AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Mr. Hauck: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to impact approximately 0 ft2 of Zone 1 and 2486 ft2 of Zone 2 of the protected riparian buffers for the purpose of placing and grading fill at the subject property as described within your application dated March 8, 2011. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge and CAMA regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved North Carolina Division of Water Quality Internet: www.ncwatergualiiy.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarolina Natundy Page 2 of 3 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 0 feet 404/CAMA Wetlands 0 (acres) Waters 0 (acres) I Buffers 2,486 (square ft.) ZONE 2 Plat included with application 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re- concentrate before discharging into the stream as identified within 15A NCAC 2B.0233(5). 3. Temporary Stabilization Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished 4. Site Restoration The property owner is responsible for site stabilization and restoration of woody vegetation. Pre-project site conditions MUST be re-established. A site that was wooded prior to this project MUST be restored with woody vegetation at a stem density of 320 stems per acre. Restoration must be completed by the first subsequent planting season (November 1 through March 30). 5. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Page 3 of 3 Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 213 .0233. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. If you have any questions, please telephone Amy Adams of the Washington Regional Office at 252-948-3917 or Amy Chapman of the 401 Oversight/Express Unit at 919-804-6400. S icerely n a For Coleen H. Su Enclosures: Certificate of Completion Buffer Rules cc: Corps of Engineers Washington Field Office DWQ 401 Oversight/ Express Unit DCM, Roy Brownlow, Acting District Manager, Morehead City Office File copy Rick Scheper, Scheper & Associates 3940 US Hwy 70E New Bern NC 28562 Filename: 11-0221 _MinV_Approval/aa