STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P. O. Box 25201, Raleigh, NC 27611-5202
PHONE: 919-733-2520
May 16, 2011
Mr. Monte Matthews
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest; NC 27587
Subject: Nationwide Permit #3
Replace Bridge #229 on SR 1169
Ashe County, North Carolina
TIP # B-3802
?1q y .119
?1P,yh?R?n,
EUGENE CONTI, IR.
SECRETARY
110481
_ WBS Project Number: 33258.1.1 (No DWQ Permit Fee Required)
Dear Mr. Matthews:
The North Carolina Department of Transportation is scheduled to replace Bridge #229. The
existing 12'x 20' bridge is structurally deficient and will be replaced with a new single span 33'x
55' bridge. Due to on-site limitations, an off-site detour is proposed. All impacts associated with
this replacement are due to bank hardening associated with the spill-through design. Stream
impacts are tabulated below.
Stream Impacts:
11- wStatiou ,
5?; r+,:^?'...
,.r:? Nmnber?yr'z Erishng ;
r •3X "'^"v E
.-.,,Stnrcture * `Proposed Prpe x
nl'u '. .J } Rh
•..;S?ze * Temporary
r£°k., r?.r"w 1>
rDewaterm . Riprap `
'SV`o`-S:Yx:t r 'ts
=Im acts feet . Total Impacts at
c±'n'•+ F.,,i
s Statron ft;
Bridge #229 12'x 20' Bridge 33'x 55' Brie 0 37 37
Total Pro'ect Im acts =120 feet
Construction of this project will require impacts to waters of the United States in the New River
Basin. The existing bridge crosses the West Fork of Pine Swamp Creek (Claus: C, Trout +). This
project was reviewed for the presence of threatened and endangered species in August of 2010.
The subject project will have no effect on any federally listed endangered plant or animal species.
Historic compliance work will be scheduled and concurrence with the State Historic Preservation
Office will be obtained if required.
P. O. Box 250, N. Wa.xESBORO, NC 28659
PHONE (336)667-9111 FAx (336)6674549
Mr. Monte Matthews
Bridge #229 on SR 1169, Ashe
Page 2
May 16, 2011
The project impacts are not significant in nature and should not alter the best usage for this
stream. All appropriate BMPs will be used during construction. Attached is a Preconstruction
Notification Form, plan sheets, photographs, a marked county map and a marked topography
map.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated-
Sincerely, A/
Heath Slaughter
Division Environmental Officer
Enclosures
cc: Monte Matthews, US Army Corps of Engineers (I additional copy)
Marla Chambers, NCWRC
Brian Wrenn, Division of Water Quality (2 copies)
Mike Pettyjohn, PE, Division Engineer
Ivan Dishman, PE, Division Bridge Program Manager
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
O2 F W A TF9OG
H v
? r
O <
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
I a. Type(s) of approval sought from the
Corps: ® Section 404 Permit ? Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
I c. Has the NWP or GP number been verified by the Corps? ? Yes ® No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
® Yes E01 No For the record only for Corps Permit:
? Yes ® No
If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer In
below. ? Yes ® No
l h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Bridge #229, TIP# B-3802
2b. County: Ashe
2c. Nearest municipality / town: Idlewild
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no: B-3802 or WBS 33258. 1.1
3. Owner Information
3a . Name(s) on Recorded Deed: NCDOT
3b . Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d . Street address: 801 Statesville Road
3e . City, state, zip: North Wilkesboro, NC 28659
3f. Telephone no.: 336-903-9202 .
3g . Fax no.: 336-667-4549
3h . Email address: hslaughter@ncdot.gov
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent[Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: 36.26886 Longitude: - 81.45888
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 0.1 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: West Fork Pine Swamp Creek
2b. Water Quality Classification of nearest receiving water: C, Trout +
2c. River basin: New
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Substandard bridge to be replaced in a rural area
3b. List the total estimated acreage of all existing wetlands on the property:
- 0.1 acres
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
- 200 linear feet
3d. Explain the purpose of the proposed project:
Upgrade substandard stream crossing
3e. Describe the overall project in detail, including the type of equipment to be used:
See attached cover letter.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
'Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
E] Yes ®No El Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? yes ® No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
Fa Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
? Yes ? Corps
W1 ? P ? T ? No ? DWQ
? Yes ? Corps
W2 ? P ? T ? No ? DWQ
? Yes ? Corps
W3 ? P ? T ? No ? DWQ
? Yes ? Corps
W4 ? P ? T ? No ? DWQ
? Yes ? Corps
W5 ? P ? T ? No ? DWQ -
? Yes ? Corps
W6 ? P ? T ? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ® P El T Riprap West Fork Pine
Swamp Creek ® PER
El INT ® Corps
® DWQ -10 37
? PER ? Corps
S2 ? P ? T ? INT ? DWQ
? PER ? Corps
S3 ? P ? T ? INT ? DWQ
? PER ? Corps
S4 ? P ? T ? INT ? DWQ
? PER ? Corps
S5 ? P ? T ? INT ? DWQ
? PER ? Corps
S6 ? P ? T ? INT ? DWQ
3h. Total stream and tributary impacts 37
3i. Comments: No impacts to waters from the new bridge itself, just riprap.
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds,
estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water im pacts below.
4c.
4a. 4b. 4d. 4e.
1
Open water Name of waterbody
impact number - (if applicable)
Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
6. Pond or Lake Construction
If and or lake construction ro osed, then complete the chart below. --.-
5e
5a. 5b. 5c .
. 5d.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments: N/A
5h. Is a dam high hazard permit required?
? Yes ®No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a. ? Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number -
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
El Yes
Bt ?P?T !]No
?Yes
B2 ?P?T ? No
?Yes
B3 ?P?T ? No
611. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
Ia. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Replacing bridge with new bridge.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
All appropriate BMPs will be used during construction
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ®No
2b. Ifves, mitigation is rcquired by (check all that apply): ? DWQ ? Corps
? Mitigation bank
2c. If yes, which mitigation option will be used for this El payment to in-lieu fee program
project?
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
31b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
61b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No
Comments:
2. Stonnwater Management Plan
2a. What is the overall percent imperviousness of this project? %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: _
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
Who will be responsible for the review of the Stormwater Management Plan?
2e ter Program
Sto
DWQ
0
r
. Unit
Q 401
DW
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
? NSW
3b. Which of the following locally-implemented stormwater management programs ED USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Pr ram Review
? Coastal counties
? HOW
Which of the following state-implemented stormwater management programs apply
4a ? ORW
.
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? [I Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? F1 Yes El No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
? Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
d
S
d
? Yes
® No
ar
s,
tan
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered 'es" to the above, submit a qualitative or quantitative cumulative impact analysis in a ccordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a . Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewa ter generated from
the proposed project, or available capacity of the subject facility.
NIA
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
? Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
GIS & visual observation
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ®No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
WRC will comment
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? ncfloodmaps
J. Heath Slaughter ? 5116/11
t's ' ature
t/A
li
/ Date
Applicant/Agent's Printed Name can
gen
nature pp
(Agent's valid only if an authorization letter from the applicant
is rovided.
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
r ?? N (00'?•?Im'???? / N w+
{ O N
r
Co.
A ?o d
YM V ?
J ,p to N 8 ? -- ?
.i ? 5 fD + + ti ?
?7 y.? mN ? r a-
/ r '? ?(?, IN r
niD
Ua / Io o I C)00 o
O,n /4? r
s::r c Qom ' WN o
i W C IC IN
? dIN? Z %O,
?cl Yd 4
??`?'? ? =emu+IN ? (O "? I
? N
{AS? 4
M / cy"k ?a I V i
44, w
co
lab
/ IV O ?? -__ N V
0 wW PIca ?,?$
ea Ito l ? i x No I j
V Ii
i V
CLYTI .4
to i ?p { V
\ Ico w
\ !• I? O `
N W I?
N 1 Ic~o ??n11i b to
J
N ?
r
k ` ` _ Q7 IQf Q1 cr Ico y L g
I
o? ?1 co
Imow` _ ? ?
?" Blow _
?' I r
,A co I
V• ? I
70
C N
7 a /?? p g M? I V
76
OD i N
Map Name: GLENDALE SPRING: Scale: 1 inch = 2,000 ft. Horizontal Datum: NAD83
Print Date: 05/16/11 Map Center: 036.2670454° N 08
J r
e
x ssu f
,
• "?
_
OO? _61 O _ l
1 JC
U
o - - F
m
.
J
o' C"
) \
7
_
I j
L/?. I
J r \ ?
?
O l
f\ 2
g s l _ ? a
m ? e c v a? ?: /, m
Brid 0 $229 1?
t J6?
?
g o
r 0
N
N 1 ? O 9
?
N ?
3
. ?
?? •" i Z
O
AV
w
1\
`` ?
?
?J
W E
jb^^ :
R
v. ?.
. T( k F
f
?
PwS i 'R vA ?
I(? 1 A t `h ? 1\
rl.
V = l 1 ?A
.A 1p
l0
$ ?
?
-
a
O
?
*
io
J
Ca c
@ 4?, ?
ilt
.
.4700000° W 081.4600000° W 081.4500000° W 081.4400000
SCALE 1:24000
Bridge #229 on SR 1169 over West Fork pine Swamp Creek, Ashe.
W
F
O
Z
u
a z z
a ti °r
¢ O N
x `a
O ,aN W OH30
,Z-,V NKV 1Z- ONZQ:
SWV
Z,- N¢2 p Va?Ui
Q ?N> OWNd W:
?q QFO WJORU?-
pW -0O
Z' N H NQ 21Q-?W?
Wm "40= ONLL LLm ? .. Ww HZti
O OF-WV¢'
asrv .N-i?.. auiFF OS
Q Nod Swao?a
F3 ON' NN WNI
UWN WKJZ QJKO¢W,.
FZU .Oti. SK? rm.
QO QW¢ V=UWNQ.
N00 '/, r0>O .7.HO.
?V.-. Q¢Z. TRH
ii?? ..a ¢LL Nro¢za
?aQ ¢LLwo Nuaaa
U
Z
JW
O Q O
LL?H
W ti ? OQ mO¢J
0
z z w ati a"QJ..zi
¢ J
? 6 W NW NWN¢
< N ¢ O¢O
Z ON OV 'I OLL
Q U ¢W ZW ,-+OVN
O N ,VyO OaQZ
Z ¢Q
6 W Om NOV¢
a s
ii Q WO ??W?
O O ¢ m? %Zrm
Q 2 W N
? W VZ N IS-O?Q
a0 wa¢w
,+ O O? iJ< 3w
J ¢ a w o0 0
°w iN ¢o m? '21
? or- w¢ >o m
N ¢W ¢Z .N-.? ?
N ON 00 F.-. WWzx
.
Q LLV 3 ¢¢Nrl
. I 1
1
W ZP
¢ FN I
O P Ww .
o?
N J
H N Q
¢ ¢
? m w
OO¢ ? 6
VO NW Q
ZH3 p? m
K F¢ W
NO, VIWW
doa wN wzu
ENO
?FK40NVJ
O NUW Q
V,-.W WFFZF,N
NZNZ=N.'.." W
WNLLUO¢V>¢
N
N z
N . r F! 1 N 3 J
I
Z Zm
m
W O
I XO
F O - ¢z
m
xo
N
wPW ao
? w a¢
z w Qu
w -w I
o w
m
a u N
^
u n¢ in• I Ka
4 . W
I 2N..
%
LL N
Z
W
I ?
I m
I
r I !]
LL Z
W
1
NI
V
'
m
N I
W
i
W
O
W
4Ky
wN ?
.
'lll
%
1 ?I
??
•
a
MM
..__
Z _ ryo
Q mo
/
o_ ,
/
Vl Jo
, 1 w
w
N
3 1
a
m
_
1
o / w
m
LL wo
- n / a
Q
? F o u
a
a u>_ J
1 ao
VKV¢ W
T O
/
=NWT
¢X
?i
I .
^
LLI I ?
I Z
m
'
?l
" W
M I dA 11
I
o
m 11 .9 1
? . 1
Q ox
W mW N I
e a N I
O O ? 1 T
U ^
¢ N
N I
4 aw
m
MM
1 n
JNa ??^
0 1
V
¢ + 1
OF O O
a
.z. ? w
? o
o°ON Q
u o
NQ o ?
m
jo W
N.. Q
MJ cr
aw (7
I _o
Ill^71?(j^ I?
M1
Jlla
vOO??K¢
IQ¢QN Q
w0
O F
?LLJNJF
OF-Z ¢r
xawaz?
N>UWJNLL
JULLZ?wO
aWOU QI-I?
¢ WZ¢LLP
..a
.. a
¢
u?
V¢
.+a
¢
N
ar
u¢
Z08E 9
d
N
U
¢
H¢
H
?V
m
M
O
YH4V V
Y
f-
o
CL W r
5.? N
N
Z
:D I
U
00 O
U I < 3 0
Hv O
N O ° 3 m^
I'/l Q jZ a Z ?N
°J W
O
N i
DW Z
w?
W
o
O
b a
J
>?
_
_
Q
? a Z ¢ zo??
w vl
W
U
w O
H w a
a H
C.0 O?
O ~
Q a
J O] U
o
0-
v~
€
P
zQ
?O
" .O c?
HWNN
a¢ p
N`
in¢„N,o
m OEM
Naw
Mo N
mo¢
.i
z
O
a
0
w
0
Z
IIOO
a-um
IT
w
0
u
0
a
9
6ZZ#
? 3/y0
J
>q
/? ?nN Io?2Y
-----------------------------
0
0
0
U
N
a
E
e
9
C6?
7.
V
rl?
O
D
^O
ry
W
f O
W