May 16, 2011
Mr. Rob Ridings
DWQ-Transportation Pernritting Unit
1650 Mail Service Center
110468
Raleigh, NC 27609
Subject: Nationwide 14 Notification for the paving of SR 1938 (Thomson Road) over UT to
Toisnot Swamp, Nash County, NC. WBS# 4C.064043.
Dear Sirs:
Please find enclosed the Pre-Construction Notification for the above referenced project. There are
impacts to one regulated stream associated with this project due lengthening pipes in order to widen
the roadway. Traffic will use an offsite detour during construction This UT to Toisnot Swamp is
located in the Neuse River Basin and is classified by the Division of water Quality at this crossing
as WSK NSW. Best Management Practices for the Protection of Surface Waters will be strictly
adhered to during construction.
Regulatory Approval:
USACE Section 404 Permit: The project qualifies for Nationwide Permit 14 (Noureporting). All
permit conditions will be followed.
NCDWQ Section 401 Certification: The project qualifies for 401 General Certification number
3704_ All conditions of the general certification will be followed.
NCDWQ Buffer Rules: No not apply as feature does not show up on either USGS topo or soils
reap. For our files, please provide written authorization that the activity is authorized.
Please contact Chad Coggin (252) 296-3532 or Byron Bateman at (252) 296-3530 if you have
any gaestions or need additional information- Your time and effort are appreciated.
`??Iap//e'c)rfuIly ors
Rbert W. Lewis., PE
Division Engineer - Division 4
(252) 237-6164 x 3532 ccoggins@ncdot.gov
Post Office Box 3165, Wtlson, North Carolina 27595-3 1 65
o? w ? rFR
y ?
Office use Only
Corps action ID no.
OWQ project no.
Form Version 1.3 Dec 102008
Pre-Construction Nodfication PCN Form
A Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: ? Section 404 Perri ? Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified bythe Corps? ® Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Perk
?401WaterQuality CertiTication - Express ? RiparianBufferAuthortzatlon
1e. Is this notHicationsolely for the record
because written approval is not required? For the record only forDWQ401
Certification:
? Yes ®No For the record only for Corps Permit:
? Yes ? No
If Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance Ietterfrom mitigation bank or irrkeu
fee program. [] Yes ® No
19. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project SR 1938 (Thompson Rd.)
2b. County: Nash
2c. Nearest municipality I town: Ctiftonville
2d. Subdivision name: NIA
2e. NCDOT only, T.I.P. or state
project no: 40.064043
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC ff
applicable):
3d. Street address
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no:
3h. Emaa address:
Page 1 of 11
PCN For -Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify: NCDOT Division of Highways
4b. Name: Robert W. Lewis. Division 4 Engineer
4c. Business name
(if applicable): NCDOT, Division of Highways
4d. Street address: P.O. Box 3165
4e. Cty, state, zip: Wilson, NC 27895-3165
4f. Telephone no.: (252)237-6164
4g. Fax no.: (252)234-6164
4h. Email address: bobbylewis@ncdot.gov
5. AgentfConsultarrt Information (ilapplicabie)
5a. Name: Chad Cogglns
5b. Business name
(if applicable): NCDOT Division 4 Environmental Officer
5c. Stmt address: P.O. Box 3165
5d. City, slate, zip: Wilson, NC 27895-3165
5e_ Telephone no.: (252)296-3532
5f. Fax fro.: (252)234-6174
5g. Emad address: ecogginsr@nodot.gov
Page 2 of 11
PCN Form - Version 1.3 DecfTnber 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: 35.8163 Longitude: - 77.9686
(DD. DD DDDD) (-00. DDDDD D)
1c. Property size: acres
2. Surface waters
2a. Name of nearest body of water (stream, river, etc.) to UT To ToisnDt Swamp
proposed project
2b. Water Quality Classification of nearest receiving water.. WS-III; NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The land use in this area is predominantly agricultural with some residential development, mainly single family tomes, in
the vicinity as well.
3b. List the total estimated acreage of all existing wetlands an the property.
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) an the property:
60, (Width of proposed Right of Way)
3d. Explain the purpose of the proposed project:
The purpose of this project is to grade and pave an existing unpaved secondary road as part of an ongoing effort to
update the slate road system and improve the transportation infrastructure in rural areas.
3e. Describe the overall project in detail, including the type of equipment to be used:
Standard earth moving, road building and paving equipment will be used to widen the road surface, achieve a finished
grade and pave the finished road.
4. Jurisdictional Deterndnations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ? yes ? No ? Unknown
project (including all prior phases) in the past?
Commems:
40. 1 the Corps made the jurisdictional determination, what type ? preliminary ? Final
of determination was made?
4c. if yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (N known): Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or Stale determinations and attach documentation.
S. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ? No ? Unknown
this project (including all prior phases) in the past?
5b. if yes, explain in detail according to 'help file" instructions.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? Q Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts inventory
1. Impacts Surnmary
la. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland Impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps -404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
TemporaryM
W 1 ? P ? T ? Yes
?No ? Corps
?DWQ
W2 ? P ? T ? Yes
? No ? Corps
? DWQ
? Yes ? Corps
W3 ? P ? T ? No ? DWQ
W4 ? P ? T ? Yes
? No ? Corps
? DWQ
W5 ? P ? T Yes
? No ? Corps
? DWQ
? Yes 11 Corps
W6 ] P? T ? No ? DWQ
2g. Total wetland impacts 0
2h. Comments:
3. Stream Impacts
If there are perennial or irgermittem stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
33. 3b. 3c. 3d. 3e. 3f. 3g.
Stream Impact Type of impact Stream name Perennial Type of jurisdiction Average
m
t impact
length
number- (PER) or (Corps - 404, 10 s
rea
width (linear
Permanent (P) or intermittent DWQ-non-404, feet)
Temporary (T) (INT)? other) (feet)
S1 ®P ? T Pipe Placement UT of Toisnot
Swamp ? PER .
®lNT ? Corps
®DWQ 1.5 12
? PER ? Corps
S2 ? P ? T ? INT ? DWQ
? PER ? Corps
53 ? P ? T ? INT ? DWQ
? PER ? Corps
S4 ? P ? T ? INT ? DW Q
? PER ? Corps
S5 ? P ? T ? INT ? DWQ
? PER ? Corps
Sfi ? P ? 7 ? INT ? DWQ
3h Total stream and tributary impacts 22
Commends: The 12 of linear stream impacts associated with this project are related to the upsizing of an existing crossline
3i
.
to accommodate widening the travel surface of the road. This stream is not deputed on the Nash County Soil Surveyor the
_..a .a,...,..t..... :c .,..1 ?, daicM M NwIRP Rlrffef Rnle9. ._
luval k4l S,ID , a," uw?wv,a' w
Page 5 of 11
PCN Form - Version 1.3 December 10, 20013 Version
4. Open Water Impacts
If there are proposed impacts to Fakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water
Impact number- Name of waterbody
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary (T)
Ot ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts 0
4g. Comments:
5. Pond or Lake Construction
If nd or take construction rosed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Weiland Impacts (acres) Stream impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5L Total
5g. Comments:
5h. Is a dam high hazard permit required?
[I Yes [K No H yes, permit ID no:
5t Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DW4)
I project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list ail buffer impacts
below. If an impacts uire mitigation, then you MUST fill out Section D of this form.
6a. ? Neuse ? Tar-Pamlico ? Other.
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f- 69-
Buffer impact
number-
Reason
Buffer
Zone 1 Impact
Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tent irnpRd uired?
? Yes
B1 ?P?T ?No
? Yes
B2 ?P?T ?No
? Yes
B3 [I P [I T ? No
6h. Total buffer impacts
6i. Comments: There are no buffer impacts associated with this project.
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justltication and Mitigation
t. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Impacts associated with this project are directly related to widening this road and upsizitg the existing crossline to
accommodate the widened road surface. Increases in road width and crossline length will conform to current engineering and
safety standards.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
This project will operate under an approved Sediment and Erosion Control Plan and will also adhere to all permit conditions
set forth by the NC Division of Water Quality.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in lieu fee program
? Pennitlee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type QuantrYy
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cDo) ?cokl
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Nom-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Pemfittee Responsible Mitigation Pan
9a. If using a permitiee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
G. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ? No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calwlate the
amount of mitigation required.
Zone
Reason for impact 6d.
Total impact
Multiplier tie.
Required mitigation
(square feet)
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mtigaton bank,
6g
.
pefmfte responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page S of 11
PCN Form - version 1.3 December 10, 2008 Version
E. Stommwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1b. N yes, then is a diffuse flow plan included? If no, explain why. ® Yes ? No
Comments: See attached erosion control plan.
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? °lo
2b. Does this project require a Stormwater Management Plan? ® Yes ? No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. if this project DOES require a Stormwater Management Plan, then provide a brief, nanafive description of the plan:
All of the stonnwater associated with this project will be directed through grassed ditches for treatment.
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ?DWQStormwaterProgram
® DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
? NSW
3b. Which of the following locally-implemented stormwatsr management programs ? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stomrwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stonnwater Program Review
? Coastal counties
? HOW
4a. Which of the following state-implemented stonnwater management programs apply ? ORW
(check all that apply): ? Session taw 2006-246
® Other. NPDES
4b. Has the approved Stonnwater Management Plan with proof Of approval been ® Yes ? No
attached?
5. DWQ 401 Unit Stormwater Review
5a_ Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Urd submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Fong - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Erwironmiertai Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federaYstatellocal) funds or the ® Yes ? No
use of public (federallstate) land?
1b. If you answered "yes to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. if you answered 'yes' to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
fin)
Comments:
2. Violations (DWQ Requirernwa)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAG 2H .0500), Isolated
Welland Rules (15A NCAC 2H .1300), DWQ Surface Walar or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)7
2b. Is this an after-theiact permit application? ? Yes ® No
2c_ If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative trrpacls (DWQ Requirement)
3a. W ill this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered'We to the above, submit a qualitative or quantitative cumulative impact analysis in accordancewith the
most recent DWQ policy. N you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
No wastewater wul be generated by the construction of this project.
Page )0of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requir amend)
5a. Will this project occur in or near an area with federally protected species or
? Yes No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
? Yes No
impacts?
?
Raleigh
5c. Myes, indicate the USFW5 Field Office you have contacted. ? A
ill
h
ev
s
e
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
HaDdatCi'
NC Natural Natural Heritage Program Database and NCDOT GIS Layers.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your s(te would impact Essential Fish Habitat?
Field observations indicate that there is no fish habitat in the vicinity of this project.
7. Historic or prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
Yes O No
status (e.g., National Historic trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO has reviewed this project and determined that it will not affect any historic properties or archaeological resources.
8. Flood Zone Designation (Corps Requirement)
Ba. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
Sb. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
-
ApplicanUAgent's Printed Name plicanUAgenYs Signature
vAp Date
(Agents signaere is valid only it an auth"bLabM letter from the appficant
is ravided.
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
rr l
4 I
? I
a $ $
Q
'
n?? biz [7 C9' ? .
o
ee a te:
Of
-
F R a
O '9?9 n
wZ = Z
?w
f
j?
°
A ?Y?
z c
? OZ
T
n
r? y
8 `
b PP
S ??
? O
11
z
? O 3?
z
E o
? ?n
> x O = n
`
g
?? "s i
s H
CJ
oa q D
z D7?
? x 4e PPS ? L?'7
z ? ? O
x 3a "?' ? m -° Z
o r?
r rn
z
m Q O
? 9 (?lJ 4
'a z a
Q e
z ?
N?
ad s 4 ¢ D
mR?CM
y ? s
5 "s =PscnA
n y
a? °y
? S?
'^ MgDB
p' me
s a??cnm
v V u
D
?
?I
A
o
z
0
a a
o F
i
o
?o z?
I °
;•s??„'?w ? Y j
'Con
+ i td _
r ?' I °o Sf LZ+9l N m O A
T Iyl I i?L??N YJ
I wu rnu
i 1
I I1 I °ooN OOH
o I C
I? II n
? I o j C
'S' I I 1 I " e O r?
__ oqy
:I -..j-..i W110 'T3 ? O tip u 4 m n0
xl '? o I m m
?. N u N m
I II °O~
f? I ui.lN w+A
a o
11D UUmi°c2+
V;
?I 1? ? I ££m £rnS
r°o I 9y3 jnan°.°ii°
0 0. o
'a Is 1 I ° Ammo'
m0 I ;q i! gMi k T
w3 C9 4T
M 'e
A? I as o 0 4
11 4
o p 11 I; I ? v' t t n '_: o
O 4I' i ' ?m ?m" ?0 1 i
EO F
za
g E j i y II I e e A O$
o:m
£I I p{i
SL+LL pd
s--G !°o??? A? c A D
MA ee+?%3 ? e p m n
5 qS nI I 'o'< } a
(D
Qv S
/ O \ a 9
?Y / A4 Z
I I '
i r t
ald , / I I I '
/? m?n?mv sv
m R
0
I
I
I
I
I II
o
?
I N
I
I
+ I
i
1
?
I ?
+ B VC S: 1 ]+ 09.
? B VC E: 97.08
O i
i
I I
i
i
i
i
I
0 !
i
i
c
s
s
Eal <A
f
o
I Oo?oi
oom?
i
w A
O
O 1
II
I 0
N I
I:
? I.
y
y ! ?
O
V I EVC E: 9).08
j
1 E VCB : 2 0+ 09.34
I VII2 11C AL. CU RVE
SEE SH EE T ]
f
IV
I I 1
Q
1
N
r
t?
r?
x
x
oc ?
kr. 1
M,
-4- J
J
I
cam.-
0
CL
f-
Y
O
u
0
a
i
g
1
f
f
f
- 1`
r
a
f
1
!1
f c
z 1
I
•
3 I
1 ?
/U
1
•
!
I
I
1
1
i
t
N
:f.
O
O
co
l
?a
O
' O
r
1I
?y l 1 ? 4 ^