David,
Here is the information about the stream SI-A that I got from our Hydro department.
The jurisdictional stream currently begins at the proposed Loop to connect SR1306 (Dockery Rd) to the
proposed US220 Bypass.and continues approximately 1115' before entering a concrete ditch that parallels the
existing US220. The concrete ditch is approximately 430' long at which point the stream continues in a
Northwesterly direction away from the project area. The first 139'+/- of the stream will be filled in by the
proposed loop and we are showing an additional 10'+/- of temporary impacts for erosion control measures and
other construction activities. Approximately 650'+/- of the stream will continue without impacts prior to
reaching the ramp from US220 to SR1306. The stream will be picked up by a 36" concrete pipe where the
stream meets the proposed fill slope for the ramp. The stream will be piped approximately 800' North to the
point where the stream is no longer being filled in by the proposed ramp and service road. This piped portion
impacts approximately 550ft of stream as well as the 430' of concrete ditch. We are also calling for an
additional 10'+/- of temp. impacts at the pipe outlet for construction and erosion control. The stream then
continues away from the project.
I hope this is what you need. I am-heading out for the day but if you need anything further I will be in
tomorrow. /I 4- h?
C.- lde'c
Thanks, : ?,?,s Ir` { 5w
Brook
Please let me know if you need any other information.
Thanks,
Sara
-----Original Message-----
From: Wainwright, David
Sent: Wednesday, April 27, 2011 11:57 AM
To: Easterly, Sara'E
Cc: Beauregard, Rachelle; Dramby, Kristoffer J; Dagnino, Carla S; Herndon, Mason
Subject: RE: R-3421C
Sara,
How is DOT planning on impacting SI-A - are you just looking to relocate the stream segment, or do you have
other plans for it?
David Wainwright
NCDENR, Division of Water Quality
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Phone: (919)807-6405 Fax: (919) 807-6494
David.Wainwright@ncdenr.gov
r
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
P Please consider the environment before printing this email.
-----Original Message-----
From: Herndon, Mason
Sent: Wednesday, April 27, 2011 9:06 AM
To: Easterly, Sara E; Wainwright, David
Cc: Beauregard, Rachelle; Dramby, Kristoffer J; Dagnino, Carla S
Subject: RE: R-3421C
Sara, I spoke with David Wainwright and he is going to be the lead DWQ project manager on this project so I'm
going to defer to him to make the official call on this issue.
Thanks!
MH
Mason Herndon
Environmental Senior Specialist
NCDENR, Division of Water Quality
Surface Water Protection
mason.herndon@ncdenr.gov
Phone: (910) 308-4021
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
-----Original Message----
From: Easterly, Sara E
Sent: Monday, April 18, 2011 1:38 PM
To: Herndon, Mason; Wainwright, David
Cc: Beauregard, Rachelle; Dramby, Kristoffer J; Dagnino, Carla S
Subject: FW: R-3421C
Ronnie and Mason,
hope this email finds the two of you doing well. I have a couple of questions that I was hoping that we could
get finalized as things are still somewhat fresh in our minds. Please see timeline of events and information
below:
1. During our January 18, 2011 field visit with Ronnie Smith, USACE Project Manager, stream SI-A, a
concrete lined feature was requested to be added to the Jurisdictional Features Mapping by Ronnie. The call
was determined to be "Jurisdictional" but requiring no mitigation.
2. Mason, NCDWQ Project Manager, subsequently visited the site on March 15, 2011 and concurred with
Ronnie's call pertaining to the jurisdictional status but stated mitigation for SI-A can be discussed at time of the
permit application.
NCDOT would like to discuss this early on in the planning process so we can make appropriate measures with
our current design and possible avoidance and minimization efforts as needed. However, NCDOT does not
feel that mitigation is warranted on this feature; mainly due to the lack of biology present and the feature being
totally lined with concrete. We would like to discuss this at your earliest convenience and would welcome the
opportunity to set up a conference call or you may respond via email on how you would like to proceed.
Please do not hesitate to contact me with any questions. I am also attaching the corresponding map (Figure 2-
4) for reference.
Sara Easterly
Central Region Environmental Specialist
PDEA - Project Management Group
Direct Number (919) 707-6113
PDEA - Main Number (919) 707-6000
Fax Number (919) 212-5785
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed
to third parties.
o ? o
mn
• - C OF VA ATH C4R
a? qt
JURISDICTIONAL FEATURES NORTH CAROLINA DEPARTMENT
-
w 00 ?
y
OF TRANSPORTATION y
RICHMOND COUNTY DIV
4 ISION OF HIGHWAYS
1 TIP PROJECT R 3421 C PROJECT DEVELOPMENT AND
(D N ENVIRONMENTAL ANALYSIS BRANCH ?''F?r NSpJr
N OF TRa