March 3, 2006
U.S. Army Corps of Engineers
Raleigh Regulatory Field Office ?()60377
6508 Falls of the Neuse Road, Suite 120
Raleigh, NC 27609
Attention: Mr. Eric Alsmeyer, NCDOT Coordinator
Subject: Proposed maintenance improvements to a structure conveying Pounder
Branch on SR 1533 (Vicksboro Road) in Vance County. WBS element
513.2091 It, STAT 10# 9800765.
The North Carolina Department of Transportation (NCDOT) proposes to replace a
pipe conveying Pounder Creek on SR 1533 (Vicksboro Road) in Vance County (Figures
1 -3).
Impacts to Waters of the United States
The project crosses a perennial stream, Pounder Branch, [NCDENR-DWQ Index No. 28-
78-1-2, Best Usage Classification C NSW; HUC 03020101] (Figure 3) in the Tar-
Pamlico River Basin. The existing structure that conveys the creek is a 72-inch
corrugated metal pipe arch that is 60 feet long with a headwall at the inlet (see
Photographs 1-3). This existing structure is rusted and undersized. The NCDOT
proposes to replace the existing structure with a 90-inch corrugated metal pipe arch that is
60 feet long. Ten feet of rip rap will be placed along the creek banks both upstream and
downstream of the structure. During the construction of the project, the NCDOT
proposes to temporarily dewater the work zone for approximately 2 weeks. This will
involve the temporary placement of sheet piling at the construction limits. To maintain
water flow during construction, water upstream of the sheet piling will be temporarily
pumped out by a hose and conveyed downstream of the construction activity where it will
be allowed to filter through vegetation before flowing into the stream. The effluent from
the work area will be pumped into a prefabricated silt bag allowing water to slowly filter
out of the bag in a dispersed matter and the sediment to be captured in the bag. Once the
stream has been dewatered, the pipe will be replaced. The sheet piling will be removed
after construction.
Division 5, 2612 N. Duke Street, Durham, NC 27704
Phone: (919) 560-6081 Fax: (919) 560-3371
A
LIN
r f /+ y / li
i,? w?'? ? ?:}- •?T? >,•-,? ,,^ :lower'
,
52 1
sc,
"e"rr \ ('' , ? ?; ' •?'`
111 _'.?? ? °?? ???(} J r / ? i*- ?i4 r J ?. ?>'(•? -.\ 1 ,,• ? i .., <
I J ttr - 't.
i \ _ "; r .• J y 1?- .: ,' t ++ G ?, 1. Nil I it ,i; lA cb' roA1?0$U
,
43,
rui
... ? .,,, •; OY?m. :,,^• ? ,, r7 T J' r J ?l lt?? \ r ??? \, 4'^. /i?'. ?/r'? ? , r .If i
?q'?•;, ,1,\ff , ?J? `,_,???,? , 'l: ?..,? \ ; ?,?.? ?? ,-? (. ; - - ` .?'? I -? ?, 1 SITE l ;7 '? ?'1';•
\ 1 1 y 4n, /
y'/ .., + +. a ?_... 'r?fM ' / t 1 w ? t: .• b r? ?Y •f'' ?; ?? Y °'-„_ r .1177 .?,
ciairg+quq 1,`/ '/ I•T ^•.? `' r`1 y .0 6y' !1' \ J ?r.
i r; ?!K' r _ \ ??? .?ftLt;????l r "'.? f a . .'HuXhv>f ;Otov? ' 1 ' ? Jr? ?
r' ?.? +;1`. 1 r ` Ia At,. ??'? / ' r , ? C.h ,=:.lr - ? t 4,1 J , (• ?, i .,l^ r.
v 1
n _ (A-
1 1 `\
r
;ti f {? ::C •' • s , . ? r /,, ,1• • +• 0 a ,CO ,.•C'f / ,, ? 0 11 J ? ? 1 ,`rr :, ?
`?'; "1L •.;7'?"v .;. ? ; IJ_,Jf? ??.,'{1531) ..*'?'?i?, ??. / I? J.?/ T??'`•' I/,,rr.? ? ' ? ?/ '
dd i l 1 ?.\
..:-
<J •, i ?! r y ?'' 1 ? ?^ RO}l?E 1'1 •. 1 i ` {` 1 4 1 l 1??? ,
1 v . r _ .. -L.. .i ?r,(? \ ?' \ 1 , ?' f J 4 ? `?' Il'/ ' ?'? ?? qty '. / , i ??
J .•d r . I 1 a III V 4 17 "? r •.
?\ 'I` = w,?`(.. , `A1? , 1 '/'V m ??\'?/i !? ?,1\ .• J?C47 f ? K\.?.. 1 ? ? ' \? ?` 1 . -.
• 1 't> .. r ' t. l( ' / ,t? nY'. =t 7 -. 1. t? `4 ?7 1,?,? _•l>?r? ,•?'?• ``' ??I'/? ?'.
YrK ,? tl.ISiOJ 1 I M ' \
• ? ?.•, - (?,Id: .? i MtC•+rrllel % `°,j J?' ? ? & \?? ?.' .I ?'t,/ \? / r .??i
? I
'•??. ?? ,?'/%? ?`, j. Project Study Area
SR 1533 Vicksboro Road
Vance County
p/' ?• '??' i`-f•? '?.Y ?'-= Vicksboro - USGS Topo Map (1970)
Figure 1 1:24,000
04
(Joins sheet IO)
H < ??
,? lia ,,.w r .•'"•? ,-??t?,•..';,,?A.?tsr `a??4 , ?iQe?? -?? •:. 1519 u, Aoe weD H
489 v - '? T WM * Zpz is C
.+ ??. r ',. ? ?. _.,r h ?'p`.j} X <? /`? `? ? ?. i ,r,,. '. 'tCa?'4'M`y.r. YP? ` J+y'. . r.•'T..
APB b nn APB '",' F * c., :xJra1 W
f' s+;+• ?4 f >.x aY r`.Cro?rckondc .J WeD` ? S:. W D.
t• ' ' s WoA
Y "!l !
151E `s ?,,.*,, a ° '•1 _ Y' W6A4.. #..
q,s N; w ,?s. ti < .} d•' 1516 ' *- 4'?? ? LOB,. i ? .?i+•
? ,? ?,.• + ? z4 APB{., ? ? t
CeB2 c , 4 ?•. J ??f`r r., {;S I5z1
L APB .1 4 ;y veD w
oB Yr't: ,? t E
1567, ''?4 ? ;,.,?. .;t.4• - ,,y. •„ ?- '{ Zia ...?.,? r • .. WeD LOB W t ..
W a y° ar
++w p s> WeD ? . ?' L o8 • "` A a
wS`.rv„ ?f ? ?? r`Y? 1jt :? ?•/? r ?nfi`t1w: X"" 5 PB..?`'
h .r f • w a? / W
j V
ox SITE 1 '
!4 WeD W e LoB
APB WeDt? 1522 x I q? .. r
APB WeD
,„ a tl ??, "' IR 1 y 1
? .1 J In /?? ? t _ m. Ir ?. v
?'y 1 1 n J `- APB` SM ,rn!
' k d 11h. y ?,
'?Ty'j.
1533 4s; 1 r !i9 'c ^ M
GJ? 1 4 •LOB l53 :v e. , - •W v y-0 `„ yalr
!. '.rl :r Faulkner .? + '
'}; ??? Crossroads t V ? ,r?7, ? 'K
4 • ? r:' ? { 'a W Lob {I APB ?h
WeD
34
B i` s W. tat ????tt t j? LoE a ?.r f LOD
AP o W
?oD LoB 1?'? ?a \ APt?? 1 ?' :^WeD Lp?jti pg ° y
,e82 Lob < f Isaz CeB2 8,X3 -? ds a .'y' WeD' W }°
?WeAN ?i, y^ ?p:r . h e Ve0 3 qpB DuQ+°???
ADB??' ,t2. . et _rtl ? WeD :, :e }?•. bd ' ?' a? T11t,•>
M 4
1 ROLANDe PONb '' tA? M LoD ?, r • ,,. 'a,.
?' 4 PQ.A
Z, el)
•??{yt: `1 4f i ? ? w 1571 7 T r CII 1 r ?.: LOB ic'
?.., ">+ u' tp ? •" ..CeB2 < -?' c I,op .. ( ? w t
Lob ,t t vi{il } i =1?ti a w° w s'V/ .
1 4 2 } ?# p. s...
"+LD `? ?: a' i ^r 4 ' t LoB r U r " .l! ?f? r, 'I /
oB r 1 ?` AP?
eB 2 a eD A
E1 ?iXx ' 9 ;,., 1 fS PB
C ,
L :t? 1 Lob A*
01
a ' ,'?' +t CCB oDa Or s ,'.„
r 15 B 4 ? '.
' ? 153 .{? (JI .?• ?t 1 , :,? ? ?, M t :' '. ?.pa:- x ??„Fr? t? .
Par. • r :f
OD. ,l`oB
1540 ,v ADB• It
1 0:. Ott i;OD.
F e
APB 7 i i a ? `1 ', p n} i DaB2 e:?r,? ?> P v
'.'S,s?` .,r iu +:'E. fur ?(;OQ >r ? ?/ ,? WeD
ts19 # Y . y, LoB
tdP,6 i 1. ? < d ;1t 4 ' CeD2 y. i y "' Lob
I ,? '?':.? ,-•?3 •.,?`gs`? LoD •i LO ? ? '' sEx .?r'' ?. LoD m ? Y A' r
y?y ?) I .S' .r t • 'A? ?', r r.f_. 1 ?.R ! {..IF'. fd'" v. ...
to[Y? ? WeD
4P8 ,?ylw•
LoE APB - ,^ of h
? .,?.. .. •Lo8 ?. a r.
o
O ?Lo,D ' dqd 1
?y t d APB, m ;' rrr
APB ;. ? ?
'aB2 LOO 2139000 FEET
N
Project Study Area
SR 1533 Vicksboro Road
Vance County
USDA-SCS (1977)
Figure 2 1:24,000
>;
T
a C
C) ?
? U
a c
_ C
r
N C
U)
O
a?
O ..
L
CL L
o.
c
Q
c
4-
3
4-
0
O N
C L-
O O
E 4-
N
U
W
O
cl? -0
N U)
Y
U
o• ?
c o
?
i 'f-
X
O O
Q0
L.L
W
W
\o
0
M
N
N
0 „C O
a?
0
N
O ?
O
en
u
en >
w
r
u
c
a
+ c
O •-
O L
C N
U +
D
4- 3
O N
4-
C
N O
E
N
U
CL
dscnO336(70062544b1Pe9)
Photograph 1. View Upstream.
dscriOMS (70042544b Jpeg)
Photograph 2. View of Outlet.
SR 1533
(Vicksboro Road)
i
dscnO334(70Ox525x24bJpeg)
i
<f,
Photograph 3. View of Downstream.
Permanent impacts at the site associated with the replacement of the structure involve a total
of 20 feet of rip rap placed along the streambank to protect the structure. Temporary
concurent impacts will include the dewatering of 20 feet of stream.
Riparian Buffer
Construction at this site involves a road crossing of a stream that is subject to the
Tar-Pamlico River Riparian Buffer Rules. Pounder Branch at Site 1 is depicted on the most
recent version of the Vicksboro (USGS 1970) topographic quadrangle (Figure 1) as well as
the Soil Survey of Vance County (USDA-SCS, 1977) (Figure 2). Construction impacts at this
site total 1,387 ftz in Zone 1 and 0 ftz in Zone 2 (totaling 20 linear feet of riparian buffer
impacts). Please note that impacts associated with installation of the sheet piling and special
stilling basin (silt bag) are included as part of these totals. Based on the impacts to the
riparian buffer at this site, this crossing is EXEMPT.
Waters of the U.S. Mitigation
Avoidance: All wetlands and surface waters not affected by the project will be protected
from unnecessary encroachment. No staging of construction equipment or storage of
construction supplies will be allowed in wetlands or near surface waters.
Minimization: The side slopes have been steepened to the extent possible at jurisdictional
sites. Strict enforcement of sedimentation and erosion control Best Management Practices
for the protection of wetlands and surface waters will be enforced during project
construction. Continued coordination will occur with maintenance forces and the
Environmental Officer during construction to minimize impacts to these sites.
Compensatory Mitigation: All compensatory mitigation requirements will be left to the
discretion of the regulatory review agencies.
Protected Species
Plants and animals with federal classifications of Endangered, Threatened, Proposed
Endangered and Proposed Threatened are protected under provisions of Section 7 and
Section 9 of the Endangered Species Act. As of March 03, 2006, the dwarf wedgemussel
(Alasmidonta heterodon) and bald eagle (Haliaeetus leucocephalus) are listed as
federally protected species in Vance County. This project is not adjacent to nor is it
surrounded by open water suitable of supporting foraging habitat for the bald eagle. A
mussel survey was conducted at this crossing by biologists with Alderman Environmental
Services, Inc. on February 25, 2006 with a finding of no effect for federally protected
species. Additionally, a review of the Natural Heritage Program database (last updated
January 2006) revealed no occurrences of protected species within the project area.
Therefore, based on lack of suitable habitat observed during the site visit and the NHP
database review, biological conclusions of No Effect have been rendered for each
species.
Summary
The NCDOT proposes to replace the existing structure with larger sized pipe. Permanent
impacts at the site associated with the replacement of the structure involve a total of
20 feet of rip rap placed along the streambank to protect the structure. The work zone will
be dewatered for approximately 2 weeks. Temporary concurrent impacts to the stream
from this activity will result in the dewatering of 20 linear feet of stream. The sheet piling
will be removed after construction. Riparian buffer im acts at Site 1 associated with this
maintenance activity total 1,387 ft2 in Zone 1 and 0 ft in Zone 2 (totaling 20 linear feet
of riparian buffer impacts). Based on the impacts to the riparian buffer at this site, this
crossing is EXEMPT.
Application is hereby made for a Department of the Army Section 404 Nationwide
Permit (NWP) 3, NWP 33, and NCDENR-DWQ Section 401 Water Quality Certification
(WQC) No. 3494, WQC No. 3366, and riparian buffer authorization for above-described
activities. An automated payment procedure has been implemented between the NCDOT
and NCDENR-DWQ. This procedure will enable the Division to apply for the 401 WQC
without submitting a check for this permit application. This procedure will provide
payment to the NCDENR-DWQ by charging the permit application fee of $200.00
directly to the appropriate NCDOT WBS element 513.209111, STAT IO# 9800765. A
pre-construction notification is attached with this request. If you have any questions or
need additional information, please contact Mr. Chris Murray at (919)560-6851.
Since?ance, Jon G .E.
Division Engineer
cc: Nicole Thomson, NCDWQ
Dallie Bagwell, NCDOT
Earl Bell, NCDOT
Katie Simmons, NCDOT
Office Use Only: Fonn Version March 05
20060 377
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 and NWP 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
Owner/Applicant Information
Nanne: NCDOT Division 5 Jon G. Nance
Mailing Address: 2612 N. Duke St. Durham NC 27704
Telephone Number: (919) 560-6851 Fax Number: (919) 560-3371
E-mail Address: JNance a dot state nc us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affilial
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 8
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Proposed replacement of a structure convening Pounder Branch on
SR 1533 (Vicksboro Road) in Vance County.
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Vance Nearest Town: Henderson
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers/names, landmarks, etc.): While traveling north
along US I BYP on the southeast side of Henderson take the Bear Pond Road Exit. Travel
east on Bear Pond Rd (aka Linbanks Rd) for approximately 2.0 miles to intersection with
Gillburg Road. Make a left onto Gillburg Road and travel north for 1.0 mile, cross through
intersection with Hwy 39, then continue for another 2.8 miles. Make a right onto SR 1533
(Vicksboro Road) and travel to project site.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 36.3203 ON 78.3507 "W
6. Property size (acres): 0.20 acre
7. Name of nearest receiving body of water: Pounder Branch
8. River Basin: Tar-Pamlico
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http•//b2o.enr.state.nc.us/admits/maps/.)
Page 2 of 8
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Site is surrounded by wooded areas and agricultural land.
10. Describe the overall project in detail, including the type of equipment to be used: The
NCDOT will replace the existing structure at Site 1. The NCDOT will also dewater the work
zone during construction. Equipment may include excavator, backhoe, bulldozer, grader, and
crane.
11. Explain the purpose of the proposed work: The existing structure is undersized.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. N/A
V. Future Project Plans
Are any future pen-nit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: The NCDOT will replace the
existing structure at Site 1 with a larger pipe of the same leng1h The NCDOT will also dewater
the work zone during construction
Page 3 of 8
r r
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
cennrntely lict imnnrtc fine to hnth structure and floodinu.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
N/A
Total Wetland Impact (acres) N/A
3. List the total acreage (estimated) of all existing wetlands on the property: N/A
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, darn
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
mnof l,P ;nrliirlnrl Tn rnlrnlnfe nnrenur mnltinly length X width. then divide by 43,560.
Stream Impact
Perennial or Average Impact Area of
Number Stream Name Type of Impact
Intermittent' Stream Width Length Impact
(indicate on ma) .
Before Impact
linear feet
acres
Site 1 Pounder Branch Fill (piped length) Perennial 15 0 0
Rip rap armoring 20 0.007
along stream bank
Temporary 20 0.007
dewatering concurrent concurrent
Total Stream Impact (by length and acreage) 20 0.007
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
f';I1 nv -nt;nn rlrorlcr;nn flnndiner rlrninavr hlllkhends- etc.
Open Water Impact
Site Number Name Waterbody
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay, Area of
Impact
(indicate on ma) applicable) e)
(if ap ocean, etc.) (acres)
N/A
Total Open Water Impact (acres) N/A
6
List the cumulative impact to all Waters of the U.S. resulting from the project.
Stream Impact acres): 0.007
Wetland Impact (acres): NONE
Open Water Impact (acres): NONE
Total Impact to Waters of the U.S. (acres) 0.007
Total Stream Impact (linear feet): 20
Page 4 of 8
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USAGE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Current land use in the vicinity of the pond: N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. All wetlands and surface
waters not affected by construction will be protected from unnecessary encroachment during
construction Strict enforcement of Best Management Practices for the protection of wetlands
and surface waters will be enforced during construction Only the smallest amount of fill
necessary to complete the project will be placed in waters of the United States.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
Page 5 of 8
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/iicwettands/strmgide.htinl.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
All compensatory mitigation requirements will be left to the discretion of the regulatory
review agencies.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
Page 6 of 8
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Site 1
Zone* Impact
(square feet) Multiplier Required
Miti gation
1 1,387 3 (2 for Catawba) N/A
2 0 1.5 N/A
Total 1,387 N/A
* Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. There is 0.04 acre existing impervious surface
with the 0.2 acre project site No additional impervious surface is proposed with this
maintenance pipe replacement' proiect Erosion and sediment control devices at this site are
comprised of temporary silt fence and special stilling basin (silt bag)
Page 7 of 8
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
This project will not generate wastewater.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.etir.state.tic.ushlcwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
41-1
3/3,
Agnicant/Agent's Signature Date
(Agent's ature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8