Loading...
HomeMy WebLinkAbout20061533 Ver 1_Complete File_20061030OF W AT F9 ? r O r/ Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality ? .20 ,SERB ?C11 943 Washington Square Mall APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE RIVER BUFFER AUTHORIZATION with ADDITIONAL CONDITIONS Mr. C.E. Lassiter, Jr., P.E. NCDOT, Division 2 PO Box 1587 Greenville, NC 27835 Dear Mr. Lassiter: You have our approval, in accordance with the attached conditions and those listed below, for the following impacts: Wetlands Buffer Zone 1 Buffer Zone 2 Streams Site Number (excavationlfill) (square ft) (square ft) (linear ft) acres Pitt 9 0 2,250 10,460 0 Net Total for Buffer 0 1 12,710 (0.29 acres) Impacts The project shall be constructed in accordance with your application dated received September 21, 2006 for the purpose of replacing Bridge 9 over Swift Creek on NC 903 in Pitt County. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3494. This certification corresponds to the Nationwide Permit 3 issued by the Corps of Engineers. This approval is also valid for the Neuse River Buffer Rules (15A NCAC 2B .0233). In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit issued by the US Army Corps of Engineers (this supercedes Condition 13 of General Certification 3494 issued on December 31, 2004). This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or total impacts to streams or buffers (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification. 1.) Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. 2.) The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification. N. C. Division of Water Quality FAX (252) 946-9215 October 30, 2006 Pitt County DWQ Project No. 20061533 Washington, N.C. 27889 Telephone (252) 946-6481 One Carojina ?aturaly An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper 3.) Placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by DWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 4.) Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 5.) If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 6.) During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 7.) The dimension, pattern, and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 8.) The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 9.) Heavy equipment may be operated within the stream channels however, its usage shall be minimized. 10.) All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 11.) No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 12.) Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 13.) All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification.. 14.) The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 15.) Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 16.) There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 17.) All stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless otherwise approved by this certification. 18.) All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular DOT maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated, with native woody species before the next growing season following completion of construction. 19.) Strict adherence to the most recent version of NCDOrs Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification. 20.) Bridge deck drains should not discharge directly into the stream. Stormwater should be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. 21.) The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. 22.) A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at (252) 948-3922. SinLW.Jime for Ala, P.E. Attachment cc: Wilmington District Corps of Engineers Mr. William Wescott, US Army Corps of Engineers, Washington Field Office Mr. Jay Johnson, Division 2 Environmental Officer, NCDOT Ms. Sonia Gregory, NCDWQ, Wetlands/401 Unit Central Files File Copy WQC #3494 GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBERS 3 (MAINTENANCE). 4 (FISH AND WILDLIFE HARVESTING DEVICES AND ACTIVITIES). 5 (SCIENTIFIC MEASUREMENT DEVICES). 6 (SURVEY ACTIVITIES). 7 (OUTFALL STRUCTURES). 19 (25 CUBIC YARDS OF FILL). 20 (OIL SPILL CLEANUP). 22 (REMOVAL OF VESSELS). 25 (STRUCTURAL DISCHARGE). 30(MOIST SOIL MANAGEMENT FOR WILDLIFE). 32 (COMPLETED ENFORCEMENT ACTIONS). 36 (BOAT RAMPS IIN NONWETLAND SITESII. REGIONAL PERMIT 197800056 (PIERS. DOCKS AND BOATHOUSES) AND REGIONAL PERMIT 197800125 (BOAT RAMPS) AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES) This General Certification is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 2B.0200 for the discharge of fill material to waters and wetland areas which are waters of the United States as described in 33 CFR 330 Appendix A (B) (3, 4, 5, 6, 7, 19, 20, 22, 25, 30, 32, and 36) of the Corps of Engineers regulations and Regional Permits 197800056 and 19780125 and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 2B .0200. This Certification replaces Water Quality Certification Number 3376 issued on March 18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes any of these Nationwide or Regional Permits or when deemed appropriate by the Director of the Division of Water Quality. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 If conducted in accordance with the conditions hereinafter set forth. Conditions of Certification: These activities do not require written concurrence from the Division of Water Quality as long as they comply with all conditions of this General Certification. If any condition in this Certification cannot be met, application to and written concurrence from DWQ are required. Also, Condition No. 8 is applicable to all streams in basins with riparian area protection rules; 2. If the activity is associated with or in response to a Notice of Violation or an enforcement action initiated by DWQ or the Division of Land Resources, this General Certification requires application to and prior written concurrence from the Division of Water Quality; 3. That appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DLR) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; 4. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored within two months after the Division of Land Resources has released the project; If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; WQC #3494 6. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 7. Access roads constructed for any of these permits shall be constructed so as to minimize wetland fill as much as is practicable and shall be restored to grade immediately after the project is completed. The site shall be re-vegetated with native species which shall be in place within three months following construction or before initiation of the next growing season; 8. In accordance with North Carolina General Statute Section 143-215.3D(e), any request for written concurrence for a 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees; Impacts to any stream length in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other river basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) requires written concurrence from DWQ in accordance with 15A NCAC 213.0200. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar-Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices; 10. Placement of culverts and other structures in waters, streams and wetlands must be placed below the elevation of the streambed to allow low flow passage of water and aquatic life unless it can be shown to DWQ that providing passage would be impractical. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. Additionally, when roadways, causeways or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. If more than 150 linear feet of additional stream is filled, culverted, rip-rapped, relocated, excavated or dredged as a result of this permit, then an application to DWQ is needed and compensatory mitigation may be required; 11. Additional site-specific conditions may be added to projects for which written concurrence is required or requested under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 12. Applications for riprap groins proposed in accordance with 15A NCAC 07H .1401 (NC Division of Coastal Management General Permit for construction of Wooden and Riprap Groins in Estuarine and Public Trust Waters) must meet all the specific conditions for design and construction specified in 15A NCAC 07H .1405. 13. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or on the same day as the expiration date of these corresponding Nationwide and Regional General Permits, whichever is sooner; WQC #3494 14. Projects with any impacts to streams, wetlands, and/or waters that have received a Notice of Violation from the Division of Land Resources and/or the Division of Water Quality are required to submit a complete application and receive written concurrence to use this Certification regardless of the proposed impact amount to streams, wetlands, and waters. 15. When written concurrence is required, the applicant is required to use the most recent version of the Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed; 16. Standard Erosion and Sediment Control Practices: Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 17. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 18. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this Certification for the project and may result in criminal and/or civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or WQC #3494 federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: 31 December 2004 DIVISION OF WATER QUALITY By Alan W. Klimek, P.E. Director WQC # 3494 4 Bridge: Pitt Number 9 ;r. All Planning documents have been completed including the Programmatic Categorical Exclusion Form L Regulatory Authorization Options for this Activity 15 33 Federal: Section 404(F)(1)(b) Exempt Activities-Maintenance of Transportation Structures. State: Activities Deemed to Comply with Water Quality Standards. Local: None Or Federal: USACE Nationwide General Permit 3 - Maintenance "s` y" t .'E?,`.• State: General Water Quality Certification #3494 Local: None C?)U6 Project Description r .: Replace existing 51' long by 24' (clear roadway) wide concrete deck bridge with timber piles with a 21" concrete cored slab bridge that is proposed to be 102' long by 42' (clear roadway) wide and supported by reinforced concrete on steel piles. Age of the bridge and safety inspection reports dictate the need for replacement of this bridge. There will be no impacts to jurisdictional waters and wetlands during bridge construction and guardrail installation. The longer bridge will result in approximately 3,055 square feet of excavated roadway fill beneath the new structure. This project does involve Section 10 (Rivers and Harbors Act) navigable waters. Notification to the Corps is being provided to be included in their database. This conveyance is shown on the Greenville,SW USGS Quad Map and Sheet Number 56A of the Soil Survey of Pitt County. The channel is 25 feet wide from bank top to bank top and drains a woodland/agricultural area. No federally protected species or historic resources are immediately adjacent to this location. In order to ensure compliance with best management practices, all attached General and Regional Conditions associated with Nationwide Permit 3 and Water Quality Certification 93494 must be followed. Keep demolition and construction debris out of the stream. Riprap will not be placed below the plane of ordinary high water for stabilization. Excavation should be confined to the right of way, and limited to the minimum amount required to excavate in high ground for the construction of the new bridge. All excavated material should be . All excavated material should be removed from the site, placed on existing spoil piles, or disposed of in farm fields. Any waste material disposed of off- site shall have a reclamation plan. All Erosion and Sedimentation measures and Maintenance Best Management Practices should be implemented. I am forwarding a copy to Mr. Andy Blankenship in Roadside Environmental for his perusal in E&S inspections. The project supervisor should always have this permit package, including the attached General and Regional Conditions associated with the Nationwide Permit 3 and Water Quality Certification #3494 on site during the bridge replacement. The project supervisor should notify me immediately if any questions or concerns should arise before and during construction. Jay B. Johnson Division 2 Environmental Officer (252)830-3490 w w x ti ti V) Ul (Z W W < z Lai w z >:: o W u 4, ° o? o z o °Z3 I I I W ? U U a ? W w°?' >v C zz I i w o ?j W I J Q V7 V W O czjz ~° I "' Z Q N p 0 O ?V C; 3;: LLJ Ln Li U? w ? ?? 0 I I I I Ln ° I I ~ o T` 1? I Z Z Q N m V) Z v J W 1 I w 2 J Q N M t I II C-0 cc: ZZ rn ci V) Z z W ?CL VtnUj w N o N N I I Z ELI O = m Cn w ui w rNi O wLn a P C"i I I o?N ?ci W w r?i a i I j 7 Q ?m J??U? w I ( 1 C?QO Z_-? Cl- LL, v ? dZ C W.1% +?G ON . 3 E I ? uWW ? ?cQo ? vP p C« oQ? N \3 ? m IL m? a C\i O W L - L-- -- -- -- -- -- I - ,°. _F?__ +I. ? ?\;,?;.,?i.?. - . W O I.Li Co '? I I r?a z Q) V W I I j O I t? Z-, Lu ?--jQ' I I? I W ? CL- mGz? w f? JOWrn i ? ?? m I ?? Q N a.. W?? ? I iIW zz?? ?? OZr? W .u i W t i ?Z?0- W U- (3 Z3 w p W m z I. W I ? ' OWrn ? o ? jlu? ° W x i i ¢ 4 p I ? oQ- x ? I LAJ +\ -x_j I I +i WETLAND LEGEND -WLB WETLAND BOUNDARY PROPOSED BRIDGE WETLAND L PROPOSED BOX CULVERT PROPOSED PIPE CULVERT BUFFER ZONE 1 AREA 12'-48' (DASHED LINES DENOTE PIPES EXISTNG STRUCTURES) 54' PIPES BUFFER ZONE Z AREA -BZ I- BUFFER ZONE I BOUNDARY -BZ 2- BUFFER ZONE 2 BOUNDARY > FLOW DIRECTION TB 1- TOP OF BANK WE EDGE OF WATER ---- --- PROP. LIMIT OF CUT -----F --- PROP. LIMIT OF FILL PROP. RIGHT OF WAY --- NG---- NATURAL GROUND --- P?-- PROPERTY LINE -TDE- TEMP. DRAINAGE EASEMENT -PDE- PERMANENT DRAINAGE EASEMENT --EAB--• EXIST. ENDANGERED ANIMAL BOUNDARY --EPB-- EXIST. ENDANGERED PLANT BOUNDARY -?--- WATER SURFACE x x x x x LIVE STAKES x x x O BOULDER --- COIR FIBER ROLLS BANK EXCAVATION & ABOVE SINGLE TREE WOODS LINE L7 DRAINAGE INLET ROOTWAD MD. RIP RAP 5 ADJACENT PROPERTY OWNER OR PARCEL NUMBER IF AVAILABLE PREFORMED SCOUR HOLE LEVEL SPREADER (LS) DITCH / GRASS SWALE NCD®T DIVISION OF HIGHWAYS PITT COUNTY PROJECT: 33575.1.1 (I1--4232) WINTERVILLE NC 903 SHEET 4 OF 6 08/06/06 o `a I ? l I I 0 0 n V 0 Cl ? o \ .o o I I I I ? ?+ .. M \ ? o ' I Ln ? ? x ? p U z 1 I w X U ? a M _ . F M W z O z Z ? U F w V) w O ?7 ?? M D I J J ^ O C. ? m LL W w O Q w N I I En co O O I I t, Z F- LA cr C - _ X ? w I - L 11 I f? I I I I I I i i J :a ? } I i I r ? a ' F O .a U ? o Q i I I o x p w 0 0 (w C D 1 - O _Z ? O I- I I L a X w ? I I I I I O O I I 1 I I n Vicinity Map Swift Creek Bridge @ NC 903 Ft.. dv Swp? .Cam m ?0 ?6eRi-? ? - r. 1128) • • ? .. ? ? .. ? 4 5 Bridge Site,'. l? w ;rao .0 IOU I ? / t ,]Ov 1131 S ras? ?... . J !t tiJ ! O o ? p B r '"? ! Ctva if tJ• yr 1712 J 11JB J ? 111111 - - ?u 171, I --- aO?? t??+ya C?e?n { ?V Prepared By: Arcadis G & M, Inc. Scale: 1:24,000 Pitt County, NC Date: 7/2006 NRCS Soil Surve Map Swift Creek /Bridge NC 903 Vy 1 - f Ulkifj; f% OA, r CO NfB ; . ?f GoA k ^ Co G ' c - . O i o jll / j?N 1 r J xA NfB2 t? O e bow v a t Bridge Site q '. '., rBl "' ao h. - ? I C i . a 4YD ? ' i ,? ., , Pit ;?, '?F' .-1 k r N Fia"a? ` i •- t ' ?., r,^ ? ,a\ p WO 1 \. ? .- ? " B' a6?:h, ,. . , f??F ??ay ? M?i' ? I ? U? a ? . * ? A, i ... .?: Ex 1 , = J ! - YV H t , A r B 1 '^ 1 , N B A r O t 4 , ? Y, ` I ''x n ` L aq h L fir i Prepared By: Arcadis G & M, Inc. Sca le: 1:24,000 Pitt County, NC Date: 7/200¢ Office Use Only: Form Version Mardi 05 USACE Action ID No. DWQ No. 2 0 0 6 1 5 3 3 (it any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P.O. Box 1587 Greenville, NC 27835 Telephone Number: _252-830-3490 Fax Number: 252-830-3341 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jav B. Johnson Company Affiliation: Division 2 Environmental Officer Mailing Address: P.O. Box 1587 Greenville, NC 27835 Telephone Number: 252-830-3490 Fax Number: 252-830-3341 E-mail Address: jbiohnsonadot.state.nc.us Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pitt 9 Bridle Replacement Pitt County 2. T.I.P. Project Number or State Project Number (NCDOT Only): WBS Element 33575 3. Property Identification Number (Tax PIN): N/A 4. Location County: Pitt Nearest Town: Winterville Subdivision name (include phase/lot number): Directions to site (include road numbers/names, landmarks, etc.): From the junction of NC 11 and NC 903 in Winterville.NC: Follow NC 903 West for 1.2 miles to Pitt Number 9 over Swift Creek. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.5264 °N 77.4260 °W 6. Property size (acres): N/A 7. Name of nearest receiving body of water: Swift Creek 8. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:/ih2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Existing paved Primary Road and Bridge in a rural agricultural/forested area. Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: Bridge replacement with typical bride and road construction equipment 11. Explain the purpose of the proposed work: Bride replacement IV. Prior Project History If jurisdictional determinations and/or pen-nits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. None V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No additional permit requests are anticipated in the near future. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 13 1. Provide a written description of the proposed impacts: Fill will he placed for roadway and shoulder construction. There will be no 404 Wetland Impacts. The fill slope will be vegetated as soon as possible to provide slope stabilization. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. No 404 Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream linear feet) Area of Impact (acres) Total Wetland Impact (acres) None 3. List the total acreage (estimated) of all existing wetlands on the property: N/A 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. 5. None Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent'. Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) Total Stream Impact (by length and acreage) 6. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. None Page 8 of 13 Open Water Impact Site Number (indicate on ma) Name Waterbody (if applicable) e) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) Total Open Water Impact acres 7. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 0 Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 9. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. No Impacts of 404 Wetlands VIII. Mitigation Page 9 of 13 DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at httT)://h2o.enr.state.nc.us/ncwctlands/stnni,,ide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. None 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wm/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Page 10 of 13 Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Neuse )? Yes © No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. I I Zone* Impact I Multiplier I Required (sauare feet) Mitieation I 1 12,250 Square Feet 13 (2 for Catawba) I I 2 ( 10,460 Square Feet I 1.5 I I Total 112,710 Square Feet I I I * Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. Page 11 of 13 This is a Bridle Replacement Project. All buffer impacts are under the 40 linear foot threshhold. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The ditches will dissipate water flow into the adiacent wetlands and not directiv into Swift Creek. Stormwater will sheet flow over the vegetated roadwav shoulder into the wetlands in those areas where no uplands exist to construct road side ditches. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. None XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: Pa-e 12 of 13 XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ( ? ?L Q'I lf?? 9' A-k co ApV111 t/ be Signature ate (Agent's si ue ' v 'd only if an authorization letter from the applicant is provided.) Page 13 of 13