STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
June 1, 2006
U.S. Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, N.C. 27889-1000
Attention: Bill Biddlecome
D @*VV
w
ANN O
S 20,6
nAN?s ? S ?R006
?ygTFRB?N
LYNDO TIPPETT
SECRETARY
Subject: NW 33 request for temporary work pad associated with bridge replacement # 29 on SR 1201 in
Northampton County.
The North Carolina Department of Transportation is requesting a NW 33 permit for a temporary
work pad that will be used in the pile installation on bridge replacement # 29. The pile installation method
determined, to be used is drilled shaft technique. This is due to the rock structure in the streambed. This
technique requires the drilling machine to be directly adjacent to the pile installation location. For this
reason a temporary work pad will need to be installed in the streambed. The work pad will be constructed
of 3-4 feet of "Class II" rip-rap laid on the stream bed with 4-6 inches of class B stone placed on top. The
pad will be located in the stream according to the provided drawings. Once the pile installation is complete
the work pad will be removed in its entirety. The bridge replacement was authorized under Action Id.
2004 1 1 286. The PCN, vicinity maps, and permit drawings are included with this letter. If you need any
additional information or have any questions concerning this project please call me at 252-482-7977.
Sincerely,
Anthony Roper
Division One Engineer
Clay Willis / ?al_
Division One EnviYonmental Officer
Cc: Garcy Ward, DWQ
Sonja Gregory, DWQ
Travis Wilson, WRC
Scott Emory, NCDOT
Sterling Baker, NCDOT
Bridge #58; Northampton County
N
0 0.3 0.6 1.2 1.8 2.4 w E ?'
Miles
Office Use Only: Fonn Versipn May 2002
USACE Action ID No. DWQ No. ,_o060889
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW 33
3. If this notification is solely a courtesy copy because written approval -for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: Clay Willis, NC DOT Division 1 Environmental Officer
Mailing Address: 113 Airport Drive
Suite 100
Edenton NC 27932
Telephone Number: (252) 482-7977 Fax Number: (252) 482-8722
E-mail Address: tcwillis(a)dot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing; Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 13
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1201 Bridge Replacement; Northampton County
2. T.I.P. Project Number or State Project Number (NCDOT Only): #13-4213 (Bridge ` # 29)
3. Property Identification Number (Tax PIN
4. Location
County: Northampton Nearest Town: Gaston
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): From Gaston take NC 42-N
approximately 2 miles. Make a left on SR 1201. Bridge will be approximately 0.8 miles
ahead.
5. Site coordinates, if available (UTM or Lat/Long): 36.52222 N, 77.626389 W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
0.5 acres
7. Nearest body of water (stream/river/sound/ocean/lake): Beaverpond Creek
8. River Basin: Chowan River
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at littp://li2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: woodlands, residential
Page 6 of 13
10. Describe the overall project in detail, including the type of equipment to be used: Replace
the existing bridge on its current alignment at approximately the same location and roadway
elevation. Install a temporary work pad in the stream to allow for drilled shaft Pile
installation technique. Equipment used will include an excavator, crane, backhoe, and dump
11. Explain the purpose of the proposed work: To replace an obsolete and structurally deficient
bridge. The temporary work pad will allow necessary equipment to be staged adjacent to pile
installation point and enable proper and safe installation.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Bridge replacement authorization is under Action ID. 200411286
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 7 of 13
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Provide a written description of the proposed impacts: No wetlands will be impacted,
and the existing bridge will be removed using DOT BMP's such that no existing bridge
material will be filled into waters of the United States. Bridge pilings will be driven into the
stream using a drilled shaft technique. This technique requires the drill rig to be staged
adjacent to the pile installation point. In order for the drill rig to achieve this a temporary
work pad must be constructed in the streambed. This will be done by an excavator placing
"Class II" rip-rap in the stream bed as depicted in the provided drawings. This work pad will
be entirely removed once the bridge piles are installed. Disturbance to the streambed will be
kept at a minimum. The stream will retain water flow through an 8 ft. section that will be left
undisturbed and the "Class 11" rip-rap bed will allow water to flow through the bed.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
I00-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainagc, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http:riwww.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (detcnnination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: 0.05 acres
Total area of wetland impact proposed: 0 acres
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please secif )
Site 1 temporary 30 Beaver Creek 36' Perennial
Page 8 of 13
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.cov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
Nt.cw.mayotica.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: N/A
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
(acres) Name Water
body Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., darn/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The size of the temnorarv work nad has been desianed to minimize disturbance to the stream
bed, while still allowing for safe pile installation. This work pad will be removed in it's entirety,
Page 9 of 13
so all impacts will be temporary. The stream bed is currently comprised of solid rock and
shallow sand layers. Therefore, it is unlikely that the weight of the work pad would result in any
stream bed change or cause stream instability. An off-site detour is being utilized to reduce
stream impacts from and on-site detour structure.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Pennits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
htt1)://h2o.enr.state.nc.us/iicwetlands/stringi(le.htin1.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
Page 10 of 13
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.cnr.state.nc.us/wrp/index.litm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Page 11 of 13
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Miti ation
1 3
2 1.5
Total
* Zone I extends out 30 tcct perpendicular trom near oanK or enanney c.unc I cxicuus mi
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213 .0242 or.0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious acreage will remain the same
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
Page 12 of 13
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/A ent's Sig ature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 13 of 13
CLASS IT RIP RAP
TO EL.490.000 (TYP.)
101'-}• CLASS II RIP RAP
TO EL. 490.000 iTYP.)
S7 A.9+88.37
15'-0'
36' I' I
I 1
35' 1' 36'-1'
15'-0'
W.P. 11 Q END BENT •I
STA. 10+
FILL FACE CL CL ( \ CL CL WP.4 QEN
ENO BENT •2
WOODS I 1 FILL FACE
GUARDRAIL I
T
0 81'-6' TA. 10+24.4 STA. 10+9.54 PC STA. II+10.00
iURVEY
R.ANCHOR
E T- P.'2 BENT ?l I
t W.P•'3 EEN T
•2'2
(TYP.l
ITTP.I --- _
=-- ?
??- --
- -- Grtl -- -------
--
-- - - STA.9+77.37 ----- - -
I
( . 1
1
+00
--------
y 9+ 00 BEGIN APPROACH SLAB_ 10+00
-
-
I 11,
1 - - _?-
S 20'00'00'E SHOULDER BERN GUTTER a I ?
90•
er
I i STA.11+06.62
END APPROACH SLAB
-- (SEE STO. NO.
---
-------- -
--ter f?
_`-
L
-
?
- --
r
au"I -- -------
--------
( T
12'0 Fl1rr,NEl \` BRIDGE
? -- --
BEGIN TAPER TOE OF SLOPE BRAIN PIPE I f` STA. 10+42.00
1
ST A. 9+00.00
CL CL C
.INE FUNNEL DRAIN
Q STA.9+47(1)
I EXISTING (TYP.I (SEE STD. NO.
820.01 6 820.041
LAWN (TYP.)
ca
W
Z
- J
SR 1201 Z
V
GUARDRAIL
4- L= 190'-0'
EXISTING DITCH LINE
7IPTION OF EXISTING BRIDLE
BER FLOOR WITH 6'ASPHALT WEARING SURFACE
%MS ON TIMBER BENTS AND TIMBER AND STEEL
:LEAR ROADWAY WIDTH SHALL BE REMOVED.
EMENT
?-&. STA. 10+42.00
GR. EL. 491430
STA. 9+88.37
W.P.•1 Q END BENT 11
FILL FACE STA. 10+24.46 STA. 10+51.54
GRADE POINT EL. 492.626 WP, •2 BENT el 1 WP. •3 BENT 11
UNCLASSIFIED
STRUCTURE
I EXCAVATION
42'0 COLUMN 42'0 COLUMN (TYP.I
F X EXP FIX +1.500% EXP EXP T
---------------------------- -- --- - ---- - - -
STA.9+77.31 c 1 ----- --iT- - -
BEGIN APPROACH SLAB 9 iL ! _W1?
HP STEEL P 12 x 53 PILES 42.0 42' 0
EST.L:15'1 (LT.) DRILLED Y DRILLED
EST.L:20'1 (RT.) PIER PIER
MIN. TIP
El. 478.00
HP 12 x 53
STEEL PILES
EST. L:15'1
MIN. TIP
El. 478.00
2'-0'CLAV$ II RIP RAP
(SLOPE 1 /2:U(TYP,)
8+50
1 Y 3001
LY 3001
.e • .a.o?w..s.
9+00 9+50 10+00 10+50 11+00
PROFILE ALONG SAY
e,vt?eriape+a.,r ?e-.n? ro..nww on
L \ 1 CLASS II CL CL
301-0' / RIP RAP ` RCLA IPS5 RA11 301-0'
CLASS 8
RIP RAP
PLAN
SCALE: 1- 20'-0'
CL L: 87'-1
CUT OVER
- GR.ANCHOR
UNIT, TYPE III
(TYP.I
(AT 8
11-01+ SHOULDER 3
MIN. I I1'•0'IAPER TI
/t•PER iY, IT YP.I
? VARIES-
TYPICAL
WITTI
TS ATION
HORIZONTAL CURVE DATA
PI STA. 12+05.20
Z? = 9.03'56(RT.)
0 = 4.46'17.0'
L = 190.00'
T = 95.20'
R = 1200.82'
W.P,•4 Q ENO BENT 12
FILL FACE
GRADE POINT EL.494.234
11+50
8+25
9+25
11+25
12+50
0 SUPEREL
P EELIMIP
DO NOT UK
u?
J
u,
O
c.=
iy
3
ul
Vy
ti
?J
V
O
y
A
.a.-
`LLI
1
I
T
f?
7
O
,J
O u!t
V
a IJ
d
t-
L-C
LL t
c _0 a1
"y i
w
r+
I
I
r
,p
U
vi
.j
J
i
?\1l1
L?
3 ?
L
N
0
4
F; ? `il 1nl
t l ?^Z
M ti
?r r; t' M
CB
T
l s
a
2 ,
z ? ? s
y ? O
> 00 t 1
ui
d J