October 25, 2006
Lee County
DWQ Project No. 20061572
SR 1504
APPROVAL of 401 Water Quality Certification
Mr. Timothy Johnson, P.E., Division Engineer
North Carolina Department of Transportation, Division 8
PO Box 1067
Aberdeen, North Carolina, 28315
Dear Mr. Johnson:
You have our approval, in accordance with the conditions listed below, for the following impacts for the
purpose of improving SR 1504 in Lee County:
c*raam Tmnae*c in the Yadkin-Pee Dee River Basin
Site Stream Name vvStream Stream Impact Type Impacts
Type Classification/ (Linear Feet)
Index No.
1 UT to Hughes Permanent Class WS-IV/18- Permanent 20
Creek 4-1
Temporary 20
2 UT to Hughes Permanent Class WS-IV/18- Permanent 20
Creek 4-1
Temporary 20
Total 80
The project shall be constructed in accordance with your application dated received September 29, 2006.
After reviewing your application, we have decided that these impacts are covered by General Water
Quality Certification Number 3404. This certification corresponds to the Nationwide Permit 14 issued by
the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before
you proceed with your project including (but not limited to) Sediment and Erosion Control; Non-
Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying
404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified
below). Should your project change, you must notify the DWQ and submit a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter, and is
thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this
approval to remain valid, you must adhere to the conditions listed in the attached certification.
N Carolina
oe
Transportation Permitting Unit Naturally
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http•//h2o.enr.state.nc.us/newetlands
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Mr. Johnson
October 25, 2006
Conditions of Certification:
Placement of culverts and other structures in waters, streams, and wetlands shall be placed below
the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result
in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream
of the above structures. The applicant is required to provide evidence that the equilibrium is being
maintained if requested in writing by DWQ. If this condition is unable to be met due to bedrock
or other limiting features encountered during construction, please contact the NC DWQ for
guidance on how to proceed and to determine whether or not a permit modification will be
required.
2. If concrete is used during construction, a dry work area should be maintained to prevent direct
contact between curing concrete and stream water. Water that inadvertently contacts uncured
concrete should not be discharged to surface waters due to the potential for elevated pH and
possible aquatic life and fish kills.
3. During the construction of the project, no staging of equipment of any kind is permitted in waters
of the U.S., or protected riparian buffers.
4. The dimension, pattern and profile of the stream above and below the crossing should not be
modified. Disturbed floodplains and streams should be restored to natural geomorphic
conditions.
5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed
for stream stabilization shall be placed in stream channels in such a manner that it does not
impede aquatic life passage.
6. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities
manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to
prevent excavation in flowing water.
7. Heavy equipment shall be operated from the banks rather than- in the stream channel in order to
minimize sedimentation and reduce the introduction of other pollutants into the stream.
8. Heavy equipment may be operated within the stream channels however, its usage shall be
minimized.
9. All mechanized equipment operated near surface waters must be regularly inspected and
maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or
other toxic materials.
10. No rock, sand or other materials shall be dredged from the stream channel except where
authorized by this certification.
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or
adjacent to surface waters is prohibited.
Mr. Johnson
October 25, 2006
12. The permittee and its authorized agents shall conduct its activities in a manner consistent with
State water quality standards (including any requirements resulting from compliance with
§303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal
law. If DWQ determines that such standards or laws are not being met (including the failure to
sustain a designated or achieved use) or that State or federal law is being violated, or that further
conditions are necessary to assure compliance, DWQ may reevaluate and modify this
certification.
13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless
otherwise authorized by this certification..
14. A copy of this Water Quality Certification shall be posted on the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if any, shall be
maintained with the Division Engineer and the on-site project manager.
15. The outside buffer, wetland or water boundary located within the construction corridor approved
by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing
activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this
certification.
16. Upon completion of the project, the NCDOT Division Engineer shall complete and return the
enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401
Certification has been completed.
17. Native riparian vegetation (ex. list trees and shrubs native to your geographic region) must be
reestablished within the construction limits of the project by the end of the growing season
following completion of construction.
18. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or
waters associated with this permit without appropriate modification. Should waste or
borrow sites be located in wetlands or streams, compensatory mitigation will be
required since that is a direct impact from road construction activities. Erosion and
sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
Mr. Johnson
October 25, 2006
d. The 'reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
19. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise
approved by this Certification. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, they shall be removed and the natural grade restored upon completion
of the project.
20. Upon completion of the project, the NCDOT Division Engineer shall complete and return the
enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401
Certification has been completed.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699. This certification and its
conditions are final and binding unless you ask for a hearing. This letter completes the review of the
Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please
Brian Wrenn at 919-733-5715.
Sincerely,
Alan W. Klimek, P.E.
Attachment
cc: Richard Spencer, Amy Corps of Engineers Wilmington Regulatory Field Office
Ken Averitte, DWQ Fayetteville Regional Office
Travis Wilson, NC WRC
Gary Jordan, US FWS
Chris Militscher, US EPA
File Copy
?01"
? da'`'?TE'o- ?OV
.?, .? Sep
J O
•?a...? ???SlORMwq??ry06
STATE OF NORTH CAROLINA ?Re
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETP
GOVERNOR SECRETARY
September 27, 2006
Rob Ridings
NCDWQ
401 Wetlands Unit r
1650 Mail Service Center 061 ? 72
Raleigh, NC 27699-1650
Subject: Nationwide Permit #14
SR-1504 Lee County
Project # 8C.053014 (DWQ Permit Fee $200)
Mr. Ridings:
>- The North Carolina Department of Transportation, Highway Division 8 is requesting a 401 Water Quality
Certification in association with Nationwide Permit Number 14, for project # 8C.053014 on SR 1504 (Cletus Hall
Rd.) in Lee County. The proposed project will replace two existing crossing pipes as follows:
Site 1- Replace existing 1 lines of 36" x 40' RCP with 1 line of 36"x 60' CMP.
Site 2- Replace existing 2 lines of 36" x 40' RCP with 1 line of 36"x 60' CMP.
The project includes 20'of class B rip-rap installed at each site for armoring and bank stabilization.
These pipes are being replaced in preparation for a scheduled paving project.
The total percentage of impervious surface within the project area will remain at less than 30%.
All erosion control devices will be appropriate to the location and in compliance with the current version of the
NCDOT Best Management Practices Manual.
The project is outside of the Critical Habitat area for the Cape Fear Shiner. There were no other threatened or
endangered species observed within the project area during the required minimum criteria check. There are no
Wetland impacts associated with this project. The project is located on an unnamed tributary of Hughes Creek, a
class WS-IV stream within the Cape Fear River basin.
If dewatering is required at this site, it will be done with the use of movable devices such as sheet metal piles or
concrete barriers. All construction will be done under dry conditions whenever possible. Any detours for this
project will be done off site, using local state roads.
If you require any additional information, please contact me.
S' er 1 ,
rt C. King
Division Environ I Officer
Highway Division 8
cc: Tim Johnson, PE
Johnny Ransdell
Barry Harrington
P.O. BOX 1067, ABERDEEN NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 9445623
v
co
?.N Q
i
-;
? w
H
`+
p
v.. x.
"t
,fit
,dy
lt,V
iay t
?.' d =; i X31 if
s. f1 + r:
74
Ok,
t J
L
a?
U)
C
c4
a)
CL
7
LU
H
co
y w ms aao ue ms m? a woo-ewjojep-nvr.:v.
L u veumo lueluoo yo 14BpAdoo oleo '® spenpodol p-E -ewjoleO ZOOZ Q
OOOt OOO 009 006 ooL 0
ru
008,z -I--s
\\ --'...._z.--rte - :'.I .--.?° ?? ? V •?j ? _ ? ?f-?....,_... ? - ? ',? ??'`;
501
I /? r
Ilk
1 f
1l ._
i J
__-
l
1? ?
fJ ',
,o
- i - ? ..- tip. _ ? ! . s ? / ? I?! •..r 1
j
?,?,iy w ms -ooe me ma m? o - wow v to Z GZ 0
uw a auMO lueluoo;o lyBuddoo osop '® spQr,podot O-£ euuolep ppy
mop ooe ms mo me a
1401-01, =.3 11
NL 008 ZL I. GIRDS.
l
?4 elf i,`// / /yam" ? 1 f f ! ,j • ? Jj}a( I (= ,r,f ?! L? ? l't?`,. '+."?r -?-
-----------------
I tt
= `-
16
•
?,?...,`? rte.
k
a •% _
•J
t f/
i
Z#
At I
Office Use Only: Form Version March 05
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ? Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: Timothy Johnson, P.E.. Division Engineer
North Carolina Department of Transportation, Division 8
P.O. Box 1067
Aberdeen. NC 28315
Telephone Number: 910-944-2344 Fax Number: 910-944-5623
E-mail Address: Tjohnson(.dot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Johnny Ransdell
Company Affiliation: NC Department of Transportation
Mailing Address: 1502 South Seventh Street
Sanford NC
Telephone Number: 919-775-3122 Fax Number: 919-774-3884
E-mail Address: jransdellndot.state.nc.us
Updated 11/1/2005
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1504 (Cleatus Hall Road) Secondary Road Construction
2. T.I.P. Project Number or State Project Number (NCDOT Only): 8C.053014
3. Property Identification Number (Tax PIN):
4. Location
County: Lee Nearest Town: Sanford
Subdivision name (include phase/lot number): NA
Directions to site (include road numbers/names, landmarks, etc.):
From US 1, exit at Deep River Road (SR 1466), north 0.3 miles to Lower Moncure Road (SR
1002). south 3.4 miles to SR 1504. Follow SR 1504 to end of pavement. Project begins at
end of pavement.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): Site #1: N35134.007' / W790 3.856'
Site# 2: N35° 33.896' / W7914.089'
6. Property size (acres): NA
7. Name of nearest receiving body of water: Cape Fear River
8. River Basin: Cape Fear River
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http;/,!h2o.enr.state._nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Existing 36" pipe at both locations. Existing land use is
rural residential and agricultural (livestock and field crops).
Updated 11/1/2005
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
Secondary road construction to improve existing unpaved road to paved road. Track hoe
Grader, dozer and earth moving equipment to be used in overall project
11. Explain the purpose of the proposed work: Replace existing_crossline pipes prior to
construction and paving of existing unpaved secondary road
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Roadway pipe crossings
Updated i I /1 /2005
Page 7 of 12
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
None
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property:
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Number
indicate on ma
Stream Name
Type of Impact
Perennial t?
Intermittent. Average
Stream Width
Before Impact Impact
Length
linear feet Area of
Impact
acres
1 UT of Hughes Crk. Perm pipe P 2-3' 20
2 Perm pipe I 2-3' 20
Total Stream Impact (by length and acreage) 40
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
None
Total Open Water Impact (acres)
Updated i 1 /1 /2005
Page 8 of 12
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Im act (acres):
Wetland Impact (acres):
Open Water Impact (acres):
Total Impact to Waters of the U.S. (acres)
Total Stream Impact (linear feet): 40
7. Isolated Waters
Do any isolated waters exist on the property? ? Yes ® No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area: NA
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. NA
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Updated 11/1/2005
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http-//'h2o. eiir. state. nc. u s/ ncwetlands/strm?aide. html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
NA
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at htte://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet): 0
Amount of buffer mitigation requested (square feet): 0
Amount of Riparian wetland mitigation requested (acres): 0
Amount of Non-riparian wetland mitigation requested (acres): 0
Amount of Coastal wetland mitigation requested (acres): 0
Updated 11/1/2005
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ? No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
* Impact Required
Zone i-,, - r -+N Multiplier
3 (2 for Catawba)
1.5
Total I I I I
* Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or.0244, or.0260. N/A
Updated 11/12005
Page 11 of 12
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. Neither the current impervious cover (gravel or
paved road bed) nor the new rrol used impervious cover (asphalt pavement) will exceed 30% of
the total site area. Erosion control devices will be appropriate to the site and in compliance with
NCDOT BMP's. Devices on site may include silt fences check dams and storm water retaining
basins.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http_//h2o.enr.state.nc.us/ncwetlallds. If no, please provide a short narrative description:
There is no anticipated development along this isolated rural route
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/a
?/0
Applicant/Agent's Signature Dat4
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Updated 11/1/2005
Page 12 of 12
4
tz.
??? '? 7 ?' ) 'jam, ?/---?/ ---• - -• -- ' ',`, ? -/' / ii/y?? ? - ? - (?.
?, ?, ,,o \ "/ - _ ?-- ? = --- _`-"? Ate' ? ? •n -. (r ??- .? ,
•? ?•;, ? _-? %: -._ - Ems. ?, ? u,%??? 'r '• '
pzD
?,? ? `? ,1, _ _? ':. it I v'- '•. / ? ??°cr
ce,
I
4-1
/
.`,\ / ,I / rr .\ ,I .NIA ? ? %j •?/? ? 1 ? / -? / it I ?? \ \? ° _ t
a
U
O
IL CO
R
O
wm
a
c
I
z
Uw
t
?O O +? I I
? I
? I
m
N
<<
I
I U I I
I
O Opp0o0oo5O0 o0 0o0
p?0oo
° p 4000
0000( 0 Os"O°°Oo06'.U'O
00000&' o°°°°o°oooPoo°
p 000
0o p o'00
Op °
O r?i ? OO
°O 1 p0 100 00 00 b00 \
o°O0? 0 v 00 1 po I
(o00° ) o0 000 ?°^?0op 0
000 00°000000 a0° o
°8 o0 0 o°°?o m
00 o00 oo o
000 •
I a
I
I I I N
I
n ?
<
O W
X
0 0
? c
a
w °
z °
M L
J m
c
a
l l?
/
Z
o
m
,
Q
W
?9L
I
J
w
/
/
0 O O fF0
O°o8 °00000
?o?CO°oeoovO OO /
/
O
------ ti
? c
ooo0
-°"
ooo Poo p00
?00 o°o o° °
o
O
O
0
P
t /
/
r
o d' a
? ? r
z?
w
to
(t ,
v ,
c?
N
Cj
J it
? it a it
0
:t
?' R ' 2,86979'
C
O I
~ I
f
r
OOOOOC
00000 O
0000000
00000004
00? O O?_
0
0
w
J
Q
U
U
O
F
O
z
28t/g?9
z
J
CL
0000 -??
o000M.0-81.
0000> ".- n000aI
f°
o?
N"
TALL
HALL
140
eon
.x
C i /
0
o ?z W
U x = !
o ?
Ld oa x
m
o
a d
M
? W. W m
vv) m J n
?[L T / P%Sf?
U
1 ?
I
a i W / U
o L
0 u / O
'A
O
oo b° °oo O
O
Q r GOB ?_ o GG
cc o
\...? 0
`b . O o o
J
°o°-p"°CO O n_ OG a00 p000000
°°Sooo ooo oOGO °00
O
O
0, 0,
v-? o0 00
00 000 0
° PQc? / O oc°Ooo00
c6 0 0' P 00
°oaSO°' OOO Q? bo obi
0°000080 ,060° ! '?
0 00 0 0
oc°0 ° o ¢0 O / t0 M?
op° CO a °° z3
00° v O W
D O v
00 `O ?
100 O Q
•OOp O ° ??0 Ic0 C? IO?V(j?? f?
IC,OC 00 V °00 O 0 ic0 Xcn?j [COO. 7'
o 0 °00 0?0 c0 r Povin??o
° ° 00 0 ° °
poo00 0 ,co ! GjI/
00 rr
i I W ? / ?44vh?
? r
? ?' ?? I R = 2.86919'
a
a } I I
I O
m r I
N
I
i
I
vcasx
0
O
W
J
U
co
p
t-
H
0
Z
s??'`2B?S
Z
L
CL
io
"
I -95.88'
A9 -,
,Ok ./
o1 Sao, \ ?q ry/," PC
36" RCP
n `RCP
INV=95.82'
?o
' o
10
'- O
' Oe
00
?l?
fi
:T REFERENCE W. SKET M
TEMPORARY DIVERSION DESIGN
CONCRETE 3ARRIER OR
! STEEL SHEET PILING
I
I
I
!
I
l
SL BAG
I i
! i
! I
I !
I I
I 1
MOTES:
L) INSTALL TEMPORARY BERMS, DIVERT STREAM
FLOW BY PUMPING WATER AROUND
WORK AREA.
Z.) PUMP CONTALKED AREA TO STET BAG
A.N'D REMOVE EXISTING PIPE & HEADWALLS.
3.) LNSTALL PIPE AND B,4CKFIIL
4.) REMOVE TEMPORARY DIVERSION DEVICES
ENERGY DISSIPATER
NOT TO SCALE
CONCRETc BARRIER OR
I STEEL SHEET PILING
i
IMPERVIOUS FABRIC
RBI OF K!Y Paz ME
fLh5t8lo(A PLI.13 Da ?i
DKEXIGE IW