HomeMy WebLinkAbout20061804 Ver 37_Stormwater Site Plans_20210111HAGEN PO BOX 14851 Phone: (336) 404-9796 ENGINEERING, PA Greensboro, NC 27415 bhagen@hagen-eng.com Stormwater Engineer's Report Ardmore at Flowers Apartments Clayton, NC 1 /6/2020 DEVELOPER: Ardmore Residential, Inc. 1400 W Northwood Dr. Greensboro NC, 27408 [tip%�i1<:�t�:Y•I: bwhite@ardmoreresidential.com Table of Contents • Site Maps - Pre Development Drainage Delineation - Post Development Drainage Delineation • Stormwater Summary - Existing Conditions - Proposed Improvements - Sedimentology - Water Quality - Water Quantity • Water Quality - Pond Calculations - Pond Report • Water Quantity - Hydrograph Return Period Recap - 1 Year Storm Hydrographs - 10 Year Storm Hydrographs - 100 Year Storm Hydrographs • Storm Sewer Calculations - Storm pipe HGL Calculations • Appendix - USGS Map - USGS Soil Survey - NOOA Rainfall Data NG HWY 42 E 160 R W (PUBLIC RIGHT OF `NAY) P G \ e \ P 0 �1 ------------ 40 5 95 j' F' i'199.42W O'2g5'+SpM 0' S1 0'S 93� �o P� �LO�ERS Q m W J iS Z p ITE - S SIT (D -)3 �Ly SOUTHWICK AVE VICINITY MAP 9 " = 2000' GRAPHIC SCALE 50 100 ( IN FEET ) 1 inch = 50 ft. \()N MUS T CO L I T Y pro � o�A A — 0 __jw z= Q �:D BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 PRELIMINARY DECEMBER 14, 2020 FOR REVIEW ONLY NOT FOR CONSTRUCTION w Z M I ' ^ V Ll O N O N d' za w W m Z z m o A � � E4 O 1-4 z Cr— N E--l�Zm ww aA u Q A Q m��ss A A a 0 M� W O z C-5.0 /- ' O' / / tl/ / / // \ \\ //♦ / / I 1 \t`� v� �o \ I I cP�� /- / / ✓ / I �, \ \ / I I 10 01 I O aJ'CP -- - - - - -- v' - OPQ-� � i'/ : // // '/ ♦olio // / m / / A, / I� i �_ 275 — —' \i / - i �O ERS PK o�OP� m W Lu J Z I TE 1 G T SIT 7 FAO o �r SOU TH WI CK A VE VICINITY MAP 1 " = 2000' 50' RIPARIAN =__=_=2g _ ;,c=_=___ �___--\\ ZGZ_-o Q BUFFER ,____ \ _—\ / / -- ��' ,' g�5 06 N 80'55'1 W 6 \ \ TO A 1/2» 229.82' \ _ _ = — _ — — R1� REBAR 4--I 80 \ 6,3 •� 1 11 — I , \ j \ �_\ .�� �r , / ,' / \ // / / I I/ I / / / �' _ 1 �\�\. N•. �1p q.6°3 8 qj\� �E\ 127. I I I 1 �— I701 1 I I I \ / / r \ / g \ \ Oft \6V 1 I IS 1 870 0" I ♦ TAT/ \ / / / / _ ' / 4Cy\ \ \ \ \ �2T I I r-_ //7///II / / / / / / / //// I \ o 11 \ Q� p 4 / \ oT�C i / '-�/ / __/� ---- / \\ \a �51�� z / / / I / �r / � 1 �/ / / � / I , I 5 /�-1 l l l / l l I I _- \ \ UUO / �p�./' ,'� C, z w ° \ \ owl �00 / co p Q co I _ / / / / / / I CD \ /♦� U P � PT-O7 N/ _ \ I _ \\ // II/l1 I J 6,'C �5 P Uco Pf G\NE / Ifll IL m IIII I I I A o , v I / \ \ ao I \ IIII I I I N / / / i I u') I G)D cp N I I co I I I �! 1 1 \ I / I \ I \ — � / \ r / / / ' ♦/ � I WE \\ r N 1 I N t \ \ /I / \\ \ \ �� PRE DEV DRAINAGE \ / L� G, I AREA TO POS 1 = 8.41AC \ AVG CURVE NUMBER 63 �, = q�8�2 1 / O �✓ \\ / � / 'II I � I I � I I I I I I I I I I I I \ I I \� ` \ \ \ ` \ \ 1 \ / / \�'. qa / / /---�--- ' M = E2� r ♦ --- -, \N CO -----� � � /� ' / \ \ / AA �/ / / '� I \ 1 1 I I 1 / I I I I I I I I I v A A V A V A � V A V ` A \ , A I / / / / ' / `\�• ,- / � � ' I \ _ --- � PIMP\GN--• /' III /-__--_�// // / �`' / / / / / \ \ 1 1 \ I I 1 I , I , I I I I \\ \ \ \ \ \ \ \ \ \ \ \ I I- __ t, ��� �' / / \ Req \ IPO v - \ co 9 0 \ \ I V j / _ g GRAPHIC SCALE \SE - v i Q Gg Zg 8 p k G 0 ��- _ ; P �E �G 2 50 0I Ix 25 50 100 \G G PP 1 I -- p2 100 I P 2 I \ I 1 / \ \ \1 I IIII i -_---- ----� \\ �\\ � ` \ \ \ \ \ \ \ I I I \ \ \ , / / / / ✓ / C \ \ I I o ao Co g6 N / SG' � � /l � I \ \\ \\ \ \\ \ \ \\ \\\\•y \�_-'' ��\\ \\\� \� � \ \ \ \ \ \ \\\ 1, II \ \ 11 I I II �P � `\ g0 tea• /// co \ \ ?,\ \ \ \\\\` (IV\ \ y \ \ \ \ \` �\ \ \ \ \ \\ \ \ \ \ \ \ \\\ \ R 83520`Og„ 1 \ v?3vvA v 1 �vvA a/ Vvvvv vvvvvvv v v� v5 \ \9y\ \ \ \ 1 \\ /� �\ \ \ \ \\\ \ \ \ \ \\\\\\\\\\ Q� 5'5 o O00 4\ ' 2923 4055 /�� ` \\ \\\\ \ N \ \\\\ cP Illr==c\ \ \\ \\\\\ \\\ vv ' S -- / \\ \\\ \\\\\Q \ \ \\�✓� ' < ass /ir v v \vvvvvAv v /NI 60� G° *1J l�lll / \tee �0 A,/ POINT OF STUDY'/r\ k5�. c; '5 a° \ 1 \� ( IN FEET ) 1 inch = 50 ft. \(DN MUST C� \ L I T Y �0A Jw z= Q m BEFORE YOU DIG! CONTACT ONE —CALL CENTER 1-800-632-4949 200 PRE DEVELOPMENT SITE DRAINAGE AREA % OF TOTAL CURVE NUMBER DRAINAGE TO POS 1 SIZE (AC) DRAINAGE AREA FAIR CONDITION WOODS 5.61 AC 66.7% 60 (TYPE B SOILS) POOR BRUSH/WEED/GRASS 2.50 AC 29.7% 67 TYPE B SOILS IMPERVIOUS AREA FROM 0.30 AC 3.6% 98 FLOWERS PARKWAY WEIGHTED CURVE NUMBER 63 PRELIMINARY DECEMBER 14, 2020 FOR REVIEW ONLY NOT FOR CONSTRUCTION z d M I v� N O N h r A W w W w m ^ H m0 I O O V1 F Z J o 1/W ^ r� I T Z N CL a�0 Z irl Co A E—I W Q Z L m O co LLJ Q Om ZA x m m A Q z z0 F 5� U N ao } m 0 z C-5.0 p /! �\ f) 10 -FF-E 278.5 Ar j 50 0 000 �p 50' =_=�______---_ RIPARIAN --i \ \ •\GJ rL g�o ROM /' - /�,� ,--- RQ�\� p5 p�' o Q BUFFER - _ — _ _ _ - _ FFE 277.071 - �5 3 8E0 r _ - gs�ap6 TO q 112" REB 229.82' AR \ - / 9 3• 1\6 ►�» FA 104)60'-\ / /, ,� i' ,�' ,/ ' _ , I 111 l // ,' i'/ �•, �' l /' Co / WASH� 'AR MAINT \ \ - Q \ o IIII\� TW: 275.00 I I FE 275.5 CD/ I ,� I ' BW: 267.00 / / \ \ v�i ,n `� / 1 I\ / r /f l � \ ✓, �� l -, � / l l l l / .. / \ n p d \ � \ � � v�i ro o / I \ � � I 1 I / / / ' / / �\ � P�PR Q pl`C\0� � j i i j i � I I I r/ I � // / •, ! / ' i !I P / � \ / r / RAVI J w \ \ � � —mil ,. ,rlll,'ll I I I I/I n vP� I I I I I \\ \ I I I ' ' /, s ' ../. ° / rr ,°r ^• G 1 3 / //r / r V. 000 ITI 11I t' \ �v 3` \ IIII �\, i/ \ ��� I I/ I I I I � I I I I I I I I _z O m m m I I I I \ \ \ \ \ \ II • / "\1 `t u,d I •I ••I wR� I ' / / \ / � � Z 00 POST DEV DRAINAGE / / / 0 TW: 275.001 1 m I 11 \1 I` AREA TO POND = 800 VD.99 AC \ \ 1 \ \ \ \ i AVG CURVE NUMBER = 86 - I r O o-Z Z��p-o Cn I I// I I , I I I I I I I I I i 1 \ 1 I I \ \ \ \ \�. `—'• \ I , ' / � k - Z---- � MP _ P MN % 2/,8•�a�\ � J� a \\ 1 / I I I I � I I 1 I I \ \\ \ \ . \ \ \ / I r / ' E• 46 ---�-- / � o \ r F� 2 6 \\ �16 .b I I k 1 V v ` V A V - ��• \ v v A \ V / I / / � �3i , / / `L / , -- /\N 0-0 \ — � W \ /v \! \ \ \\ a\/ /�/ I /I / I / I I I / II I I 1I \ \ \ \ \ \ ' �• \ \ � � \ \ ` \ c ' ' FF/ E' 2/R�1 '9.p1:�0r° 0^•2n8/2�- iV/ J// / i \ �� � / ' I �/ \\0N P I \No0SS - - \1 , r I11 ,' 1 pl / / / / I I I I I I I I I I I ° � I I I \I \I \ \ 11 \ \ ` :\ •' \ •.\ / / / / / —_—' � �, %� I / I � \N _ • ' 1 I � /r 11 ��— / l / , I I I \ \ I I° I / I l I I I I \ 1 '� a \ \ I / l___—' � �' �� � ' � , I I _, / I // �,///� / / / 5 / / I I 1 \ \ I Ir I l I I I l I I I I \ \ \ ; \ .\ 1 \ \ I / _ -- � i � �• /'�' /' l ' I \1 � • / / / !� ii�/j rN 2 / l I I \ \ \ \ /. i I 1 1 , I I / I I I I 1 \ 1 \ \ ,\' . \ \ I --- i y^' / \ \ '/ 0 \ _ FFE 282:5 ----- 2� C0FPA278.25 2� 2�2� POST DEV DRAINAGE AREA - N ' \N OPv ONSITE BYPASS TO000 AVG CN 60 / \ g % Go/TW: 275.00 2 1 �ORS j BW: 268.00/ II II i • � / / \ \ 11 \I c� j 8� %,'� � � ,' \ J� N \ 0 'FFE �76.0- / mil / - r ii 1 � �`�\ \ I I � - I I 1 I � �Ov>��9 � `\ ` \ \ \ \ I ,� '` / • �2�� '�� / L) \ F� Tl 5 \ ' AN TW: \g g 00 TW: 275.00 \ TW: 275 BW: ' E 2�,2 III \ `\\_ _ - \\ 2 2�08° � o \ \ NJ . 0-( z %,�.\I \ \\ \ / 1 \ NI Q 0 D fTl POINT OF STUDY\1 0 4� BEFORE YOU DIG! e 5\ 7.50 aCONTACT ONE —CALL CENTER 1-800-632-4949 r ` ZJ �Q �O ERS P�� O�oP� o J m w J S W Z ITE 1 C -r\ S SIT o Al-r SOU TH WI CK AVE VICINITY MAP I " = 2000' GRAPHIC SCALE 25 50 100 ( IN FEET ) 1 inch = 50 ft. POST DEVELOPMENT SITE DRAINAGE TO POND DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER IMPERVIOUS AREA 6.17 AC 68.6% 98 GRASSED AREA (GOOD CONDITION) 2.82 AC 31.4% 61 WEIGHTED CURVE NUMBER 86 POST DEVELOPMENT BYPASS DRAINAGE AREA % OF TOTAL CURVE NUMBER DRAINAGE TO POS 1 SIZE (AC) DRAINAGE AREA FAIR CONDITION WOODS 2.02 AC 76.3% 60 (TYPE B SOILS) GRASSED AREA 0.63 AC 23.7% 61 (GOOD CONDITION) WEIGHTED CURVE NUMBER 60 PRELIMINARY DECEMBER 14, 2020 FOR REVIEW ONLY NOT FOR CONSTRUCTION ^ O 00 w 01 � 00 O � >Ubp Q O bbb O M Cd Z 0000 Cd oc � Z rn M �I z M I V L V L N N m w A a W m z D z 0 E-4 O O z O11 cj:� N Co aw wa(� z -CIO o m A kq 0 a O E-� A A U� _ a m A � a m 0 Z C-5.1 Stormwater Summary Existina Conditions This report will analyze two separate parcels, site 1 and site 2. Site 1 is 6.435 acres in size and is completely vacant grassed land with a small dirt path which comes on to the property. Site 2 that is being developed is 10.807 acres in size and is mostly wooded, with a portion that is densely grassed. At the western side of the property on site 2, there is an existing sediment basin. Proposed Improvements For site 1, the development will consist of 180 apartment units, a clubhouse, a pool, car wash and various other amenities. There is an existing stormwater pond to the south of this site which was previously sized to account for this parcel one day being developed. The pond was sized such as to allow for up to 85% impervious. The current site design for site 1 utilizes only 75% impervious, therefore no new stormwater pond improvements are required for this site 1. Storm sewer pipe infrastructure will be installed within this site to transport all storm drainage to this existing pond for treatment. For site 2 The proposed development will consist of 216 Multi -family apartment units, a cabana, pool, dog park and mail kiosk. A previous stormwater permit was obtained for this site, however, the pond was previously only sized to handle a portion of this site (due to a ridge in the middle of the site), with the remainder of the stormwater draining to a separate pond. In an effort to keep all pond maintenance associated with this site 2 under Ardmore control, this wet pond is being upgraded so that is can handle impervious from the entire site. The proposed stormwater from all impervious areas on site will drain towards this new wet pond in the western portion of the site. Sedimentology For site 1, during construction, stormwater will be routed to a skimmer basin which will be at the southern portion of this site in the approximate location of the parking lot south of building 1500. Silt fence, construction entrances, inlet protection, porous baffles and stabilization methods will also be utilized to reduce sediment leaving the site. Once site 1 has been stabilized, the skimmer basin will be removed, parking lot finalized, and all stormwater will route to the existing pond that was previously mentioned. For site 2, there is already a skimmer basin in place, so this skimmer basin along with silt fence, construction entrances, inlet protection, porous baffles and stabilization methods will also be utilized to reduce sediment leaving the site. This skimmer basin is in the same approximate location as the final proposed wet pond, so, as sitework progresses, and the site is stabilized, the skimmer basin will be transitioned to a permanent wet pond. Stormwater Quality Per the Johnston County Stormwater Ordinance and the NCDEQ Stormwater requirements, a minimum of 85% of the Total Suspended Solids associated with site runoff must be removed by an engineered stormwater device. For site 1, this requirement has already been met as mentioned previously due to the existing pond. For site 2, a wet pond will be utilized for this design. This wet pond will utilize a 48" riser structure with a 2.5" orifice at the permanent pool elevation, and a 15" orifice at the water quality elevation. Per NCDEQ Stormwater requirements, this water quality elevation provides adequate storage to treat the first inch of runoff across the site. This water quality volume is then released over approximately 57 hours which satisfied the 2-5 day release time requirement. Stormwater Quantity Per Johnston County Stormwater Ordinance, the stormwater device is required to attenuate the 1 year twenty-four hour storm event to pre -development levels. For site 1, this requirement is already met with the existing pond. For site 2, this report will analyze the peak flows created by the 1 year, 10 year and 100 year twenty -four- hour storm events. The peak flow hydrographs were generated using the SCS Method and can be seen on the following page along with pond elevations associated with each storm event. Point of Study 1 (site 2) Storm Event Pre- Post Elevation in Pond 1(Feet) Developed Developed Rate (CFS) After Routing (Crest of Spillway: 253.50') through Pond 1 (CFS) (Dam Elevation: 255.00) 1 Year, 24 hr 1.865 0.993 250.87 10 Year, 24 hr 12.05 11.10 252.68 100 Year, 24 hr 29.37 71.48 253.98 STORMWATER QUALITY LC 5 -- � / ' __-- ---__---- - - - - --- - - \I - _--- 2, 55� o cp 00 \1 ------- ---- -- ----- -- __ ------------------- --------------------- 0 - II - --- D,o ' � - _ - — - - — - 2 4 5 244 WET POND - ---- - II _ _ _ _ - - - T' \(DN MUST C L ITY0CIA A J LU Q m 0Q0 BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 �\� N - _ - - -- - - ---- -- - - - - - - - - - � 2 - - - - - - - U - L- - - - - - 44 o I � I II II _I i , •, L 5 0 O 250 ---- ---------------------- ---------------- - --- ---- - - -- - - - - - - - - - - — — --- - _ " - _ _ � ---- - ' \ - - - - - - -- -- — - 1 -_ -_ - ' - — � i I ■\ ■ 1 I N55 ----- — - - - -- -- - - _---------- -- 249 ------ - --o--j- _ ---- ------IAN ----- --- --__----550RA24--------- ----- ------ ----------- 00 00 CONSTRUCT DAM WITH IMPERMEABLE SOILS COMPACTED TO 98% STD. PROCTOR DENSITY W/ A MOISTURE CONTENT OF -1 % TO +3% OF OPTIMUM. SOILS SHALL BE UNIFORM IN CHARACTER AND INSTALLED IN 8" MAXIMUM LIFTS. SOILS SHALL BE FREE OF ORGANICS AND PARTICLES OF 2" OR GREATER CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. CORE GEOTECHNICAL ENGINEER TO BE ON SITE DURING INSTALLATION OF POND OUTLETS TO ENSURE _ COMPACTION _ AROUND PIPES 6' WIDE VEGETATED SHELF AT 1:6 SLOPE. BOTTOM ELEVATION: 248.0 TOP ELEVATION: 249.0. 10.00' DAM EL 255.0' L JI OUTLET 243.5' 1 100 LF 24" ALUMINUM @ 0.5% SLOPE 7 2 " X 72" U ANTI -SEEP PLATES SANDWICHED BETWEEN FLANGED GASKET IN FLANGED JOINTS CUT-OFF TRENCH BACKFILL W/ IMPERMEABLE SOILS COMPACTED TO 98% STD PROCTOR DENSITY - 48" DIAMETER ALUMINUM RISER WITH TRASH RACK. TOP OF RISER ELEV 253.0. SHOP DRAWING TO BE REVIEWED BY ENGINEER PRIOR TO FABRICATION. 15" ORIFICE AT 250.5' 2.5" ORIFICE AT 248.5 SUBMERGED ORIFICE OUTLET DESIGN i SEE DETAIL THIS SHEET BOTTOM 244 6' X 6' X 2' 3000 PSI CONCRETE PAD ANTI FLOTATION DEVICE 6" DRAIN VALVE AT EL 244.0' WITH HANDLE TO TOP OF RISER. VALVE SHALL HAVE A PLATE TO ADAPT TO A 6" SKIMMER DURING CONSTRUCTION. POND 1 N.T.S. 1' S E D I M E N T S T O V AGE CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. RIP RAP BAFFLE CLASS B STONE OVER NON WOVEN FABRIC. FROM ELEVATION 244.00 TO 248.5. SIDE SLOPES TO BE 2:1. TOP 5' WIDE. DETA J L 20' WIDE SPILLWAY EL: 253.50' �o ERS PKV� o�oP� o J m iS w J J w z I TE 1 C S s1 r FAO O �Ly SOUTHWICK AVE VICINITY MAP 1 " = 2000' Figure 10.4 Typical Submerged Orifice Outlet Configuration d" PVC PVC tee Screw type phi " s Outlet box Temporruy pool q Penualleat pool 4'-PV(:' tubbed into box o 00z \2.5" ORIFICE DRILLED THROUGH CAP 4" PVC cap with hole III IIIcd Nate: Consider 6" piping if die control orifice is larder than 2" Pond b dtotn Durable materials, such as reinforced concrete, are preferable to corrugated metal in most instances. The riser should be placed in or at the face of the embankment. By placing the riser close to the embankment, maintenance access is facilitated and flotation forces are reduced. The design engineer must present flotation force calculations for any outlet design subject to flotation forces. Outlets are described in greater detail in Section 7,.0, Common BMP Design Elements. M M , 1.0' THICK CLASS B STONE OVER NON WOVEN FABRIC 100YR STORM MAX ELEV. 253.94' WATER QUALITY MAX ELEVATION 250.50 PERMANENT POOL ELEVATION 248.5 CLAY LINER TO BE INSTALLED. SEE CLAY LINER NOTES ON THIS SHEET GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) 1 inch = 20 ft. 80 1.5' CLASS B RIP RAP 20' 3: SPILLWAY DETAIL NOT TO SCALE DAM EL Anti -Flotation Device 1: Flowers Riser Height: 9 feet Riser Diameter: 48 in Riser Area: 113.04 cf Weight of Water: 62.4 Ibs/ft^2 Weight of Conc. 150 Ibs/ft^3 Min Weight Req. 7054 Ibs Anti -Flotation Dimemstions Length (ft) 6 Width (ft) 6 Height (ft) 2 Weight Provided 10800 Ibs Min Factor of Safety 1.5 Factor of Safety Provided 1.53 Okay POND SLOPES AND DAM OUTSIDE OF PERMANENT POOL ARE TO BE 3:1. SLOPED AREA IN POND BELOW PERMANENT POOL IS 2:1 SLOPE A CLAY LINER SHOULD BE INSTALLED IN POND BASIN PER THE FOLLOWING SPECIFICATIONS: -MINIMUM THICKNESS OF 12 INCHES WITH AN ADDITIONAL 12 INCH LAYER OF COMPACTED SOIL ABOVE IT -PERMEABILITY = 1 X 10-6 CM/SEC -PLASTICITY INDEX OF CLAY = NOT LESS THAN 15% -LIQUID LIMIT OF CLAY = NOT LESS THAN 30% -CLAY PARTICLES PASSING = NOT LESS THAN 30% -CLAY COMPACTION = 95% OF STANDARD PROCTOR DENSITYSOURCE: DCR (1999) _V 6LrAL 30469 /z01 „I�I\ 1-6-20 M U� I 0 N 0 N of W w m Q Z m N N z N 1rT J 1� w CI_ (1 00 I=— O 21 a ^ �Ey c) Z C = a m n O O��o Q � m Q A N� a m C A Q 0 �z z� OF �a 5� U W oLd a r m C; z C—6.0 Wet Pond 1 Water Quality Design Calculations Drainage Area 8.99 Acres Impervious Area to Pond (Total impervious/43560) 6.17 Acres Buildings 107,500 SF Sidewalk 28000 SF Pavement 120000 SF Flowers Parkway Impervious 13100 SF Total 268,600 SF Impervious (Imp. Area to Pond / DA) 68.59% Rv = 0.05 + 0.9(%Imp) 0.66730665 VPP (Volume permanent pool) 32398 Cubic Feet APP (Area Permanent Pool) 11057 SF DAV (Average Depth = VPP / APP) 3 Required WQV (cf) = Rv * Ad*43560sf/ac*Rd*1ft/12in 21776.685 Cubic Feet Provided WQV (Volume between15" Riser orifice Elev and 2.5" WQV orifice elev) 26305 Cubic Feet Forebay Volume (must be between 15-20% of the VPP) 6333 Cubic Feet Main Pool Volume (VPP - Forebay Volume) 26065 Cubic Feet New BMP Manual DAV Calculations (Values from Table 1 in C-3. Wet Pond) 3 4 60.00% 2.09 1.77 70.00% 2.51 2.09 Imp 68.59% 2.450764363 2.044868086 Interpolated Value 2.47914076 Surface Area Requirements: % Impervious 68.59% Surface Area Ratio Required 2.47914076 or 9708.4243 SF Surface Area Provided 11057 SF 19.55 % Water Quality Pond 1 Draw Down Time Q=CdAV2gh Cd - Coefficient of discharge A- Area of orifice g - Gravity - 32.2 ft/s2 h - head from mid point of orifice Pipe Diameter 2.5 in Area 0.034071181 ftz Cd 0.6 g 32.2 ft/sz Invert of orifice 248.5 ft Water Elevation 250.5 ft Avg. Head 0.895833333 ft Qavg 0.155272654 cfs WQV Volume 26305 CF Elevation Head Q (CFS) Incremental Volume (CF) Time (Hrs) 250.5 1.791666667 0.219588693 1461 1.848644178 250.4 1.691666667 0.213372655 1461 1.902499443 250.3 1.591666667 0.206970013 1461 1.961353495 250.2 1.491666667 0.200362877 1461 2.026030793 250.1 1.391666667 0.193530304 1461 2.097559658 250 1.291666667 0.186447512 1461 2.177242023 249.9 1.191666667 0.179084815 1461 2.266754771 249.8 1.091666667 0.171406146 1461 2.36830106 249.7 0.991666667 0.163366959 1461 2.484843702 249.6 0.891666667 0.154911134 1461 2.620478908 249.5 0.791666667 0.145966282 1461 2.781062535 249.4 0.691666667 0.136436255 1461 2.975318832 249.3 0.591666667 0.126188541 1461 3.216943126 249.2 0.491666667 0.115031491 1461 3.528958502 249.1 0.391666667 0.10266908 1461 3.95388131 249 0.291666667 0.088598173 1461 4.581825396 248.9 0.191666667 0.071821531 1461 5.652084411 248.8 0.091666667 0.049669191 1461 8.172900556 Totals 26305 56.6166827 Hours 2.359028446 Days STORMWATER QUANTITY Hydrograph Return Period Re,cd4 ow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 1.865 3.923 ------- ------- 12.05 18.11 ------- 29.37 ex site 2 3 SCS Runoff ------ 22.48 30.00 ------- ------- 51.75 65.51 ------- 88.80 proposed 5 SCS Runoff ------ 0.385 0.958 ------- ------- 3.431 5.347 ------- 8.964 onsite bypass pond 1 7 Reservoir 3 0.904 2.515 ------- ------- 7.701 20.78 ------- 63.44 pond 9 Combine 5, 7, 0.993 3.131 ------- ------- 11.10 26.08 ------- 71.48 post dev combined Proj. file: Site 2 Wet Pond 1-6-21.gpw Thursday, 01 / 7 / 2021 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D9 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.865 2 734 11,959 ------ ------ ------ ex site 2 3 SCS Runoff 22.48 2 718 51,468 ------ ------ ------ proposed 5 SCS Runoff 0.385 2 734 2,822 ------ ------ ------ onsite bypass pond 1 7 Reservoir 0.904 2 828 50,327 3 250.87 64,754 pond 9 Combine 0.993 2 822 53,149 5, 7, ------ ------ post dev combined Site 2 Wet Pond 1-6-21.gpw Return Period: 1 Year Thursday, 01 / 7 / 2021 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 ex site 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.410 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 2.90 in Distribution Storm duration = 24 hrs Shape factor . Composite (Area/CN) = [(5.610 x 60) + (2.500 x 67) + (0.300 x 98)] / 8.410 Q (cfs) 2.00 1.00 0.00 ' ' 0 2 4 Hyd No. 1 ex site 2 Hyd. No. 1 -- 1 Year Thursday, 01 / 7 / 2021 = 1.865 cfs = 12.23 hrs = 11,959 cuft = 63* = 0 ft = 29.00 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 ---1 0.00 26 Time (hrs) 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 ex site 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.000 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.52 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 23.69 + 0.00 + 0.00 = 23.69 Shallow Concentrated Flow Flow length (ft) = 530.00 0.00 0.00 Watercourse slope (%) = 7.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.42 0.00 0.00 Travel Time (min) = 2.00 + 0.00 + 0.00 = 2.00 Channel Flow X sectional flow area (sqft) = 14.00 0.00 0.00 Wetted perimeter (ft) = 11.94 0.00 0.00 Channel slope (%) = 1.50 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =4.06 0.00 0.00 Flow length (ft) ({0})800.0 0.0 0.0 Travel Time (min) = 3.28 + 0.00 + 0.00 = 3.28 Total Travel Time, Tc.............................................................................. 29.00 min 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 3 proposed Hydrograph type = SCS Runoff Peak discharge = 22.48 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 51,468 cuft Drainage area = 8.990 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(6.170 x 98) + (2.820 x 61)] / 8.990 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' ' 0 2 4 Hyd No. 3 6 8 proposed Hyd. No. 3 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 10 12 14 16 18 20 22 24 26 Time (hrs) I TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 proposed Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 50.0 0.0 Two-year 24-hr precip. (in) = 3.52 3.52 0.00 Land slope (%) = 7.00 0.75 0.00 Travel Time (min) = 3.25 + 0.98 + 0.00 = 4.23 Shallow Concentrated Flow Flow length (ft) = 130.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =2.03 0.00 0.00 Travel Time (min) = 1.07 + 0.00 + 0.00 = 1.07 Channel Flow X sectional flow area (sqft) = 3.14 0.00 0.00 Wetted perimeter (ft) = 6.28 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) =7.20 0.00 0.00 Flow length (ft) ({0})750.0 0.0 0.0 Travel Time (min) = 1.74 + 0.00 + 0.00 = 1.74 Total Travel Time, Tc.............................................................................. 7.00 min 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 5 onsite bypass pond 1 Hydrograph type = SCS Runoff Peak discharge = 0.385 cfs Storm frequency = 1 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 2,822 cuft Drainage area = 2.650 ac Curve number = 60* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 24.90 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(2.020 x 60) + (0.630 x 61)] / 2.650 onsite bypass pond 1 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 2 4 Hyd No. 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 5 onsite bypass pond 1 Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.52 0.00 0.00 Land slope (%) = 8.00 0.00 0.00 Travel Time (min) = 20.47 + 0.00 + 0.00 = 20.47 Shallow Concentrated Flow Flow length (ft) = 150.00 0.00 0.00 Watercourse slope (%) = 8.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.73 0.00 0.00 Travel Time (min) = 0.53 + 0.00 + 0.00 = 0.53 Channel Flow X sectional flow area (sqft) = 14.00 0.00 0.00 Wetted perimeter (ft) = 11.94 0.00 0.00 Channel slope (%) = 1.50 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =4.06 0.00 0.00 Flow length (ft) ({0})955.0 0.0 0.0 Travel Time (min) = 3.92 + 0.00 + 0.00 = 3.92 Total Travel Time, Tc.............................................................................. 24.90 min Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 pond Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 3 -proposed Max. Elevation Reservoir name = <New Pond> Max. Storage Storage Indication method used. Wet pond routing start elevation = 248.50 ft Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0 10 Hyd No. 7 pond Hyd. No. 7 -- 1 Year 20 30 40 Hyd No. 3 Thursday, 01 / 7 / 2021 = 0.904 cfs = 13.80 hrs = 50,327 cuft = 250.87 ft = 64.754 cuft 50 60 70 80 90 0 Total storage used = 64,754 cuft Q (cfs) 24.00 20.00 16.00 12.00 4.00 1 0.00 100 Time (hrs) Pond Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D9 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Pond No. 1 - <New Pond> Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 244.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 244.00 4,641 0 0 1.00 245.00 5,618 5,121 5,121 2.00 246.00 6,688 6,145 11,266 3.00 247.00 7,851 7,261 18,527 4.00 248.00 9,106 8,470 26,997 5.00 249.00 12,597 10,803 37,800 6.00 250.00 14,202 13,390 51,190 7.00 251.00 15,872 15,028 66,218 8.00 252.00 17,606 16,730 82,948 9.00 253.00 19,399 18,493 101,441 10.00 254.00 21,248 20,314 121,756 11.00 255.00 23,154 22,192 143,948 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.50 15.00 0.00 Crest Len (ft) = 12.56 20.00 0.00 0.00 Span (in) = 24.00 2.50 15.00 0.00 Crest El. (ft) = 253.00 253.50 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 244.00 248.50 250.50 0.00 Weir Type = 1 Rect --- --- Length (ft) = 100.00 1.00 1.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 1.00 1.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 ' ' 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 256.00 254.00 252.00 250.00 248.00 246.00 244.00 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Discharge (cfs) Hydrograph Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 9 post dev combined Hydrograph type = Combine Peak discharge = 0.993 cfs Storm frequency = 1 yrs Time to peak = 13.70 hrs Time interval = 2 min Hyd. volume = 53,149 cuft Inflow hyds. = 5, 7 Contrib. drain. area = 2.650 ac Q (cfs) 1.00 0.90 0.80 0.70 1 .1 0.50 0.40 0.30 0.20 post dev combined Hyd. No. 9 -- 1 Year 20 30 40 Hyd No. 5 50 60 Hyd No. 7 Q (cfs) 1.00 0.90 0.80 0.70 1 .1 0.50 0.40 0.30 0.20 •��� 0.10 ■ i 0.00 1 :1 •1 100 12 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D9 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 12.05 2 732 51,564 ------ ------ ------ ex site 2 3 SCS Runoff 51.75 2 718 121,695 ------ ------ ------ proposed 5 SCS Runoff 3.431 2 730 13,897 ------ ------ ------ onsite bypass pond 1 7 Reservoir 7.701 2 734 120,500 3 252.68 95,992 pond 9 Combine 11.10 2 730 134,396 5, 7, ------ ------ post dev combined Site 2 Wet Pond 1-6-21.gpw Return Period: 10 Year Thursday, 01 / 7 / 2021 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 1 ex site 2 Hydrograph type = SCS Runoff Peak discharge = 12.05 cfs Storm frequency = 10 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 51,564 cuft Drainage area = 8.410 ac Curve number = 63* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.00 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(5.610 x 60) + (2.500 x 67) + (0.300 x 98)] / 8.410 Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 1 6 8 ex site 2 Hyd. No. 1 -- 10 Year Q (cfs) 14.00 12.00 10.00 . 11 4.00 2.00 i i I I I I I I I` 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 3 proposed Hydrograph type = SCS Runoff Peak discharge = 51.75 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 121,695 cuft Drainage area = 8.990 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(6.170 x 98) + (2.820 x 61)] / 8.990 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 2 4 Hyd No. 3 proposed Hyd. No. 3 -- 10 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 5 onsite bypass pond 1 Hydrograph type = SCS Runoff Peak discharge = 3.431 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 13,897 cuft Drainage area = 2.650 ac Curve number = 60* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 24.90 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(2.020 x 60) + (0.630 x 61)] / 2.650 Q (Cfs) 4.00 3.00 2.00 1.00 0.00 ' ' ---" 0 2 4 — Hyd No. 5 onsite bypass pond 1 Hyd. No. 5 -- 10 Year 6 8 10 12 14 16 18 20 22 24 Q (Cfs) 4.00 3.00 2.00 1.00 '- 0.00 26 Time (hrs) Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 pond Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 3 -proposed Max. Elevation Reservoir name = <New Pond> Max. Storage Storage Indication method used. Wet pond routing start elevation = 248.50 ft pond Thursday, 01 / 7 / 2021 = 7.701 cfs = 12.23 hrs = 120,500 cuft = 252.68 ft = 95,992 cuft Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 66 72 Time (hrs) Hyd No. 7 Hyd No. 3 0 Total storage used = 95,992 cuft Hydrograph Report 17 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 9 post dev combined Hydrograph type = Combine Peak discharge = 11.10 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 134,396 cuft Inflow hyds. = 5, 7 Contrib. drain. area = 2.650 ac Q (cfs) 12.00 10.00 . 00 4.00 2.00 post dev combined Hyd. No. 9 -- 10 Year Q (cfs) 12.00 10.00 111 4.00 2.00 0.00 10.00 0 6 12 18 24 30 36 42 48 54 60 66 Time (hrs) Hyd No. 9 Hyd No. 5 Hyd No. 7 18 Hydrograph Summary ReportH ydraflow Hydrographs Extension for Autodesk®Civil 3D9 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 29.37 2 732 118,757 ------ ------ ------ ex site 2 3 SCS Runoff 88.80 2 718 215,483 ------ ------ ------ proposed 5 SCS Runoff 8.964 2 730 33,566 ------ ------ ------ onsite bypass pond 1 7 Reservoir 63.44 2 724 214,260 3 253.98 121,367 pond 9 Combine 71.48 2 724 247,826 5, 7, ------ ------ post dev combined Site 2 Wet Pond 1-6-21.gpw Return Period: 100 Year Thursday, 01 / 7 / 2021 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 1 ex site 2 Hydrograph type = SCS Runoff Peak discharge = 29.37 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 118,757 cuft Drainage area = 8.410 ac Curve number = 63* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(5.610 x 60) + (2.500 x 67) + (0.300 x 98)] / 8.410 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' 0 2 4 Hyd No. 1 6 8 ex site 2 Hyd. No. 1 -- 100 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 .600- 1 1 1 1 1 1 1_ i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 3 proposed Hydrograph type = SCS Runoff Peak discharge = 88.80 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 215,483 cuft Drainage area = 8.990 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(6.170 x 98) + (2.820 x 61)] / 8.990 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0.0 2.0 4.0 6.0 Hyd No. 3 proposed Hyd. No. 3 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 5 onsite bypass pond 1 Hydrograph type = SCS Runoff Peak discharge = 8.964 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 33,566 cuft Drainage area = 2.650 ac Curve number = 60* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 24.90 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(2.020 x 60) + (0.630 x 61)] / 2.650 Q (cfs) 10.00 M 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 5 6 8 onsite bypass pond 1 Hyd. No. 5 -- 100 Year Q (cfs) 10.00 M 4.00 2.00 J/ 1 1 1 1 1 1 I1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 3 -proposed Max. Elevation Reservoir name = <New Pond> Max. Storage Storage Indication method used. Wet pond routing start elevation = 248.50 ft. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 Hyd No. 7 pond Hyd. No. 7 -- 100 Year Thursday, 01 / 7 / 2021 = 63.44 cfs = 12.07 hrs = 214,260 cuft = 253.98 ft = 121,367 cuft Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 1 11 Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 01 / 7 / 2021 Hyd. No. 9 post dev combined Hydrograph type = Combine Peak discharge = 71.48 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 247,826 cuft Inflow hyds. = 5, 7 Contrib. drain. area = 2.650 ac post dev combined STORM SEWER CALCULATIONS Ardmore Flowers 11 10 22 17 S2 18 16 19 15 8 7 14 21 20 31 6 30 2829 13 25 5 27 26 24 12 4 23 2 3 1 44 63 4g3 Outfall 62 40 41 56 39 57 58 55 38 59 52 60 37 51 53 35 36 50 61 49 33 54 Outfall 45 48 46 47 Project File: Hydraflow Storm Pipes.stm Number of lines: 63 Date: 12/15/2020 Storm Sewers v2019.20 Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 1 End 109.00 -104.62 Curb 0.00 0.23 0.95 0.1 263.50 1.50 265.14 36 Cir 0.012 2.02 276.50 a-1 to a-0 2 1 141.00 -87.82 Curb 0.00 0.22 0.95 0.1 267.14 1.50 269.26 24 Cir 0.012 0.50 276.50 a-2 to a-1 3 2 142.00 12.48 Curb 0.00 0.15 0.95 0.1 269.35 1.50 271.48 24 Cir 0.012 1.40 277.25 a-3 to a-2 4 3 121.00 66.84 Curb 0.00 0.34 0.95 0.1 271.58 1.50 273.40 24 Cir 0.012 1.50 278.60 a-4 to a-3 5 4 113.00 13.94 Curb 0.00 0.35 0.95 0.1 273.50 1.50 275.20 24 Cir 0.012 1.50 281.75 a-5 to a-4 6 5 116.00 -11.38 Curb 0.00 0.25 0.95 0.1 275.29 1.50 277.03 24 Cir 0.012 0.50 283.10 a-6 to a-5 7 6 62.00 14.74 Curb 0.00 0.04 0.95 0.1 277.63 1.00 278.25 18 Cir 0.012 0.84 283.50 a-7 to a-6 8 7 138.00 -30.28 Curb 0.00 0.02 0.95 0.1 278.60 2.00 281.36 15 Cir 0.012 1.49 288.50 a-8 to a-7 9 8 55.00 16.05 Curb 0.00 0.08 0.95 0.1 281.46 2.00 282.56 15 Cir 0.012 0.62 287.05 a-9 to a-8 10 9 71.00 21.02 Curb 0.00 0.18 0.95 0.1 282.66 1.51 283.73 15 Cir 0.012 1.49 287.05 a-10 to a-9 11 10 97.00 82.95 Curb 0.00 0.51 0.95 0.1 283.83 1.00 284.80 15 Cir 0.012 1.00 287.05 a-11 to a-10 12 1 173.00 31.95 Curb 0.00 0.33 0.95 0.1 269.64 1.00 271.37 24 Cir 0.012 0.71 276.75 b-1 to a-1 13 12 107.00 -24.81 Curb 0.00 0.21 0.95 0.1 271.47 1.00 272.54 24 Cir 0.012 1.45 277.85 b-2 to b-1 14 13 143.00 -22.42 Curb 0.00 0.25 0.95 0.1 273.14 1.00 274.57 18 Cir 0.012 0.70 279.25 b-3 to b-2 15 14 142.00 -24.34 Curb 0.00 0.14 0.95 0.1 274.67 1.00 276.09 18 Cir 0.012 0.80 283.10 b-4 to b-3 16 15 39.00 28.61 Curb 0.00 0.06 0.95 0.1 276.44 2.00 277.22 15 Cir 0.012 1.50 283.05 b-5 to b-4 17 16 38.00 -93.16 Curb 0.00 0.08 0.95 0.1 277.32 1.50 277.89 15 Cir 0.012 0.50 283.10 b-6 to b-5 18 17 65.00 13.53 Curb 0.00 0.44 0.95 0.1 278.24 1.51 279.22 12 Cir 0.012 0.50 282.60 b-7 to b-6 19 18 84.00 -14.60 Curb 0.00 0.04 0.95 0.1 279.31 2.00 280.99 12 Cir 0.012 1.00 283.50 b-8 to b-7 20 13 111.00 -74.33 Curb 0.00 0.27 0.95 0.1 273.39 2.00 275.61 15 Cir 0.012 0.96 279.50 c-1 to b-2 21 20 53.00 -35.87 Curb 0.00 0.11 0.95 0.1 275.96 1.00 276.49 12 Cir 0.012 1.00 279.50 c-2 to c-1 22 16 42.00 0.00 Curb 0.00 0.19 0.95 0.1 279.22 1.00 279.64 15 Cir 0.012 1.00 283.90 d-1 to b-5 23 1 91.00 -32.89 Curb 0.00 0.29 0.95 0.1 271.89 3.00 274.62 15 Cir 0.012 0.81 279.05 a-1 to a-1 Ardmore Flowers Number of lines: 63 Date: 12/15/2020 Storm Sewers v2019.20 Storm Sewer Inventory Report Page 2 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 24 23 97.00 28.93 Curb 0.00 0.10 0.95 0.1 274.97 1.00 275.94 12 Cir 0.012 0.50 279.05 a-2 to a-1 25 24 52.00 0.00 Curb 0.00 0.13 0.95 0.1 276.04 1.00 276.56 12 Cir 0.012 1.00 279.50 a-3 to a-2 26 4 51.00 92.72 Curb 0.00 0.22 0.95 0.1 274.50 1.51 275.27 12 Cir 0.012 0.50 278.75 f-1 to a-4 27 26 99.00 0.00 Curb 0.00 0.24 0.95 0.1 275.36 1.00 276.35 12 Cir 0.012 1.00 278.75 f-2 to f-1 28 5 45.00 96.40 Curb 0.00 0.10 0.95 0.1 276.29 2.00 277.19 12 Cir 0.012 0.88 280.75 g-1 to a-5 29 28 40.00 -32.18 Curb 0.00 0.11 0.95 0.1 277.29 2.00 278.09 12 Cir 0.012 0.50 280.75 g-2 to g-1 30 29 43.00 9.38 Curb 0.00 0.10 0.95 0.1 278.19 1.00 278.62 12 Cir 0.012 1.49 280.75 g-3 to g-2 31 30 72.00 -83.99 Curb 0.00 0.31 0.95 0.1 278.72 1.00 279.44 12 Cir 0.012 1.00 282.50 g-4 to g-3 32 8 48.00 83.39 Curb 0.00 0.09 0.95 0.1 281.46 5.00 283.86 15 Cir 0.012 1.00 287.05 h-1 to a-8 33 End 74.00 -58.17 Curb 0.00 0.01 0.95 0.1 248.50 8.00 254.42 30 Cir 0.012 1.33 263.00 j-1 to j-0 34 33 24.00 59.85 Curb 0.00 0.36 0.95 0.1 258.42 3.00 259.14 30 Cir 0.012 0.65 275.05 j-2 to j-1 35 34 73.00 -22.12 Curb 0.00 0.29 0.95 0.1 263.14 3.00 265.33 30 Cir 0.012 0.86 275.05 j-3 to j-2 36 35 39.00 31.08 Curb 0.00 0.32 0.95 0.1 265.43 3.00 266.60 30 Cir 0.012 1.98 274.10 j-4 to j-3 37 36 170.00 -58.95 Curb 0.00 0.27 0.95 0.1 266.70 0.75 267.98 30 Cir 0.012 1.47 276.75 j-5 to j-4 38 37 90.00 6.43 Curb 0.00 0.57 0.95 0.1 268.08 0.76 268.76 30 Cir 0.012 1.89 275.05 j-6 to j-5 39 38 199.00 26.86 Curb 0.00 0.61 0.95 0.1 269.35 0.75 270.84 24 Cir 0.012 1.50 275.10 j-7 to j-6 40 39 173.00 12.04 Curb 0.00 0.10 0.95 0.1 271.69 0.75 272.99 15 Cir 0.012 1.47 280.00 j-8 to j-7 41 40 30.00 -77.76 Curb 0.00 0.15 0.95 0.1 273.09 1.00 273.39 15 Cir 0.012 1.49 277.50 j-9 to j-8 42 41 35.00 81.95 Curb 0.00 0.04 0.95 0.1 273.75 1.00 274.10 12 Cir 0.012 1.01 277.50 j-10 to j-9 43 42 30.00 -38.55 Curb 0.00 0.03 0.95 0.1 274.19 1.00 274.49 12 Cir 0.012 1.16 277.50 j-11 to j-10 44 43 40.00 -47.01 Curb 0.00 0.16 0.95 0.1 274.59 1.00 274.99 12 Cir 0.012 1.00 277.50 j-12 to j-11 45 36 159.00 69.87 Curb 0.00 0.50 0.95 0.1 267.70 1.00 269.29 18 Cir 0.012 1.46 274.10 k-1 to j-4 46 45 97.00 -76.11 Curb 0.00 0.01 0.95 0.1 269.64 3.00 272.55 15 Cir 0.012 0.52 279.00 k-2 to k-1 Ardmore Flowers Number of lines: 63 Date: 12/15/2020 Storm Sewers v2019.20 Storm Sewer Inventory Report Page 3 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 47 46 101.00 -17.29 Curb 0.00 0.27 0.95 0.1 272.90 5.00 277.95 12 Cir 0.012 0.50 281.40 k-3 to k-2 48 47 103.00 4.30 Curb 0.00 0.27 0.95 0.1 278.05 1.00 279.08 12 Cir 0.012 1.00 281.40 k-4 to k-3 49 36 108.00 19.74 Curb 0.00 0.22 0.95 0.1 267.70 2.00 269.86 18 Cir 0.012 1.48 277.50 1-1 to j-4 50 49 122.00 -79.81 Curb 0.00 0.25 0.95 0.1 269.96 1.50 271.79 18 Cir 0.012 1.06 278.10 1-2 to 1-1 51 50 194.00 41.10 Curb 0.00 0.30 0.95 0.1 271.89 1.00 273.83 18 Cir 0.012 0.50 278.10 1-3 to 1-2 52 51 118.00 2.56 Curb 0.00 0.33 0.95 0.1 273.93 0.50 274.52 18 Cir 0.012 1.50 279.40 1-4 to 1-3 53 52 99.00 84.90 Curb 0.00 0.43 0.95 0.1 274.87 0.51 275.37 15 Cir 0.012 0.50 279.40 1-5 to 1-4 54 53 57.00 -4.71 Curb 0.00 0.13 0.95 0.1 275.47 2.00 276.61 15 Cir 0.012 1.00 280.10 1-6 to 1-5 55 37 78.00 -76.98 Curb 0.00 0.45 0.95 0.1 269.33 0.76 269.92 15 Cir 0.012 1.00 274.10 m-1 to j-5 56 38 85.00 -72.84 Curb 0.00 0.18 0.95 0.1 270.10 0.75 270.74 15 Cir 0.012 1.00 274.50 n-1 to j-6 57 38 151.00 53.96 Curb 0.00 0.17 0.95 0.1 271.50 2.00 274.52 15 Cir 0.012 0.61 278.60 p-1 to j-6 58 57 117.00 -20.62 Curb 0.00 0.18 0.95 0.1 274.62 0.50 275.21 15 Cir 0.012 0.66 278.95 p-2 to p-1 59 58 133.00 22.75 Curb 0.00 0.11 0.95 0.1 275.31 0.50 275.98 15 Cir 0.012 1.39 280.25 p-3 to p-2 60 59 112.00 65.19 Curb 0.00 0.12 0.95 0.1 276.32 1.00 277.44 12 Cir 0.012 0.50 280.10 p-4 to p-3 61 60 52.00 0.00 Curb 0.00 0.09 0.95 0.1 277.54 1.00 278.06 12 Cir 0.012 1.00 280.10 p-5 to p-4 62 39 36.00 -88.46 Curb 0.00 0.26 0.95 0.1 271.69 0.50 271.87 15 Cir 0.012 0.50 276.05 q-1 to j-7 63 62 55.00 0.00 Curb 0.00 0.25 0.95 0.1 272.22 1.00 272.77 12 Cir 0.012 1.00 276.05 q-2 to q-1 Ardmore Flowers Number of lines: 63 Date: 12/15/2020 Storm Sewers v2019.20 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 109.00 0.23 6.18 0.95 0.22 5.87 0.1 6.6 7.1 41.55 88.63 6.88 36 1.50 263.50 265.14 266.60 267.24 0.00 276.50 a-1 to a-0 2 1 141.00 0.22 3.31 0.95 0.21 3.14 0.1 4.1 7.6 23.88 30.04 9.44 24 1.50 267.14 269.26 268.49 270.99 276.50 276.50 a-2 to a-1 3 2 142.00 0.15 3.09 0.95 0.14 2.94 0.1 3.7 7.6 22.29 30.01 7.99 24 1.50 269.35 271.48 270.99 273.16 276.50 277.25 a-3 to a-2 4 3 121.00 0.34 2.94 0.95 0.32 2.79 0.1 3.4 7.6 21.21 30.05 7.81 24 1.50 271.58 273.40 273.16 275.05 277.25 278.60 a-4 to a-3 5 4 113.00 0.35 2.14 0.95 0.33 2.03 0.1 3.1 7.6 15.44 30.05 6.21 24 1.50 273.50 275.20 275.05 276.62 278.60 281.75 a-5 to a-4 6 5 116.00 0.25 1.17 0.95 0.24 1.11 0.1 2.3 7.6 8.44 30.01 4.48 24 1.50 275.29 277.03 276.62 278.06 281.75 283.10 a-6 to a-5 7 6 62.00 0.04 0.92 0.95 0.04 0.87 0.1 2.1 7.6 6.64 11.38 6.01 18 1.00 277.63 278.25 278.45 279.25 283.10 283.50 a-7 to a-6 8 7 138.00 0.02 0.88 0.95 0.02 0.84 0.1 1.6 7.6 6.35 9.89 7.25 15 2.00 278.60 281.36 279.33 282.38 283.50 288.50 a-8 to a-7 9 8 55.00 0.08 0.77 0.95 0.08 0.73 0.1 0.9 7.6 5.55 9.89 5.65 15 2.00 281.46 282.56 282.38 283.51 288.50 287.05 a-9 to a-8 10 9 71.00 0.18 0.69 0.95 0.17 0.66 0.1 0.6 7.6 4.98 8.59 5.40 15 1.51 282.66 283.73 283.51 284.63 287.05 287.05 a-10 to a-9 11 10 97.00 0.51 0.51 0.95 0.48 0.48 0.1 0.1 7.6 3.68 7.00 4.51 15 1.00 283.83 284.80 284.63 285.57 287.05 287.05 a-11 to a-10 12 1 173.00 0.33 2.12 0.95 0.31 2.01 0.1 6.0 7.3 14.62 24.50 7.24 24 1.00 269.64 271.37 270.75 272.75 276.50 276.75 b-1 to a-1 13 12 107.00 0.21 1.79 0.95 0.20 1.70 0.1 5.6 7.4 12.58 24.50 5.95 24 1.00 271.47 272.54 272.75 273.81 276.75 277.85 b-2 to b-1 14 13 143.00 0.25 1.20 0.95 0.24 1.14 0.1 5.1 7.6 8.62 11.38 6.54 18 1.00 273.14 274.57 274.12 275.71 277.85 279.25 b-3 to b-2 15 14 142.00 0.14 0.95 0.95 0.13 0.90 0.1 4.5 7.6 6.85 11.38 5.33 18 1.00 274.67 276.09 275.71 277.10 279.25 283.10 b-4 to b-3 16 15 39.00 0.06 0.81 0.95 0.06 0.77 0.1 4.3 7.6 5.84 9.89 7.03 15 2.00 276.44 277.22 277.13 278.20 283.10 283.05 b-5 to b-4 17 16 38.00 0.08 0.56 0.95 0.08 0.53 0.1 4.2 7.6 4.04 8.57 4.59 15 1.50 277.32 277.89 278.20 278.70 283.05 283.10 b-6 to b-5 18 17 65.00 0.44 0.48 0.95 0.42 0.46 0.1 3.9 7.6 3.46 4.74 5.88 12 1.51 278.24 279.22 278.87 280.01 283.10 282.60 b-7 to b-6 19 18 84.00 0.04 0.04 0.95 0.04 0.04 0.1 0.1 7.6 0.29 5.46 1.36 12 2.00 279.31 280.99 280.01 281.21 282.60 283.50 b-8 to b-7 20 13 111.00 0.27 0.38 0.95 0.26 0.36 0.1 1.0 7.6 2.74 9.89 5.52 15 2.00 273.39 275.61 273.84 276.27 277.85 279.50 c-1 to b-2 21 20 53.00 0.11 0.11 0.95 0.10 0.10 0.1 0.1 7.6 0.79 3.86 3.37 12 1.00 275.96 276.49 276.27 276.86 279.50 279.50 c-2 to c-1 22 16 42.00 0.19 0.19 0.95 0.18 0.18 0.1 0.1 7.6 1.37 7.00 3.87 15 1.00 279.22 279.64 279.60 280.10 283.05 283.90 d-1 to b-5 Ardmore Flowers Number of lines: 63 Run Date: 12/15/2020 NOTES:Intensity = 61.15 / (Inlet time + 11.30) ^ 0.75; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2019.20 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 23 1 91.00 0.29 0.52 0.95 0.28 0.49 0.1 1.6 7.6 3.75 12.12 6.67 15 3.00 271.89 274.62 272.37 275.40 276.50 279.05 a-1 to a-1 24 23 97.00 0.10 0.23 0.95 0.10 0.22 0.1 0.8 7.6 1.66 3.86 4.25 12 1.00 274.97 275.94 275.43 276.49 279.05 279.05 a-2 to a-1 25 24 52.00 0.13 0.13 0.95 0.12 0.12 0.1 0.1 7.6 0.94 3.86 2.95 12 1.00 276.04 276.56 276.49 276.97 279.05 279.50 a-3 to a-2 26 4 51.00 0.22 0.46 0.95 0.21 0.44 0.1 0.8 7.6 3.32 4.74 5.79 12 1.51 274.50 275.27 275.12 276.05 278.60 278.75 f-1 to a-4 27 26 99.00 0.24 0.24 0.95 0.23 0.23 0.1 0.1 7.6 1.73 3.86 3.42 12 1.00 275.36 276.35 276.05 276.91 278.75 278.75 f-2 to f-1 28 5 45.00 0.10 0.62 0.95 0.10 0.59 0.1 0.9 7.6 4.47 5.46 6.92 12 2.00 276.29 277.19 276.98 278.07 281.75 280.75 g-1 to a-5 29 28 40.00 0.11 0.52 0.95 0.10 0.49 0.1 0.7 7.6 3.75 5.46 5.55 12 2.00 277.29 278.09 278.07 278.91 280.75 280.75 g-2 to g-1 30 29 43.00 0.10 0.41 0.95 0.10 0.39 0.1 0.5 7.6 2.96 3.86 4.81 12 1.00 278.19 278.62 278.91 279.36 280.75 280.75 g-3 to g-2 31 30 72.00 0.31 0.31 0.95 0.29 0.29 0.1 0.1 7.6 2.24 3.86 4.23 12 1.00 278.72 279.44 279.36 280.08 280.75 282.50 g-4 to g-3 32 8 48.00 0.09 0.09 0.95 0.09 0.09 0.1 0.1 7.6 0.65 15.64 1.68 15 5.00 281.46 283.86 282.38 284.17 288.50 287.05 h-1 to a-8 33 End 74.00 0.01 7.43 0.95 0.01 7.06 0.1 5.7 7.4 52.00 125.7 10.77 30 8.00 248.50 254.42 253.43 256.74 0.00 263.00 j-1 to j-0 34 33 24.00 0.36 7.42 0.95 0.34 7.05 0.1 5.6 7.4 52.02 76.95 13.88 30 3.00 258.42 259.14 259.93 261.46 263.00 275.05 j-2 to j-1 35 34 73.00 0.29 7.06 0.95 0.28 6.71 0.1 5.5 7.4 49.75 76.95 13.60 30 3.00 263.14 265.33 264.60 267.63 275.05 275.05 j-3 to j-2 36 35 39.00 0.32 6.77 0.95 0.30 6.43 0.1 5.5 7.4 47.85 76.95 10.35 30 3.00 265.43 266.60 267.63 268.87 275.05 274.10 j-4 to j-3 37 36 170.00 0.27 3.74 0.95 0.26 3.55 0.1 4.9 7.6 26.98 38.55 6.61 30 0.75 266.70 267.98 268.87 269.75 274.10 276.75 j-5 to j-4 38 37 90.00 0.57 3.02 0.95 0.54 2.87 0.1 4.6 7.6 21.78 38.62 6.44 30 0.76 268.08 268.76 269.75 270.35 276.75 275.05 j-6 to j-5 39 38 199.00 0.61 1.60 0.95 0.58 1.52 0.1 2.4 7.6 11.54 21.20 6.32 24 0.75 269.35 270.84 270.40 272.06 275.05 275.10 j-7 to j-6 40 39 173.00 0.10 0.48 0.95 0.10 0.46 0.1 1.3 7.6 3.46 6.06 4.80 15 0.75 271.69 272.99 272.37 273.74 275.10 280.00 j-8 to j-7 41 40 30.00 0.15 0.38 0.95 0.14 0.36 0.1 1.1 7.6 2.74 7.00 4.19 15 1.00 273.09 273.39 273.74 274.05 280.00 277.50 j-9 to j-8 42 41 35.00 0.04 0.23 0.95 0.04 0.22 0.1 0.8 7.6 1.66 3.86 4.25 12 1.00 273.75 274.10 274.21 274.65 277.50 277.50 j-10 to j-9 43 42 30.00 0.03 0.19 0.95 0.03 0.18 0.1 0.6 7.6 1.37 3.86 3.73 12 1.00 274.19 274.49 274.65 274.98 277.50 277.50 j-11 to j-10 44 43 40.00 0.16 0.16 0.95 0.15 0.15 0.1 0.1 7.6 1.15 3.86 3.67 12 1.00 274.59 274.99 274.98 275.44 277.50 277.50 j-12 to j-11 Ardmore Flowers Number of lines: 63 Run Date: 12/15/2020 NOTES:Intensity = 61.15 / (Inlet time + 11.30) ^ 0.75; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2019.20 Storm Sewer Tabulation Page 3 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 45 36 159.00 0.50 1.05 0.95 0.48 1.00 0.1 1.6 7.6 7.57 11.38 5.38 18 1.00 267.70 269.29 268.87 270.36 274.10 274.10 k-1 to j-4 46 45 97.00 0.01 0.55 0.95 0.01 0.52 0.1 1.1 7.6 3.97 12.12 5.11 15 3.00 269.64 272.55 270.36 273.36 274.10 279.00 k-2 to k-1 47 46 101.00 0.27 0.54 0.95 0.26 0.51 0.1 0.8 7.6 3.90 8.63 8.12 12 5.00 272.90 277.95 273.37 278.79 279.00 281.40 k-3 to k-2 48 47 103.00 0.27 0.27 0.95 0.26 0.26 0.1 0.1 7.6 1.95 3.86 3.57 12 1.00 278.05 279.08 278.79 279.67 281.40 281.40 k-4 to k-3 49 36 108.00 0.22 1.66 0.95 0.21 1.58 0.1 3.4 7.6 11.97 16.09 7.70 18 2.00 267.70 269.86 268.87 271.17 274.10 277.50 1-1 to j-4 50 49 122.00 0.25 1.44 0.95 0.24 1.37 0.1 3.1 7.6 10.39 13.93 6.72 18 1.50 269.96 271.79 271.17 273.03 277.50 278.10 1-2 to 1-1 51 50 194.00 0.30 1.19 0.95 0.29 1.13 0.1 2.4 7.6 8.58 11.38 5.98 18 1.00 271.89 273.83 273.03 274.96 278.10 278.10 1-3 to 1-2 52 51 118.00 0.33 0.89 0.95 0.31 0.85 0.1 1.8 7.6 6.42 8.04 5.04 18 0.50 273.93 274.52 274.96 275.52 278.10 279.40 1-4 to 1-3 53 52 99.00 0.43 0.56 0.95 0.41 0.53 0.1 1.3 7.6 4.04 4.97 3.49 15 0.51 274.87 275.37 276.13 276.42 279.40 279.40 1-5 to 1-4 54 53 57.00 0.13 0.13 0.95 0.12 0.12 0.1 0.1 7.6 0.94 9.89 1.91 15 2.00 275.47 276.61 276.52 276.99 279.40 280.10 1-6 to 1-5 55 37 78.00 0.45 0.45 0.95 0.43 0.43 0.1 0.1 7.6 3.25 6.08 4.72 15 0.76 269.33 269.92 269.98 270.65 276.75 274.10 m-1 to j-5 56 38 85.00 0.18 0.18 0.95 0.17 0.17 0.1 0.1 7.6 1.30 6.07 3.60 15 0.75 270.10 270.74 270.49 271.19 275.05 274.50 n-1 to j-6 57 38 151.00 0.17 0.67 0.95 0.16 0.64 0.1 4.0 7.6 4.83 9.89 6.59 15 2.00 271.50 274.52 272.12 275.41 275.05 278.60 p-1 to j-6 58 57 117.00 0.18 0.50 0.95 0.17 0.48 0.1 3.3 7.6 3.61 4.97 4.42 15 0.50 274.62 275.21 275.41 276.00 278.60 278.95 p-2 to p-1 59 58 133.00 0.11 0.32 0.95 0.10 0.30 0.1 2.1 7.6 2.31 4.97 3.19 15 0.50 275.31 275.98 276.20 276.59 278.95 280.25 p-3 to p-2 60 59 112.00 0.12 0.21 0.95 0.11 0.20 0.1 1.1 7.6 1.51 3.86 4.14 12 1.00 276.32 277.44 276.76 277.96 280.25 280.10 p-4 to p-3 61 60 52.00 0.09 0.09 0.95 0.09 0.09 0.1 0.1 7.6 0.65 3.86 2.44 12 1.00 277.54 278.06 277.96 278.40 280.10 280.10 p-5 to p-4 62 39 36.00 0.26 0.51 0.95 0.25 0.48 0.1 0.5 7.6 3.68 4.95 4.42 15 0.50 271.69 271.87 272.49 272.67 275.10 276.05 q-1 to j-7 63 62 55.00 0.25 0.25 0.95 0.24 0.24 0.1 0.1 7.6 1.80 3.86 3.76 12 1.00 272.22 272.77 272.82 273.34 276.05 276.05 q-2 to q-1 Ardmore Flowers Number of lines: 63 Run Date: 12/15/2020 NOTES:Intensity = 61.15 / (Inlet time + 11.30) ^ 0.75; Return period =Yrs. 25 c = cir e = ellip b = box Storm Sewers v2019.20 APPENDIX `USGS U.S. DEPARTMENT S. GEOLOGICAL GIICAL SURV YERIOR science for a changing world -78.3750' 35.7500' 738000M E 39 40 3959000m N 58 57 56 55 54 53 52 51 50 49 M 47 46 35.6250' 38 -78.3750' 39 40 41 41 42 42 43 The National Map USTopo 43 44 44 45 Produced by the United States Geological Survey N1N ' SCALE 1:24 000 North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and N 1 0.5 0 KILOMETERS 1 2 1 000-meter grid: Universal Transverse Mercator, Zone 175 1000 500 0 METERS 1000 2000 This map is not a legal document. Boundaries may be 9/2° generalized for this map scale. Private lands within government 169 MILS 1 0.5 1°34" E=—0 1 reservations may not be shown. Obtain permission before 28 MILS MILES entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 Imagery .....................................................NAIP, June 2016 - November 2016 FEET Roads ......................................... U.S. Census Bureau, 2016 UTM GRID AND 2019 MAGNETIC NORTH Names............................................................................GNIS, 1980 - 2016 DECLINATION AT CENTER OF SHEET Hydrography...............................National Hydrography Dataset, 2001 - 2018 CONTOUR INTERVAL 10 FEET Contours............................................National Elevation Dataset, 2008 U.S. National Grid NORTH AMERICAN VERTICAL DATUM OF 1988 Boundaries ..............Multiple sources; see metadata file 2017 - 2018 100,000 - m Square ID Wetlands.................FWS National Wetlands Inventory 1983 This map was produced to conform with the OV National Geospatial Program US Topo Product Standard, 2011. A metadata file associated with this product is draft version 0.6.18 Grid Zone Designation 17S 45 46 C- NORTr AROLINA QUADRANGLE LOCATION 1 Knightdale 1 2 3 2 Zebulon 3 Middlesex 4 5 4 Clayton 5 Stancils Chapel 6 Powhatan 6 7 8 7 Selma 8 Kenly West ADJOINING QUADRANGLES 47 47 FLOWERS QUADRANGLE NORTH CAROLINA - JOHNSTON COUNTY 7.5-MINUTE SERIES 48 48 78.2500' 35.7500' 59 58 57 56 55 54 53 52 51 50 49 48 47 3946000m N 749000mE -78.2500' 35.6250° ROAD CLASSIFICATION Expressway Local Connector v Secondary Hwy _ Local Road to to Ramp 4WD 00 • Interstate Route US Route O State Route �Y M N �x �U) o(D c+) j CD Z U. W FLOWERS, NC y< 2019 z z 3 0 N 740110 35° 39' 6" N 35° 38' 51" N R R Soil Map —Johnston County, North Carolina 740160 740210 740260 740310 740110 740160 740210 740260 740310 3 M a Map Scale: 1:2,230 W printed on A portrait (8.5" x 11") sheet Meters N 0 30 60 120 180 Feet 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 740360 740360 3 0 N 740410 35' 39' 6" N I 35' 38' 51" N 740410 3 m b 12/15/2020 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons rwr Soil Map Unit Lines 0 Soil Map Unit Points Special Point Features Vo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit .14 Gravelly Spot 0 Landfill Lava Flow Marsh or swamp + Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot 4 Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Soil Map —Johnston County, North Carolina MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Other line placement. The maps do not show the small areas of .- Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation — Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: rwr Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator L Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background . Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 24, Jun 4, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 22, 2018—Oct 25, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Johnston County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI MaB PaD Marlboro sandy loam, 2 to 8 percent slopes Pacolet loam, 10 to 15 percent slopes 2.3 5.8 21.2% 53.1 % Ud Udorthents, loamy 1.0 9.0% Wt Wehadkee loam, 0 to 2 percent slopes, frequently flooded 1.8 16.6% Totals for Area of Interest 10.8 100.0% 05�D_A Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Map Unit Description: Marlboro sandy loam, 2 to 8 percent slopes ---Johnston County, North Carolina Johnston County, North Carolina MaB—Marlboro sandy loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3t4k Elevation: 80 to 330 feet Mean annual precipitation: 38 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 210 to 265 days Farmland classification: All areas are prime farmland Map Unit Composition Marlboro and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Marlboro Setting Landform: Broad interstream divides on marine terraces, ridges on marine terraces Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Crest Down -slope shape: Convex Across -slope shape: Convex Parent material: Clayey marine deposits Typical profile Ap - 0 to 10 inches: sandy loam Bt1 - 10 to 71 inches: sandy clay Bt2 - 71 to 80 inches: sandy clay Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 48 to 72 inches Frequency of flooding: None Frequency of ponding: None Available water capacity. High (about 9.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 1 of 2 Map Unit Description: Marlboro sandy loam, 2 to 8 percent slopes ---Johnston County, North Carolina Hydric soil rating: No Data Source Information Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 24, Jun 4, 2020 usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 2 of 2 Map Unit Description: Pacolet loam, 10 to 15 percent slopes ---Johnston County, North Carolina Johnston County, North Carolina PaD—Pacolet loam, 10 to 15 percent slopes Map Unit Setting National map unit symbol: 3t4w Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Pacolet and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile A - 0 to 3 inches: loam E - 3 to 6 inches: loam Bt - 6 to 25 inches: clay BC - 25 to 40 inches: clay loam C - 40 to 80 inches: sandy loam Properties and qualities Slope: 10 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity. Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 1 of 2 Map Unit Description: Pacolet loam, 10 to 15 percent slopes ---Johnston County, North Carolina Hydric soil rating: No Data Source Information Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 24, Jun 4, 2020 usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 2 of 2 Map Unit Description: Udorthents, loamy ---Johnston County, North Carolina Johnston County, North Carolina Ud—Udorthents, loamy Map Unit Setting National map unit symbol: 3t59 Elevation: 20 to 330 feet Mean annual precipitation: 40 to 55 inches Mean annual air temperature: 59 to 70 degrees F Frost -free period: 200 to 280 days Farmland classification: Not prime farmland Map Unit Composition Udorthents and similar soils: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents Setting Down -slope shape: Linear Across -slope shape: Linear Parent material: Loamy mine spoil or earthy fill Typical profile C - 0 to 80 inches: sandy clay loam Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water capacity. Moderate (about 8.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Hydric soil rating: No Data Source Information Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 24, Jun 4, 2020 usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 1 of 1 Map Unit Description: Wehadkee loam, 0 to 2 percent slopes, frequently flooded ---Johnston County, North Carolina Johnston County, North Carolina Wt—Wehadkee loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 3t5l Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Wehadkee, undrained, and similar soils: 85 percent Wehadkee, drained, and similar soils: 10 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wehadkee, Undrained Setting Landform: Depressions on flood plains Down -slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile A - 0 to 8 inches: loam Bg - 8 to 43 inches: sandy clay loam Cg - 43 to 80 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Ponded Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water capacity: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6w Hydrologic Soil Group: B/D Hydric soil rating: Yes usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 1 of 2 Map Unit Description: Wehadkee loam, 0 to 2 percent slopes, frequently flooded ---Johnston County, North Carolina Description of Wehadkee, Drained Setting Landform: Depressions on flood plains Down -slope shape: Concave Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 8 inches: loam Bg - 8 to 43 inches: sandy clay loam Cg - 43 to 80 inches: sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Ponded Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: Frequent Frequency of ponding: None Available water capacity: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Hydric soil rating: Yes Minor Components Chewacla Percent of map unit: 3 percent Landform: Flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: No Riverview Percent of map unit: 2 percent Landform: Flood plains Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: No Data Source Information Soil Survey Area: Johnston County, North Carolina Survey Area Data: Version 24, Jun 4, 2020 usDA Natural Resources Web Soil Survey 12/15/2020 Conservation Service National Cooperative Soil Survey Page 2 of 2 12/15/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 ' Location name: Clayton, North Carolina, USA* ' Latitude: 35.6542*, Longitude:-78.346* Elevation: 295.3 ft** source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, I Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.98 5.80 6.60 7.44 8.30 9.00 9.64 10.2 10.9 11.5 (4.55-5.47) 1 (5.30-6.34) 1 (6.05-7.22) 1 (6.79-8.14) 1 (7.55-9.06) 1 (8.15-9.83) 1 (8.66-10.5) 1 (9.14-11.1) 1 (9.66-11.9) 1 (10.1-12.6) 10-min 3.98 4.63 5.29 5.95 6.61 7.16 7.65 8.09 8.61 9.05 (3.64-4.37) 1 (4.24-5.07) 1 (4.84-5.78) 1 (5.43-6.50) 1 (6.01-7.22) 1 (6.89-8.35) 1 (7.25-8.84) 1 (7.64-9.41) 1 (7.97-9.92) 15-min 3.32 3.88 4.46 5.02 5.59 (3.03-3.64) 1 (3.56-4.25) 1 (4.08-4.88) 1 (4.58-5.49) 1 (5.08-6.10) 30-min 2.27 2.68 3.17 3.64 4.14 (2.08-2.50) 11 (2.45-2.93) 1 (2.90-3.46) 1 (3.32-3.98) 1 (3.76-4.52) 6.05 6.45 6.81 7.22 7.58 (5.48-6.60) 1 (5.80-7.03) 11 (6.10-7.44) 1 (6.41-7.89) 11 (6.67-8.30) 4.55F 4 5.30 5.75 6.14 (4.12-4.97) -5. (4.44-5.38) 1 (4.74-5.79) 1 (5.10-6.28) 1 (5.40-6.72) 60-min -1.42F 1.68 F 2.03 F 2.37 F 2.76 F 3.09 F 3.40 F 3.72 F 4.12 F 4.48 (1.30-1.56) 1 (1.54-1.84) 1 (1.86-2.22) 1 (2.16-2.59) (2.51-3.01) 1 (2.79-3.37) (3.06-3.71) 11 (3.33-4.06) (3.66-4.51) 11 (3.94-4.91) 2-hr 0.832 0.990 1.21 1.43 1.70 1.94 2.17 2.42 2.74 3.04 (0.754-0.922) (0.902-1.09) 1 (1.10-1.34) 1 (1.30-1.58) (1.53-1.87) 1 (1.74-2.13) (1.93-2.39) 11 (2.14-2.65) (2.41-3.01) (2.64-3.35) 3-hr 0.587 0.700 0.860 1.02 1.23 1.41 1.60 1.80 2.07 2.33 (0.533-0.652) ( 0.638-0.775) ( 0.782-0.952) (0.928-1.13) 11 (1.11-1.35) (1.26-1.56) (1.42-1.76) 1 (1.59-1.98) (1.81-2.28) (2.00-2.57) 6-hr 0.352 0.420 0.516 0.615 0.740 0.855 0.972 1.10 1.27 1.43 (0.321-0.390) (0.383-0.463) (0.470-0.569) (0.559-0.677) (0.668-0.813) (0.767-0.938) (0.864-1.06) (0.966-1.20) (1.11-1.39) (1.23-1.57) 12-hr 0.206 0.245 0.303 0.363 0.440 0.512 0.585 0.666 0.779 0.885 (0.188-0.227) (0.224-0.270) (0.276-0.334) (0.330-0.400) (0.397-0.483) (0.458-0.560) (0.518-0.640) (0.583-0.727) (0.671-0.850) (0.751-0.967) 24-hr 0.121 0.147 0.187 0.220 0.266 0.305 0.345 0.388 0.450 0.502 (0.111-0.132) ( 0.135-0.160) ( 0.172-0.204) ( 0.202-0.240) ( 0.243-0.290) (0.277-0.332) (0.312-0.376) (0.349-0.424) ( 0.401-0.493) (0.443-0.550) 2-day 0.070 0.085 0.107 0.125 0.151 0.172� ( 0.194 ) 0.218 0.251 0.279 (0.065-0.076) (0.078-0.092) (0.099-0.117) (0.115-0.136) (0.138-0.164) F(0-156-0.187 0.176-0.211 (0.196-0.238) (0.224-0.275) (0.246-0.307) 3-day 0.050 0.060 0.075 (0.046-0.054) (0.055-0.065) (0.070-0.082) 4-day 0.039 0.047 0.059 (0.037-0.043) (0.044-0.051) (0.055-0.064) 0.088 0.105 0.119 0.134 0.150 0.173 F 0.1 11 (0.081-0.095) (0.097-0.114) (0.109-0.129) (0.122-0.146) (0.136-0.163) (0.155-0.189) (0.170-0.209) 0.069 0.082 0.093 0.105 0.117 0.134 0.147 (0.064-0.074) (0.076-0.089) (0.085-0.100) (0.095-0.113) (0.106-0.126) (0.120-0.145) (0.132-0.161) 7-day 0.026 0.031 0.039 0.045 0.053 0.060 (0.024-0.028) (0.029-0.034) (0.036-0.042) (0.041-0.048) (0.049-0.057) (0.055-0.064) 10-day F F0.021 0.025 0.030 0.035 0.041 0.045 (0.020-0.022) (0.023-0.027) (0.028-0.033) (0.032-0.037) (0.038-0.043) (0.042-0.048) 0.066 0.074 0.084 0.092 (0.061-0.071) (0.067-0.079) (0.076-0.091) (0.083-0.100) 0.050 0.055 0.062 0.067 (0.046-0.054) (0.051-0.059) (0.056-0.067) (0.061-0.073) 20-day 0.014 0.017 0.020 0.023 0.026 0.029 0.032 0.035 0.039 0.042 (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.028) (0.027-0.031) (0.029-0.034) (0.032-0.037) (0.036-0.042) (0.038-0.045) P�-�day]F 0.012 0.014 0.016 (0.011-0.012) (0.013-0.015) (0.015-0.017) [Wd7ay 0.010 0.012 0.013 (0.009-0.010) (0.011-0.012) (0.013-0.014) 0.018 0.021 0.023 0.025 0.026 0.029 0.031 (0.017-0.019) (0.019-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) 0.015 0.017 0.018 0.020 0.021 0.023 0.024 (0.014-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.020-0.022) (0.021-0.024) (0.023-0.026) 60-day 0.009 11 0.010110.012 11 0.013 0.015 0,016 0,017 0.018 0.019 0.021 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.021), (0.019-0.( 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). umbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a ven duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not iecked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.346O&data=intensity&units=english&series=pds 1/4 12/15/2020 Precipitation Frequency Data Server 100-000 PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.55421, Longitude:-78.3464" L L L L L ry ry �4 N �4 r4 � N� O O O N A4/3 H A V 4 � O O O U' O -I H m [aH ry rn v Ln Duration 100-000 t 10-000 C ZI C 1-000 C e 0-100 a d-010 0 001 i I I I I I I I I i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Tue Dec 15 16:13:4a 2D20 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) —1 2 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — I D-min — 3-day 15-min — 4-day — 3D-min — 7-day — 50-min — 1d-eay — 2-nr — 20-clay — 3-hr — 30-day — 6-hr — 45-tlay — 12-hr — 6o-day — 24-hr https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.346O&data=intensity&units=english&series=pds 2/4 12/15/2020 Precipitation Frequency Data Server Large scale terrain N orfol k al elll Greensboro • Rocky Mount Role+gh . 1 —•— C A R O L I N A *Greenville Aotte + gar Fayetterille i Jaeksonvill — I 00 0i6m + dr ilmini n.n L�flS/C}4Y Large scale map 2,n-Sale m Greensboro o ❑arham Rocky Mount rl Rai gh North Greenville Carolina 14tte F ayettevi I I e —" � J Eck°.ai _- i I le 100km 60mi / \ Sliltnii ..i tri. Large scale aerial Norfolk https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.346O&data=intensity&units=english&series=pds 3/4 12/15/2020 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.346O&data=intensity&units=english&series=pds 4/4 12/15/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 ' Location name: Clayton, North Carolina, USA* ' Latitude: 35.6542*, Longitude:-78.346* Elevation: 295.3 ft** source: ESRI Maps m y� ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, I Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration ���������� 1 2 5 10 25 50 100 200 500 1000 0.415 0.483 0-5-5-01F 0.620 IF 0.692 0.750 F 0.803 0.851 0.90-7-IF 0.959 5-min (0.379-0.456) (0.442-0.528) (0.504-0.602) (0.566-0.678) (0.629-0.755) (0.679-0.819) (0.722-0.875) (0.762-0.929) (0.805-0.991) (0.843-1.05) 0.664 0.772 0.881 0.992 1.10 1.19 1.27 1.35 1.44 1.51 10-min (0.606-0.729) (0.707-0.845) (0.806-0.963) (0.905-1.08) 1 (1.00-1.20) 1 (1.08-1.30) 1 (1.15-1.39) 1 (1.21-1.47) 1 (1.27-1.57) (1.33-1.65) 0.830 0.971 1.11 1.25 1.40 1.51 1.61 1.70 1.81 1.90 15-min (0.758-0.911) (0.889-1.06) 1 (1.02-1.22) 1 (1.15-1.37) 1 (1.27-1.53) (1.37-1.65) (1.45-1.76) 11 (1.52-1.86) 1 (1.60-1.97) (1.67-2.08) 1.14 1.34 1.58 1.82 2.07 2.28 2.47 2.65 2.87 F 3.07 30-min (1.04-1.25) 1 (1.23-1.47) 1 (1.45-1.73) 1 (1.66-1.99) 1 (1.88-2.26) (2.06-2.49) (2.22-2.69) (2.37-2.89) 1 (2.55-3.14) (2.70-3.36) 60-min 1.42 1.68 2.03 2.37 2.76 3.09 3.40 3.72 4.12 4.48 (1.30-1.56) (1.54-1.84) (1.86-2.22) 11 (2.16-2.59) 1 (2.51-3.01) (2.79-3.37) 1 (3.06-3.71) 1 (3.33-4.06) 1 (3.66-4.51) (3.94-4.91) 1.66 1.98 2.43 2.87 3.40 3.88 4.34 4.84 5.49 6.08 2-hr (1.51-1.84) (1.80-2.18) (2.20-2.68) 1 (2.60-3.16) 1 (3.06-3.74) (3.48-4.26) 1 (3.87-4.77) 1 (4.28-5.31) 1 (4.81-6.03) (5.28-6.69) 1.76 2.10 3.0 2.58 8 3.69 4.24 4.80 5.40 6.23 6.99 3-hr (1 .60-1.96) 1 (1.92-2.33) (2.35-2.86) 11 (2.79-3.40) 1 (3.32-4.07) (3.80-4.68) (4.26-5.29) 1 (4.76-5.95) 1 (5.43-6.86) (6.02-7.71) 6-hr 2.11 2.51 3.09 ) 3.69 4.43 5.12 5.82 6.57 7.62 8.59 ) (1.92-2.33) (2.30-2.77) (2.82-3.41 (3.35-4.06) (4.00-4.87) (4.59-5.61) (5.17-6.37) (5.79-7.19) (6.62-8.33) (7.37-9.41 2.48 2.96 3.65 4.38 5.31 6.17 7.05 8.02 9.39 10.7 12-hr (2.26-2.74) 1 (2.70-3.26) (3.33-4.03) 1 (3.98-4.82) 1 (4.78-5.82) 1 (6.24-7.71) 1 (7.02-8.76) 1 (8.08-10.2) 1 (9.05-11.7) 2.90 3.52 4.49 5.28 6.39 7.31 8.28 9.32 10.8 12.0 24-hr (2 .67-3.17) (3.24-3.84) (4.13-4.90) (4.84-5.75) (5.83-6.96) (6.64-7.96) (7.48-9.02) 1 (8.37-10.2) 1 (9.61-11.8) (10.6-13.2) 2-day 3.37 4.07 5.14 6.02 7.24 8.25 9.31 10.4 12.1 13.4 (3.10-3.66) (3.75-4.43) (4.74-5.60) (5.53-6.55) (6.63-7.88) 1 (7.51-8.98) (8.44-10.2) 1 (9.40-11.4) 1 (10.7-13.2) (11.8-14.7) 3.57 4.31 5.42 6.32 7.57 8.60 9.67 10.8 12.4 13.8 3-day (3.31-3.87) 1 (3.99-4.67) 1 (5.01-5.87) 1 (5.83-6.84) 1 (6.95-8.20) 1 (7.86-9.31) 1 (8.80-10.5) 1 (9.77-11.8) 1 (11.1-13.6) (12.2-15.1) 3.78 4.55 5.70 6.62 7.90 8.94 10.0 11.2 12.8 14.2 4-day (3.51-4.08) (4.22-4.91) (5.28-6.14) (6.12-7.13) (7.27-8.51) (8.21-9.65) (9.16-10.8) (10.2-12.1) (11.5-13.9) ( 12.6-15.4) 4.39 5.27 6.51 7.51 8.89 10.0 11.2 12.4 14.1 15.4 7-day (4.09-4.72) 1 (4.90-5.66) 1 (6.05-7.00) 1 (6.96-8.06) 1 (8.22-9.55) (9.21-10.8) 1 (11.3-13.4) 1 (12.7-15.2) ( 13.9-16.8) 5.02 6.00 7.31 8.33 9.74 10.9 12.0 13.2 14.8 16.2 10-day (4.70-5.37) 1 (5.61-6.41) 1 (6.82-7.81) 1 (7.77-8.90) 1 (9.05-10.4) 1 (10.1-11.6) 1 (11.1-12.9) 1 (12.1-14.2) 1 (13.5-16.0) (14.7-17.4) 20-day 6.74 8.00 9.58 10.8 12.5 13.9 15.3 16.7 18.6 20.1 (6.32-7.20) 1 (7.50-8.54) 1 (8.97-10.2) 1 (10.1-11.6) 1 (11.7-13.4) 1 (12.9-14.8) 1 (14.1-16.3) (15.4-17.8) (17.0-20.0) (18.3-21.7) 8.38 9.90 11.7 13.0 14.8 16.3 17.7 19.1 21.0 22.5 30-day (7.88-8.94) 1 (9.31-10.6) 1 (10.9-12.4) 1 (12.2-13.9) 1 (13.9-15.8) 1 (15.1-17.3) 1 (16.4-18.8) (17.7-20.4) (19.3-22.5) (20.6-24.1) 10.7 12.5 14.5 16.1 18.1 19.6 21.2 22.7Uo_�2426.3 45-day FL,.8-22.5) (10.1-11.3) (11.9-13.3) (13.7-15.4) (15.2-17.0) (17.0-19.2) (18.4-20.8) (21.2-24.1)6.4) (24.3-28.0) 60-day 12.8 15.0 17.2 18.9 21.1 22.7 24.4 25.9 28.0 29.6 (121-13.5) (14.2-15.8) (16.3-18.2) (17.8-20.0) (19.9-22.3) (21.4-24.1) (22.9-25.8) (24.3-27.5) (26.1-29.8) (27.5-31.5) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (fora given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.6542&Ion=-78.3460&data=depth&units=engIish&series=pds 1/4 12/15/2020 Precipitation Frequency Data Server PDS-based depth -duration -frequency (DDF) curves Latitude: 35.55421, Longitude:-78-34601 30 c -r 20 a w -a 15 ra a .10 5 0 L L L L L ry O O O N A4b H A 4 V � O O O Ln O rl H m [aH ry rn v Ln Duration c 30 25 y ■ O -------------------=---- ---- i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created {GMTY Tue Dec 15 16.13.20 2D20 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — I D-min — 3-day 15-min — 4-day — 30�-min — 7-day — 60-min — 10-day — 2-nr — 20-day — 3-hr — 30-clay — 6-hr — 45-day — 12-hr — 60-day — 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.3460&data=depth&units=english&series=pds 2/4 12/15/2020 Precipitation Frequency Data Server t,f r r Large scale terrain I N orfol k al elll • 7 Dul 11 and Greensboro • 9 Rocky Mount Role+gh . 1 C A R O L I N A * Greenville Aotte + gar Fayetterille i Jaeksonvill — 100km 60mi OL} ru i7rr;rt�w Large scale map Norfolk �n Salem o Greensboro tJarharn Rocky Mount Rai e gh North Greenville Carolina 1 Otte F ayettevi I I e - — ' � ,Jacksonville 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.6542&Ion=-78.3460&data=depth&units=engIish&series=pds 3/4 12/15/2020 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.6542&Ion=-78.3460&data=depth&units=english&series=pds 4/4 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is resent. Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of Inn a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number:_ BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spray ' The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3V5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.5 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 248.5 245 Pe anen Pool --------------- - Volume Sediment Removal Elevation 245 Volume 244 -ft Min. -------------------------------------------- ------ Sediment Bottom Elevation 244 1-ft n Storage Sedirr FOREBAY Storage MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Ardmore at Flowers BMP drainage area number: Print name:Brantlev E. White Address:1400 W. Northwood St, Greensboro, NC 27408 Phone:336-383-5906 Signature: Aft/ . t/—,— Date:L-111, J-? L; Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, KY1S A-PXl L . R q r h u s , a Notary Public for the State of N13K r) Can1; r%O, Countyof {Za.ndu l p h , do hereby certify that $ran- I e v r.. W K +-c- personally appeared before me this 1 ' day of aynu�ZZ , o I , and acknowledge the due execution of the forgoing wet ette'ntiion basin maintenance requirements. Witness my hand and official seal, c rH1�/Wv� k, &Lkw Kristen lAarhus NOTARY PUBLIC Randolph County North Carolina My Commission Expires 9128/2025 SEAL My commission expires q I -Z $ 12172 S Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ardmore at Flowers 2. Location of Project (street address): SW quadrant of NC Hwy 42 andBuffalo Rd. City:Clayton CountyJohnston Zip:27527 3. Directions to project (from nearest major intersection): At the intersection of NC Hwy 42 and Buffalo Road head South on Buffalo Rd. for approximately 0.27 miles then turn right on SW Flowers Parkway the site will be on the Right. 4. Latitude:35° 39' 17.2044" N Longitude:78° 20' 8.6028" W II. PERMIT INFORMATION: of the main entrance to the project. 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SKU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberDWR#2006-1804 v29 , its issue date (if known)12-2-19 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 9.82 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Pagel of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Ardmore Residential, LLC Signing Official & Title:Brantley E. White, President; Thomas L. White, Vice President; or Ricky L. Hopkins, Secretary b. Contact information for person listed in item 1a above: Street Address:1400 West Northwood Street City:Greensboro State:NC Zip:27408 Mailing Address (if applicable): City: State: Zip: Phone: (336 ) 383-5926 Fax: ( ) Email:tshaw@ha eg n-eng.com c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Rebecca Flowers Signing Official & Title:Reid Stephenson, Power of Attorney b. Contact information for person listed in item 2a above: Street Address:4880 NC 42 East City:Clayton State:NC Zip:27520 Mailing Address (if applicable): City: State: Zip: Phone: (919 ) 369-8332 Fax: ( ) Email:reid@flowersplantation.com 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( ) Email: 4. Local jurisdiction for building permits: Point of Contact: State: Fax: Phone #: Zip: Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The proposed project will consist of apartments, amenities, and the associated utilities and stormwater 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ® Approval of a Site Specific Development Plan or PUD Approval Date: 3/11 /2013 ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Neuse River basin. 4. Total Property Area: 10.81 acres 5. Total Coastal Wetlands Area: 0.0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:10.81 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHi line. The resultant project area . used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 61 % 9. How many drainage areas does the project have? 3 (For high density, count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area _ Receiving Stream Name Neuse River Stream Class * WS-IV;NSW Stream Index Number * 27-(38.5) Total Drainage Area (so 507,038 On -site Drainage Area (sf) 470,883 Off -site Drainage Area (so 36,155 Proposed Impervious Area** s 268,765 % Impervious Area** total 53 % Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 107,500 On -site Streets (so On -site Parking (so 120,000 On -site Sidewalks (so 28,000 Other on -site (so Future(so Off -site (so 13,100 Existing BUA*** (so Total (so: 268,000 Stream Class and Index Number can be determined at: http://portal.ncdenr.org web/wcl[ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Protects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bpip-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http//portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http//portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/12ages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for _ 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the _ receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 5260 Page No: 0236 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/Ir/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tim Shaw Consulting Firm: Hagen Engineering eering Mailing Address:PO Box 14851 City:Greensboro Phone: (336 ) 286-3350 Email:tshaw@ha eg n-eng.com State:NC Zip:27415 Fax: ( IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Rebecca Flowers certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) BrantleU E. White with (print or type name of organization listed in Contact Information, item 1a) Ardmore Residential LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, , a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: Date: I, , a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 SUPPLEMENT-EZ COVER PAGE AC, PROJECT INFORMATION 1 Project Name i Ardmore at Flowers -2 Projerea (ac) 10.81 ct A 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Densityt , High 6 Does this project use an off -site SCM? j No COMPLIANCE WITH 02H .1003(4) 7 _ _ Width of vegetated setbacks provided (feet) 50' 8 Will the vegetated setback remain vegetated?Yes 8 Its BUA other that as listed in .1003(4)(c-d) out of the setback? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: _ a 11 Infiltration System { 0 12 Bioretentio_n Cell 0 13 Wet Pond 1 14 Storrnwater Wetland 0 15 Permeable Pavement 0 _ 16 Sand Filter 0 _ 17 Rainwater Harvesting (RWH) 0 _ 18 Green Roof 0 19 Level S reader -Filter Stri LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title. 28 Organization: I _ 29 _ Street address: 3 30 City, State. Zip: I _ 31 Phone numbers 32 Email: Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer CARO i SS��''9 r� .. a SEAL 30469 46T 65 • .NGINE,.• G� 11111 Date — 6,7 -- Z. DRAINAGE AREAS 1 Is this a high density project? -—�-- Yes 7 2 If so number of drainage areas/SCMs 1 r Is alpapart of this project subject to previous rule 3 versions? No FORMS -LOADED nRAINAGE AREA INFORMATION Entire Site 4 Type of SCM Wet Pond 5 Total BUA in promect s ft 268765 sf 268765 sf New BUA on subdivided lots (subject to permitting) 6 (soft) —_ — New BUA outside of subdivided lots (subject to 7 (sf) permitting) 268765 sf 268765 sf 8 Offsite - total area (sq ) _ 9 offsite BUA ft 10 Breakdown of new BUA outside subdivided lots: t Parking (s ft 120000 sf 120000 sf Sidewalk (sq ft 28000 sf 28000 sf -Roofs ft 107500 sf 107500 sf - Roadway s fl 13100 sf 13100 sf �T- Future ft - Other, please specify in the comment box below sft) New infiltrating permeable pavement on 11 subdivided lots sq ft New infiltrating permeable pavement outside of tl 12 subdivided lots (sq ft Ebsitng BUA that will remain (not subject to 13 rmitting) (sq ft 14 Epsti BUA that is already permitted (sq ft 15 EbstiBUA that will be removed sq ft 16 Percent BUA 69% 17 DesFgn storm inches _— 1 in 18_ Design volume of SCM cu ft 26305 cf 19 Calculation method for design volume SIMPLE ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drains a area(s): e WET POND 1 Drainage area number j 1 21 Design volume of SCM (cu ft) 1 26305 d GENERAItYWC FROM02H.1M 3 Is the SCM sized to treat the SW from ail surfaces at build -out? Yes 4' Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H_V)? 3:1 Does the SCM have retaining walls, gabion walls or other engineered I 6 side slopes? 1 No Are the inlets, outlets, and receiving stream protected from erosion 7 00-year storm)? Yes Is therean overflow or bypass for inflow volume in excess of the i 8 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Dratvdown Orifice 10-if applicable, will the SCM be cleaned out after_oonshuction? ! Yes 11 Does the maintenance access comply with General MDC (8)? ' Yes 12 Does the drainage easement comply with General MDC (9)? Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 j General MDC (10)? 1 Yes 14' Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that compiles with General MDC (12)? Yes 16, Does the SCM follow the device specific MDC? Yes 171 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 021-1.1053 18,Method used S_AJDA t 19'Has a stage/storage table been provided in the calculations? ' Yes Elevation of the excavated main pod depth (bottom of se- ment ! 20 removal) (fmsi) 244.00 211 Elevation of the man pod battom{rop of sediment removal) (frnsQ ; 245.00 22 FJevatlon of the bottom of the vegetated shelf (fmsq-248.00 23 Elevation of the permanent pod (fmsl) 248.50 241 Elevation of the top of the vegetated shelf (fmsQ I 249.00 25 Elevation of the temporary pod (fms) 250.50 26 Surface area of the man permanent pod (square feet) 11057:1 27 Volume of the main permanent pod (cubic feet) 26066 d 28 Average depth of the man pool (feet) 3.00 It 29 Average depth equation used I Equation 2 36 If using equation 3, man pod perimeter (feet) J 31 If using equation 3, width of submerged veg. shelf (feet) 32� Volume of the forebay (cubic feet) 6333 cf 33 i Is this 15.20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 12 in 35 Design volume of SCM (cu ft) I 26305 cf 36 Is the outlet an orifice or a weir? Ortlice 37 If orifice, orifice diameter (inches) 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawd_own time for the temporarypool (days) 2.35 Are the inlet(s) and outlet located in a manner that avoids short- 41 circuiting? I l Yes 42 Are berths or baffles provided to improve the flow path? No 43 Depth offorebay at entrance (inches) 54 in 44 Depth of forebay at exit (etches) 54 in 45; Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6-1 Does the orifice drawdown from below the top swlrt Of the 48 permanent pool? Yes Does the pond minimize impacts to the receiving channel from the 1- 49 yr, 244w storm? Yes Are fountains proposed? (If Y, please provide documentation that ; 50 MDC(9) is met.) No I 51 Is a trash rack or other device provided to protect the outlet system?Yes r5 52 Are the dam and embankment planted In non -dumping turf grass? Yes 3 Species of turf that will be used on the dam and embankment Centipede 54 Has a planting plan been provided for the vegetated shell? Yes ADDITIONAL INFORMATION j Please use this space to provide any additional information about the 55 wet pond(s): s j� 4 Wet Pond 1 2:51 PM 1/7/2021 ROY COOPER Governor MICHAEL S. REGAN Secretary UNDA CULPEPPER Director NORTH CAROLINA Environmental Quality December 2, 2019 DWR # 2006-1804 v29 Johnston County Ms. Rebecca Flowers, President DWF Development 4880 NC Hwy 42 East Clayton, North Carolina 27527 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN SW Flowers Parkway at Flowers Plantation Dear Ms. Flowers: The Division of Water Resources (Division) recently reviewed the proposed stormwater management plan (SMP) for the subject project as required by Individual 401 Water Quality Certification issued by the Division on November 5, 2008. Submittal of the SMP satisfies the stormwater condition no. 9 of the 401 certification for this phase of the project and is subject to the requirements below. The Division approves the SMP for SW Flowers Parkway at Flowers Plantation consisting of three (3) wet ponds including all associated stormwater conveyances, inlet and outlet structures, and grading and drainage patterns depicted on plan sheets dated July 26, 2019, which are incorporated by reference and are enforceable by the Division. The following conditions also apply [15A NCAC 02H .0506(b)(5)]: a) The maximum allowable drainage area for the approved Wet Pond #1 shall be 428,826 square feet and the maximum allowable built -upon area within that drainage area shall be 300,178 square feet. The maximum allowable drainage area for the approved Wet Pond #2 shall be 328,916 square feet and the maximum allowable built -upon area within that drainage area shall be 230,241 square feet. The maximum allowable drainage area for the approved Wet Pond #3 shall be 307,694 square feet and the maximum allowable built -upon area within that drainage area shall be 215,386 square feet. Any changes to these allowable maximum areas shall require the applicant to submit and receive approval from the Division prior to any construction or modification of the current site. DE Q ,� North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 �+� / 919.707.9000 Page 2 of 2 DWR # 2006-1804 v29 b) The footprint of all stormwater management device(s) as well as an additional 10-foot wide area on all sides of the device(s) shall be located in either public rights -of -way, dedicated common areas or recorded easement areas. The final plats for the project showing such rights -of -way, common areas and easement areas, shall be in accordance with the approved plans. c) The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. d) The SMP may not be modified without prior written authorization from the Division. e) Maintenance activities for stormwater management device(s) shall be performed in accordance with the notarized O&M agreements signed by Ms. Rebecca Flowers of DWF Development on October 3, 2019. The O&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the approved SMP. The Division shall be notified promptly of every transfer. f) The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion or as soon as possible if the project has already been completed. This form is made available online at https:Hedoes.deq.nc.gov/Forms/Certificate-of-Completion. g) Additional SMP(s) for future phases must receive written authorization from the Division before any land disturbance, construction, or expansion of the new phase(s) may occur. Please contact Chonticha McDaniel at (919) 707-3634 or chonticha.mcdaniel@ncdenr.gov if you have any questions or concerns regarding this matter. Sincerely, Mac Haupt, Acting Supervisor 401 & Buffer Permitting Branch cc: Andrew Stocks, P.E. — Stocks Engineering, PA (via email) DWR, Raleigh Regional Office DWR 401 & Buffer Permitting Branch File ` \♦`\♦` \\\\\ \\ \` \\` \\ \\\ ♦\` ♦\` \\\ \\` \' \ ` \ \ \\i i �\ `\ `\ \\ `\ `\ `\ \\\ \ ♦`\ ♦\ \ \\ It It It ------------------ `\ \` It \\ / POND I % l 1 \9 I IN - IN IN \NN NN\ IN \ \ \ \ �\ ♦ - \ \ \ \ \ ♦ ♦ \ / / ,! l ♦ / \ 1 \I -ice_ \ �, \ \ 1 \ I I \ I \ IN IN, \ - --- / ' ! 1 / r'- - - - - - - 1 \ \ y I \ \ - - - \ _ / I / r-- - - - -- \ --- \/ / / \ - i I \ \\ \ \ --- -_ / / - _ / /-✓ / \/ I I I I I I I I / I I 11,, I I I I I I I I � 1 I ,/ 1 `\ \ \\ `♦ \ \_' ----/ / / / / / ,/ /\/ / / /-- I- / 1 / / / % I \ .L /• \ 1 1 1 1 1 1 \ \ I I \ I 10' X 40' / 11 /I 11 11 11 \ \ \ / / \ I 1 1 1 1 1 1 i I I / I 1 1 I\ I I 1 CARRY THE SHOULDER 6' OFF NEW EDP V. IN 284.41 24' RCP 4'LF 28.5Y. W/2-6' FES —INV. OUT 284.15 \. \\ , I III I I I 1 \ \ \ \ • • \ - \ \ 1 `\ `\ \ \ ♦ \\ \ ,YI I I I I I I I / I , / / / I 1 I I I 1 1 ; \\ \\ \ \ \\ \ \ \ - I 1 i oo +• / \ \ � 4 A. \ \ � _ �\ \. \\ _�- � - \ \ BORE PlT .: •Ag+ I IN IN 11 A?. ♦\ ypp .\ ` .\ \ ♦\ \ 10' X �i9\' \ t I I 1 \ 1 I 1 1 1 1 1 / / i• % \\ \ \ `fd -CEl l//NiS\ Pl T \ \ ------------ IN it ! - _i / ,I / / \\ \ 1 '\ \\ 1 \ 1 I� I I I j j ( / 1 I I / - _ ' /' /' / ' ' % 1 ---- ----- ,/ \ 1 1 \ 1 1 I I I \ / -_ // // i ' / 1 __--'- __�_�' � '� '' /' i /' / � �' ° . \I\• \ 1 \ 1 \ 1 \ \ \ 1 1 11 I I 1 l \ lam- / / / / It _ _-------- /'� f ` \xFX \ \ \ �\ \\ 1 I ---' / �'/' _- p .. • .µOD Sr-� A \ \ ! I I i I � 1 i 1 � ♦ \ . \\ / � _-� _ / / / / / // - , / / / --_---------' �' � -� , - _,- / �r\. h \ \ \ I I I I 1 1 I I I I I I 1 \ ♦ \ \ \` / / / ,/ , , / / % / I I 1 1 '---------'� , - I 1 �' ' /-<- ♦� \ \� \\\ \ I ! 1 1 It 1 1 ------ - -'' I I \ \\ --------- ,- / I \ \ \ \ \ \ 1 ! I I \\ \ \ -_-\__ - It 1 I I `� i / \ \ /- -_- `--_''' _ _ ,' 1 1 \ :\.�.0 \\• \ \ 1 \ `\ -\ \ ` /-' ,'' / / / / -� 1 -C \ 1 1 1 \ 1\ 1 1 1 I I �\ \\ \ \ \ \\ \ \ --_- \ _ - ,- ,/ , / ,ice\. \\ \♦ \ \ \ \ \ 1 I -- It X\\ --------------------- / 1 / / i I L \ V ' ` . ' .-----------, /17 / ,/ I I \\ 1/011 It / AND THE ANGEL SAID TO THEM, "FEAR NOT: OR OLD, I BRING YOU GOOD TIDINGS OF GREAT JOY, WHICH SHALL BE TO ALL PEOPLE. FOR UNTO YOU IS BORN THIS D Y I THE CITY OF DAVID A SAVIOR, WHO IS CHRIST THE LORD. LUKE 2: 10-11 BEFORE YOU DIG, CALL 0 0 D NORTH CAROLINA &NE CALL CENTER www.ncocc.org SCALE: 1 " = 100' 0 160 200 250 300 • orn r00 x1 0 m 0 � to N N W z 0 IZ 0 U d Z_ W W Z_ ZZ LLI cn Y 0 O (n W� W� Z Z O 00 LQ I\ Z N = Cn <z W z � Cn J_ WW = Coo z BLN=C-1874 y v C A IlO Q SEAL 19843 c 7/26/19 OVERALL GRADING PLAN REVISIONS 11/27/19 EC COMMENTS FILE NO. 2018-033 HORZ. SCALE: 1"=100' VERT. SCALE: 1 "=100' CE-02 3 1 2.09 FT. FREEBOARD- 1 YEAR STORM 250.01 PERMANENT POOL 248.00 6:1 - VEGETATED 2 SHELF 1 1 1 5 1� BOTTOM / POND 220.00 WET DETENTION POND PROFILE NOT TO SCALE NOTE: CONTRACTOR TO COMPACT BOTTOM OF POND TO ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR. I OTE: PORTABLE PUMP SHALL BE USED FOR PUMP IOWN AND MAINTENANCE. (SCH 40 PVC) 6„ 1 � 6:1 VEGETATED SHELF TOP OF DAM 252.10 1F 4" PVC CAP WITH SCREW TYPE PLUG TOP ELEV. 248.75 NORMAL POOL = INV. ELEV. 248.00 BOTTOM ELEV. 247.75 4" PVC CAP WITH 3" DRILLED ORIFICE 1 21e]�1_il���y:I���A_1�U�Y•7_1"J��A_1�. ALL PLANTS SHALL BE 3" CONTAINER PLANTS, THERE SHALL BE A MINIMUM OF 3 PLANT SPECIES, AND A MINIMUM OF 50 PLANTS PER 200 SF OF VEGETATED SHELF. BELOW PERMANENT POOL Botanical Name Common Name OTY. Iris virginica Blue flag iris 169 +34 Ludwigia spp. Primrose willow 169 +34 Peltandra virginica Arrow arum 170 +34 POND SIDE SLOPES Vegetate w/Centipede Seed ® a rate of 60 lbs./Ac. STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0 248.00 17,772 0 0 1.00 249.00 19,487 18,621 18,621 2.00 250.00 21,258 20,364 38,985 3.00 251.00 23,085 22,163 61,148 4.00 252.00 24,970 24,019 85,167 4.10 252.10 27,690 2,632 87,799 252.10 -8, 20 � 8'I 252.10 251.75 251.75 ..: S' ' • 3.0" ORIFICE `j 250.15 1 -YR. ELEV_ 250.01 2*48 3 1 1.56 FT. FREEBOARD - 1 YEAR STORM 252.54 PERMANENT POOL 250.00 6:1 - VEGETATED 2 1 F22 SHELF 1 1F_ BOTTOM POND 243.00 WET DETENTION POND PROFILE NOT TO SCALE NOTE: CONTRACTOR TO COMPACT BOTTOM OF POND TO ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR. I OTE: PORTABLE PUMP SHALL BE USED FOR PUMP IOWN AND MAINTENANCE. 254.10 3 1F 6:1 2 VEGETATED 1 F_ SHELF POMD #> TOP OF DAM 254.10 6„ 4" PVC CAP WITH SCREW TYPE PLUG M1 TOP ELEV. 250.75 6" (SCH 40 PVC) 6" NORMAL POOL = INV. ELEV. 250.00 BOTTOM ELEV. 249.75 4" PVC CAP WITH 2.5" DRILLED ORIFICE CONCRETE WEIR DETAIL --0 6' Doi a 20' 6' VEGETATED SHELF LANDSCAPE PLAN ALL PLANTS SHALL BE 3" CONTAINER PLANTS. THERE SHALL BE A MINIMUM OF 3 PLANT SPECIES, AND A MINIMUM OF 50 PLANTS PER 200 SF OF VEGETATED SHELF. BELOW PERMANENT POOL Botanical Name Common Name OTY. Iris virginica Blue flag iris 147 +55 Ludwigia spp. Primrose willow 147 4-55 Peltandra virginica Arrow arum 148 t55 POND SIDE SLOPES Vegetate w/Centipede Seed ® a rate of 60 lbs./Ac. STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0 249.50 9,149 0 0 0.50 250.00 10,335 4,868 4,868 1.50 251.00 11,720 11,019 15,887 2.50 252.00 13,164 12,434 28,320 3.50 253.00 14,663 13,905 42,226 4.50 254.00 16,219 15,433 57,659 5.40 254.90 18,401 15,567 73,226 254.10 POND #2 P, 0A W �f252.70 9,/I • I I I III � \ I 4 10 I I I I 2.5 ORIFICE 9 250. 00 CONCRETE 9/ 25 00 o WEIR 252.55 TOP (9 254' III \ #2 CV 252.10 \` • \ J..0- ORIFICE 9 248.00 20' CONCRETE WEIR @ 250.15 TOP @ 251.75 \ ` / / \ 30' Wf�E x 20' LONG �`�. \ 30' WIDE x 20' LONG/ /i / CLASS B\RlP RAP CLASS B RIP RAP SPILLWAY. J\8 IN DEPTH ; ; • \ SPILL WA Y. 18 IN j kPTH l I 1 \ \ \ i I I I / L .10 AI N\ II 7 l I \ \\ I 252.10 \ 252.10 II 1 • 'I 34+00 \ I \ II / / I / I / I SCALE: 1 " = 30' 0 30 60 75 90 I I Conversion Procedure - Sediment Basin to Wet Detention Pond 1. After the site is completely stabilized, contact Stocks Engineering O 252-459-8196 for verification of completion and stabilization. 2. Contact Johnston County for approval to remove all temporary erosion control measures. 3. Upon approval from Johnston County, begin the conversion of the wet pond from a temporary sediment trap to a permanent BMP as follows. 4. If standing water is in the basin, contractor shall pump the water out discharging through a silt bag. 5. Remove the skimmer which is connected to the riser and convert to the permanent orifice as shown below in detail. 6. Bring the side slopes surrounding the pond and vegetated shelf to the proposed grade. 7. Contractor shall verify pond depth and muck out sediment to the design depth of the pond. 8. Excavated material must be disposed of in an approved off -site location. 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as sediment deposits in the bottom of the pond may affect the depth. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering ® 252-459-8196 to inspect excavated pond before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing pond per details. Establish appropriate permanent vegetation around pond as soon as possible. 12. Upon completion of pond construction, remove sediment from silt fence and dispose of at an approved off -site location. Plant vegetated shelf and seed and mulch side slopes. 13. Contact Stocks Engineering ® 252-459-8196 to inspect completed pond before placing pond in service. 0 I I I 1 1 I o0) -00 xl rn 0 `� m N LO uJ z 0 w O 0 z w w z c� z w Z Cn � U o Ww 3:w WV) Z 0 LO z_ 00 �r- � Z N = U �z Z _i J W () bi' w= Cn z coo I BLN=C-1874 y g v C A � gyp/'' per, oFESS pN' /4' SEAL 19843 CNAEL 7/26/19 SCM DETAILS #1 and #2 REVISIONS 111/27/19 EC COMMENTS FILE NO. 2018-033 HORZ. SCALE: 1"=30' VERT. SCALE: NONE THERE IS A RIVER WHOSE STREAMS MAKE GLAD THE CITY OF GOD, THE HOLY HABITATION OF THE MOST HIGH. PSALM 46:4 CE-07