HomeMy WebLinkAbout20060739 Ver 1_Complete File_20060621DWQ Project No.• 0 (0O 9 3- t County: M a O r
Applicant: N C V c;-r ??V t $iOn $ +e+no`? ?7? se?nnSoA
Project Name: 59, Norl O)OOrrq, COVn'?y
Date of Issuance of 401 Water Quality Certification: 'S" n2 W1 a O b lp
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It
is not necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
I, T E. W P- I c, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporto'ng materials.
Signature: Date: 9 '2I ' 0
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance
and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature Registration No.
Date
?TL4NQS??r ,. ,,%rfU
AFy?, rJ
WATF9pG
r
0
JUN 2 3
WATEIR.QU
"SAN ST0RMWATALay
ER 13Rr11jCp
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
Division of Water Quality
June 21, 2006
Moore County
SR 1407
DWQ Project No. 060739
State Project No. 8B.206311
? r
APP'kbVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
i
Mr. Timothy Johnson, P.E. Division Engineer
NCDOT, Division 8
P.O. Box 1067
Aberdeen, North Carolina 28315
Dear Mr. Johnson:
You have our approval, in accordance with the conditions listed below, for the following stream impacts for the purpose
of replacing a deficient crossing pipe on SR 1407 in Moore County:
Stream Impacts in the Cape Fear River Basin
Permanent Temporary Fill Permanent Fill in Temporary Fill Total Stream Impacts
Site Fill in in Perennial Stream in Stream Requiring
Intermittent Intermittent (linear feet) Perennial Impact Mitigation
Stream Stream Stream (linear (L.F.)
linear feet 'near feet 'near feet feet
Site
1 25 25
Total
25 25
Total Stream Impact for Project: 25 linear feet
The project shall be constructed in accordance with your application dated May 1, 2006, received May 3, 2006, and with
the minor modification received June 9, 2006. After reviewing your application, we have decided that these impacts are
covered by General Water Quality Certification Number 3404. This certification corresponds to the Nationwide Permit
14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you
proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. This approval will expire with the accompanying, 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the DWQ and.submit a new application. If the property is sold, the new owner must
be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions.
o Carolina
Ne
Nturally
North Carolina Division of Water Quality 225 Green Street- Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service
Internet: ncwaterquality.org FAX (910) 486-0707 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Mr. Timothy Johnson
June 21, 2006
Page 2
If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the
future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and
(7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification.
Additional Conditions:
Placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for
culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement
of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may
result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above
structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by
DWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction,
please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will
be required.
If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing
concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters
due to the potential for elevated pH and possible aquatic life and fish kills.
During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected
riparian buffers.
The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed
floodplains and streams should be restored to natural geomorphic conditions.
The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization
shall be placed in stream channels in such a manner that it does not impede aquatic life passage.
All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most
current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams
and other diversion structures shall be used to prevent excavation in flowing water.
Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation
and reduce the introduction of other pollutants into the stream.
Heavy equipment may be operated within the stream channels although its usage shall be minimized.
All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification.
Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
prohibited.
The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If DWQ determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further
conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification.
k'.
Mr. Timothy Johnson
15 June 21, 2006
Page 3
All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized
by this certification.
A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water
Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-
site project manager.
The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification.
Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certification of
Completion Form" to notify DWQ when all work included in the 401 Certification has been completed.
Native riparian vegetation (ex. list trees and shrubs native to your geographic region) must be reestablished within the
construction limits of the project by the end of the growing season following completion of construction.
There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit
without appropriate modification. Should waste or borrow sites be located in wetlands.or streams, compensatory
mitigation will be required since that is a direct impact from road construction activities.
Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect
surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated; and
maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be
removed and the natural grade restored upon completion of the project.
This approval will expire with the accompanying 404 federal permit. This condition supercedes condition No. 19 in
General Certification No. 3404.
Mr. Timothy Johnson
June 21, 2006
Page 4
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699. This certification and its conditions are final and binding unless you ask for a hearing. This letter
completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any
questions, please contact Ken Averitte at (910) 433-3303.
Sincerely,
Alan W. Klimek, P.E.
Attachments (General Certification and Certificate of Completion form)
cc: Wilmington US Army Corp District Office
Art King, Division 8 Environmental Officer
Richard Spencer, US Army Corps of Engineers, Wilmington Field Office
DWQ Fayetteville Regional Office
Rob Ridings, 401/Wetlands Unit, DOT Group
Central Files
File Copy
L"
Moore.sr1407.doc
Wetland Impacts ADVI?e__ Cro
n? 07 _SY
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
None
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized
clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both
structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood
Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA
Map Service Center at 1-800-358-9616, or online at htti)://www.fema.aov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland,
beaver pond, Carolina Bay, bog, eta)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact .
Site Number
(indicate on ma)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
Site 1 Perm 25 ft UT into Bear Creek loft Perennial
Temp 40ft
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and
associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet
before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.),
excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear
footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary)
to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-
800-358-9616, or online at www.usgs.t;ov. Several internet sites also allow direct download and printing of
USGS maps (e.g., www.topozone.com, www.mapguest.com etc.).
Cumulative impacts (linear distance in feet) to all streams on site: Perm: 25ft
Temp: 40ft for construction and dewatering). Rip Rap :40ft *for bank
stabilization above plane of normal high water in the same area as the temp
impact
ocStMpo
rya n,,,
STATE OF NORTH CAROLINA
44k 0(IJ
yam, 0,7
OSgN? TpR?'OU,?1l 006
?,q?Rry
DEPARTMENT OF TRANSPORTATION e'cF,
MICHAEL F. EASLEY
GOVERNOR
Rob Ridings
NCDWQ
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
DIVISION OF HIGHWAYS LYNDO TiPPETT
SECRETARY
May 1, 2006
06® 20
Z
Subject: Nationwide Permit #14
SR-1407 Moore County
Project # 8B.206311(DWQ Permit Fee $200)
Mr. Ridings:
The North Carolina Department of Transportation, Highway Division 8 is requesting a 401 Water Quality
Certification in association with Nationwide Permit Number 14 for project # 8B.206311 on SR 1407 (Mack Rd.) in
Moore County. The proposed project will replace an existing deficient crossing pipe as follows:
Site I- Replace existing 1 lines of 84" x 75' CMP with I lines of 117"x 79"x 100' CUT.
The total percentage of impervious surface within the project area will remain at less than 30%.
All erosion control devices will be appropriate to the location and in compliance with the current version of the
NCDOT Best Management Practices manual.
The project is outside of the Critical Habitat area for the Cape Fear Shiner. There are no Wetland impacts
associated with this project. This project is located on an unnamed tributary of Bear Creek, a class WS-III stream
(at this location) within the Cape Fear River basin. If dewatering is required at this site, it will be done with the
use of a movable device (sheet metal piles or concrete barriers). Construction will be done under dry conditions
whenever possible. There were no threatened or endangered species observed within the project area during the
required minimum criteria check. Detours for this project will be done off site using local state roads.
If you require any additional information, please contact me.
Siely?
Art C. Kin
g
Division Environm tal Officer
Highway Division 8
cc: Tim Johnson, PE
Tim Welch, PE
Barry Harrington
P.O. BOX 1067, ABERDEEN NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 9445623
m
m
3
Q.
0
0
m
0
3
OU,?
1
4
r
/
; i 111 1? sir
; ,?? cn
bl?
10
5
53
, ?
.. ? /
I ?
? ? \ , / ` ?
` \ \l \
_ ? / ; f I, ,ti
pry` ?..+C.i ? i •
/ ?? ! (! I ?i `
? /. 4? 11, ?? f . Gay
? / ?•
,?i `t`., r? / JI
?_? ._ G-?t \) ,'.tl? d ?. 7 ?? ? ?-d.?Lh' t1 ?G?} • ??' I?-'?'?-'/ +it?,`j?.? f'' .'; ct Lo
49-9
r n
1.`t 1` ?-" 1 '! 1 r / ,. V F ..A I , J r ( H ?7 ??
•
u
r
? C? .
I
':\ ;?
i v . • ! 1 !?
?f ? ?j , /???? `Ij? 1 ?S / C f lr ?.? 3 ) ` l_ H ?? , t 4
J if
7? ?V
r ?
uigar
, 1/ ' a
I )/ 1 ?)/
?
-`
'??,
'"
` _
..., /
, ?1? \)/ \.?3
.. J
I \lt`-J\ } ?
?I ,?r?? l;
,
i., ?
..
., J
f \ ?
.
SA 6
Copyright C 1999 DeLorme Yarmouth, ME 04096 Source Data: US(GS F-- 11000 f Scale:1: 25,000 Ntail: 13-0 Lftbm: wLAuM
K?
Office Use Only: Form Version October 2001
USACE Action ID No. DWQ No. 2 0 0 6 0 7 3 9
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
L Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Pernvt
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: Timothy Johnson, P.E., Division Engineer
North Carolina Department of Transportation, Division 8
P.O. Box 1067
Aberdeen North Carolina 28315
Telephone Number: (910) 944-2344 Fax Number: (910) 944-5623
E-mail Address: TJohnson&dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: T. F. Welch, PE
Company Affiliation: NC Department of Transportation
Mailing Address: PO Box 289
Siler City, NC 27344
Telephone Number: (919) 742-5649 Fax Number: (919) 663-0214
E-mail Address: twelchgdot.state.nc.us
-5-
.n
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project SR 1407 Moore County
2. T.I.P. Project Number or State Project Number (NCDOT Only): 813.206311
3. Property Identification Number (Tax PIN): N/A
4. Location
County : Moore
Nearest Town: Robbins
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From Robbins follow NC 705
North for approx. 7 miles, turn left onto SR 1405 and go approx. 1 1/2 miles and turn right
onto SR 1407. Site is approx. 0.1 miles.
5. Site coordinates, if available (UTM or Lat/Long): N 35* 28.06' W 79* 41.78'
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Rural
7. Property size (acres
8. Nearest body of water (stream/river/sound/ocean/lake): Bear Creek
9. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at h- r a )
-6-
10. -Describe the purpose of the proposed work: Replace existing 1 line of 84"x 75' CMP with 1
line of 117"x 79"x 100' CMP.
11. List the type of equipment to be used to construct the project: Excavator
12. Describe the land use in the vicinity of this project: Rural/Residential
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application:
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
-7-
1. Wetland Impacts
Wetland Impact
Site Number
indicate on ma)
Type of Impact* Area of
Impact
acres) Located within
100-year Floodplain**
es/no) Distance to
Nearest Stream
feet
Type of Wetland***
None
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at ;,;r,
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Im act Perennial or
Intermittent?
especify)
Site 1 Perm 100 ft UT into Bear Creek loft Perennial
Temp 40ft
--
I t 1 7 -
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
Several internet sites also allow direct download and printing of USGS maps (e.g.,
l 11 H .., etc.).
Cumulative impacts (linear distance in feet) to all streams on site: Perm: 100ft Temp: 40ft
(for construction and dewatering). Rip Rap AN *for bank stabilization above plane of
normal high water in the same area as the temp impact.
-8-
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
None
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
-9-
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at IW i, If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
-10-
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
-11-
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Neither the current impervious cover asphalt pavement) nor the new proposed impervious cover
(asphalt pavement) will exceed 30% of the total site area. Erosion control devices appropriate to
the site will be utilized on this project which may include silt fences, check dams, and storm
water retaining basins
XII. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XM. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature Dafe
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
-12-
? ''7777; ?\\. //?' ` "rfJ? 1 '7/ `?? i ; \ ? •v?j?- ? ?
_ r kJ
71
22
t
3-D Top(20mOt copy. v 199f uet oe.e xar.oam. nx? varr JAY! mm um.0 1 ---iI M U Scak: 1: 25, 98 Deb& 13-8 Dab.: WGS94
-----+"`°°m'?c .9sr:>s.?m.cvr-ter gt-?: '.?X:??",,,,12?''.?.°??, ?<.?'4riC? - was, ,s?s.°?+a°?ac•T'!!?"'f?r?""3t"?';ry...•-•r.•'^w s4:-*
?'osF? I R R N D Oa?>_ !P ' H C f O U N T Y q I I
:4 '''? CRO' !.!!6 F• '`I i 82
1667
:3 '457 P" Ci H,1
'? `5?_ i0 !3 AI 1464 Oy
.'I
' '4-5 •+ J ?? ,? s? ?. I ?JWlawn ? \1-: :, r,?i5t3 - \''. ?:. 111 ? ?o ? ? i4F= ? -??IFn7 ? rln. y:7yl??3
t t 1412 Id17.
145 9 U.2 a a \ a it / 1418 , •1\ e?- '6Q,
' P226?` - 1609 / A 1419 663 r \ 46', 1813
IVG p r??69 ti° _ ?` 191 t\ 1419'~ ° !003 145A e. ._-?` \a C23 O y? 1604 t?
1410
1405 •'466 - t} '? m .+
1421
5 \ G18 1461
1605
. ??? `` 224 r is --14 9 P81? o ?. '78? 1460 '.462 86 01486 8e0e tpt6o6 2
003
ey/? 140 7500
e ., llkislmoare e ? = '457 58 _ (J `',•• ` 80TI i r3
I 1409 77,\ O '471 1472 16'0
e ?^ 1494' 1419 FcA {'? 1608 611 1
/ 1 \ s 142 r 3 rs ..; 14-=2 1423 i•? ,v,i f 1696 1489 Y?,1 1609 ',?
1408 14211 1458 /L4-70
?-'- fff •. ,? "( i^-,sto 4 - ' 1497 1680 l
7
€ 158 1 / 1,1(1 `•f ;? ` ?4-8 ?1428 `\oe) .{Q ` 70.- 03 'x457 v 1 ?^ T y1 52?'1506750?`Q 15? t1a70
1403 S 1 ! a_s 1429 1499 -- t _ R
1405 1405 F. i524 1425 ? 11 163E
• f " °'g• r- + 77 419 tt: ?e c 7687 Y
' l -? a 92 ".`11 ^' % 14 ! 1 ?. x.7555 " ts03 ( 1474 ? L V
- ?.I 9 -- 1 \ ??..... e.•? " 1484 1484
/ 1635 ?.?-1
1475
-? ?, I \
,41.127 _ -91 ee 'O 1 531 rf ° l 14,9 o C ites0? t `14871
1604, i L 7, ?-;, 1654 1, 114Y 52 ?_ I^-(I `?., 1 ?? ) 178x7 ?-
C ?? 1\ 1651 1483 17.8 (>! e f,>- '` ti
1 4491 ,\ •t ?,. a d701,, 1478 a o v ( w 'V?%€
Dater •'P22J 143 1 476
- : 1482 16,18
/
v
173 G1ler` 5E: ls. .1498 1450 448 1rl- o?N` 1 o?4tt -\o° u P234
'? ' ?? :? "?`? ?\•"• ...? 1425 1432 W-,O - ' 100, I \\\ j+r1 ,R )Q`?? 747 } 4 a 1487 R
1293 1
1520 ;• ?samsau f%,;?`7i T? 1 80
S I ?'
> IsOB s 38A
- ?- ,''?..'/'!'
1002 ?
?, '1 1519 W?Ij It • 6 - ?n-?_ ,' ?? 1147,1 ^
II( • ( r• 1440
-L-,Sp'- - a 1 '002 1432 71;6 s?y48e -J _ P7lktroal
7 I 1 r- \\ -__ J 1505' 1477 _ _ '-• ..
1002 1501 (1275 '?d -89 J 1276
a ` ?j•. \ `
3b 1434 14A7 1629
•t , ?" 1
Garnersm T.
149 ?r6a `F21 j S / 1495 214
`. / 1281 ??.. , 90 C O Sipe .- ?C221 , 1 1170;
1490 1492 0 1491. 1493
J at-
/ 9 l` 1
1 9rj )v 144 I 1433 Gt/- -UZ\ t? `?:- A 1 I! 7 ,? 1497\ 11 -
tfl ?•96 1402 0e•?-J 152 I r.o
Y? 7 ( 1401 t?`) I 1 ?,1 1266 r 1493 \). '? o
--rs YC• .° j. 1-306 1284 -4 (+ \\ YYY
> e M1 a 1477 S 2
1400
l 1 ?r
} r• e / 1332 is :?ead%t _;,, f 4 >? e
2aQ-c1? _ l VAs1 11 1267 1210 1327 ; 1 . 11
--'_•^ ,?'? f 1do, , ,IadeJ€,t:i + 1.. 1333,
l
121,
e\ ?oS ?.? `l
- I 1 if ?/ J p 1 r?
3V F:'',;. '`-, ( / -•G..
r\ C .a t ' 1277 1268
\ Sr
'C12 i
'28 1299
127628
-rain t,oE„? s /t ;T 1278 275 C98 - ?' lzss ?i r5•, r7 a --
< y
7281 f / 1270 \ 1701 :.• 1261
{ ({ / .N 1216
! s % 0
!I Im +D 7 •1' 1270 .
2%9 ??`? ?`Y?•j? v ?d?r`. ` _I /1/ 5 ?I 1•`. t,,? Y?
Y;\\ l 1 ;1 a e1•\ !? l?•" r, 1 1296 . t "783 / (' i+2-•47 i
1 ^ 291 f 4 1278 '? ll ai `?t •'`,V 3-_9 t --? r` FJ$?-Y? J N.r.S.ATCS-
nt -°• __? ---- j, . ^ t i i _.. \ J8 ? (: ? .?? f n I i:Mh.
1'_ 7 j ''?. a •? ?,il r_-•7.? _r 14.1-0^?'i 11 fC&EST
j \-1297
127! i0 i?n r :? fir; 124.1 1
,<9aG104 `. `'-
33
1 y.'. 1305
\`.1280 .1 I~ ,273 i _ 1_0 ? i *;. '? _ , s ?.t(
1240 .t\ ,. .?
24
G238
.;? - - ` -
. d1
7 , ?"?c? ,•,? F'10? 1,40 '`_ ? ,•+?•. C232
'-?` t.+..>•>t .e? t ?_' ? a --fn.;+ \ ?s'l+ I ? ,'f a `? ? /''?-? ?3ris 3' '?.`Y T ? `? __ /,><. sf t;:S?z?xs'"-??' ?,1?' ? X. ,J ? bY"? W+L4E 1 1 .: , .a }• F ! ?7 /i ?, - G ?.: A "?'? s ?; a €.I.. sr „^ia•'Ti•7•:w .. a ?
"-4i!•1'?,y r }Hr. ?"?^,1.?? r ' . 'yX f+?' S ?*..tU. - r?' "r?r;S'. i? .7 tz?1-w i y??? ,? '? ?` s `S" :. ?t? - `'? ? :'r ?.a c
L. ? _?`75"t t ? `Y t.1:'1+rp r '€sl"?? .c. ?1?'?r 4.1.,? s'1r ?r+,-Et?r _ - .J?c '? fi > nayg a .}°tdL ?-!'r ?, K,. fA? ` 'r'?9'???:?? ?????i? .''1?.'2?i -_?q ? ?ul.? c i>?..st ? ^?,.: +u'i-s?>?aJ a-':, ar ? ? ?k ,i?t !?f?+"Cp..`" ? r"'?.f s^ 8•. r'ry?`73
k; ?9c'r 5., •TV; kr&b w § - ?. '? ; ?1• >'L 1"`? iM'`. k 1,
N.:•? b- >• -?- ? 3:`=`,.-+~'ia 1 ?iFA. 4h'.'T+1}},??1 -?!" 5?L 'Y ,e;.`• is >'ve
?. ?'o-•?xF,c ` ,C 5?I fry???'?2.x°!?i "* ttfi ,n _,y d 1 "4 Ez'+. 1F-?.: ?.?t-tl ?`' v "'t 7?f. rt '?
<:r ?,,?`i 7 .31'' a -3t" ?'b'+' .? ???? -1^ ? • I'l i`t?' °'rr`n j: ? '4 :.r fa ram„" ??••-•. .c?? 5 s'' ? ?i}' .rr s
??+hl' 7. ... i?¢-_ .•&r`„'y`•'?-r+: s7t+o$?. u?L,li'? ..:?s?tl-? +1:'3.. ?ws>:.'?n°?.:>:. ?'"? as-..m?``i?.'_?. .... ..'?. ..,_? ? e.. ?.A??i.w[>.t'*.`_:c ?'i:. .. - ?.:._"J.?...A.Y"a!`... R'.?.5??3..: :i
SR1 107 P)00"e co
® 11.1 „ Y( q q 11 x 1(30 1
U -r ? r.?'o Bear Cree
I
in
N
Tree to be removed
I
I
I I
I
I
I
I
I I
I
1
u I I
? I I
m I I
x I vl
j? I I
I ?I
xl
I 1
xl
cr I vl
. 1 001
I
O I xl
WI
CL I
I
I I
I
I
I
I I
I
i[)
in
B
t ?
I
s
O
U-
moore1407.dgn 04/18/2006 10:50:14 AM
Telpor'o,,ry 5: 1f ?erce5
'%nsl'allea?a5 ,?eGesso?y.
k A-
C-t- C-6.
?' 0
0o c
000 0000
000 0000 d
0°000 0000C
0 0000
0000 000 0
CAP
0 ?c) 0 ? gip.
?0
0 0-
i
•C rC 1??1 ? \ ? k r
0 0 0 i
o d ?° o
0
000
0 000000
0000 000000
00o0?
0000 p00000
G
C
?0
0,0
0 I
00
0
I p
co
- I
I
w _ _?__ SR lyo'j Moore Co.
1 11rlC„x loop
u 1 ? n"1 p 084r Cr2Q.K
--\ ?en??PorA? -5: ?'
?e r%ce s n ??'a 11 A s
Oe ce,55Gf y
i
I
' I
TEMPORARY DIVERSION DESIGN
ENERGY DISSIPATER I
NOT TO SCALE
LL TEMPORARY BERMS, DIVERT STREAM
BY PUMPING WATER AROUND
AREA.
CONTALNED AREA TO SILT BAG
REMOVE EXISTING PIPE & BEADWALLS.
LL PIPE AND BACIMM
VE TEMPORARY DIVERSION DEVICES
CONCRETE BARRIER OR
I STEEL S-EE T PILING
I
IMPERVIOUS FABRIC
CONCRETE BARRIER OR
PILING
?X 79 ,X iDo
112T Of WE ruv? > l e 117
MM=ffi MW ME a Lf T oL r3' ca.. Cr-,?!
D8.alGE t1ESIQF
a
?? I I