Loading...
HomeMy WebLinkAbout20061506 Ver 1_Complete File_20061018O?O? W AT ?9QG '(D? Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources p Ta r-`-,yam Alan W. Klimek, P.E. Director Division of Water Quality October 18, 2006 Henderson County DWQ Project No. 061506 NCSR 1100 (Gap Creek Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer, P.E. Division Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: You have our approval, in accordance with the attached conditions and those listed below, for the following impacts for the purpose of making improvements to NCSR 1100, Gap Creek Road in Henderson County: Stream Impacts in the Broad River Basin Site Permanent Fill in Temporary Fill in Permanent Fill in Temporary Fill in Total Stream Stream Intermittent Intermittent Stream Perennial Stream Perennial Stream Impact Impacts Stream (linear ft) (linear ft) (linear ft) (linear ft) (linear ft) Requiring Mitigation linear ft Site 1 135 ft. Streambank 135 ft. Stabilization Streambank Stabilization Site 2 10 10 Site 3 10 10 Site 4 25 25 Total 180 180 Total Stream Impact for Project: 180 linear feet. The project should be constructed in accordance with your application dated September 14, 2006 (received September 18, 2006), including the environmental commitments made in the application letter. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Nos. 3495 and 3404. This Certification corresponds to Nationwide Permit Numbers 13 and 14 issued by the U.S. Army Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. N?o ?` tCarolina JVatimally North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 2964500 Customer Service Internet =v.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748 An Equal Cpportunity/Affirmative AGion Employer Mr. J. B. Setzer, P.E. October 18, 2006 Page Two 1. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 2. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 3. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. 4. Placement of culverts and other structures in waters, streams and wetlands, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48-inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48-inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, streambeds or banks, adjacent to, or upstream and down stream of the above structures. The applicant is required to provide evidence that equilibrium is being maintained, if requested in writing by DWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 5. Adequate sedimentation and erosion control measures must be installed and maintained on the project site to minimize sediment transport to downstream aquatic resources. Temporary cover (wheat, millet or similar annual grain) or permanent herbaceous cover should be planted on all bare soil within fifteen (15) days of ground disturbing activities to provide long-term erosion control. Erosion control mating should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples or wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. 6. In-stream work and land disturbance within the 25-foot buffer zone are prohibited during the trout-spawning season of January 1 through April 15 to protect the egg and fry stages of trout form off-site sedimentation during construction of the roadway. 7. For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr), High Quality Waters (HQW) or Water Supply I or II (WS-I, WS-II), stormwater shall be directed to vegetated buffer areas, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff prior to discharging directly into streams. Mowing of existing vegetated buffer areas is strongly discouraged. 8. The dimension, pattern and profile of the stream, above and below the crossing, should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 9. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 10. Any riprap placed for bank stabilization should be limited to the streambank below the high water mark, and vegetation should be used for stabilization above the high water elevation. Riprap should not be place in the active thalweg channel or placed in the streambed in such a manner that precludes aquatic life passage. Bioengineering limildf-m nr ctnirhire-, chnnld hn nrnnerly resumed cited 'Ind installed Mr. J. B. Setzer, P.E. October 18, 2006 Page Three 11. Heavy equipment should be operated from the banks rather tharr in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 12. All mechanized equipment operated near surface waters must be regularly inspected daily and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 13. Rock check dams at culvert outlets should be removed at project completion to avoid impeding aquatic life movement. 14. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures should be used to prevent excavation in flowing water. 15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 16. If concrete is used during construction (e.g., headwalls), a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 17. No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this certification. 18. A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 19. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State or Federal law. If DWQ determines that such standards or laws are not being met (including failure to sustain a designated achieved use) or that State of Federal law if being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification. 20. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for permitted areas associated with the bank stabilization work. 21. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S. or protected riparian buffers. 22. Upon completion of the project, the NCDOT Division Engineer, shall complete and return the enclosed "Certificate of Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This form shall be returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. Sincerely, Alan Klimek, P.E., Director Division of Water Quality cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental David Baker, USACE Asheville Field Office Transportation Permitting Unit A 4*1-- T_-?---- A_L ___11? n_.-.---t Staff Report Project Num: 20061506 Version: 1 Status: Received Name: NCDOT- SR 1100 Project Type: Road maintenance/repair/improvements County: Henderson Region: Asheville Location: Terry Creek and UT at N.C Elks Camp Tuxedo Latitude: +35°10'51" Longitude: -82°26'03" SW Plan Location: Owner: NC DOT Division 11 Contact Person: Tippett, Lyndo Inspection Date: 10/09/2006 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Title: Phone: Entry Time: 01:15 PM Exit Time: 01:45 PM Inspection Type: Staff Report Phone: 828-296-4500 Question Areas: E Site Visit Inspection Summary: NCDOT is proposing to grade, widen and pave NCSR 1100 (Gap Creek Road) in Henderson County. Proposed impacts are to three (3) unnamed tributaries to Terry Creek with 45 linear feet of pipe extension and 135 linear feet of gabion baskets for stream bank stabilization. It is recommended that WQ Certification Nos. 3495 and 3404 be issued. The 401 Certificatin was issued on October 18. 2006. Page: 1 Project Num: 20061506 Owner: NC DOT Division 11 Inspection Date: 10/09/2006 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Yes No NA NE Do impacts described in the application differ those seen in the field? ? ¦ ? ? If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ? ¦ ? ? If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ? ¦ ? ? If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ? ¦ ? ? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? ? ¦ ? ? Are there additional stromwater conditions that should be required due to the following classifications: ? ¦ ? ? # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ? ? ¦ ? # If yes, what phase is this? Are there prior impacts from prior phases? ? ? ¦ ? If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: Page: 2 N %4 }ye,,. STATE o N ? M STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY September 14, 2006 Mr. David Baker, NCDOT Regulatory Project Manager 008 U.S. Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-2714 Subject: Nationwide 13/14 Permit Application SR 1100, Gap Creek Road Henderson County State Project # 14C.045068 (DWQ Minor Permit Fee $200.00) Dear Mr. Baker: The North Carolina Department of Transportation (NCDOT) is proposing to widen, grade, drain and pave SR 1100, Gap Creek Road, in Henderson County. This proposal entails r widening and paving the existing gravel road to a standard 20-foot roadway. The work is necessary to improve safety and reduce maintenance costs. Funds have been allocated for this project and NCDOT would like to perform this work during the 2006-07 paving season. Gap Creek Road is a secondary gravel road, which conveys only local traffic. I am enclosing a PCN, a straight-line diagram with the proposed erosion control and construction limits along this project. In addition, I am sending a typical section of the road, drawings for the pipe culvert replacements as well as a marked county and USGS quad map. The North Carolina Natural Heritage Database was checked for records of threatened and endangered species. There are no records for threatened or endangered species for the unnamed tributaries of Terry Creek. There are no records of threatened or endangered species for the entire Terry Creek watershed. The UT to Terry Creek is small (<2 feet wide) and does not have sufficient flow to support mussels and is not likely to support fish. The impacts from the culvert replacements will be minimal. For these reasons, we believe there will be "no effect" on threatened or endangered species. Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation Office (SHPO) and the Office of State Archaeology determines that further investigations are required, NCDOT will conduct the appropriate site investigations and obtain compliance from SHPO prior to project construction. I ! Mr. David Baker Page 2 - SR 1100, Henderson County September 14, 2006 The best management practices will be used to minimize and control sedimentation and erosion on this project. The construction foreman will review all sedimentation control measures during installation to ensure sedimentation is being effectively controlled. If the planned devices are not functioning as intended, they will be replaced immediately with better devices. The sedimentation control devices will be in place prior to pipe culvert removal and will remain in place until the new pipe is in place. Impacts to Waters of the United States The unnamed tributaries to Terry Creek are not shown on USGS topographic maps. The streams are small but appear to have perennial flow. The channels are well defined and are composed of sand and gravel. The channels lack vegetation. For these reasons, we believe that the streams are under the jurisdiction of the U.S. Army Corps of Engineers. In order to replace these culverts and install gabions, it will be necessary to impact waters of the United States in the Broad River Basin. NCDOT is requesting to replace/extend three metal culverts and install 135 feet of gabion baskets for stabilization beside an unnamed tributary to Terry Creek (DWQ Class B, Tr). Listed below is a summary of the proposed impacts. Site No. Existing Condition Proposed Condition Net Impacts Station Site 1 Streambank 135' gabion baskets 135' 8+25 to 9+60 destabilized Site 2 30'x 36" CMP 40'x 36" CMP 10' 9+60 Site 1 30'x 42" CMP 40'x 42" CMP 10' 43+96 w/ rock headwalls Site 2 25'x 24" CMP 50'x 30" CMP w/headwalls 25' 58+16 Permanent Impact 180 linear feet Permits Requested NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to you concerning the 404 Nationwide Permit request. Mr. David Baker Page 3 - SR 1100, Henderson County September 14, 2006 Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ). In addition, I am requesting Mr. McHenry and Mr. Ed Ingle, Roadside Environmental Field Operations Engineer (NCDOT), to comment directly to me concerning this permit request. Temporary encroachment into the buffer zone of the UT to Terry Creek will be required on this project for the installation of gabion baskets from Sta. 8+25 through Sta. 9+60. The UT's are classified as trout. If you have any questions or need additional information, please contact Lori Jones or me at(828)891-7911. Sincere) ajY Mark Gibbs, P.E. District Engineer Enclosures cc: Mr. John Hennessy, DWQ, DENR, Raleigh (7 copies) Mr. David McHenry, Mountain Region Coordinator, NCWRC Mr. Mike Parker, DWQ, DENR Mr. J. B. Setzer, P.E., Division Engineer, NCDOT Mr. Mark Davis, Division Environmental Officer Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT Mr. Steve Cannon, P.E. Henderson County Maintenance Engineer, NCDOT File 0 of warF? QG I 7V Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401, General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules SR 1100 - Gap Creep Road Henderson County ?Of h10 R /H O ?t O fOf T4ANSR0!`' NCDOT Division 14 Office Use Only: Form Vcrsion May 2002 USACE Action ID No. DWQ No. 2 0 0 6 1 5 0 6 (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 13/14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: 4142 Haywood Rd. Horse Shoe, NC 28742 Telephone Number: 828-891-7911 Fax Number: 828-891-5026 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mark T. Gibbs, P.E. Company Affiliation: North Carolina Department of Transportation Mailing Address: 4142 Haywood Rd. Horse Shoe, NC 28742 Telephone Number: 828-891-7911 Fax Number: 828-891-5026 E-mail Address: mgibbs(Mot state. nc. us Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1100, Gap Creek Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): N/A N/A 4. Location County: Henderson Nearest Town: Tuxedo (Henderson Co.) Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Tuxedo, travel south on US 25 to the interchange with SR 1104 and NC 225, take NC 225 east 0.9 miles to SR 1265 Turn right on SR 1265 and go 0.9 miles to SR 1100. Turn right on SR 1100 and go 0.2 miles to the end of pavement which is the start of the protect. Go 825 feet to the beginning of Site 1 Site 2 is located 135 feet from the beginning of Site 1 Site 3 is 3436 feet past Site 2. Site 4 is 1420 feet past Site 3. The project continues up SR 1100 for an additional 304 feet beyond Site 4 to the end of pavement from the other side 5. Site coordinates, if available (UTM or Lat/Long): Site 1: 35.18056'N-, 82.43361°W Site 2: 35 18083° N 82 43417° W Site 3: 35.17583° N ; 82.44306° W Site 4: 35.17333° N ; 82.44639° W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): N/A 7. Nearest body of water (stream/river/sound/ocean/lake): Terry Creek (DWO Class: B; TO and UT at N.C. Elks Camp (DWQ Class B) Page 2 of 8 8. River Basin: Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) IV. 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Residential 10. Describe the overall project in detail, including the type of equipment to be used: There will be gabions installed under the right shoulder to accommodate shoulder widths for improved safety and decreased impact from 8+25 through 9+60. The existing deteriorating pipes will be excavated and replaced. Crosspipes will be replaced/extended to accommodate standard shoulder widths for safety. The road will be widened and paved. A backhoe, loader, dump truck and standard hand tools will be used to complete this work. Note: The 36" CMP at 0+33, carrying the UT at N.C. Elks Camp, and the 60" CMP at 60+20, carrying Terry Creek, are both in good condition and not to be replaced. 11. Explain the purpose of the proposed work: To widen, grade, drain and pave an existing substandard road to meet current NCDOT secondary road standards. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A Page 3 of 8 VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: In order to construct the proiect in accordance with our current secondary road standards, it will be necessary to impact waters of the United States in the Broad River Basin. Specifically, NCDOT is requesting to install gabions and to extend/replace three culverts in unnamed tributaries to Terry Creek (DWQ Class: B Tr). Impacts are listed in table below. i. Individuallv list wetland impacts below: Wetland Impact T e of Area of Located within Distance to *** Site Number Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland (indicate on ma) (acres) (es/no) (linear feet) N/A • List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading. fill, excavation, hooding, ditching'drainage, etc. For dams, separately list impacts due to both structure and flooding. •• 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FENIA-approved local Floodplain maps. Maps are available through the FEh1A Map Service Center at 1-800-358-9616, or online at hity: 'www.fema.gov. '"• List a wetland type that best describes wetland to be impacted (e.g., freshwater'saltwater marsh. forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 3. Individuall list all intermittent and perennial stream imp acts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please secif Site 1 Gabions 135 UT to Terry Creek 1' . Perennial Site 2 Culvert 10 UT to Terry Creek 1' Perennial Site 3 Culvert 10 UT to Terry Creek 2' Perennial Site 4 Culvert 25 UT to Terry Creek 1' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separatery list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, tip-rap, crib wall, gabions, etc.), excavation, ditchindstraightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at wvvw.usgs.Vov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.mnozone.com, www,mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 180 Linear Feet Page 4 of 8 4. Individually. list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Water will be diverted during the installation of the pipe to minimize sedimentation. The pipe will be placed below the stream bottom to minimize fragmentation of aquatic habitat. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 5 of 8 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/stnngide.htm1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceel2.net. If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 VIII. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No E] IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A Page 7 of 8 X. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIII. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A J. Fc" Applicant/Agent's Signature Datc (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 a) M U W O (D O to ?- ? N + C cv) N tl7 co Y Q Z c co + o L V) O N Ln (D O CD Q) r ,- r CO co co (1) + LC) Cl) :3 0 C N U) O (D ti 0 + 00 Y W C N L 0 O O c a) 0 ch CO V CO ..................... + ro o N c c + co rn O L ? C O O 0 (0 _ + a (nn 0 C) a) a? O a 0 c 0) .. Ln 0) co N d W o c O C U w N O C c 'N o U ? rn w e a) rn o Y O a a c N o i O c? ?t U CL a = cn U) 7 C/) G) cn v? C ? 'aa ° m m 0 U N O N CD O O O X' -+. cn o 3 o CD (D . 0 0 0o CCD c a. > 7 o ,c n O (D r. o m m - x co N U7 (D -, CD O (D CD ccn ° to + -' w o Q cn rn O CD = CD N r. S O + co d O N ..... (O CO t ................ p (ND ? O W \ cn Q -? d cn CD v CD a a n. 3 cD o G) a QN ° o , Q: a 4 Q7 0 a N 0 0 w - a i v ) CD a 0 Co c r o ~ ° N w U'- (D w Q o Q) Z 7 -, o a N W N O i <J1 0 O cn n D) CD 2 3.1 U tD O e- ? CY) t N ? C d; tV W N O C co O C CY) c?9 m M M 1 1 0 x C I :3 0 Ib r 1 I M I I N I ' tv 1 C N 1 L C J 1 1 0 1 0 U O U I m m o 1 ' 0, 2 - U o C a I I N Q_ X (D N LIJ U Cl) .x ' CD a) Ca M 'It O N CL _ C CL) CD :t W C7 3 3 1 0 1 (n (D I 1 1 O ?„ 1 CO V) ?+ ' I W m CV 7.Lo -,t C U C ' O O >m C N m c4mco O Cm Emm .N ?U < O o o c o n ` O Y Q cl CJ 'a N C` C N cm Cl) s- N N cu .- U Q 3 d r- _ = i in C7 F - n a? U IA N LO O N W C Ib O Z O C O M 1 N « ? Lf) i O v 1 1 Lc; M 1 1 I N d I 1 1 co 1 S U 1 ? O J L I 1 U o c U 1 _0 0 1 U °? n- CV i C I W n X C 1 i N V _. U s O W N ?t N O to CL L ?- W i _ O M 3 N o 1 L N to rn I , E + a , i N 0 o cn ? lu- V- N Lo 't 0 o c I ag o >rn a) - rn c5Oco o o c0) E_rnrn y U X o O 0 _ o o. n a? ` o Y U) ¢ d d M C C ?•- -: N ? N cn m ? t- U d 3 a V- _ = W m co N to (n 0 F U) 2 co 0 co M 0 +r ? 04 C c} W 04 00 O O rn Z M M ' I N m :3 e- I I1'> I M 1 1 1 N I 41 I ra I C O I O J I I O U ` a? c I I .0 U d ) o p i C U a) I N [L C ?. I _ X N C-6 I LiJ co X L) CD E CV to O N I C. - L N W N I ' 0 N co ' 1 t I O ` co 'n I I O `O N I I N >1 ~ U C ' O » C) LO w (n O C C C) E C) C) Q U m o 0 o c O c n C ) ` ,C ` . Q C) C) .a p` C r' N ?-- N N m 4t cu CL r _ L ( V) N C f - n Henderson County SR 1100 - Gap Creek Road I ` t Site 1 - Sta 8+25 to 9+60 Site 2 - Sta 9+60 Inlet Sta 9+60 Sta 8+25 uaoion oaSKei instaiiauon site Inlet Inlet Site 4 - Sta 58+16 Outlet cv O Y m d V CL ea C O r r Q m C O V C O N d 'G C d 2 N m N Ll. d L Q. V 0 0 Cf) I Q. C G O C N L O 'O C 2 1 ? o , +-I .5L.L8 \ ? ?' ? ? ` ? ' ? N) `•,k?' of . in .g ' Ln p co N LO 7 1 N \ ? _ ? Ch N _ lam! , ? ?+ z N ,off N 1 J? r to r ? L(7 f ? I r / , ?• ? rt I ? r CN v 01 l ? c 1 h ? z co ? 0 ? 6, Ln of r _ 1 ^ N , r oo) o ? r ?. A6.L8 1I ? •ol r r• of ?, 1 r J? 1 o Q ' mo ) r I L N ? J ? e- N Y) n a v N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY 50' 0" RIGHT OF WAY CENTERLINE 6' 10' 10' 4' 3' ASPHALT ;PAVEMENT SHOULDER SHOULDER DITCH .y? MAX SLOPE FILL 112:1 CUT 1:1 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS EROSION SYMBOLS 3TD # DESCRIPTION 245.03 TEMPORARY SILT DITCH ----•---------------------------------------- TSB 245.05 TEMPORARY DIVERSION •--------------------------------------------- -- -TO - - 393.01 TEMPORARY SILT FENCE --------------------------------------------• "' 390.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM -------------------- L 245.01 SILT BASIN TYPE A --------------------------------------------------------------- -0 245.02 SILT BASIN TYPE B -------------------------------------------------------------- 892.04 TEMPORARY ROCK SILT CHECK TYPE A ------------------------------ 895.10 TEMPORARY ROCK SILT CHECK TYPE B ------------------------------ -- D 892.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ----------------------- 892.02 TEMPORARY ROCK SEDIMENT DAM TYPE B ----------------------- -- u 897.01 ROCK PIPE INLET PROTECTION ----•-------------•------------------------ - 894.01 ROCK SILT SCREEN -------------------------------------------------------------- -- 245.04 STILLING BASIN ----------------------------------------------------------------------® 868.01 RIP RAP -------------------------------------------------•----------------- ))) J) ? RR J J J? DITCH LINER ----------------------------------------------------------- ENVIRONMENTALLY SENSITIVE AREA PIPE OUTLET ENERGY DISSAPATOR----------------------- - =•• EROSION CONTROL MATTING -------------------- EcM FIBER GLASS ROVING ---------------------------------- .-----------• FGR A SILT CHECK DAM TYPE-A -----------------------------------•-----------•- SILT CHECK DAM TYPE--B------------------------------------------------------- STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL SYMBOLS Culvert ---------------------------------------------------------- Fence ---------------------------------------------------------- Guardrail ------------------------------------------------------- -x?x-x- Stream or Body of Water -"' Flow Arrow - - Spring ------------------------------------------- ---------------- ?:. Exist. Pole ------------------------------------- --------------- o Exist. Power Pole ---------------------------- -------------- b Exist. Telephone Pole ---------------------- -------------- -?- Exist. Joint Use Pole ------------------------ -------------- Telephone Pedestal ------------------------- --------------- Cable TV Pedestal -------------------------- --------------- ? Exist. Water Valve -------------------------- --------------- ------- ---------------------------- Sewer Clean Out --------- Power Manhole ------------------------------ ---------------- Water Manhole ------------------------------- --------------- Light Pole -------------------------------------- ---------------- Gas Valve ------------------------------------- ---------------- Q Telephone Manhole ------------------------ ---------------- Power Transformer ------------------------- ---------------- Q Sanitary Sewer Manhole ------------------ --------------- Q Storm Sewer Manhole --------------------- --------------- s Water Line ------------------------------------ ----------------- Property Line -------------------------------- --------------- Property Line Sy m b o 1 e -------------------- --------------- Exist. Iron Pin -------------------------------- 0 --------------- up Property Monument ------------ ------------ ---------------- a Well -------------------------------------------- ------------------ O W rnl CDI r-l MI NI --I ;:I C )i ml col vl OI rnl VI col col r-1 rl OI co Q) C O .p cu ._ h m ca T; C cc c N tJ) FT ? ? C 3 m U X M M M M M M M M M M M M M M M M M M M M M M M C (9 O E o = d. tO 0 to to LO M tO to to LO LOW to LO LO tO tO 0 LO LO O to LO cn ca w m ? CV •W w E c3 U .0 L o d In C N U d O = p cu a 3° s o v 21 c U D C O CL fT ? r W r? h V' LO O N O Q) <O O N 'd• r r r `r cn co 0) N co W M O 0 4) ca a) ° r N N M N N M CI C") M M M M N N N N O O E a) S? -D ?; w U N N M p a) Co ?w o nZ N C p C C N LO 'D as (I) f• N M to at CO CO r r? V' V' (D W O N CO (D r r CO D) N O y m O cu 2 V r r r O O CV N r r r Orr O r r O r r N N r r ca ' L 7 ` ? O Q ( 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O 0 0 O O 0 cr w O w O -° O OI O OC C C4 O p p C ,p cu rm0to V, MMMOOtn0000tr) O V' V' V'MM r- MtoMOti V•MCO?rCON NO M -M N V'M NN O ?'CJ 0 E roJ :B < _ - sN"M - W M CDOrnrrNco V•rwmONNOM Q I- totONrOONr` V'MCOCONCOCID tf)CDOOco co II 11 Im p O a ) C ?N Nm gCV 1 x Q)v p x : v O CU y C o r- tOMO 0 M toto0 0 0 a 0 0 0 OCDOOMtO ?" E! M r LO M O CO M CD r- O O I` O CD M r O V' r M LO O O O A ' O R O a) C N (u O CU y M M r C LO to V' IT M r M co r M V' co V' to LO V' U ) N p ccuu Q J a O ° In 0 t() W to to t() to to m U.) 0 0 In LO M to U.) to (n M to 0 ° 6 (6 c6m(6(6 (6 c6c6 c6 C6 O6 6 (66c6 c66c.6(6 (6 of .? -v Z ( N3: r r r r r r r r r r r r r r r r r r r r r r r tU) Y C) ? (D .n N N N N y N N N N N N N N N N N N N N N N N N 'O • O CU d N p d O p Q) O N 0 0 0 p d O O N d d 0 Q te ` G -. C3 } } } } } } } } } } } } } } } } } } } } } } } r U LLI U ccuIu? o (V 0 0 0 L CO O r1=ZtC2 C 15C>=.C15 LZ?OZtC15 ZcCLtCZ O) ) C) O O Q C? , !Y O C) d O) CU U) Q) M O 0)P.0.0 d O ,U) d .0.9) C) Q J J? J E J iR J ?. J J? J ?. ?. J J N o ?S c.6 t- J W ?l U N oOOOOOOOOOOCO LO tn0O tOMONtotn0O W w0mco0 V'OOOtOto V' CO ....a :9 N CD h O h N N + + + + + + + + + + + + + + + + +++++ ?' + O O N V' O N O N CD CO M M O M V' V' ' ' CIO y t; m r ) U ) Cn tO V'OOO)r?rNNNNMNMMMM U . , Q •' O O O O O O p p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D M O C) a CO o LO 0 0 0 0 0 0 0 0 0 0 co CD C 0 tO to ' co O ci ?'- 0 ° OOO OtONrr- NN OOOtO O(OM tO V + + + + + + + U + co :a . p co p. + + + + + + + + + + + + + O r to I O tO LOO N V' CO h CO N N CO O (n CO 0)(T 2 0 75 CnUOCL - (nI-L NNNNNMMMM V V ?t V U) U Q (u F° - N N M col NI col M Cl) M O O O N N U CD C? CD < N `4 O cz O H (D ?t N LO T O Cl O O O U? c) O C) C) (ND ~ N O to O ^ a LO T Cl) O O O 6(6(6 T T T N N N N U U J J J (D O O T i- N t t + co 030 O In to O O O r .? .r O co O 4' T V co co O O O a? m o ? a d (D N CO Co m d d CD d c0 d d0 cD N Ca (D O O I "1 CD co CD N - "T In 101 I d I ONI IMi I0I I I I I I I I I I I I I F M M co co N N N N M N T M T vM M N co M N ^ co U 0) a) ? M co In r a) co w ti ti d' 0 O N a) m w O d N .t T T T < Q) T at (D ? T N O M? )l9 O CD O M O CO CO M M O S p p (D N N m 0 m m 0 mm 0 N" N N T N N N N N N (n Z C13 m Y X v NI NI NI NI NI NI NI NI NI NI NI NI NI NI C141041 NI NI NI NI NI NI NI L p > C S r MI MI MI MI MI col ml MI MI MI MI MI col MI MI MI MI cot MI MI ctrl MI MI v ro cu C M v xa w j e cal c01 cal cal col col ml CDI ml CDI CDI CDI (DI col col (DI col col ml col mI c01 COI aci C J J N c ? of of of OI of OI OI of 01 OI OI OI of 01 OI OI OI OI OI OI OI 01 01 M X J m c C m + + + t + + + + + + + + + + + + + + + + + + + r. a L C a ? L 0 CL C-41 C-41 041 C-41 NI C-41 C-41 NI 041 041 C-41 C141 C-41 C'41 C-41 C-41 C-41 041 C141 C141 NI NJ CNI c '' D cu m x D v MI MI MI MI col cot ml ml MI MI col MI col MI MI col col MI col MI col Cot col d $ c ? c m X N col col col CDl CDI (Dl cof cot cal CDI cal (Dl cal cat cot col (Dl cal Ol CD1 cal cal ml t Q O) cu ? J C.1 J C y : T T T T TI TI ml -ml CDI dl 001 cm dl cot col -1 1-1 col Tj TTI oI of 0)I (01 hl MI C-41 m V) xS m C •?n m L ?LLL? L= L L L L?LLLti=Lt7=L J .00 tm J Q 0 .0 a) pLM .O.Lm a) J 0 J .00 a) cm cu cm ? O J cc 00 0 0 00 0 0 0 CD LO In 0 0 N O O O w to m (D (A d O N 0 LO U) d CD O CD CO O N ca U N CD t` O h + + + + + + + + + + + + + + + + + + N +++. (A O N d CO N 00 N Co co O M m G7 d d I _, N tM0 TNNNN0N0MM0 V d Ijd00000OT 0 0 0 0 0 0 0 0 0 0 O 0 0 0 C) O D 0 0 0 0 0 0 otC7OOOOOOOOOOmom 0 C'l)OOOM ' (n 0 U) ) O N CO (n N ti 1-- N N 0 0 0 Cn O co m Cn d c0 O 0 CC) U co h + + + + + + + + + + + + + + + + c •N + + + + + O T Cn w co C!7 Ln 0) N d 00 h 00 N N CD O Cl) M G7 G7 cu 0 0 T T T N N N N N CO CO M Cl) d d d d C3 col c" co (N n, °I '00 CD N NI NI NI c')1 col col col CDI 01 010101 NI NI NI col CIA MI (DICDI(DI 01 NI CIA ct:: 9= 4_1 a> N ? J J J CD LO O t- N + + + co co O to Cn CD O O O O co to tl' ? ti v co co Cn Ln Cn C p cu O O F- F- L U (U C (U E 0 U Q) ly- d d N d N d Ql ` vJJJ J_.1 UJ ` `J V cul H ?F- c Z`?Z'cF- Z2 ?`c c 00 J J .6 °. °o- °. n. a 3 CL M o E E E E E E E o E E M F- F- F- U) F- F- F- CO U) F- U) D) C U O C1 U) Y vO O O O to m O O O O O m w 0 0 U LD O O to 1- V' O CD 0 0 0 V' M O O CU 4 M- e- Cl) r M ?- ?- Cl) La U In p ? CDr-MN V'1- - tnN.-- MI- CUM? 0 O O Cl) MwNt000CDt00CD0 ?NCD W NOOOtOO.-N c9 N n. t t t t t t t t t t t t t t t U) CO V' O CO CO CO O V' CO (n tD CO CO r' . N M M M VVto O CD O O O O O O O O O O O O O O 0 0 m O O O C? to m O N 0 O O CD to a CD O N 1- n M N W O N O O O tt7 O t t t t t t t t t t t t t t U') co t OOTCON?CMM V' V'?? Ct) 't7 d C) C O C N N Y L U N N N 7 y O C L QI C O N L 3 N (U C_ L :a C 1-141 !1 -14 1 I S? /)00 SOIL DR . pRpPosE KL/ zo xis` 3 14PPE I I o I u I o ? I l ?? rJ l J I I v I` I I I SSG ZX3xlo v I fl3 I ? r ro 1 I I I i ?oZ o ''o ';F Z'x ?'x fo' 10 I I 5t?ka;1?. v l h. -t 54 3 Srr' ?? -I- o 0 I ??, ?'FrJiiEhS ?: o Ig +? ?Zl SR /100 P5 Z 5r1a.?L AND riZ 5 BcIFfER 94.70 5 -Tr-,K j0'7?3?a CMP 9460 E"JD GABIAAIS. Q ? ? Iv0 e5A I c? • I' :'F {1r•C-m `- SqC, f73 / 0 PL: N $EG IN ?OV l ?Uf ?R g ;-?IS 08 I G ?^ -4'?Ea z•x?'x?' • e cam' ' a 58? 2'x '.x a 0 ? I 70? o 3% j ?? • ? i l? fl ? l 0 I I U ? I^ 3 , i e 3 I% , o Lo CtZ? 5 T 17 CNO Q 19 9 I REPwcE 3o?x ?g" NopE I I o ?v 18'cMP '? -?- I 35'X Zo' I 4Z7 t.. ? I i Q a y a 5 /y i 3 .a Ul SR /100 P3 3 V I ` a r ` •a 'a is 3 o I? a `? 19 /o7uo "1 A PRoPo I 190 YPE a C,-. OLD COREIII 1h7r1 RL SR 1100 p9 q SO 'X18" liDPE 2.'X3'X4,' 4D IX VS" Cr^P 2Ix 3'X!o' 0 © car-s i oIQ 1991 I ? rSrw ? I I a 0 19 1831 io ?a °I 1 ? ? eal. of o i I7 1 9 9 F TI 9 3 0'j r 5 i; I r5 1 S Z)K It uv i I Y I fco PRn PGs Est • ? _C f SO 1® TYPE !J ?'X ;'r 'o' l I C?L/??;Ca7?L1 ? i ,? III Qj _ ?'?-. ? •x _ ?,? SHED `"- i I, ? u Ii I h ,' 0 7. 1 f, I " ?I ?I I Zo+ob r5 5 ,I J 18 OI 8 OI -r +rr • ?i , ?i ?I z l ?I ci ?f a? ?I i II ? li I" I ?I lNl' rl I I. I' I? 99 ® 5 R Uca 0 3 ? I0 ??, }?RoPoSc 1-So SO,x?3"fIDP i i Yj?E 8 2'x r. D rA ID 27}?0 /=ILL Z' I s I. ;-g COIr-OIV- AS -A/.??JED -T'O 30453 26-t4D 6CC Q] CE FILL i D 2 DI - ti fl Ig Z ? I 2.5 S - s IT ? y iz' I I ? IS ? I z/ +50 I GRAv? [. CR_ 1 PRoFos; .?o . 30'X18"NDPC ai I a 0 A a 3 - o 4-- 0 to al 3 sR t??? I ? d I 10, SOIL. DR Pg 7 I? u` Q Imo... 4-8o ?e a i 3 le PRDPoSS $0'X1$";-; ;:F? 3 Z I Io' ASP,4Rtr DR 8 8 ?? +83 gOX15° CMP R-PLP,GE y0'x 10 9Ws r? I i _1 z' c,Rn;sL C R ' t!z y0'x!S"c1.1P 3 I l? © P.EPLAr.E I?q'X l3' N:r? I?° I i I ©? 3O+SD AND 4 ? S 3 0 t-oD ?i FILL (Ar'Fii7X r;lD? I% PCO?o.e.l 1Z So',1 Dn.+C Ae4_s: -rv r ?V ?agl I SR 1100 X98 I I' -}-$0 PROPDSE 5 0'X I ?" r! DP, ll ( 57A 39 +5D +/- o I IA 0 I 39 ?n i l n L 5 Po no4 c-Lk-- R1w bed •d D To STA . 3915 }? . _ I I I ? I ??? 13 1 I ? p ',TA 3'0170 _ +yo FRovo5E golX ir" [4pp I TYKE B 2'x 3'x 1, I 1. c t3 Q Sep 2'X3'xL ( T Ln 3 s.--;v 7% S q C? Is9 ? 3 I I o o I la Zo' ?mP REP[Rcr zo'x?a• C)R? 2 DR REPLFCE 25'x8"?ePs O I UCKC? I L ' z; I ? R DCK ?% ' H?F,CAA, ,ti , i _ 5'R 1100 ?5 9 (oo'CFS/R MP rZ=rcFcf-' s!o'x'i1' Cmp > BUILD r%=4 P,)c 6erlDi1rtLs z' s rA? Pr.? Z'x3'x4m RA,14TL op I 4-.3z 20'r.i5" cMP I I?"' RFPLFtF Zo'x?3" hDPc ?. 3 I SDI I I a I° I I I ?a ?z D I? to II I Q a tJ I I I i I ?o;?co `7 r n Sri IIoo ?y 10 I0 e zo'sorC DR Iz? _ Iv REST x I 0 a . 9 9 I ? 111 x I i 0. I I ? ? S?UJF z o I 10 3 15 U I lu X Sv"b 2'xo•Xe" o I ,?x Y ? l 0 171x1 ro J ?HDDs ? 1 _PUCt 2J?15 C\i 'iC 1 DR. - 4-0 N Y I .. x ll u I i a Lr D U ?61o ? I - to ? , u S'f' D'J ro'KI5* CMP P,EPLFCt /o 'x r? Nvr? +y5 I a I SR l/oo Py Ii P?oPos?? ?, I ? -- 50'?c1HOPE +40 30' CiRAVeL p,? e I ?RCpos6 40'X 13" HDPC 3 / +zo 5 I Ty,< Z'?C 3 X . So ?I 15, f e `'I I ND PG .53 I? I a ? p ss,?, z'xa xo 3 ?3 0 I I d I ,? 1 0, 5I I'3 1 Jf Er, 8/ 0 `,? 5 Acs 1 ro'x?* avc 10V ESA 5o iz" L) 311 I A S/Z 1100 P? I2. (JO, C5A Sc`rt--- = I i 0 I I I I a 1 u- I 0 59 c,RDR c 7V P.!:-- d fro ._? ?/ +rc, rrr ? ?v? h rsT;s_"r.n1 1 4 ' C14 p 'C?FCE 50'00-cmp 8ui?o ?p,cwgL?; riP.!'/- I 57 5.91, s° z'x3'xW I ( i - 3 c; 'U) I ti ILn I. 5 'r p i ?I 1 I '. l ' I a3 ? L I 5?rvJ 1 r, ri L' y> O LW ? s ? O O n? SR /100 ps 13 E D F OTC C7 Co1 tZO 1 Zc? C-C,IJJO OF pR I . ? l00" ?x3IX / / TYPS A Z 40?X GMP DO ?l97 ??6 rL/ Cr_' C.%7 i` 20 ,? say ??i? 3 I 'I ? I 7 'X3',r o TCGT PIPE DATA SR 1100 Gap Creek Road County: Henderson WORK ORDER: STATION PRESENT SIZE PROPOSED SIZE NOTES 0+33 50'X36" CMP Good Condition; Do Not Replace; 4'Stream 4+74 20'X15" HI)PE Proposed Driveway pipe 8+73 30'X18" CMP 40'X18" HDPE Replace Cross i e 9+60 30'X36" CMP 40'X36" CMP Replace Cross i e; Live Water; 1'Stream; 14+25 30'X18" CMP 30'X18" HDPE Replace Driveway pipe 14+27 35'x18"CMP Driveway Pipe Replace as Necessary 17+64 40'X15" CMP 40'X15" HDPE Replace Driveway pipe 19+90 50'X18" HDPE Proposed Crosspipe 22+90 50'X 18" HDPE Proposed Crosspipe 28+50 50'X18" HDPE Proposed Crosspipe 31+12 40'X15" CMP 40'X18" HDPE Replace Driveway Pipe 31+80 30'X18" HDPE Proposed Driveway Pipe 31+83 40'X15" CMP 40'X18" HDPE Replace Driveway Pipe 32+30 50'X18" HDPE Proposed Crosspipe 33+80 40'X18" HDPE Proposed Driveway Pipe 36+40 40'X18" HDPE Proposed Crosspipe 39+80 50'X18" HDPE Proposed Crosspipe 43+32 20'X15" CNIP 20'X18" HDPE Replace Driveway Pipe 43+58 25'X15" HDPE 25'X18" HDPE Replace Driveway Pipe 43+96 30'X42" CMP 40'X42" CMP Replace Crosspipe; Live Water; 2'Stream; Build new Rock Headwalls 44+26 20'X15" CMP 20'X18" HDPE Replace Driveway Pipe 45+10 30'X15" CMP 30'X18" HDPE Replace Driveway Pipe 46+45 10'X15" CMP 10'x18" HDPE Replace Pipe 46+67 20'X15" CMP 20'X18" HDPE Replace Driveway Pipe C,l4-,o 20'X15" CMP 20'X18" HDPE Replace Driveway Pipe 53+90 50'X18" HDPE Proposed Crosspipe 54+20 40'X(8" HDPE Proposed Driveway Pipe 57+50 50'X12" HDPE 50'X18" FIDPE Replace Driveway Pipe 58+16 25'X24" CMP 50'X30" CNIP Proposed Crosspipe; Live Water; 1'Stream; Build Headwalls 59+69 10'X8" PVC 10'X18" HDPE Replace Driveway Pipe 60+20 40'X60" CMP Good Condition; Do Not Replace; 5'Stream POLE DATA Project: SR 1100 Gap Creek Road County: Henderson Owner: Duke PowerBellsouth Page 1 of 2 Station Pole Number Dist. From Center Present Road Dist. From Center Project Dist. Center Project After Moving Remarks Lt. Rt. Lt. Rt. Lt. Rt. 10+03 17 Guy Wire 10+22 16 Multi-use Pole 10+35 16 Multi-use Pole 12+66 17 Multi-use Pole 14+95 12 Guy Wire 15+00 27 Multi-use Pole 15+23 use Pole 17+54 16.40T 18 Multi-use Pole 19+63 15 16 Multi-use Pole 22+57 14 11 Multi-use Pole 24+82 11 Guy Wire 24+82 19 Multi-use Pole 24+82 14 Guy Pole 27+10 12 14 Multi-use Pole 30+25 11 18 Multi-use Pole 30+59 12 Telephone Ped 32+18 12 Multi-use Pole 33+12 22 Guy Wire 33+28 10 30 Multi-use Pole 33+35 18 Guy Wire 36+45 20-T 26 Power Pole 41+18 28 Power Pole POLE DATA Project: SR 1100 Gap Creek Road County: Henderson Owner: Duke Power/Bellsouth Pabe 2 of 2 Station Pole Number Dist. From Center Present Road Dist. From Center Project Dist. Center Project After Moving Remark Lt. Rt. Lt. Rt. Lt. Rt. 43+09 17 Telephone Ped 43+33 15 Telephone Ped 52+92 30 Multi-use Pole 54+82 4 24 Multi-use Pole POLE DATA Project: SR 1100 Gap Creek Road County: Henderson Owner: Duke PowerBellsouth Page 2 of 2 Station Pole Number Dist. From Center Present Road Dist. From Center Project Dist. Center Project After Moving Remarks Lt. Rt. Lt. Rt. Lt. Rt. 43-+-09 17 Telephone Ped 434.33 15 Telephone Ped 52+92 30 Multi-use Pole 54+82 4 24 Multi-use Pole M O y? f m O LO 3 C 'AMP + yq? 1? C W COD i 40 C,N \?•?/? \ .\ a U y• c3 \ CL ii \ s . : 5 ? Y o L . , 1.1 Ter ,y J ? G p O aiO ? N W coo