Loading...
HomeMy WebLinkAboutWM0100329_Permit (Issuance)_20131101 r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary November 1, 2013 Petroleum Transport Company Attn: George Isler P.O. Box 490 Pilot Mountain, NC 27041 Re: Well Construction Permit:WM0100329 McCall's Grocery and Gas Property PIN: 8546-40-4147-000 Transylvania County, NC Dear Mr. Isler, In accordance with the application received by this office on October 30, 2013,we are forwarding well construction permit numbered WM0100329, dated November 1, 2013.The permit is for construction of one monitoring well as described in the application and the attached permit. The well will be installed on the subject property as referenced above. The permit will be effective from the date of issuance for a period of one year and is subject to the conditions and limitations as specified therein.A Well Construction Record shall be completed and signed by the certified drilling contractor for the well.This form shall be submitted to the Department upon completion of the well. Please reference the permit number on the well construction record. Please review the attached permit conditions. Please contact Andrew Moore if you should have any questions or need additional information at 828- 296-4500. Sincerely, G. Landon Davidson, P.G. Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office cc: ARO/file - ec: Steven Lucas Water Quality Regional Operations-Asheville Regional Office - 2090 U.S.Highway 70,Swannanoa,N.C. 28778 Phone(828)2964500 FAX (828)299-7043 Internet: h2osncstate.nc.us An Equal Opportunity/Affirmative Action Employer NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Petroleum Transport Company FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM consisting of one well owned by Petroleum Transport Company, P.O. Box 490, Pilot Mountain, NC 27041.The well will be located on the property owned by Joe and Sharon Henderson,located in Transylvania County(PIN#8546-40-4147-000).This Permit is issued in accordance with the application received on October 30,2013 in conformity with specifications and supporting data,all of which are filed with the Department of Environment and Natural Resources and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made,this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 2. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 3. You are required to provide a copy of this permit to the property owner(s). 4. You are required to provide notification to the property owner upon well completion and upon termination of monitoring. 5. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(0)where applicable. 6. The monitoring well shall be maintained in accordance with 15A NCAC 2C.0108. 7. Well construction record (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion. 8. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit and the property owner within 30 days of the well abandonment. Permit issued the 1st day of November, 2013 FOR THE NORTH CARO�FN� E VIR Off TALMAN/AGEMENTCOMMISSION Landon Davidson, Regional Supervisor Water Quality Regional Operations Section By Authority of the Environmental Management Commission Permit No. #WM0100329