HomeMy WebLinkAboutWM0100329_Permit (Issuance)_20131101 r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Pat McCrory Thomas A. Reeder John E. Skvarla, III
Governor Director Secretary
November 1, 2013
Petroleum Transport Company
Attn: George Isler
P.O. Box 490
Pilot Mountain, NC 27041
Re: Well Construction Permit:WM0100329
McCall's Grocery and Gas
Property PIN: 8546-40-4147-000
Transylvania County, NC
Dear Mr. Isler,
In accordance with the application received by this office on October 30, 2013,we are forwarding well
construction permit numbered WM0100329, dated November 1, 2013.The permit is for construction of
one monitoring well as described in the application and the attached permit. The well will be installed
on the subject property as referenced above.
The permit will be effective from the date of issuance for a period of one year and is subject to the
conditions and limitations as specified therein.A Well Construction Record shall be completed and
signed by the certified drilling contractor for the well.This form shall be submitted to the Department
upon completion of the well. Please reference the permit number on the well construction record.
Please review the attached permit conditions.
Please contact Andrew Moore if you should have any questions or need additional information at 828-
296-4500.
Sincerely,
G. Landon Davidson, P.G.
Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
cc: ARO/file -
ec: Steven Lucas
Water Quality Regional Operations-Asheville Regional Office -
2090 U.S.Highway 70,Swannanoa,N.C. 28778
Phone(828)2964500 FAX (828)299-7043
Internet: h2osncstate.nc.us
An Equal Opportunity/Affirmative Action Employer
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other
applicable Laws, Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
Petroleum Transport Company
FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM consisting of one well owned by Petroleum Transport
Company, P.O. Box 490, Pilot Mountain, NC 27041.The well will be located on the property owned by Joe and
Sharon Henderson,located in Transylvania County(PIN#8546-40-4147-000).This Permit is issued in accordance
with the application received on October 30,2013 in conformity with specifications and supporting data,all of
which are filed with the Department of Environment and Natural Resources and are considered integral parts of
this Permit.
This Permit is for well construction only, and does not waive any provision or requirement of any other applicable
law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina
Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and
regulations pertaining to well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory
hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written
petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is
made,this Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other
specified conditions, limitations, or exceptions as follows:
1. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued
by another agency.
2. The well(s) shall be located and constructed as shown on the attachments submitted as part of
the Permit application.
3. You are required to provide a copy of this permit to the property owner(s).
4. You are required to provide notification to the property owner upon well completion and upon
termination of monitoring.
5. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C
.0108(0)where applicable.
6. The monitoring well shall be maintained in accordance with 15A NCAC 2C.0108.
7. Well construction record (GW-1) for each well shall be submitted to the Division of Water
Resource's Information Processing Unit within 30 days of the well completion.
8. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A
NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of
Water Resource's Information Processing Unit and the property owner within 30 days of the well
abandonment.
Permit issued the 1st day of November, 2013
FOR THE NORTH CARO�FN� E VIR Off TALMAN/AGEMENTCOMMISSION
Landon Davidson, Regional Supervisor
Water Quality Regional Operations Section
By Authority of the Environmental Management Commission
Permit No. #WM0100329