HomeMy WebLinkAbout20060927 Ver 1_Complete File_20060608:u
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
June 5, 2006
Ms. Sue Homewood
1584 YANCEYVILLE STREET, GREENSBORO, NC 27415
NC DENR Division of Water Quality
585 Waughtown Street
Winston-Salem, NC 27107
(One Color Copy)
Mr. Todd Tugwell
U.S. Army Corps of Engineers
Regulatory Field Office
6508 Falls of the Neuse Road, Suite 105
Raleigh, North Carolina 2761
(Two Copies)
LYNDO TIPPETT
SECRETARY
0
D ???a V
?D
JUN 0 8 2006
`tit DENR - WATER QUALITY
?nANDSMD STDRUWATER BRANCH
SUBJECT: Alamance County, Replacement of culvert on Lindley Mill Rd (SR1003) crossing an
unnamed tributary of Mary's Creek State Project Number: 7B.200114.8
To Whom It May Concern:
The North Carolina Department of Transportation (NCDOT) proposes to replace culverts on
Lindley Mill Rd (SR 1003). The existing culverts are failing due to bottoms of pipes rusting out.
Replacement is necessary in order to reduce future maintenance needs and increase traffic safety.
This activity will result in impacts to a UT of Mary's Creek. The NCDOT anticipates that the pipe
replacement activity will be authorized under Nationwide Permit (NWP) 3 and 33. This application
is intended as a request for Nationwides 3 and 33 from the US Army Corps of Engineers. We are
also providing a courtesy notification to NC Division of Water Quality to replace the pipes under
General Water Quality Certificate # 3494 (NWP 3) and notification under 43366 (NWP 33). The
following information is being provided to satisfy Condition 1 of General Water Quality Certificate #
3494 and #3366.
PHONE 336-334-3192 FAX 336-334-3637
,.
PROJECT INFORMATION
Road Name SR Number Project Length
miles Classification
Lindley NO Rd SR 1003 N/A Rural
River Basin: DWQ
ID Water Quality
Designation % Impervious Surface
Cape Fear 16-26 C; NSW N/A
Buffer Rules' Buffer Rule Conditions (where applicable)
No Not Applicable
Protected Species
Presentb Mapped Historic
Pro erti& CAMA
AEC Essential Fishery
Habitat
No No No No
'Separate documentation attached as needed: See the attached Endangered Species Review Sheet for further
information: 'When Applicable - See the attached Historic Review Letter for further information
PIPE REPLACEMENT INFORMATION
Site N/A Stream Type Perennial
Station
Existing Pipe 41' long X 72" X 44" wide Proposed 60'L X 81"W X 59"H
Pi e
Construction Pump Around Dewatering ABC Aggregate
Method Device*
Burial Depth One foot (unless too rocky) E/C Plan See Attached
Date
Construction As soon as practicable Duration 15 days
Date
Impacts (ft.) 19 lin. ft-enclosure; 20 lin. Ft-rip-rap dissipaters; Approx. 100 sq. ft -
temporary
Special
Conditions
Restoration Within 15 working days of the of the pipe replacement the natural stream
Plan contours will be restored and seeded. Temporary silt screens placed along
shoreline will be cleaned and removed following vegetation establishment.
RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; E/C =
Erosion control. *A less intrusive dewatering device may be used in lieu of the one proposed.
-2-
MINIMIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the protection of
surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of
the US, and coordination (including a pre-construction meeting) with the Division Environmental
Officer.
MITIGATION INFORMATION
Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet
Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not occur
in a unique natural wetland.
APPLICATION INFORMATION
Enclosed please find the Pre-construction Notification Form and supporting documentation for the
above referenced project. If you have any questions or need any additional information, please
contact Dennis Johnson at (336) 375-5589 or Jerry Parker at (336) 256-2063. Your time and effort
are appreciated.
Sincerely,
m --ryijvL
M. Mills, P.E.
Di ' ion Engineer, Division 7
cc: Mr. Jerry Parker, Division Environmental Officer
Mr. Chuck Edwards, District Engineer
Mr. Dennis Johnson, Bridge Maintenance Engineer
Mr. Mike Venable, County Maintenance Engineer
Mr. Barry Harrington, Area Roadside Field Operations Engineer
Wetlands/401 Unit NCDENR DWQ Raleigh
-3-
Office Use Only: Form Version October 2001
2 0 0 0 s927
USACE Action ID No. D`VQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 3 & 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name:_ Mr. J M Mills P E Division Engineer - Division 7
Mailing Address: P.O. Box 14996
Greensboro NC 27415
Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673
E-mail Address: mmills@dot state nc us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Jerry Parker
Company Affiliation: NCDOT - Division 7
Mailing Address: 1584 Yanceyyille Street
Greensboro NC 27415
Telephone Number: (336) 256-2063 Fax Number: (336) 334-4149
E-mail Address: jparker g dot state nc us
Page 1 of 9
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Lindley Mill Road (SR 1003))
2. T.I.P. Project Number or State Project Number (NCDOT Only): 47B.200114.8 (non-TIP)
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Alamance Nearest Town: Saxapahaw
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From I-85/40 take Exit 147 and
head south on NC 87 for approximately six miles to Lindley Mill Road. Turn right on
Lindley Mill Road and continue approximately two miles to the site crossing Moore's Chapel
along the way.
5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Rural Forest and agricuturall with few residences.
7. Property size (acres):
8. Nearest body of water (stream/river/sound/ocean/lake): UT to Mary's Creek
9. River Basin: Cape Fear
Page 2 of 9
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr,state.nc.us/admin/maps/.)
10. Describe the purpose of the proposed work: To replace structuraIlly deficient pipe culvert
to improve traffic safety and bring the road up to current construction standards.
11. List the type of equipment to be used to construct the project: Road construction
equipment (trackhoe, grader, backhoe and bulldozer).
12. Describe the land use in the vicinity of this project: Forest and rural farmland with some
residences.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application:
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 3 of 9
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Permanent stream impacts will result from placement of rip-rap stabilization along banks..
Nineteen feet of new stream impacts are anticipated Temporary stream impacts will result
from the placement of cofferdams and siltscreens.
2. Wetland Impacts
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fenia.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
3. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please seci
Lindley Mill Rd
Pipe replacement 19 ft(en)
50sf(tmp)
20ft r
UT to Mary's Creek
2 to 6 ft
Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs-gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tol)o one.com,
www.mapquest.com, etc.).
Page 4 of 9
*Cumulative impacts (linear distance in feet) to all streams on site: Project should involve
only 19 f3 increase in stream enclosure. - enclosure (en), 19
temporary (tmp) sandbags and rock silt dams in streams---approximately 50 sf,
riprap (rp) permanent placement of riprap at each end of pipes ---approximately 201f total
4. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
VIII. Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
Culvert replacement activities are necessary to maintain traffic safety. Impacts will be
minimized by strict enforcement of Best Management Practices for the protection of wetland and
surface waters restrictions nainst the staging of equipment in or adjacent to waters of the US,
and coordination (including a pre-construction meeting) with the Division Environmental
Officer.
Page 5 of 9
IX. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr. state.nc.us/ncwetlands/strmgide. html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
A finding of insignificant impact is anticipated, therefore, a mitigation plan is not provided.
Cumulative impacts are less than 150 feet. The maximum amount of impact to a single
stream is approximately 19 linear feet. No Outstanding Resource Waters, federally protected
species or their habitats, or essential fishery habitats occur in the project area. This project is
not located in a High Quality Water area.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/i?,!p/indcx.htm. If
Page 6 of 9
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
X. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
XI. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify N/A )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Page 7 of 9
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XII. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
In accordance with the February 25, 1991 delegation agreement one copy of the sediment and
erosion control plan will be submitted to DENR - Division of Land Resources and NCDOT
Roadside Environmental Prior to construction.
XIII. Sewage Disposal (DWQ Only) .
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIV. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No X
Is this an after-the-fact permit application?
Yes ? No X
Page 8 of 9
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
-6-0(.
Applic nt gent's Signature Date
(Agent' nature is valid only if an authorization letter from the applicant is provided.)
Page 9 of 9
N.C. D.O.T.
BRIDGE MAINT. DEPT.
EROSION CONTROL SEQUENCE
COUNTY Alamance Co.
S.R. No. 1003 Lindley Mill Rd
PIPE No. 2139
PROJECT
No. 7B.200114.8
DESCRIPTION:
REMOVAL OF EXISTING PIPE STRUCTURE 72" x 44" Wide X 41' Long CM Pipe
then REPLACE with NEW CMPA PIPE STRUCTURE 81" x 59" Wide X 60' Long CMA Pipe
Note:
All Erosion Control devices & proper installation plus maintenance of erosion control will be performed
by using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual
NOTE: Pipe is perched and this is a rocky area may not be able to place pipe 1' below streambed
Shoulder at this site now is 3" to 4' wide - We need to widen this out to 9' for guardrail
1 DAM BOTH ENDS of STREAM with ABC AGGREGATE (underlain & wrapped with
Filter Fabric) or LESS INTRUSIVE DEVICE to ALLOW DEWATERING of WORK AREA
2 INSTALL PUMPS to DIVERT FLOW AROUND WORK AREA
PUMP CLEAN WATER AROUND WORK AREA
3 EXCAVATE SITE to REMOVE EXISTING PIPE & EXCAVATE AREA FOR NEW PIPE
4 DEWATER WORK AREA & PUMP WATER INTO DIRT BAG (Special Stilling Basin)
5 EXCAVATE to SUFFICIENT DEPTH to ALLOW BURIAL of the PIPE to 1 foot BELOW
STREAMBED PLACE BASE STONE & new SECTIONS of Pipe
6 INSTALL SILT FENCE AS SITE CONDITION REQUIRE 1605.01
7 BACKFILL PIPE & SHOULDER AREA
8 PLACE FILTER FABRIC AROUND PIPE & SLOPE AREA THEN RIP RAP
KEEPING RIP RAP OUT of STREAM
9 REMOVE BOTH DAMS of ABC AGGREGATE or LESS INTRUSIVE DEWATERING
DEVICE to ALLOW NORMAL STREAM FLOW
10 RESEED AREA AS NEEDED
11 REMOVE ALL EROSION CONTROL DEVICES AFTER VEGETATION is ESTABLISHED
APPROXIMATE PROJECT START DATE 8/1/2006
PREPARED BY J. L. Cornell TRANSPORTATION SUPV.
APPROVAL DIV. BRIDGE ENG. Date
DATE 5/2/2006
5-3-fib
jcomell
COUNTY Alamance Co,
S.R. No. 1003 Lindley Mill Rd
PIPE No. 2139
SEQUENCE1
1 DAM BOTH ENDS OF STREAM WITH ABC AGGREGATE (underlain & wrapped with
Filter Fabric) or LESS INTRUSIVE DEVICE to ALLOW DEWATERING of WORK AREA
2 INSTALL PUMPS to DIVERT FLOW AROUND WORK AREA
PUMP CLEAN WATER AROUND WORK AREA
3 EXCAVATE SITE TO REMOVE EXISTING PIPE & EXCAVATE AREA FOR NEW PIPE
4 DEWATER WORK AREA & PUMP WATER INTO SILT BAG (Special Stilling Basin)
5 EXCAVATE to SUFFICIENT DEPTH to ALLOW BURIAL of the PIPE to 1 foot BELOW
STREAMBED PLACE BASE STONE & new SECTIONS of Pipe
6 INSTALL SILT FENCE AS SITE CONDITION REQUIRE
0
SILT FENCE
AS NEEDED
PUMP
'TREAM F?
SILT FENCE
IV
Removal of
EXISTING PIPE
- 41' -
NOTE: Pipe is perched
ILT FENCE place pipe 1' down
below streambed
72" x
LT BAG
ABC AGGREGATE
(underlain & wrapped with Filter Fabric)
SILT FENCE
I AS NEEDED
I LEGENDS
trees
ABC AGGREGATE
(underlain & wrapped with Fifter Fal
>ric)
Y
jcornell
COUNTY Alamance Co.
S.R. No. 1003
PIPE No. 2139
Lindley Mill Rd
SEQUENCE2
5 EXCAVATE to SUFFICIENT DEPTH to ALLOW BURIAL of the PIPE to 1 foot BELOW
STREAMBED PLACE BASE STONE & SECTIONS NEW PIPE
6 INSTALL SILT FENCE AS SITE CONDITION REQUIRE
1003
SILT FENCE
AS NEEDED
I
SILT FENCE
0
NEW
PUMP PIPE 1
131" x "
STREAM FLOW , BURIED 1 ft. BELOW STREAM BED j
60, PUMP
SILT BAG
A C AGGREGATE
?I (underlain & wrapped with Filter Fabric)
SILT FENCE ILT FENCE
AS NEEDED
1003
LEGENDS
0 trees
jcomell
1 .
19
- ?\ 67 O r I ' 'I
--- -MAtai qqN --- ---? I --rune -- -- -- JO W
lai
- / v .'3) ? J ? .? 2131• "? •
Is ; • r 2142 N u•00'
V. ..? tr 2166 2143
i
49 9
.2233 2151
2
,f
97 21 ! 144
s I
h 2321 ' .? 2327 •r''1 4 1 h /d•\ v1 /' I
1130 2147 2145
' • 2329 2391 •2176 •?N ' • . B :: V I 7
r.? 2328 216 2177 15050 2150 2142
' 2362 2330..- 2158 /•
.1 ?• 21 a5 I
2321 ?y .•, m ti 2190 i
X51 yd. 2176 2149 .4
-
r 23,7E 2331 2178 a5. .7 2142 v
n ?
'zIe i ?1W4. J r / .V / 2147 1 6 T
0
7p ry . 2422 .7 r • 1 2146
2145 u 0 I Q'
[ G 2333 • `?i
?' h r 2332 1 100 AL.-
2.321 I 4 '• > 2148 2188
- 2
2327 _
?• ,3 ?'.' 2328 0• 1004 1960
3 1.0
'
2334 ?? ' • 21 74 -kN w 73FiA •. 2328 "'? 2338 •',. I
21 '•\ 2405 v 2335
1004
0 \ - ,`1'• ' ? . ° 2335/ ? 'i r . I ]7.7!'
c 2327 26 16 r.
2367, Bethel ='' S 2
•? •? Ch. 2337 B ww" 2174
2363 0 ?' •1 - letory .0 1003 2:75
1 2 7 J Concord Ch.
2327 ••` 9• 2355 Ch at 7338 ;•i: 1.
_ 005 . a o
\ • • 2368 11004 1005 1.0 1005 '
ti I 1005 t 1003 '' 2
• 3 100'5 1 ?. IOCS ?-' •? •'? 1003 - SDring Ch.
v
• 1005 1 4 2751 1 •° 2338 J 2339 .1 • 3 2179 IOM
L,w ° 1004-, 1.6 '\•. Coy 6-'6y "I N 2?_ •'1
2369 • 2359 2356 , ':L 2403 ` /•. % '?'
1 7 7 z • 2350 2
• .,, '\ , - • ,?? , I
4 .
>771 .L . ° 2348 .5 n •: -?, 2345
;?' 81
Sylvan' I v1 2357 .5 ''?. ?• . J N "0
'
Sc 2360 .5 23"
3 2346 u? 0 2340 v 2182
0O11OK1^ a 1 5 ' fl T. z9 (lest lCrove C .9
2386 1Q04 •/ ; 2354 $ 2356 b 2. 2:=46 Ch. hatom
Ch. 2341 .5 2182 _
2359 1.2 ,I 1003 1.2 w
7 1.0 7370 ( P°0??• • i • 2354 - \ .
1
2352 - 2345
\ 1 R ? a > ? , ? . \ . \ . • /* 2347 • - _ _ , .' 2342 / 2104
v Y
/• =L 2351 m C .4
2369 9 - 2356 J' 1 2406\ •? / •'? Mo.d41e r . ,
' Bethlehem /'• I' ,I 1. 6 104
• 2395 m Ch.I 234r. -
-.4 2355 . 5 J ,. 2343 'O mt. 011ve
2252 6 1003 2345 't' 1' 2345 2344 2342 Ch.
> 2369 1004 2184 2356 2351 1, I I Center Ch, •? .. 'CJeet \ • > 2102
2353 2346
. .. . .. ... .. ...L . .?. ...,.l. .J ...ry .?. ?.. '
b 87
A T H A M C O U N T Y 1
I6 I=
,? ( ..r -l • p `? .? _ `.C f: ELk V 448 ?: v ??K
Thm,
A
17
\ 217? l• --f !. , 1 ?? i .. ' ?`_,<k9 j . ?,
Lw)
6M 67
• ,. ; . ? °'? (? ' f. 550.E ,? ?<?. / ? ?? '1?1 ;rt?r.:? \
?'i i '`O.. ' 1` ? i `? A ? „?Can•?asC\ 1?`` ? +' \ f ':IF: J ?, ? L A..G
Lim
? j?J' _ _l ,M11usu ILt hupCl ? ?:.`,?•.. , -ji' J t _ . •1
J . ?, ? '• ,h}t,o?s,'Citapel Ttlln.6 ,? ?'`;- ' "'ter :,•°+w.. `•
Gran i ?\ R••.
r' Il !
Wealver,
St6ckA! a R233ik
n U t I
indley Mi j Rpa (SF? 1003 + d,
?:=rte--? J, _._,.--._...-? _• ? '\ j , - ,1.1 {•`_ J'? J, (, _ ? ? ..
1 / } i ?? ,) •??` , __ v.-,mss I' ? , //
Cern
_• ) ?0' lr
C,?+ (rte "? ?• •?" t (? .. • • ?+ / '? `? ??'
8* w
Name: SAXAPAHAW Location: 035° 55' 28.5" N 079' 20' 46.7" W
Date: 6/6/2006 Caption: Lindley Mill Road (SR 1003)
Scale: 1 inch equals 2000 feet Alamance County
1997, Maptech, Inc.
. 4 ?? 1 1•