Loading...
HomeMy WebLinkAbout20090517 Ver 1_Certification of Completion_20101001Blue Ridge Parkway DWQ# 09-0517 June 1, 2009 Page 3 of 3 P@Xngm 0C•T 1 2010 t'ETOVALITY DWQ Project No.: 01-as/ County: Alleghany UA DDEMR. SAANDSTOM BRANCH Applicant: Blue Ridge Parkway Project Name: PRA-BLRI 2D16 (Repair/Resurfacing, Section 2-D, MP 247.9 to MP 261.2) Date of Issuance of 401 Water Quality Certification: 6/1/2009 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 16?JPail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's ut onzed agent, or the project engineer. It is not necessary to send certificates from all of these. A licant Is Certi tcatio t-Vf 74 2 , hereby state that, to the best of my abilities, due care and diligence was used in the o ervation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: rf Z/n ire/ecf -FReG,s lrrt - A/P-S Osc -T A enf S C it ICUlton I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final 1, as a duly registered Professional Engineer in the State of North Carolina, having been, authorized to observe (periodically; weekly„full time) the construction of the project,for the Permittee hereby state that; to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buller Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No.