HomeMy WebLinkAbout20110303 Ver 1_Application_20110427 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR OR, ? D ? . 1?o>> Sgyos ?M`y4n?Yp'00*y EUGENE A. CONTI, JR. SECRETARY March 28, 2011 Ms. Lori Beckwith US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 11®3®3 Subject: Nationwide Permit #14 SR 1354, Bruce Road State Project No. 13C.057115 (DWQ Minor Permit Fee $240) Madison County, NC Dear Ms. Beckwith: I have enclosed a straight-line diagram with erosion control plan, a PCN application for NWP #14, and a vicinity map relative to the proposed secondary road project on SR 1354 Bruce Road, Madison County, NC. We propose to replace/extend one (1) pipe culvert on an unnamed tributary (UT) to Gabriel Creek. Total culvert extension will be 20 linear feet with a temporary impervious dike for dewatering during installation. The UT to Gabriel Creek is an approximately 2 feet wide stream with a predominately sand substrate. The channel upstream of the crossing was dry on the day of the site visit while water was flowing from the pipe's outlet. Water seemed to collect underneath the pipe's inlet and come up through the floor of the pipe. Existing channel morphology will be maintained upstream and downstream of the culvert. The culvert will be placed below existing streambed elevation whenever possible. Riparian vegetation will be reestablished along disturbed areas associated with the culvert extensions. Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering streams. No effect on federally listed species (threatened or endangered) or their habitats is anticipated. As a part of the 401 Certification process, a copy of the application will be forwarded to the NC State Historic Preservation Office as required by Section 106 of the National Historic Preservation Act of 1966 and GS 121-12(a). Division Thirteen Office Post Office Box 3279 Asheville, NC 28802 Phone: 828/251-6171 Office of the Division Engineer Fax: 828/251-6709 www.ncdot.gov/doh/operations/divisionl3 j. OF N7a rF^r NC'?\OJ awl Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: X Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? X Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes X No For the record only for Corps Permit: ? Yes X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No 2. Project Information 2a. Name of project: SR 1354 Bruce Road 2b. County: Madison 2c. Nearest municipality / town: Mars Hill 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 13C.057115 3. Owner Information 3a. Name(s) on Recorded Deed: Warren and June Ebbs Gillespie 3b. Deed Book and Page No. 324/425 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 921 Jenkins Valley Road 3e. City, state, zip: Alexander, NC 28701 3f. Telephone no.: (828) 683-3577 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: North Carolina Department of Transportation 4b. Name: J.J. Swain, Jr., P.E., Division Engineer 4c. Business name (if applicable): N.C. Department of Transportation 4d. Street address: 55 Orange Street, P.O. Box 3279 4e. City, state, zip: Asheville, NC 28802 4f. Telephone no.: 828-251-6171 4g. Fax no.., 828-251-6394 4h. Email address: vallennncdot.oov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): N/A 5c. Street address: N/A 5d. City, state, zip: N/A 5e. Telephone no.: N/A 5f. Fax no.: N/A 5g. Email address: N/A Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude: 35.832407 N Longitude: 82.547386 W 1c. Property size: 1.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UT to Gabriel Creek 21b. Water Quality Classification of nearest receiving water: Class C 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing paved secondary road in low density urban area 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 32 3d. Explain the purpose of the proposed project: Increase the typical section of the secondary road 3e. Describe the overall project in detail, including the type of equipment to be used: Widen, grade, drain, base and pave the roadway. Extend one pipe on a jurisdictional stream. Equipment used will include excavators, trucks, and graders 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: X Yes ? No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): N/A Agency/Consultant Company: Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes X No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans s a phased project? ? Yes X No F s, explain. Page 3 of 10 PCN Form -Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ? Wetlands X Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWO W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. - 3a. 3b. 3 c 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404 width (linear Temporary (T) (INT)? , other) (feet) feet ) S1 X P ? T Pipe Culvert UT to Gabriel X PER X Corps 2 20 Creek ? INT X DWQ S1 ? P X T Dewatering UT to Gabriel X PER X Corps 2 10 Creek ? INT X DWQ S2 ? P ? T X PER X Corps ? INT X DWQ S2 ? P ? T X PER X Corps ? INT X DWQ 3h. Total stream and tributary impacts 30 3i. Comments: 20 feet of permanent and 10 feet of temporary impacts at same location. Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individ st all o en water im acts below. 4a. 4c. 4d. 4e Open water Name of waterbody . impact number - pplicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or ; Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 0. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland number (acres) of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 51h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? 61 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No 83 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimum pipe length used to obtain needed typical section and shoulder width for safety. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. N/A 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool []cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to rotected ri ari b ff id if p p an u ers ent ied within one of the NC Riparian Buffer Protection Rules? ? Yes X No 1 b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A 2b . Does this project require a Stormwater Management Plan? X Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No. 000250 Post Construction Stormwater Program ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed X Other: N/A 3c. Has the approved Stormwater Management Plan with proof of approval been N/A attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 X Other: N/A 4b. Has the approved Stormwater Management Plan with proof of approval been attached? N/A 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A 5b. Have all of the 401 Unit submittal requirements been met? N/A Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la . Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? ®Yes ? No 1 b . If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? ?Yes ®No 31b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form 7 Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted ? Raleigh . ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS protected species by county list, habitat requirements, field survey. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 61b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Current Maps/Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state federal or tribal , governments have designated as having historic or cultural preservation t t N i El Yes ® No s a us (e.g., at onal Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Current Maps/Database 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ®No 81b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps Roger D. Bryan 9 28 Mar 11 Applicant/Agent's Printed Name licanU ent's Signature A 2 Date v lid (Agent's signature only i an authorization letter from the applicant is rovided. Page 10 of 10 N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY SUBJECT: SR 1354, Bruce Rd. LOCATION: From SR 1609 to Sta. 32+71 WORK TYPE: Widen, Grade, Drain, Base, & Pave. WORK ORDER: 13 C. o52,j 5PRIORITY: COUNTY: Madison TOWNSHIP-: Mars Hill DATE 03/16/11 SCALE: 1" = 50' NOTES: Maintenance Limits Length: 2,271'= 0.43mi. PREPARED BY: JSA/JMD/JPR l(L 5 r ASPHALT I PAVEMENT 1 41 4, ,mil PIPE DATA SR 1354, Bruce Rd. County: Madison WORK ORDER : STATION PRESENT SIZE PROPOSED SIZE NOTES 12+40 20'x15"CMP Drive Pipe Rt. 12+76 60'x15"CMP Drive Pipe Rt. 13+62 25'x15"CMP Drive Pipe Rt. 16+00 25'x15"CMP Drive Pipe Rt. 16+40 25'x15"CMP Drive Pipe Rt. 17+00 25'x15"CMP Drive Pipe Rt. 17+76 25'x15"CMP Drive Pipe Rt. 18+95 N/A Ext 10+/-' Cross Pipe, Buried inlet & outlet extend as per field conditions. 18+97 25'x12"CMP 25'x15"CN P Drive pipe Rt. 22+40 45'x24"CMP 65'x24"CMP Cross Pipe, Corroded replace, Spring under road drain as per CvIE instructions. 22+42 30'x18"CMP Drive Pipe Rt. 23+50 25'x12"CMP 25'x15"CNV Drive Pipe Rt. 25+50 40'x15"CMP Drive Pipe Rt. 25+97 1811CMP Cross Pipe unknown outlet 28+30 35'x15" CMP Drive Pipe Rt. 28+60 25'x15"CMP Drive Pipe Rt. 29+80 30'x12"CNN 30'x15"CMP Drive Pipe Rt. Page 1 of 1 POLE DATA Project: SR 1354 Bruce Rd. County: Madison Owner: French Broad / Verizon Station Pole Plumber Dist From Center Present Road . Dist From Center Project Dist Center Project After Moving Remarks Lt RL LL Rt LL Rt 10+19 17 17 Telephone & Power 11+36 12 12 Telephone & Power. 12+01 28 28 Telephone & Power 13+97 16 16 Telephone & Power 15+70 18 18 Telephone & Power 17+66 23 23 Telephone & Power 23+41 19 19 Guy Wire 23+57 15 15 Power 23+88 13 13 Telephone 25+09 17 17 Telephone & Power 25+10 17 17 Guy Pole 26+88 15 15 Guy Wire 26+97 12 12 Telephone & Power 28+34 22 22 Telephone & Power .30+30 16 16 Telephone & Power 30+16 16 16 Telephone & Power YARD ROKPl L,D SAR3PRA RoLE?I PVLLOFF 1qf g7- S ZIK 1354 3RUxe RD. io ?IA?D AARO ° $ARMA "HISETiAWAW DS. Z814 P. 1691 q Prar25'ris"Ct aF i GR pp'i 13+ (n 2- Q MARS HILL. COLLEGE D6. 0 P. O * Install low & or endpoint measures in TSF. * Construct using the 30 day option. * All wattles require PAM. * All basins located at a 5% or greater grade must be tiered. GP DR, PARkIQ& .i - L4 I '/. R 11+30 P& OP CHAUDLER ?Q• 448' P. 156 MAIN STREET 3, Cox. SEEPS RD(.K WALI^ 6R AR . `Cox Ie"cMtP,-.p. .20 x t5"cmp F -%J. 41a WaM ? PAS Z 9 I 10 j1PAWE - ' Dokio kiuLMIC tz. I$I P. Z6I R IL, JoHk) s FAVE 040J lER PP.. I" P.111LI GR, DR, E _ - GULF GAS STAY0N ...PAVED.. _ ._. _. _... CO 14c, SIGN DROP FIELD I t 80 WOODS Igt _._. BQuCE LUCILI.E SPRINKLE 1) B. 2'72 P. 283 END BURIED WKNO WN * Install low & or endpoint measures in TSF. AA * Construct using the 30 day option. * All wattles require PAM. * All basins located at a 5% or greater grade J must be tiered. _ i7+b6 4- (;R., PARKING RICHARD JR, `. LoRE'rr19 Dg. o P.0 B, t (oo R. HOUSE RONALD `_ BARSA2A 1201-610 DB. 0 P. 0 i ?o N iE ISt 70 RoNgLD '• BARBARA RoLem DB, 0 P, 0 YARD MALCO`+IRE JEQRV JACKSOJ DB. 4WD P. 7Zo 25'v 12" CARP REP. W/ 25'X15" CARP 10, SOIL evfr, R IA+gs APE SiZF F UNKNOWN Ext 10' r KENNETH `. EDWARD MTELLOB D8. 117 P. Q 6 2 Prot It,' 6P DR. prof 25'x i5"CAP . R-._ I + SADIE ELIZABETH WAU.iN DB. o P• 0 Pr.f 10' &R, OR, --- RoGER?ELZAGETH ALFORp DB.ggq P.4,7Q Pr.r 10' &R 00.. .25"xI§"L_nP 3EFFREY LEDFo2D Prq IV' (h OR D8.0 P. o Ie 2S'R 15"4 A P R I l -, R. J . L R2oKaIES ING. DB,O . P.O q 3s2' HOUSE Tire ryt, A Gv-ez It WOODS I I YARD 3 BeUCE $L UCiu-6 EPRINk.LE DB. ZIZ P. Z'E3 NELEq /YMYS D8, o P'0 1 24* 30 R SO1? f2'/. loo ESA 2?Stream Bmer9es from L1?der Rd, T-Li L41 ?4fv Rep, 65 x 24" LAP JUn1E I IUARPEN GILLESPIE De. 32U P. L47_5 * Install low & or endpoint measures in TSF. * Construct using the 30 day option. * All wattles require PAM. * All basins located at a 5% or greater grade must be tiered. 41T r FIELD TrbmgS ;' rYIRYA Milo q" (vn k Da . Z"7 P, 134 i ?p,• 1315 ?Sr12'?41P 1xa, ?s' P WAR vALVE 4WJRE 4 CLF 2 3 v / HENRI?'fA ANON ° '° / DO, 175 ?. SIT I / 6'x 3'x Typ6 o Aa?1? Ty?? AOkcr[ AVER DR, 16" CUP 6's 3'r Z' rype 8 Bas1'n /rY/e A 6-cck MALCO(VISE JEQZ/ jkkK! N D3. 4'I P.72p q? 3'Y 2' iyee 6 Beset., Tyra A Che W0005 r. 7 ?-3% I Pie LD #h 9'14'781213 to * Install low & or endpoint measures in TSF. * Construct using the 30 day option. * All wattles require PAM. * All basins located at a 5% or greater grade must be tiered. 2.7 R Ie 9 ? vAw? w 4" DRa??S PI rES NANCY PotJDE2 Y AB. 350 P. 15,3 F/M HYDPAUT ?? y' DRAinI PI PE 1o q / - Ga- DR'i 1s+5b DoLPO ! S.W. SIL,-CRS CQ DR DB. 178 P. 7y / P??? 35 x IS "GMT ROCKWALL Z$+1 Z-' 2n CoM[, WALK u 1 3ROWN FWO SPIrtjDT#4Rir-r -rKVST DS. Z8-7 P.49 R - 21.20 ?'3Y HELEN NAYS Dt3. B P. 0 BRUCE LUGiLLE SPRINKLE v D8. Z72 P. Z93 2 o q 1$" AMP l I7NKuo,0OQ (aS L CONr,. $7?P$ k`E WOOD5 YARD r. J * Install low & or endpoint measures in TSF * Construct using the 30 day option. * All wattles require PAM. * All basins located at a 5% or greater grade must be tiered. LU 00 z 7•F MZ _o U OI ST-A: 32+71 PROJECT C1JD5 Hype B 8,:;?, sf>?& A4ae?u }# 5707z3z1 JOHOUiE ARANDA D& LI 7 P. C58 31?°??- 1F 4q"(4877-13L f'3/. PiEup 1,41-41 V ° ?. vwowu? V ? 30 R 1v ?,vEOD YARD NWCy PONDER D8. 350 P. 153 1357 \ Madison County \ 1 I 1354 ` \ 1 1 _ / 13! SR 1354 Bruce Road 1357 ? i 4 m 1357 1353 1356 I 1 -?e -?_-P-- ? 1 '_ m g _ -1 1609 I I _ -P1355 I / 1354 ?.m 10 3 I I I \ 1609 \ 23 i 1 f i 1359 -7 1 s 1358 / 1355 a 1428 11627 az zs $ $ 1? - 1560 I .; ` MARS HILL 1563 POP. 1,635 1609 4 Q InAO J / it ' -V ,11 a r • e ?''t + • ? I, r 1355 , ? n• ? V +• I'L , 1 oil 40" ';, •. 1111' .i 11? Md Hi a 0• A 1371 • • +? ' f f WATER j'• J .. •!? f :r .-. ,,.. , I `? ?,• • _ ? 1, ,, i ,, /l J -? JRT?f 'AWE LD ' -T `?\ - -. '^' .l1?? ',?:." • l.. `? 16 NIJ Name: MARS HILL Location: 035.8300627° N 082.5493973° W Date: 323/2011 Caption: SR 1354 Bruce Road Scale: 1 inch equals 1000 feet Madison County, NC Figure 2 Site 1 Upstream (top of picture at left) Figure 1 Site 1 Downstream (top of picture at left)