Loading...
HomeMy WebLinkAbout19980199 Ver 2_Certification of Completion_20110320 6 - Certification of ComoIetion DWQ Project No.: 19 9 8 019 9 y2 Applicant: USMC Camp Le j eune Project Name: Freeman Creek Boat Ramp Repairs, Camp Lejeune N, Date of Issuance of Wetland Permit: March 10, 2011 Ccrtiflcatc of Comnletion . ? Ai4o Upon completion of all work approved within the 401 Water Quality Certificatbti and Buller lTules, an subsequent modifications, the applicant is required to return this certificate to the 401 Oversight(Express Permitting North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, Carl Baker hereby state that, to the best ofmy abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance.and ' nt of the 401 ater Quality Cartification and Buffer Rules, the approved plans and specifications, and other supp tin materials,Z/ .4 Signature: Date: ?-arl-Bciker, Deputy Public Works Officer Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of die constriction such that the construction was observed to be built within -substantial compliance and intent of the 441 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: I If this project was designed by a Certified Professional John Kevin Avolis as a duly registered Professional Engineer Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (p Engineer, (periodically, weekly, full time) Ilia constriction of the project, for the Perrnittee hereby state that, to the best of ruy abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantit?complia td intent of the 441 Water.Qunlity Certification and Buffer Rules, the approved plans And succificatk,Ae. .:.... Signatu ; Registration No. 15738 Date April 13, 2011 a %L ? 8 at I )3?r? CT'd sssssssSS jasn QOC:OT TT ET JdU County: Ons 1 ow