HomeMy WebLinkAbout20110189 Ver 2_Application_20110425 S&ME February 17, 2011 Kimley-Horn & Associates, Inc. 4651 Charlotte Park Drive, Suite 300 Charlotte, North Carolina 28217 Attention: Mr. Matt Cox, P.E. Reference: Seasonal High Water Table Evaluation Retail Store No. 3036-00 Yanceyville, Caswell County, North Carolina S&ME, Inc. Project No. 1051-11-025 Dear Mr. Cox: APR 2 5 2011 WE NR - WATER QUALITY S&ME, Inc. (S&ME) has conducted a Seasonal High Water Table (SHWT) Evaluation per S&ME Proposal No. 1351-23750-11 dated January 31, 2011. Authorization to proceed with this study was provided by execution of the "Standard Agreement for Professional Services between Kimley-Horn and Associates, Inc. and an Associate Consultant" by Austin L. Watts, P.E., of Kimley-Horn and Associates, Inc. This evaluation was performed to provide information for a new Stormwater Management Permit Application to the North Carolina Department of Environment and Natural Resources (NCDENR) - Division of Water Quality (DWQ) and/or a local review agency. A soil scientist investigation was conducted to evaluate the soil properties of one (1) proposed Stormwater Best Management Practices (BMP) area for a possible stormwater wet detention basin. The soil scientist investigation was conducted to determine SHWT elevations. Use of an on-site stormwater wet detention basin is being considered to comply with stormwater management requirements. The use of stormwater BMP's is subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for permitting of stormwater BMP's are provided in the North Carolina Division of Water Quality - Stormwater Best Management Practices Manual (NCDENR-SW-BMP), dated July 2007 (Revised June, 2009). The NCDENR-SW-BMP requires that a wet detention basin permanent pool elevation shall be within six (6) inches above or below the SHWT elevation. S&ME, INC. /371801d Battleground Road/ Greensboro, NC 27410 / p 336.288.7180 / f 336.288.8980/www.smeinc.com Seasonal High Water Table Evaluation S&ME Project No. 1051-11-025 Retail Store No. 3036-00 February 17, 2011 PROJECT BACKGROUND The subject site is associated with the planned Retail facility in Yanceyville, North Carolina. The property is located on the west side of Sherwood Drive (NC Highway 86) approximately 0.5 miles southeast of the intersection of NC Highway 86 and US Highway 158 in Caswell County, North Carolina (Figure 1). An S&ME soil scientist conducted an evaluation of the soils within the area identified by Kimley-Horn & Associates for a proposed stormwater management system. The soil scientist evaluation was conducted to evaluate the suitability of the soil properties relative to Stormwater Management permitted by the NCDENR-DWQ and/or a local review agency. Maps were prepared using Arcview 10.2 a Geographic Information System (GIS). Base maps were generated using information from the following sources: ESRI, Inc. and a site map provided by Kimley-Horn and Associates, Inc. (Figures 1-2). FINDINGS In-situ Soil Type (Soil Series) S&ME conducted one (1) hand-auger boring (HAB) to characterize the soils within the proposed area for Stormwater Management (Soil Profile Description - Appendix I) at the location indicated on Figure 2. A detailed soil profile description was made to a depth of approximately six feet below the existing ground surface (bgs) at the location evaluated to characterize the soils potential suitability for stormwater management systems. The soil scientist evaluation includes field descriptions for soil texture; color; structure; depth, and thickness of soil horizons. The field evaluation also includes identification of the thickness and type of any restrictive horizon(s) if present; depth of seasonal high water table (if present). The soils evaluated were described to the series level using current United States Department of Agriculture (USDA) and Natural Resource Conservation Service (MRCS)-Soil Taxonomy. The soils evaluated at the hand auger boring location (HAB # 1) was most similar to the Enon soil series. The location evaluated consisted of approximately 17 inches of fill material on top of the native soil. Seasonal High Water Table Determinations The SHWT evaluation was performed by advancing a hand auger boring to a depth of approximately six feet bgs at the hand auger boring location. The location of the evaluation was approximated in the field (Figure 2). During the hand auger advancement, soils were evaluated by a Licensed Soil Scientist for evidence of SHWT influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by SHWT fluctuations, such as iron reduction and oxidation and organic matter staining. Seasonal High Water Table Evaluation Retail Store No. 3036-00 S&ME Project No. 1051-11-025 February 17, 2011 Please note that these evaluations are based on secondary evidence and not on direct groundwater level measurements. Groundwater levels fluctuate for numerous reasons and these findings do not indicate that groundwater levels have not or will not rise above the noted depths. See Figure 2 for the approximate test location, and the table below for the soil series and approximated SHWT depths. Careful consideration will need to be taken when utilizing the evaluated location for use associated with stormwater BMP's due to the shallow depth to SHWT. Proposed Retail Site - Yanceyville, NC Seasonal High Water Table Actual Water Table (inches Test Location In-situ Soil Type (Soil Series) (SHWT-inches below ground below ground surface) surface) Hand Auger Boring # I Enon 30 > 74 CLOSING S&ME appreciates the opportunity to provide these services to you. If you have any questions, please contact us. Sincerely, S&ME, Inc. Paul Penninger, L.S.S.41014/ Rob Willcox, L.S.S. Senior Soil Scientist Natural Resources Department Manager Attachments: Figure 1 - Vicinity Map Figure 2 - Hand Auger Boring Location Map Hand Auger Boring Profile Sheet SA1588\1588 REPORTS\Other Branches\105 - Raleigh\1051 Reports - Raleigh\1051-11-025 Yanceyville Retail\1051-11- 025 Kimley-Horn - Retail Store No. 3036-00, Yanceyville, NC - SHWT Detennination Report.doc 3 S&ME, INC. SITE/SOIL EVALUATION Project No. /Q/? lf- O2 Phone No. Date: 1 III Location I NCF I. L[ G Pin County: 605WFt, C Property Size Proposed Facility: Water Supply: On-Site Well ? Evaluation: Auger Boring Community ? Pit PesclJbd .61; 2_oo gW/Ue V Public ? Cut ? Weather: pAel-l-t1 GL kg Antecedent Moisture /77,o /,< T Surface Water: NA -r P i,Ar FACTORS PROFILE PROFILE i# ) CQn' 0 PROFILE # ? Ce ' PROFILE Landscape Position % L - 4--1,"76 Horizon Depth I n-5 Color Munsell 6 r g 4 Texture C Structure Consistence 5 ,a ? -4-f F ILL Boundary Horizon Depth If 5-17 36-39 51 .? + Color- Munsell : v ' J- ?X /1i p 14, Texture c-, C C G Mottles - /A Q (0 2 C Structure -I _t . ; y A1A551 ?e Consistence S 5 Sf SS ! -1-a S F-I L,L ?? t2Sl? e-10) Boundary Horizon Depth III /7- Z-4 39 - ¢(D Color - Munsell /Qt,e ¢ ti Texture C1 C Mottles C /61 R (- 4 Structure ttJ bJa /IIg551 Consistence ;S > ?- S 2.5 bt R 1 Z I S ? Boundary Horizon Depth IV Z<} Q 4?,_ 59 Color - Munsell (,J(. M I Z Texture SCE G Mottles C 1614k&13 _ Z .S (o /o - t S Y Structure ., e Consistence S $ ?r S 70C ?QS Boundary Soil Wetness 3D .t Restrictive Horizon S wq 30" Saprolite LTAR Classification ,EGEND .ANDSCAPE POSITION t Ridge Interfluve i Shoulder Linear Slope i Foot Slope Q Nose Slope i Head Slope ?c Concave Slope v Convex Slope r Terrace Flood Plain rEXTURE > sand Is Loamy sand d sandy loam I loam si silt sit silt loam sicl silty clay loam cl clay loam scl sandy clay loam sc sandy clay sic silty clay c clay CONSISTENCE WET Ns non-sticky Ss slightly sticky S sticky Vs very sticky Np non-plastic Sp slightly plastic P plastic Vp very plastic MOIST vfr Very friable fr friable fi firm vti Very firm STRUCTURE sg single grain m massive cr crumb gr granular sab subangular blocky ab angular blocky pl platy pr prismatic Permit (to be provided by DWQ) ]ll. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. _ 1. Plans (1" 50' or larger) of the entire site showing: -Design at ultimate build-out, yn - Off-site drainage (if applicable), (@ D - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, APR 2 5 2011 Pretreatment system, - High flow bypass system, DENR IMATERWALITY - Maintenance access, SAND8TORMgr *4 BRWy - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. Pond 3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, nsions, 1 pond with hardened emergency spillway, .? - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. fA4 PD4? " ' 3. Section view of the wet detention basin (1 = 20 or larger) showing: GrD55 - Side slopes, 3:1 or lower, 5 ec71 ?? - Pretreatment and treatment areas, and - Inlet and outlet structures. 7M Nota ?^ =j 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the lans r t ri t d t ti b i p p o o use as a we e en on as n. Qp,,,? L?yiS 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. A 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the JA / entire drainage area is stabilized. . 7. The supporting calculations. c3M? ? 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. ^ 9. A copy of the deed restrictions (if required). 7M4 A? 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County Report soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 xuIP - Maintenance access, - Permanent pool dime , ? - Forebay and main Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 591 Sediment Removal .587 9Sediment nen Pool -------------- ume Sediment Removal Elevation 585 Volume --- Bottom Elevatio 586 in. Bottom Elevation 584 1-ft r Storage Sedimei Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Walmart Store No 3036-00 Yanceyyille NC BMP drainage area number:Drainage Area 1 Print Title: Address: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Lr a Notary Public for the State of County of h n , do hereby certify that 1 I t for personally appeared before me this ??- day of LACJ)?Cb,1njI., and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, fl?k?? SEAL My commission expires CYL .15 • Q_C)) I Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit No. (to be provided by DWQ) ?? OF W Q TF9 .....r- . h ?. NCDENR T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1. PROJECT INFORMATION Project name Walmart Store No. 3036-00, Yanceyville, NC Contact person Justin M. Houston, P.E. Phone number (704) 9547489 Date 11-Apr-11 Drainage area number Drainage Area 1 11. DESIGN INFORMATION Site Characteristics Drainage area 296,208 ftz Impervious area, post-development 88,427 ft2 % impervious 29.85 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 7,866 ft3 OK 11,434 ff3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 3.0 in 0.65 (unitless) 0.75 (unitless) 4.00 in/hr OK 1.52 ft3/sec 0.62 ft3lsec -0.90 ft3lsec 592.00 fmsl 591.00 fmsl 591.50 fmsl 591.50 fmsl 590.50 fmsl 585.00 fmsl 584.00 fmsl 1.00 ft Y (Y or N) 592.0 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 " Permit No. (to be provided by DWQ) 11. DESIGN INFORMATION' ------ ---- - --- ---- --- Surface Areas Area, temporary pool 12,852 ftz Area REQUIRED, permanent pool 5,006 ft SAIDA ratio 1.69 (unitless) Area PROVIDED, permanent pool, A,._,,d 8,451 ft1 OK Area, bottom of 1Oft vegetated shelf, Abot shelf 6,827 ft' Area, sediment cleanout, top elevation (bottom of pond), Ab«_por,d 1,539 ff Volumes Volume, temporary pool 11,434 ft3 OK Volume, permanent pool, Va,--P d 25,515 ft3 Volume, forebay (sum of forebays if more than one forebay) 4,991 ft3 Forebay % of permanent pool volume 19.6% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.69 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp,--Pd 25,515 ft' Area provided, permanent pool, Af,.-pool 8,451 ft' Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, d., (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Ap,-,,p,, 8,451 ft` Area, bottom of 10ft vegetated shelf, Abut anan 6,827 ft' Area, sediment cleanout, top elevation (bottom of pond), Abot p d 1,539 ftz "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 5.50 ft Average depth calculated 3.89 ft OK Average depth used in SAIDA, day, (Round to nearest 0.5ft) 4.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.90 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.00 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) It Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 1.52 ft3/sec Post-development 1-yr, 24-hr peak flow 0.62 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.06 ft3/sec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio :1 Length to width ratio 1.5 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Gate Valve Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 OFFICE USE ONLY Date Received Fee Paid Permit Number(s) State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. APPLICANT'S NAME (specify the name of the corporation, individual, etc. who owns the project): Wal-Mart Real Estate Business Trust 2. OWNE eeffiplianfiee): Sarah T. Crowson / Wilson Properties, Inc. 3. OWNER MAILING ADDRESS (for person listed in item 2 above): ?[2@99161 P.O. Box 1395 133 Mountain View Drive Pilot Mountain, NC 27041 APR 2 5 201' UENR - WATER QUALITY WETLANDS 4. OWNER ADDITIONAL CONTACT INFORMATION: Phone: 336-456-7442 Fax: Email: 5. PROJECT NAME (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, inspection and maintenance agreements, etc.): Walmart Store No. 3036-00, Yanceyville, NC 6. PROJECT LOCATION: Street Address: Highway 86 City: Yanceyville County: Caswell State: NC Zip Code: 27379 Latitude: N 36° 24'43.857" Longitude: W 79° 20'42.6172" 7. DIRECTIONS TO PROJECT SITE (from nearest major intersection): Approximately a half mile southeast of the intersection of NC Highway 86 and County Home Road. 8. CONTACT PERSON (who can answer stormwater-related questions about the project): Name: Austin L. Watts, P.E. Company: Kimley-Horn and Associates, Inc. Phone: (704) 319-5698 Fax: Email: austin.watts@kimley-hom.com ? p = U RANCH 1/2009 Version 1.1 Page 1 of 5 II. PERMIT INFORMATION 1. THE PROJECT IS (check one): ?X NEW ? A RENEWAL ? A MODIFICATION 2. OTHER JURISDICTIONS: Which local government(s) has jurisdiction over the project (e.g. Town of Cary or Johnston County)?: Town of Yanceyville I STORMWATER MANAGEMENT PROGRAM Check all of the state-approved stormwater management programs (implemented by either the State or local government) that apply to your project: ? Phase II Post Construction ? Water Supply Watershed ? Neuse or Tar-Pamlico NSW ? Randleman WSWS ? USMP ? Coastal Counties ? HQW ? ORW 4. PERMIT HISTORY (renewal or modification requests must complete this item): Existing DWQ Permit Number: Date Issued: 5. PROJECT TYPE (check one): ? Low Density* ?X High Density* * Low Density projects shall be under 24% Impervious with only vegetated stormwater conveyances. A curb and gutter or pipe system for stormwater conveyance shall result in reclassification of project as High Density even if below 24%, except when pipes are used for road or driveway crossing purposes. 6. ADDITIONAL PROJECT REQUIREMENTS (check all that apply): ? CAMA Major ?X Sedimentation/Erosion Control ? NPDES Stormwater ?X 404/401 Permit ? Non-404 Jurisdictional Permit ? Other: Note: Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III. PROJECT INFORMATION 1. STORMWATER TREATMENT METHODS (Describe briefly how stormwater will be treated): Stormwater will be treated by a Wet Detention Basin designed to treat 90% of Total Suspended Solids. Important Note: attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. RIVER BASIN/STREAM INFORMATION a. Stormwater runoff from this project drains to which River Basin?: Roanoke b. Nearest named stream: South Fork Rattlesnake Creek c. Water quality classification of nearest named stream: C 1/2009 Version 1.1 Page 2 of 5 3. TOTAL PROJECT AREA: 1 5.32 (acres) 4. PROJECT BUILT UPON AREA: 1 30% 5. DRAINAGE AREAS (How many drainage areas does the project have?): 1 Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name South Fork Rattlesnake Creek Receiving Stream Class C Drainage Area 6.80 Existing Impervious* Area 0.47 Proposed Impervious*Area 2.03 % Impervious* Area (total) 30% Impervious* Surface Area Determination (Breakdown) Impervious* Surface Area Drainage Area I Drainage Area 2 On-site Buildings 0.34 acres On-site Streets -- On-site Parking 1.15 Acres On-site Sidewalks 0.01 Acres Other on-site 0.06 Acres Off-site 0.47 Acres Total: 2.03 Acres Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 6. EXPLAIN HOW THE OFF-SITE IMPERVIOUS AREA WAS DERIVED: NCDOT's 2' contours were pulled for area outside of the survey boundary. Site visits have been taken to view the surrounding area. Aerials were used to scale the existing makeup of the surrounding properties. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development draining to the proposed stormwater management devices prior to the sale of any lot. If applicable, please complete and submit a copy of the deed restrictions and protective covenants along with your application. 1/2009 Version 1.1 Page 3 of 5 V. SUPPLEMENT FORMS 1. The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The most current form(s) located on the 401/wetlands unit website at http://h2o.enr.state.nc.us/su/bmp forms.htm must be used. Please include both the Design Summary and the Required Items Checklist along with all required items and supporting design calculations. (Check the supplement forms that will be required for your project): ? Bioretention Supplement ? Dry Detention Supplement ? Grassed Swale Supplement ? Infiltration Basin Supplement ? Infiltration Trench Supplement ? Level Spreader/Filter Strip/Restored Buffer Supplement ? Sand Filter Supplement ? Stormwater Wetland Supplement ?X Wet Detention Supplement VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and two copies of the Express Review Stormwater Management Application JMH • Signed and Notarized Inspection and Maintenance Agreement • Three copies of the applicable Supplement Form(s) for each BMP • Application processing fee (payable to DWQ) • Detailed narrative description of stormwater treatment/management • Three copies of plans and specifications, including: ?X Development/Project name ?X Engineer and firm ?X Legend 0 North arrow 0 Scale 0 Revision number & date 0 Mean high water line 0 Dimensioned property/project boundary 0 Location map with named streets or NCSR numbers 0 Original contours, proposed contours, spot elevations, finished floor elevations JMH JMH JMH JMH JMH 0 Details of roads, drainage features, collection systems, and stormwater control measures ?X Wetlands and streams delineated, or a note on plans that none exist X Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations 0 Drainage areas delineated 0 Vegetated buffers (where required) 1/2009 Version 1.1 Page 4 of 5 VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf. please comnlete this section - N 1. DESIGNATED AGE4 (individual or firm): Kimley-Horn and Associates, Inc. 2. MAILING ADDRESS: 4651 Charlotte Park Drive, Suite 300 Charlotte, NC 28217 Phone: (704) 333-5131 Fax: (704) 333-0845 VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) Steven L. Mitchaet , certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants (if applicable) will be recorded, and that the proposed project complies w, tth the req 're ents of 15A NCAC 21-1.1000. Signature: Date: H` _. / " Wff MW 1/2009 Version 1.1 Page 5 of 5 Additional Information on Section III - Basic Information The Drainage Area discussed in this section totals 6.80 Acres. This is portion of the larger drainage area that is detained by the proposed wet detention basin. The total drainage area to the outfall is 9.02 Acres, however, a portion of this area is not detained as no impervious area is being added. • w • NCDENR Stormwater Management Calculations Walmart Store No. 3036-00 Yanceyville, NC U@@@flw7RN APR 2 5 2011 lwlslll Prepared for: Walmart Stores, Inc. Sam Walton Development Complex 2001 SE 10th Street Bentonville, Arkansas 72716-0550 • • • © Kimley-Horn and Associates, Inc. 2011 • • • Walmart Store No. 3036-00 Yanceyville, NC STORMWATER MANAGEMENT CALCULATIONS Prepared for: Walmart Stores, Inc. 2001 SE 10th Street Bentonville, Arkansas 72716-0550 Prepared by: KIMLEY-HORN AND ASSOCIATES, INC. 2000 South Boulevard, Suite 440 Charlotte, North Carolina 28203 April 2011 015476140 • w w • • • • • • • • w • • • w w • • • w w w w • • • w w • • w • w • • • • w w • • • w TABLE OF CONTENTS OVERVIEW SITE MAPS SITE LOCATION MAP FIGURE 1 FLOOD INSURANCE RATE MAP FIGURE 2 USGS QUADRANGLE MAP FIGURE 3 WATERSHED MAPS PRE-DEVELOPMENT DRAINAGE MAP FIGURE 4 POST-DEVELOPMENT DRAINAGE MAP FIGURE 5 WATER QUALITY WET POND CALCULATIONS NCDENR WET DETENTION BASIN SUPPLEMENT FORM WATER QUANTITY CALCULATONS PRE & POST DEVELOPMENT SUMMARY TIME OF CONCENTRATION CALCULATIONS PRE VS. POST CURVE NUMBER CALCULATIONS STORMWATER SCHEMATIC DIAGRAM PRE- & POST DEVELOPMENT ROUTING INPUT PRE- DEVELOPMENT ROUTING RESULTS: (1-YEAR - 24-HOUR STORM EVENT) POST-DEVELOPMENT ROUTING RESULTS: (1-YEAR - 24-HOUR STORM EVENT) RIP RAP APRON CALCULATIONS OVERVIEW OVERVIEW Background This report has been prepared to support the Site Plan Submittal for a proposed Walmart Store No. 3036-00. The approximately 5.32-acre project site is located in Yanceyville, North Carolina (see Figure 1). The project consists of the following components: • Construction of a 14,869 square foot Walmart Store, which includes the grading, infrastructure, and roadway improvements, required to serve the proposed lot. • A stormwater management system comprised of the creation of a wet detention pond. Existing Conditions The subject property is currently undeveloped and is a mix of heavily wooded areas and open space. A stream flows through the middle of the site from west to east via a previously permitted culvert. Surrounding properties consist of commercial businesses and residential properties. Flood Plain/Floodway The proposed site does not contain areas within a 100-year floodplain boundary as determined from FIRM Panel # 3710899600) dated September 28, 2007 (see Figure 2). Site Topography Based off survey provided by James Mauney and Associates, P.A., the existing topography of the site ranges from approximately 630 feet at the western corner of the site to approximately 578 feet around the outfall on the east side of the site. The site grades allow the entire site to grade to the eastern outfall. Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using a wet detention pond as treatment. The pond is designed to treat the first one inch of runoff and will draw down over a period of two to five days. The wet detention basin has been designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Water Quantity The Town of Yanceyville does not have any stormwater detention requirements. However, the proposed wet detention pond has been designed using ICPR to match pre-development and post-development peak runoff rates for the 1-year 24-hour storm event. Conclusion The proposed Stormwater Management measures were designed using methods prescribed by the aforementioned resources. Based on the analyses provided herein, the proposed systems will be adequate to address the stormwater requirements of the North Carolina Department of Environment and Natural Resources. Existing information is based on survey data provided by James Mauney and Associates, P.A. NCDENR Stormwater Management Calculations 1 • Walmort Store No. 3036-00 Vanceyville, North Carolina SITE MAPS SITE LOCATION MAP • • • • • • • • • • • • • • • • • • • • • • • • • • • • • WALMART SITE LOCATION MAP STORE NO. 3036-00 Kimsey-HomandAssociates,Inc. YANCEYVILLE, NC NOT TO SCALE THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERNCE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. FIGURE • • • • i • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • FLOOD INSURANCE RATE MAP . K • • • • • 76 Wal-Mart SiteClvil\_Secure\140 Yanceyville\02 - DWG\Work\Vic W N E S WALMART F.I.R.M. PANELS: FIGURE STORE NO. 3036-00 3710899600 J 2 KimleyHom and Associates, inc. YANCEYVILLE, NC SCALE: 1"= 1600' THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES. INC. SHALI. BE WITHOUT LLASILrTY TO KIMLEY-HORN AND ASSOCIATES, INC. USGS QUADRANGLE MAP • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • i • • i • • • • to Clvll\ Secure\140 Yancevvllle\02 - DWG\Work\ N W E S C M WALMART USGS QUADRANGLE FIGURE STORE NO. 3036-00 YANCEYVILLE, NC (1997) ?cmley-HomandAssodates,Inc. YANCEYVILLE, NC SCALE: 1" = 2000' 3 THIS DOCUMLM, TOOEWEIX WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES. INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. WATERSHED MAPS • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PRE-DEVELOPMENT DRAINAGE MAP b 3illlJl? .,.......,-, -.- - ?.... ?.? ,,, „ .,..,.,.. ...., ?.,.?......,.. 1c.11un1 ..iDui - , iun ri l ui ci •??uu?c - iuGwnulcNl NV -'N?4N4W r111N4S4Md SNOMS U OW S1d23NOO 2NL N1)M MdH1d'JO1 'iNj?(nDw smi swo- (rot) N" ON'3111A,\3ONV), SISAI`dNV 2EiVMMOlS ICIG-CC[ W41 :3NONd t,ZBZ VNOOMu MWN lLLO OYNo OOC 311nG ' IlViD2J MOO 13NNOO 1N3NdM3AA4 3?Jd 31W0 NUVd 3UO WVIO LOB* oul?seaelaossypue ??? wo 48 WI H- 1 N s N \ \ \ \ \ / / / / / / j W TT?? TL..J V 1 H ?J C I I M I ! ----------- E I, C I ' I' la I All -------------- z ?I ?/? I 4? U° ? 9\ ? R•? It 1 rI ui Q ;:e $ \ o a $?°' r •- - - z _------ -?----------------- 8 1 1 It 11 1 I 1 O 41 w O H O W r-, us II U O ' r•1 O IH----------------------------------------------A---------------------------- I 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 Omp'u8noDau-a6nulouQ-NV-ld ]NIGVaD Obi9Lb9i0\>tuOM\E)MQ - ZO\aIIIAAa:)uo k 0jI\3.An:)aS-\llnl3a}lS }unW_1nM 9!_bSiO\A3Q-l ?H3\1>I • • • • • • • • • POST-DEVELOPMENT DRAINAGE MAP • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • NAdONMI UNr AO ASnJN 'CUMAad SYM L HOIHM 110. S ON '3l11AX30NVA llvl]2j lvlo213wwoo - / / i / / e 5r? / r m _ --- aft I xr ow ,may AAA, C IS ( +rt S ' W w /+?1 i ----------------- d= Z l w< 1NAIW UNY ASUdund 0IID0AdS AHL HOA AINO UAUNAINI St '.43VWJS AV 1NAYInWSNI NY SV 'NIAHAH Ud1NASdtld SNOISAU UNr SIS)\IVNV 2JEUVMMJOlS 1N]Mdol?]A301SOd 8 N .s s j({ g Y IK 11 A' 1 i / Yo+R pgptltlCCr l?yd S1dA3N0:1 AHL N11M HAH1Ao01 '1NANnoOU SIHL .p s`ve (roc) :zrd Icla-m (VOL) :U°' uzaz rwaaro MaoN 'auow iat "' F2 3Utl0 JIWd aLLUwrHS wat oul'saleloossvpue ?_? UJOH-AalwlA W U 91 o E, CD W r" W II z ? a 0 0 0 P 1 ?1 (D Fl 11 1 .? M; Z N I IIIIIIf-1111E1 i i.. lij 1 1 1 1 1 1 1 1 1 1 1 ------------------------- 1 1 1 I 1 I I 1 1 1 I BCC 1 • d ' 1 j ----------- O .`Left ------------ C 11 ?if?t t i I __________ -- ----------- 4. ** , F' J? e ----1--u Ivv ld tjiviuvd`J uV ?yLVS lO\?1??M\?MQ - 20\all!nAa::)uro,, obT\a An7aS-\ll^l3aj-IS :-,VOW-1n1,\ 9Lb9i0\A3Q-1 -lH3\:N • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • WATER QUALITY • • • • • • • • • • • • • • • • • WET POND CALCULATIONS Kimley-Horn and Associates, Inc. WET DETENTION BASIN Project Information Project Name: Walmart #3036-00, Yanceyville KHA Project #: 015476140 Designed by: JMH Date: 2/22/2011 Revised by: Date: Revised by: Date: Site Information Sub Area Location: DA-1 Post Drainage Area (DA) = 6.80 Acres Impervious Area (IA) = 2.03 Acres Percent Impervious (1) = 29.9 % Required Surface Area Permament Pool Depth: 4 ft SA/DA = 1.69 (90% TSS Removal via Pond) Min Req'd Surface Area = 5009.4 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.32 in/in Storage Volume Required = 7866.2 cf (above Permanent Pool) Elevations Area (s.f.) Temporary Pool Elevation = 592.00 ft 12,852 Permanent Pool Elevation = 591.00 ft 8,451 Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 12852 sf (Elevation = 592.00 ) Area @ Top of Permanent Pool = 8451 sf (Elevation = 591.00 ) Volume of Temporary Storage = 11216 cf Side Slopes of Pond = 3 : 1 Side Slopes of Maintenance Shelf = 6% Side Slopes of Pond (below shelf) = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 8451 > 5009) sf Volume of Storage for 1.0" Storm = 11216 Yes ( 11216 > 7866) cf u _ FI Kimley-Horn and Associates, Inc. WET DETENTION BASIN Project Information Site Information Project Name: Walmart #3036-00, Yanceyville KHA Project #: 015476140 Designed by: JMH Date: 2/22/2011 Revised by: Date: Revised by: Date: Sub Area Location: Drainage Area (DA) = Impervious Area (IA) = Percent Impervious (1) = Orifice Sizing Q2 Days '= Q5 Days - Orifice Size = Q Orifice - Drawdown Time = DA-1 Post 6.80 Acres 2.03 Acres 29.9 % (Drainage Area) 0.0649 cfs 0.0260 cfs 1.90 in 0.064 cfs 2.0 days less than 5 days (yes/no) ? yes greater than 2 days (yes/no) ? yes Orifice Equation: Q=CAgV(2gh) (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Q2<Q< Q5 c = 0.6 A9= Area of Pipe g = gravity = 32.2 ft/s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter • • • • • • • • • • NCDENR WET DETENTION BASIN SUPPLEMENT FORM Permit No. (to be provided by DWQ) A OF W AT?q AT'* O? ?G NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1. PROJECT INFORMATION _ Project name Walmart Store No. 3036-00, Yanceyville, INC Contact person Justin M. Houston, P.E. Phone number (704) 9547489 Date 11-Apr-11 Drainage area number Drainage Area 1 11. DESIGN INFORMATION Site Characteristics Drainage area 296,208 ftz Impervious area, post-development 88,427 fe % impervious 29.85 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 7,866 ft3 OK 11,434 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 3.0 in 0.65 (unitless) 0.75 (unitless) 4.00 in/hr OK 1.52 ft3/sec 0.62 ft3/sec -0.90 ft3/sec 592.00 fmsl 591.00 fmsl 591.50 fmsl 591.50 fmsl 590.50 fmsl 585.00 fmsl 584.00 fmsl 1.00 ft Y (Y or N) 592.0 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & rl. Design Summary, Page 1 of 2 • • • • Permit No (to be provided by DWQ) fl. DESIGN INFORMATION Surface Areas _ Area, temporary pool 12,852 ft2 Area REQUIRED, permanent pool 5,006 ft SA/DA ratio 1.69 (unitless) Area PROVIDED, permanent pool, Ape-_pd 8,451 ft' OK Area, bottom of 1 Oft vegetated shelf, Ab,? ,, 6,827 ft` Area, sediment cleanout, top elevation (bottom of pond), Abotpond 1,539 ft' Volumes Volume, temporary pool 11,434 ft3 OK Volume, permanent pool, Vv---. 25,515 ft3 Volume, forebay (sum of forebays if more than one forebay) 4,991 ft3 Forebay % of permanent pool volume 19.6% % OK SA/DA Table Data Design TSS removal 90 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 1.69 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, VP--P0.1 25,515 ft' Area provided, permanent pool, A,--P., 8,451 ft' Average depth calculated ft Need 3 ft min. Average depth used in SA/DA, d,,, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Ap--P, 8,451 ft` Area, bottom of 1 Oft vegetated shelf, Atot shy 6,827 ft' Area, sediment cleanout, top elevation (bottom of pond), kt_p d 1,539 ff "Depth" (distance blw bottom of 1 Oft shelf and top of sediment) 5.50 ft Average depth calculated 3.89 ft OK Average depth used in SA/DA, d,„ (Round to nearest 0.5ft) 4.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.90 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.00 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 1.52 ft3/sec Post-development 1-yr, 24-hr peak flow 0.62 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.06 ft3/sec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 1 Length to width ratio 1.5 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Gate Valve Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & It. Design Summary, Page 2 of 2 WATER QUANTITY CALCULATIONS • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PRE & POST DEVELOPMENT SUMMARY • • • • • • • • • • • • • • • • a • • • • • E ?? i? da Y? u Ll? m E E ,,0A V/ y C E W M E O O d U) d ? O 2 r N N O a ca a O N N N z - a5 Id Q Q T U C O CU } o? COo 2 a3 O C Z O N C N (D 0 0 d .? > > .O Q N a) a) E a Y 0 0 w w d 0 a a 2 A m v w 0 CL 0 y N } U CO i i Y m p N 0- c O O O l? V c C V O U a`> a E :n % Z Z rn (D U m O U U O N m CO N a) (O N Q O N N } U Lo Y i- a 0 cu a) ° N E F V N O U z a) U E 7 z O N Q of of i Q Q Q w W z rn ? Q Q Q 16 o Q Qw Qw Q z Q ? m O r m U cn 00 N _O Lq N w a) c6 Q Q1' w (D Z 1L1 N r) Tz Co O E (n -0 Q i O Q O L w m ? 0i E cu O O tLO LJJ Q c06 w -2 Q O " to Lri LO U QQ ? U v- ?- O O O d E z; O co `O a N E -0 o U O C C-) E U m z O _ Q U ? 0 TIME OF CONCENTRATION CALCULATIONS a N l0 ?_ o y C ? O N U O p d m G) ~ CL` 0 a a ui ei ui m m m m 0 m? c r` } T Q o `o O co 7t U ? 1) L C z ti m m m m a` > > a) Q) x Q=tj cr C?-Y Q w m 0 CL i m. E F- C o0 7 to N N o O m V c, N > c0 F m u m ,T ? U O O m ? C N Q j 1... C O U " 7 a7 m Vl O C C m 10 U O a) m m h CL f0 m C ; U O m w 16 y m O m U Q o a m > m > c m c dD m m ? ? j N N C N N O) c C w C C ? ' sT ? C L 1) ? M N m O ? U N o 0 ? o m a ? co N m oCL o 0 r) 0 j o 0 r 03 _ J pO ` N M 3 0 LL c 0 a V CD ? 0 C7 ? C c r w L ? 3 > > 0 o U o LL m $ 30 f` m 30 A C m o N O m U) C `° m C `° m !d m m m c CL N c= c y c tq m F U U U m c m ? m a c? j I ? J ? O I Z W a O m W t m m m w 0 m z ? 3 w a , 0 Q w N C ny C o ? a c o m 0 5 °o LL S m a m O J A C U 11 Ci O p U LL o O N ° 2 C ° m U L ) m o ? ? D O H N ll _ m C O C U i ?m LL m oc ? i h m ? U 1 O N 3 w .2 1 ? C ~ L i ? c p (n LL U LL p o; Fw7 N O N .y >+ G to O C Q ? 0 N C O y O 0 CL m > E d ~ a` O 04 N N m m m t0 f0 i0 m 0 c ? m 'a C 0 0 O M O mm 3 E ? a a a Z ? °? m aOi O C IDa y'>'> 0 ID O Y O C U ?O a` € o o cc co F C O V N O O F- > u u m m.? c m = ca y ? ? ? ? i N Q v t= f= ? c 0 0 C c m y m o m U v ?.4 c o v 2 U U `0 0 m m a ? £ a i- F m ID -ID 3 a 0 3 'V O CD LL A N O U Q `o O •o > > a cc c n. D ? c 3 L 4 M F N N y c O) m C C C (D C t. U I O C j C O M o r y M ? N ? , O r O CL o a o s J L 5) p N ? S N ? O LL C .4 °o w m J t0 - O y m CD CD m > w o 3 L `m CL 'o U O L o LL d m N O. mt U N L tT q U U O C m ? O m Z O O W CL a o _ Cc m w 0 L m > w Z E2 E W 7 Z a) m Z F Q O F 0 w 0 Z a. a c O A O w y C Ny C e c a a 3 J o c LL oo `? ' n °o LLm m O J C ` 3 O U LL O p U p p _o C c C - m L m U L c ? m w m F m H LL - (0 c C C O m C LL C a y n U U ? N my Q' N LL' O O H ? ?' r m Ea LL L O U LL `O 2 r N O N • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • PRE VS. POST CURVE NUMBER CALCULATIONS - m m n = E • ?ZZ my ? ? m m o Z - U G m _ d • L K N ? • 2z a U ? N N V O A O yy . Z U m U Z . o v a $ o m co m - o c? T t6 d Q ? O Z o w ? N ^ C C J o : N • ? G U • n 0 , O o o E ? m N? L L ? L a 1 a ? . o U ? > v = L ?y N m ? N ? A 3 , E u?aa m m?°? o?? ? _ ? W m m - Z a" N N C? _ N " ?!' n1 o < ai _ ? J K a aY r - F n m E = ` w c c - o m E ° w O ? o g ? - I O m O w > ? - v uu'y „ v m m w p `m E m 0 o a f ' ,m V LL CL S • N O N O N y Z m d Q EE O Z c y m ? O U CL > .0 > m m E CL` o U Y N N U z d m m m m m m ??? c? Q } m o O ? x C ? 3 .4k a a E 5 m ? n zm d m d a° _ o c U a m> > a` x ? Y c E `o C v O a` m E _ °o. z z E m v o Z U `o m m U ?p X O 2 aU U m ym Q Z U x Z U O O O. O 2 O V' x 0 a N m m U E m z `o DU y .m.. 3a m c ? o m C_ t0 m UO ? J m m z m m rn m (D ? V O O O ? m N tp O r fV r IG in o m u? m r m m m m Y 44 [[ f•. p ? ? J C N $ m ' mc? 3 c?j a 4 c U O C m a a L 2 E m d m O f Z 17 o ? m ?D ? N M m M Qf fV O t0 th N m Q N O C O G G lV io u?i m °n m fI`? t. _: m m m m , 9 o a U £ m I E i N J Q. a E IfIfI I? N N - m E_ O ' w Z ¢a ? ? z 7 tp U o? m m ? N n N m Y n _ F N a? 4 m U to > O : LL • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • STORMWATER SCHEMATIC DIAGRAM W z ?zH P a a ? o Q a .+ a ? H N d U N Q 3 w H H F H A O E F N N a a 5 H Q C1 F w U N a H H m 3 rd?b1 w ua ? r .-U+ b C U r C7 a) 0 ] x b1M V. N ?4xx Id Id V Q) ?D va?L E rd JuWU W 0 m N F N o N y Z"4>F£ m0Z:)w N v l4 7 N .q U w p G Z .1 d) a{ ? U ro F v 0 tr? C q a v H C ro •H U4) Ou 1HN HH • m a•a)H (d 4 u o4 s? P ro " N v a)tiw ? v a441 W w ? u Q m a m a w aaauQroaxwwx U vi U 0 U U N •C N l:+ N O O N a U C a? 0 bA 0 0 a b 4Y U b U U C 0 ar • • • • i • • • • • • • • • • • • • • • • • • • • w • • • • • • • • • • • • w • • • • PRE- & POST DEVELOPMENT ROUTING INPUT PRE AND POST DEVELOPMENT INPUT Basins =___-------- ---= ------------ ---- -------- --------------------- ------------------------ Name: POST-DETAINED Node: POST-DETAINED Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: 323.0 Rainfall File: Scsii-24 Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 5.00 Area(ac): 6.800 Time Shift(hrs): 0.00 Curve Number: 71.90 Max Allowable Q(cfs): 999999.000 DCIA(%): 0.00 ------------------------------------ Name: POST-UNDETAINED --------- Node: --------------------- POST ---------------------------------- Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Rainfall File: Scsii-24 Rainfall Amount(in): 0.000 Area(ac): 2.220 Curve Number: 61.10 DCIA(%): 0.00 Peaking Factor: 323.0 Storm Duration(hrs): 0.00 Time of Conc(min): 12.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 ---------------------------------------------------------------------------------------------------- Name: PRE Node: PRE Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Rainfall File: Scsii-24 Rainfall Amount(in): 0.000 Area(ac): 9.020 Curve Number: 61.60 DCIA(%): 0.00 Peaking Factor: 323.0 Storm Duration(hrs): 0.00 Time of Conc(min): 22.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 ----------- ----------------------------------------------------------------------- -------- ___= Nodes _____------------- ---------------------------------------------- ---------------------------- -------------------------------------------------------------- Name: POST Group: BASE Type: Time/Stage Time(hrs) Stage(ft) --------------- 0.00 585.000 999999.00 585.000 Base Flow(cfs): 0.000 Init Stage(ft): 585.000 Warn Stage(ft): 585.500 ------------------------------------------------------------------------------------------ Name: POST-DETAINED Base Flow(cfs): 0.000 Init Stage(ft): 591.000 Group: BASE Warn Stage(ft): 593.000 Type: Stage/Area Stage(ft) Area(ac) 591.000 0.1940 591.500 0.2704 592.000 0.2950 593.000 0.3251 ------------------------------------------------------------------------------------------ Name: PRE Base Flow(cfs): 0.000 Init Stage(ft)! 579.000 Group: BASE Warn Stage(ft): 579.500 Type: Time/Stage Time(hrs) Stage(ft) --------------- --------------- 0.00 579.000 999999.00 579.000 ------------- ---------------------------- Drop Structures ________________________________________°_°__________________________ Interconnected Channel and Pond Routing Model (ICPR) ©2002 Streamline Technologies, Inc. Page I of 4 PRE AND POST DEVELOPMENT INPUT Name : CS-1 From Node: POST-DETAINED Length(ft): 90.00 Group : BASE To Node: POST Count: 1 UPSTREAM DOWNSTREAM Friction Equation: Automatic Geometry : Circular Circular Solution Algorithm: Most Restrictive Span(in) : 24.00 24.00 Flow: Both Rise(in) : 24.00 24.00 Entrance Loss Coef: 0.500 Invert(ft) : 586.000 585.000 Exit Loss Coef: 1.000 Manning's N : 0.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Dot Clip(in): 0.000 0.000 Solution Incs: 10 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall *** Weir 1 of 2 for Drop Structure CS-1 *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Circular Span(in): 1.90 Rise(in): 1.90 *** Weir 2 of 2 for Drop Structure CS-1 *** Count: 1 Type: Horizontal Flow: Both Geometry: Rectangular Span(in): 36.00 Rise(in): 36.00 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 590.250 Control Elev(ft): 591.000 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 TABLE TABLE Invert(ft): 592.250 Control Elev(ft): 592.250 Weirs Name: SPILLWAY From Node: POST-DETAINED Group: BASE To Node: POST Flow: Both Count: 1 Type: Vertical: Mavis Geometry: Trapezoidal Bottom Width(ft): 40.00 Left Side Slope(h/v): 3.00 Right Side Slope(h/v): 3.00 Invert(ft): 592.500 Control Elevation (ft): 592.500 Struct Opening Dim(ft): 9999.00 Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 TABLE Hydrology Simulations ------ Name: 001 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\001.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 3.00 Time(hrs) Print Inc(min) ---- --------------- 30.000 5.00 ------------------------- ------------------------------------------- Name: 002 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\002.R32 Interconnected Channel and Pond Routing Model (ICPR) ©2002 Streamline Technologies, Inc. Page 2 of 4 a • • • • PRE AND POST DEVELOPMENT INPUT Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 3.50 Time(hrs) Print Inc(min) --------------- 30.000 5.00 ---------------------------------------------------------------------------------------------------- Name: 010 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\010.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 5.30 Time(hrs) Print Inc(min) --------------- --------------- 30.000 5.00 ---------------------------------------------------------------------------------------------------- Name: 100 Filename: K:\CHL LDEV\015476 Wal-Mart SiteCivil\ Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\100.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii-24 Rainfall Amount(in): 7.50 Time(hrs) Print Inc(min) 30.000 5.00 ----------------------------------- =========---------------------------------------------------- Routing Simulations _____________ ------------------------------------------------------------------ Name: 001 Hydrology Sim: 001 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\001.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- 11.000 30.000 13.000 5.000 30.000 30.000 Group Run --------------- ----- BASE Yes Delta Z Factor: 0.00500 End Time(hrs): 30.00 Max Calc Time(sec): 60.0000 Boundary Flows: ----------------------------------------------------- Name: 002 Hydrology Sim: 002 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\002.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 11.000 30.000 13.000 5.000 30.000 30.000 Group Run Delta Z Factor: 0.00500 End Time(hrs): 30.00 Max Calc Time(sec): 60.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) ©2002 Streamline Technologies, Inc. Page 3 of 4 PRE AND POST DEVELOPMENT INPUT --------------- ----- BASE Yes ---------------------------------------------------------------------------------------------------- Name: 010 Hydrology Sim: 010 Filename: K:\CHL LDEV\015476 Wal-Mart SiteCivil\ Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\010.I32 Execute: Yes Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 11.000 30.000 13.000 5.000 30.000 30.000 Group Run --------------- ----- BASE Yes Delta Z Factor: 0.00500 End Time(hrs): 30.00 Max Calc Time(sec): 60.0000 Boundary Flows: ---- ---- -' - --' Name: 100 Hydrology Sim: 100 Filename: K:\CHL_LDEV\015476 Wal-Mart SiteCivil\_Secure\140 Yanceyville\03 - Calculations\Storm\ICPR\100.I32 Execute: No Restart: No Patch: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) --------------- --------------- 11.000 30.000 13.000 5.000 30.000 30.000 Group Run --------------- ----- BASE Yes Delta Z Factor: 0.00500 End Time(hrs): 30.00 Max Calc Time(sec): 60.0000 Boundary Flows: Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. Page 4 of 4 PRE-DEVELOPMENT ROUTING RESULTS: (1-YEAR - 24-HOUR STORM EVENT) • • • • • • • • • • • • s • • • • • • • • • • • • • • • • • • • i • • • • • • • • • • • X X n ro Ow i U W U 0 0 r 30 l4 F W o X 3 ro O w ? rl U C H N3 u) E O ?4 F w C X H ro z W ro N Q) C N w FC4 N roves u to w a ro qm ro tr? N i .C? b w C a? ro z b rnw ? ro v v m E tri N F ? C O N E .{ Q n O F Ez F a vxw a0 0 F F N w `? ro z 04 x O ? N Q 0 0 0 0 N r N 0 0 0 0 0 0 0 0 0 0 W K4 W Pi a 0 a U N O O U N a? N O O N ?i a U 'O O bA Y b ^O W U 'O Y U O Q? • w • w w • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • w • • POST-DEVELOPMENT ROUTING RESULTS: (1-YEAR - 24-HOUR STORM EVENT) w 0 a? on a xaUn ro0w r u W 0 O O 3 ? E O s. Fw 41 X C ro0 x 3 O It O w w C H v 3 m E O 1a Fw C x H ro W 1? N }I W w 7 Sa w N x ro (d v w 01 W ro Qm x 0) v w C bi w ? ro s? m ro a x v a? b bi w ? ro W m v N N bl fJ F a? N x ro z C O ro C E a 0 mH Fz mw PPS £ F WO z F v W v] E N ax z ox N w A a F >+ off a -- 0 r o ? 00 o ri o ro o m N CO l0 V' o r m o 0 0 N N O W 01 H M 0 0 O to 0 0 0 0 0 0 0 0 lfl o m m o io O N ul N m m O N1 O N O O1 o o o o ww u) u) row F Q Cl) W oz aH F Q F cl) O a U vi a? _O O U N O N O O N a U rO bA .Y O O O a .b A a? U a? U N O U i. a? C • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • RIP RAP APRON CALCULATIONS i • - - -- -- - -- -- - - -- -- -- - -- - -- -- -- -- -- -- -- -- -- -- -- -- -- -- --- -- - - -- -- -- -- -- -- - -- -- -- --- -- -- -- - -- -- -- -- -- -- -- -- - -- -- -- -- - -- - -- - -- - - - -- _ - --- - --- v -- - -- - -- - -- - - - - - - -- _ -- __ - -- -- -- -- -- -- -- -- -- -- - -- -- - -- -- - - r -- =_ -- - -- -- - -- - -- -- -- - -- - -- - - - - -- -- - - - -- - - -- -- -- -- -- - -- -- - --- - -- -- -- -- -- - -- -- -- -- -- -- -- - -- -- -- -- -- -- -- - -- --- - - _ --- -- -- -- - - - -- -- -- -- -- -- -- - _ -- _ -- _ -- _ -- - __ _ _ _ ? o ? o ? n o (Sdd) ADDOIDA Z Z Z O N Q. T a C) ?- C0 C O N I-- O N it d O N LLI M > O (N N N J D O m is m o 000 U Z z 0 o N o ( r) F- W ?n 0 E O = -D _0 C Z 'p a) N O U W .O > > a> N E -0 r) Y IN C ' m „ O M N in U- C H Q o? Q W m w 0 c6 0 3 C O 0 U N W C o °-0 •- U ? Vl 7 J J N N O N ? Q Q O n U C cC Q V N N 00 ? ? 00 v Q L I a) cn O co i Q Q m m (nUv i c t _ ? Lo (O(O N j Q > v r C a N (fl co N Q J v C N N N T > c ) v v ? o o Q r Lo Lo 00 > v O LL O - T C.0 v r- C6 04 V1 O _ C_ M :M' M _ _ _ .M _ C _C C O O O O o 0 0 0 ? I 0) N 0 N O C Q v 0 i m Ii N E N > CD W C) 0 O! 0 0 0 C uj W .0 > 3 to to to 0 0 C - E > O O - W N o r 0 - (o'(o'r_: N a) C O 11 0 M C O ? c I 0 , 11 L LO 0) Cl- ^ ° U7 to N to d o o .- 0 a? (D a) I , O' E .v S N NI cc) A i a) > O ?- N M' V Z U 6 6 3 c I ( 5 i > i 0 i ? ( 0 o ? LL J c, o ? i o