Loading...
HomeMy WebLinkAbout20080067 Ver 3_Approval Letter_20110419?IM, WENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary April 19, 2011 DWQ Project # 08-0067, Ver. 3 Wake County North Broad Street, LLC 201 Weston Parkway, Suite 203 Cary, NC 27513 Subject Property: Alston Pond Ut to Basal Creek [030403, 29-43-15-3, B, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Sir or Madam: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.033 acres of 404/wetland (0.019 acres permanent impact and 0.014 acres temporary impact), 147 linear feet of perennial stream, 27 linear feet intermittent stream (temporary impact), and 13,550 square feet of Zone 1 Neuse River basin protected riparian buffers and 19,501 square feet of Zone 2 Neuse River basin protected riparian buffers, as described in your application dated February 1, 2011, and received by the Division of Water Quality (DWQ) on February 3, 2011, with additional information received February 14, 2011, on to construct the proposed residential development at the site. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3821 (GC3821). The Certification(s) allows you to use Nationwide Permit(s) NW29 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non- discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Phone: 919-807-6301 1 FAX: 919-807-6494 Internet hftp://pu,al.ncdenr.org/weh/wq/ws An Equal Opportonity 1 Affirmative Action Em; ,foyer North Broad Street, LLC Page 2 of 4 April 19, 2011 Type of Impact Amount Approved nits Plan Location or Reference 404/Wetland 0.033 [(acres) 0.019 acres permanent impact and 0.014 acres temporary impact] PCN application page 5 of 13 Stream - perennial 147 (linear feet) PCN application page 5 of 13 Stream - intermittent 27 linear feet) - temporary impact PCN a lication page 5 of 13 Buffers Zone 1 13,550 (square ft.) PCN a lication page 7 of 13 Buffers Zone 2 19,501 (square ft.) PCN a lication page 7 of 13 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; 6. Diffuse Flow All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within North Broad Street, LLC Page 3 of 4 April 19, 2011 15A NCAC 2B.0233(5). However, if diffuse flow as per 15A NCAC 02B.0233(5) is not achieved, then the DWQ shall be notified and corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of erosion gullies. At no time shall stormwater from the proposed development be piped directly through the buffer without prior DWQ written authorization. Stormwater Management Plan Implementation Procedures (No Further Approval Needed) • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the Wetlands, Buffers, Stormwater, Compliance and Permitting (WeBSCaPe) Unit prior to the commencement of the modifications. 8. Locate, Stake and Survey Proposed Perennial Stream Impacts The centerline of your proposed stream impacts must be located, staked and surveyed in the field and this survey submitted to the DWQ prior to the occurrence of the proposed impacts. If your actual stream impacts meet or exceed 150 linear feet, you will need to mitigate for the entire length of stream. 9. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the Wetlands, Buffers, Stormwater, Compliance and Permitting (WeBSCaPe) Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the Office of Administrative Hearings. You must file the petition with the Office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center North Broad Street, LLC Page 4 of 4 April 19, 2011 Raleigh, NC 27699-6714 Telephone: (919)-431-3000, Facsimile: (919)-431-3100 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Ian McMillan or Amy Chapman at 919-807-6301. Sincerely, leen H. Sullins CHS/ijm Enclosures: GC3821 Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Troy Beasley, Withers & Ravenel, 1410 Commonwealth Drive, Suite 101, Wilmington, NC 28403 Filename: 080067 Ver3AlstonPond(W ake)401_NBR