HomeMy WebLinkAbout20110374 Ver 1_CAMA Application_20110420 Beverly Eaves Perdue Governor ¢?;a^ r NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management James H. Gregson Director 201 1037 A April 13, 2011 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Location: Division of Water Quality Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Steven Smith Dee Freeman Secretary ?c??odr?p APR 2 0 2011 The project site is located 277 Tosto Road, adjacent to Big Creek in South River, Beaufort, Carteret County. Proposed Project: The applicant is proposing to maintenance excavate the boat basin and expand the length of the access channel, replace the bulkhead, and construct a new docking facility. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/2011. If you have any questions regarding the proposed project, please contact Brad Connell at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave., Morehead City, NC 28557--3421 One phor;e: 252-808-28081 FAX: 252-247-3330 Interrnet: www,nccoastalmanagement.net NOrthCa.rolina An Equal ?ppcrfuniiy'', Af'hinafiue action Employer ?Vatu all f DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Steven Smith. 2. LOCATION OF PROJECT SITE: The project is located at 277 Tosto Road adjacent to Big Creek, in South River, Carteret County. Photo Index - 2006: 80-8375, grids H-11, I-11; 2000: 60-725, grids P-14. State Plane Coordinates - Y: 136199.416 X: 830197.216 Latitude: 34°57'12.95"N Longitude: 76°35'3.73"W 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/15/11 Was Applicant/Agent Present - Yes 5. PROCESSING PROCEDURE: App1_icatio» Received - cc: 4/4/11 Office - MHC 6. SITE DESCRIPTION: (A) Local Land Use Plan -Carteret County Land Classification From LUP -Rural/Conservation (B) AEC(s) Involved: ES, PTA, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Septic-system Planned - None (F) Type of Development. Existing -Single family residence, shed, boat basin, bulkhead, and boat ramp Planned - new and maintenance excavation, new docking facility, and replace bulkhead (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED FILLED SHADEDANCORP (A) High Ground 10,000 ft2 990 ft2 (B) Open Water 8,950 ft2 380 ft2 2,285 ft2 (D) Total Area Disturbed: 22,605 fC (E) Primary Nursery Area: No (F) Water Classification: SA;HQW,NSW Open: Yes (G) Cultural Resources: No 8. PROJECT SUMMARY: The applicant is proposing to maintenance excavate the boat basin and expand the length of the access channel, replace the bulkhead, and construct a new docking facility. Field Investigation Report: Steven Smith Page 2 of 3 9. Narrative Descriotion: J ? The property is an 8.67-,acre parcel lc;,ated at il;e end of Tosto Road (State Road 1318) in South River, Carteret County. Mr. Stc,en Smith wishes to construct a .1-slip docking facility, replace an existing wooden b iKtiead with vinyl around the existing man-made boat basin, expand the `isle-to dockage a=?itt?in the basin, perforn), maintenance excavation of the existing basin an.i its mass-made ,access c tunnel, and new excavation to expand the length of the access chanw-.1. This pi olwct is loented along Big C:reck, a tributary of South Rivet-. `Ih;s site is locatcil_ fl,(: Xt crse izivcz- ba.>in. Itcth ol" fhe adjacent waterfront 4 properties are simiho- s n IeJ.-: il4 i' ?sjdc noes. There is approximately 1,000' of sfiote'.ine adiacent tt? tl., rionib of Bid; Creek. Big Creek is greater than 1,600' across at this location. Immediate offshore water depths reach -2' below the normal water level (nwl). The existing boat basin is approximately 110' long and 60' wide. The existing access channel is 20' wide and 1.00' long. Existing depths within the basin are approximately -3' nwl deep. This basin can support up to four boat slips. The current vegetation on the tract mainly consists of upland grasses and wetlands. There are approximately 1.2 nacres of CoastalWetlands on the tract. There is no submerged aquatic vegetation (SAV), .ear the vicinity of the prcji"t area. The elevation of the tract is +5' n.v l along this high bluff shoreline. 'The property is currently developed with a single family dwelling, two out buildings, a boat basin stabilized with a bulkhead, a boat ramp into the Basin, and a side••to dock in the basin. The Carteret County Laud Use Plan classifies the project area as Rural, with LAMA AFC's classified as Conservation. These waters of the mouth of Big Creek are not designated as Primary Nursery Area, but are open to shellfish harvesting. These Estuarine Waters carry a water quality classification of SA; IIQW, NSW. The bottom substrate is firm without shell. There are no Cultural Resource sites noted along this stretch of. shoreline. 1-0. Proposed Development: The request is to construct a 1-slip-dockiaag facility, replace an existing wooden bulkhead with vinyl around the existing boat basin, expand the side-to dockage within the basin, perform maintenance excavation of the existing basin and its access channel, and new excavation to expand the length of the access channel. The proposed private residential docking facility will be constructed on the eastern shoreline of the property, approximately 150' east of the existing residence. The main access pier will be 5' wide and 159' long. There will be a "T" platform at the waterward terminus of the access pier. This platform will be 6' wide and 60' long. There will be an Brad Connell April 13, 2011 Morehead City Field Investigation Report: Steven Smith' Page 3 of 3 ------------------ ----- 18'-wide, side-to wet slip outside of the platform. This boat slip will be supported by three clusters of dolphin tie pilings. This docking facility will extend 170' waterward of the nwl. The proposed bulkhead will encompass three sides of the basin. The new vinyl bulkhead will be installed 2' waterward of the existing wooden bulkhead. This new bulkhead will be 190' long. Side-to dockage is proposed immediately waterward of the new bulkhead and within the existing basin. This dockage will be 6' wide and 165' long, in total. This dockage within the basin supports four boat slips. The proposed maintenance excavation will take place within this existing boat basin and access channel. This excavation will return the boat basin and access channel to the original (permittad,in 1983) depth of -5' nwl. Due to natural shoaling offshore, the proposed new excavation will lengthen the access channel to connect to the existing -5' nwl contour in Big Creek. The new access channel extension will be 20' wide and 100' long. This will involve an average removal of -2' of material within the footprint of excavation. The permanent spoil disposal area will be contained on site, located approximately 150' west of the boat basin. It will be contained by silt fence entirely on high ground. This spoil area will encompass 10,000 square feet. The work to be performed will utilize traditional marine construction methodologies (i.e. "bucket to barge," vibrating pile driver, etc.). 11. Anticipated Impacts: The proposed new and maintenance excavation will involve the removal of 455 cubic yards of sandy/silt material. The existing access channel will be extended another 100' out into Big Creek. The new bulkhead will fill 380 square feet of shallow bottom within the boat basin. Any turbidity created as a result of this proposal will be short lived. The spoil area will fill approximately 10,000 square feet of high ground. The new 1-slip docking facility will usurp 10,200 square feet of Public Trust Area. It will shade 2,285 square feet of Estuarine Waters. This docking facility will extend approximately 150' waterward, and will not pose a hazard to navigation. The proposed dockage is greater than 200' from the adjacent riparian property line. There will be a total of five boat slips, four existing in the basin and one proposed at the new docking facility. This proposal does not necessitate review under the State Environmental Policy Act (SEPA) because the new access channel is within 100' of the shoreline. This project is subject to the NCDWQ Neuse River Basin Riparian Buffer Rules. These waters of Big Creek are not designated as Primary Nursery Area, but are open to shellfish harvesting. These waters carry a water quality classification of SA; HQW, NSW. There are no SAVs in the project area. There are no Cultural Resource sites along this area of the Big Creek shoreline. Brad Connell April 13, 2011 Morehead City NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor Jaynes H. Gregson, Director Dee Freeman, Secretary MEMORANDT "J DATE: April "13, 2011 TO: Doug Huggett THRU: Roy Brownlow FROM: Brad Connoll SUBJECT: Comments and Recommendations CAMA Major Permit - Steve Smith, Carteret County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal involves the filling of 10,000 square feet of high ground. The boat basin and access channel will excavate 8,950 square feet of shallow bottom. The private residential docking facility will incorporate 2,235 square feet of Public Trust Waters. The bulkhead will impact 380 square feet of shallow bottom. The waters of Big Creek are open to shellfish harvest. This section of the waterbody is not a Primary Nursery Area. There is no SAV in the nearby_ vicinity of the project area. There are no Cultural Resource sites in the proposed work area., Assuming that state and federal agencies concur with the proposal and that the NCDWQ determines this project to be consistent with the Neuse River Riparian Buffer Rules, I recommend the project be authorized as proposed, contingent upon the following conditions: 1) A pre-construction meeting must be scheduled with a DCM representative at least thirty days prior to the initiation of any construction activities; 2) Excavation will not exceed -5.0 feet belm4, +he normal water level. In no case shall the depth of excavation exceed the depth of connecting waters; 3) In order to protect water quality, runoff from the construction must not visibly increase the amount of suspended sediments in adjacent waters; 4) No vegetated wetlands/marsh grass will be excavated or filled; 5) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized; 6) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any -maintenance work authorized by this permit, and such notification shall include: 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer -50% Recycled \ 10% Post Consumer Paper Steve Smith April 13, 2010 Page 2 A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site must be approved by a representative -of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan; 7) All excavated materials will be confined above mean high water and landward of .regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters; 8) No spoil material is to be placed within 50 feet of the normal water level or the landward edge of the Coastal Wetlands, except that which will be used to backfill the area behind the permitted bulkhead; 9) The proposed bulkhead will not extend waterward more than 2 feet from the normal water level at any point along its alignment at the time of construction; 10) The'proposed bulkhead must be constructed prior to any backfilling activities; 11) This permit authorizes a maximum of 5 boat slips. At no time shall more than 5 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft; 12) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.); 13) Any development or land disturbing activity that is considered non-water dependent is not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. CC: Ted Tyndall, DCM Roy Brownlow, DCM ®CM MP-1 APPLICATION for RECEIVED Maier Development Permit MAR 2 3 2011 (last revised 12/27106) DCM-MHD CITY North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary'Applicant/ Landowner Information T Business Name J A Project Name (if applicable) A 1 . , ?. Applicant 1: First Name MI Last Name Steve P Smith Applicant 2: First Name k MI..II A - Last Name A- If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 160 Herons Gate Drive Mooresville NC ZIP Country Phone No. FAX Nn. A- 28117 USA 704 - 634 - 2940 ext. = - Street Address (if different from abovo) City State ZIP A . A A- N . 4- A; q- Email se AMA a slrr, @ v? ? Nds.?,-ea rat . ?.? 2. Agent/Contractor Information Business Name r 0SkS:lt "?^1 L W . Agent/ Contractor 1: First Name MI Last Name Charles Jones Agent/ Contractor 2: First `Name MI Last Name ? N A Mailing Address PO BPx A- City State 296 Bay Drive N . Smyrna NC ZIP Phone No. 1 one N,,or. 2 A 28579 252 - 729 - 9711 ext. - ext. f v FAX No. 2-52- 1 , Contractor # ti Street Address (d different from above) City State ZIP Email COQ kk,? tot (!, CSC. lr I`, cri <Form continues on back> 1`0m•DCM MP-1 (Page 3 of 5) b. Name of body of water nearest to proposed project Big Creek MAP, 31 2011 APPLICATION for Major Development Permit . Project Location County (can be multiple) Carteret Subdivision Name I I— 1 -1 fJ A- - ----1 --- ----DCtvt-=Mf11 IF Address State Rd. # 277 Tosto Road N City State Zip i Beaufort ' NC 28516- Phone No. Lot No.(s) (if many, attach additional page with list) ext. , A- a. In which NC river basin is the project located? Neuse c. Is the water body identified in (b) above, natural or manmade? EgNatural []Manmade []Unknown e. Is proposed work within city limits or planning jurisdiction? []Yes NNo RECEWEO d. Name the closest major water body to the proposed project site. South River/Neuse River f. If applicable, list the planning jurisdiction or city limit the proposed work falls within. Carteret County 4. Site Description a. Total length of shoreline on the tract (ft.) I b. Size of entire tract (sq.ft.) approx. 1,000' approx. 1,197,900 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high wate) or 8.6 ac, 9.4, 9.5, NWL (normal water level) l (!f many lot sizes, please attach additional page with a list) [ - 8' ?NHW or ZNWL f e. Vegetation on tract lawn grasses, assorted trees, wetlands f f. Man-made features and uses now on tract j exiting house and outbuilding I g. Identify and describe the existing land uses adiacent to the proposed project site. residential h. How does local government zone the tract? € i. Its the proposed project consistent with the applicable zoning? n. a. {{ (Attach zoning compliance certificate, if applicable) t- _- - []Yes []No UNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No _ k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes SNo ?NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ?NA L National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 4 of 5) APPLICATION for MAR 2 3 2011 Major Development Permit m. (i) Are there wetlands on the site? ®Yes ?No (ii) Are there coastal wetlands on the site? ®Yes ?No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. on site septic tank o. Describe existing drinking water supply source. on site well p. Describe existing storm water management or treatment systems. n.a. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Purpose of project is to maintain and enhance boating activities and to prevent sediment from entering adjacent waters by replacing a deterioated bulkhead. The property will remain residential in use. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. barge mounted excavator; dump truck, pile driver/vibrator; water pump d. List all development activities you propose. Perform maintenance excavation to existing boat basin and access channel; replace existing bulkead; construct a new pier into Big Creek with adjacent dolphin pilings, replace and extend docking structure(s) within and adjacent to existing boat basin e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 20,000 ®Sq.Ft or ?Acres g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. n.a. i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ?NA j. Is there any mitigation proposed? ?Yes ®No ?NA If yes, attach a mitigation proposal. <Fonm continues on back> Form DCM MP-1 (Page 5 of 5) RECEIVED APPLICATION for MAR r 3 2011 Major Development Permit 6. Additional Information DCM m-ffD C?7?y In addition to this completed application form, (MP-1) the following items below, if applicable, must be subrrritted in order for the application package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Gertrude Mason Phone No. ZJr Z - 7 Z &_ C : 7% Address 139 Gertrude Lane, Beaufort, NC 28516 LE_[?_ I/ Name George Tosto Phone No. Address 227 Big Creek Road, Beaufort, NC 28516 Name . A Phone No. Address 't g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Dredge & Fill Permit #73-77. CAMA Permit # 40-83 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date March 22, 2011 Print Name aveth Signature Please indicate application attachments pertaining to your proposed proj ®DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts ?DCM MP-3 Upland Development ®DCM MP-4 Structures Information e. SCE"J Form DCM MP-2 EXCAVATION and FILL. (Except for bridges and culverts) MAR 2 3 2Gil Dt:AQ,flff),Cn.?,. Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Length { ? Access Channel (NLW or NWL) -- 200' - Canal --------- -- Boat Bast 110' --? Boat Ramp I -- ------ -? Rock Groin -- Rock Breakwater Other (excluding shoreline stabilization I Width 20' -- 301 to 60' - - Avg, Existing Depth i -3.5' --- -- --- - ---- -3.5' - --- --- - ---- -- - - ---- ---- - NA - r- NA Final Project Depth -5' nwl -5' nw1 NA NA L7. EXCAVATION [] This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. silt/sand 455 c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB). or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL - ®None (ii) Describe the purpose of the excavation in these areas: d. High-ground excavation in cubic yards. na [ 2. DISPOSAL OF EXCAVATED MATERIAL _ []This section not applicable 1 a. Location of disposal area. b. Dimensions of disposal area, on adjacent high ground in the appiic a.-il's yard a!e3 100';' V10, c. (i) Do you claim title to disposal area? ®Yes ?No ?NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ®None (ii) Describe the purpose of disposal in these areas: 04- N d. (i) Will a disposal area be available for future maintenance? ®Yes ?No ?NA (ii) If yes, where? In adjacent yard area f. (i) Does the disposal include any area in the water? ?Yes ®No ?NA (ii) If yes, how much water area is affected? N 'T 3. SHORELINE STABILIZATION ?This section not apple (If development is a wood groin, use MP-4 - Structures) 11 a. Type of shoreline stabilization: h I annth• annmv i gn, s Z OBulkhead ?Riprap ?Breakwater/Sill ?Other: c. Average distance waterward of NHW or NWL: 2' or less e. Type of stabilization material: vinyl g. Number of square feet of fill to be placed below water level Bulkhead backfill 380 Riprap Breakwater/Sill Other i. Source of fill material. sutiable material obtained from excavation project Width: 2" d. Maximum distance waterward of NHW or NWL: 5' C f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ?No ?NA (ii) If yes, state amount of erosion and source of erosion amount information. minimial amount behind existing bulkhead h. Type of fill material. sand 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ?Yes ?No ?NA b. (i) Will fill material be alaced in coastal wetlands/marsh (CW) If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? silt fence will be erected around spoil site c. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ?None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? barge mounted excavator, dump truck, vibrator d. (i) Will wetlands be crossed in transporting equipment to project site? ?Yes ZNo ?NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. March 22, 2011 Date Project Name Steve Smith A I n e Applicant Signature A. Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA !Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DUCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: 0commercial ?PubliGCovernment M rtvatellommunity []This section not applicable b. (i) Will the facility be open to the general public? 1-1-1 es ONO c. (i) Dock(s) and/or pier(s) (ii) Number 2 (iii) Length 159'. 165' (iv) Width 556' (v) Floating ?Yes ONO e. (i) Are Platforms included? ®Yes ?No If yes: (ii) Number 1 (iii) Length 69 (iv) Width 6' (v) Floating ?Yes ONO . Note: Roofed areas are calculated from drioline dimensions. d. (i) Are Finger Pier;; included? ?Yes ?No it rte!;: (it) Number (iii) Length (iv) Width (v) Floating ?Yes ?No f. (i) A;e Boatlifts included? ?Yes ONO If yes: (ii) Number (iii) Length (tv) Width g. (i) Number of slips proposed h. Check all the types of services to be provided. 1 n Full service, including travel lift and/or rail, repair or (ii) Number of slips existing rairtenance service 4 J Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 5 ? Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 (existing) ` ? Other, please describe: L Check the proposed type of siting: ® Land cut and access channel []Open water; dredging for basin and/or channe's ®Open water; no dredging required []Other; please describe: ;. Describe the typical boats to be served (e.g., open runabout, charter bnats, sail boats, mixed types). mixed. types k. Typical boat length: 20' to 50' m. (i) Will the facility have tie pilings? ®Yes ?No (ii) If yes number of tie pilings? 3 piling clusters 1. (i) Will the facility be open to the general public? [-Yes ONO 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ? Office Toilets ? Toilets for patrons; Number: ; Location: I?EC1vI1/Fn°, ? Showers ? Boatholding tank pumpout; Give type and location: MAR 2 3 2011 b. Describe treatment type and disposal location for all sanitary wastewater. mHD CM c. Describe the disposal of solid waste, fish offal and trash, d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m, Is the marina/docking facility proposed within a primary or secondary nursery area? ?Yes ?No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ?Yes ?No o. Is the mannaraocKmg raenay proposeo wamn or aalaCenr iv coasEa; wGUanua,ma1aii ?wv), auvu,c,yvu a,,,.a., ., y ,.., .. ??• .-„ •• •• --•-••• (Si3), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?m ?SAv ?SB ?WL ?None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No MAR 2 If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. Dcilq Crry 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ?Commercial ?Public/Government ?PrivateiC;ommun;ty (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. ?4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS b. Number ®This section not applicable a. Is the structure(s): ?Commercial ?Public(Government ?Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing d. Description of buoy (color, inscription, size, anchor, etc.) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 330', 190' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body approx. 1700' e. (i) Will navigational aids be required as a result of the project? ?Yes ®No ?NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 450', 540' d. Water depth at waterward end of structure at NLW or NWL -5'6" nwl r° MAR 2 3 2011 Drk,r_I ,a -----..xnu MY 8. OTHER 0This section not applicable Give complete description: March 22, 2011 Date Project Name Steve Smith PP44 "tam App Iican ignature UCEMD Jones Coastal Consulting, Inc. 296 Bay Drive MAR 2 3 2011 Smyrna, NC 28579 Telephone: 252-729-9711 ncM-Mtm crTY March 22, 2011 Mr. Brad Connell NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Dear Mr. Connell: On behalf of Mr. Steve Smith, please find enclosed a.AMEN permit application requesting authorization to conduct development activities at and adjacent to his property located in the community of South River, Carteret County. The property is specifically located at 227 Tosto Road and adjacent to Big Creek, a tributary of South River. A portion of Big Creek upstream of Mr. Smith's property has been designated as a primary nursery area. Mr. Smith's property consists of three tracts of land totaling approximately 27.5 acres in size. The waterfront tract, which is the subject of this permit application, is approximately 8.7 acres and has an existing residence and several outbuildings located on the property. The majority of this tract is vegetated with lawn grasses and trees with elevations of approximately 8' above mean sea level. Along the water's edge, a fringe of coastal wetlands exists. In 1977, a former property owner obtained the required state and federal permits (Dredge and Fill Permit No. 73-77) to excavate an access channel through this wetland area and to also excavated an upland boat basin. In 1983, another property owner obtained the necessary permits (LAMA Permit No. 40-83) to conduct maintenance excavation and to expand the existing upland basin. All of the excavation projects were to a depth of -5' normal water level (nwl). Over the years, previous land owners have installed a wooden bulkhead, a concrete boat ramp and constructed a dock within the boat basin area. A CAMA general permit has also authorized the placement of riprap in front of the wetland fringe to protect this area from -cosion. Mr. Smith has recently acquired this property and now wishes to undertake maintenance and new development activities at this property. They include: - Restoring the water depths in the boat basin and the access channel to a -5' nwl depth. Excavation will be accomplished by a barge mounted excavator with the spoil material being placed in a disposal area in the applicant's yard approximately 150' landward of the basin; - Replacing the existing bulkhead with a new vertical wall structure. The new wall will not exceed 5' (with an average distance of 2') waterward of the existing bulkhead; - Construct a 6' wide dock around a portion of the boat basin. A section of the new dock will replace an existing deteriorated one. The dock will located over the water on the north and west side of the basin but over high ground on the south side; - Construct a new pier into Big Creek which will extend into the water for a distance of 159'. The pier will be 5' wide and will provide access to a 6' wide x 60' long "T" platform. Off shore of this platform will be three dolphin clusters which will be 18' from the "T" platform and will provide a dockage area for a deep draft vessel. Water depths between the platform and dolphins are approximately -5 1/2' nwl deep. According to detailed measurements made by Mr. Smith, this proposed pier will not exceed the established pier length for similar uses along the same shoreline. Upstream of this property, an existing pier and adjacent mooring pilings extend into the waters of Big Creek for a distance of 183'. If you have any questions concerning this application request or need additional information, please don't hesitate to contact me at the above address. rdially yours, E" REECEWED Charles Jones MAR 2 3 2011 JCC, Inc. cc: Steve Smith nCM-MHDCny Property of Steve Smith N 45'57'56"E N 46'04'09"E 376.07 " P I ECM 199.74' ECM Cr '' I RECEIVED j o ? Ol 9'p? :? m 16 ZQ1? ? to MAR 2 3 01-1 I- n DCM-lviliD Irn 4 Proposed Spoii Area 1 m V a> V L4 W?r D O C / ? I N ? C?Ti LL M e? 165.8 t f ' U c ECM IIHE ` a J.A " S S8g Qz, ? N 1i 55 gyp... ?I ' p 3S57 VOK cps a IE m N -4 O P eyy?r Oai -? 0 W 3 3' 3 ^ r 2m N ? S K ? Q 7C Q. iL Qo • 1? ? T. 28 W. O BIG CREEK I IDs X i ? t? P 'O .°o c A c o ? 0 O x 00 N TOSTO RD SITE W O U BIG CREEK RD. s IPA C?c ys ? ?P?Q F IPO 1 2 w 6' wide ?- 18, q Dolphin Cluster '? L RECEIED 1. AR 2 3 201 --- -- - -- -- OCM-MffD CITY Tcalypical1 eCross' "= Section of Pier and Dolphin Cluster S 30 m x N. M ? l] N C Q a 1 ,a M M t a T, f f cropDock Xfl 111 Jr? r A- ? e? ?AL- Fch - A t+::4 Typical Cross Section of excavation, bulkhead replacement and basin dock construction Scale V-20' J ?r Overhead View of Boat Basin Scale 1"=30' Proposed Maintenance Excavation, Bulkhead Replacement and Pier/Dock Construction By: Steve Smith, 227 Tosto Rd., Beaufort, NC Drawn by: Clones 3-14-11 Sheet 2 of 2