Loading...
HomeMy WebLinkAbout20090668 Ver 2_Certification of Completion_20110411 Certification of Completion DWQ Project No.: N-J)(Wn$ V Z- County: t4EW "A CA/M Applicant: NCG W 1 Lr.>UJ G C-oM AA 14sa 1 ot4 Project Name: i' jN.1T BDIi1rTIW-T ___ ?? 1M a? ' _ 01 Date of Issuance of Wetland Permit: V>Ce,. Z009 Certif cafe of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification L . hereby used in the observation of the construction suc compliance and intent of the 401 Water Qualityw"T ' and other supporting materials. Signature: Agent's Cert Jkadon orr¢ APR 1 1 2011 hereby state th y - nA at, to the best of my abilities s used in the observation of the construction such that the construction was observed to be built within Ms compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified professional I, _maigg, T. A944,Ae1 cm: as a duly registered Professional Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, an oth supportin aterials. Signature: Registration No. Date APIZ 1 Zo I I the best of my abilities, due care and diligence was was observed to be built within substantial it o 4 % the approved plans and specifications, C R I S E R TROUTMAN T A N N E R TRANSMITTAL LETTER TO: FROM: IAN MCMILLAN Mark T. Arcud, PE COMPANY: DATE: NC Division of Water Quality April 8, 2011 401 Oversight/ Express Permitting Unit ADDRESS: CTT'S PROJECT NUMBER: 1650 Mail Service Center 5818 DENR Water Quality Raleigh, NC 27699 -1650 PHONE NUMBER: CLIENT'S REFERENCE NUMBER: 919-791-4200 RE: Federal Point Boating Access Area Improvements WE TRANSMrr: ? ATTACHED ? UNDER SEPARATE OMER ? HAND CARRIED BY ? UPS/FEDEX THE FOLLOWING: ? TRACINGS ? PRINTS ? INSPECTION REPORT ? SHOPDRAWINGS ? SPECIFICATIONS ? OTHER COPIES DATE SHEET NO. DESCRIPTION REMARKS 1 ORIG 4-8-11 CERTIFICATE OF COMPLETION D ZIR U, 0» :jjDENR-- WA A? NOTES/COMMENTS: If you have any questions, give me a call at 397-2929! Thanks. Cc: CTT File by: CRISER TROUTMAN TANNER CONSULTING ENGINEERS WILMINGTON, NC RALEIGH, NC P.O. Box 3727 Wilmington, NC 28406 1 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 t 910.397.2971 cttengineering.com