Loading...
HomeMy WebLinkAbout20051890 Ver 1_Staff Report_20051209Staff Report Project Num: 20051890 Version: 1 Status: Received Name: Cedar Grove S/D Phase IV Project Type: Residential Subdivision County: Chatham Region: Raleigh Location: UT Meadow Branch CPF basin Carrboro Latitude: +35°51'10" Longitude: -79°10'25" SW Plan Location: Owner: Lewis, Chuck Contact Person: Lewis, Chuck Inspection Date: 12/09/2005 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Eric Kulz Secondary Inspector(s): Question Areas: Site Visit Inspection Summary: Title: Phone: 919-542-9534 Entry Time: 08:00 AM Exit Time: 08:30 AM Inspection Type: Staff Report Phone: Page: 1 Project Num: 20051890 Owner: Lewis, Chuck Inspection Date: 12/09/2005 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Do impacts described in the application differ those seen in the field? If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? Are there additional stromwater conditions that should be required due to the following classifications: # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? # If yes, what phase is this? Yes No NA NE ^ ^ ^ ~ ^ ^ ^ ^ ^ ^ ^ ~ ^ ^ ^ ^ ^ ^ ^ ^ Q ^ Q Q ^ ^ Q ^ 1 Are there prior impacts from prior phases? ~ ~ Q If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: No real comments, I recommend issuance. Some confusion over mitigation for i ~~~~~ ~~ ~~~'~~F /~~~'s^ Page: 2