HomeMy WebLinkAbout20051890 Ver 1_Staff Report_20051209Staff Report
Project Num: 20051890 Version: 1 Status: Received
Name: Cedar Grove S/D Phase IV Project Type: Residential Subdivision
County: Chatham Region: Raleigh
Location: UT Meadow Branch CPF basin Carrboro
Latitude: +35°51'10" Longitude: -79°10'25"
SW Plan Location:
Owner: Lewis, Chuck
Contact Person: Lewis, Chuck
Inspection Date: 12/09/2005
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Eric Kulz
Secondary Inspector(s):
Question Areas:
Site Visit
Inspection Summary:
Title: Phone: 919-542-9534
Entry Time: 08:00 AM Exit Time: 08:30 AM
Inspection Type: Staff Report
Phone:
Page: 1
Project Num: 20051890 Owner: Lewis, Chuck
Inspection Date: 12/09/2005 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit
Do impacts described in the application differ those seen in the field?
If yes, please describe differences:
Are the Intermittent/Perennial calls different in the application?
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application?
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification?
Additional conditions recommended for the Certification:
Recommended project modifications:
Is this a modification request to an existing Certification?
Are there additional stromwater conditions that should be required due to the following classifications:
# 303(d)list, Class WS, NSW, ORW, HQW
Describe:
Is this a subdivision or otherwise part of a larger project?
# If yes, what phase is this?
Yes No NA NE
^ ^ ^ ~
^ ^ ^ ^
^ ^ ^ ~
^ ^ ^ ^
^ ^ ^ ^
Q ^ Q Q
^ ^ Q ^
1
Are there prior impacts from prior phases? ~ ~ Q
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment: No real comments, I recommend issuance. Some confusion over mitigation for i
~~~~~
~~
~~~'~~F
/~~~'s^
Page: 2