Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20051890 Ver 1_401 Application_20051011
j[F ~; R f' ~7 A 41.N ~ r V6* ~ ~: J ~; NATURAL SYSTEMS ~s~~so E N G I N E E R I N G 3719 BENSON DRIVE, RALEIGH, NC 27609 • PHONE (919) 878-5444 • FAX (919) 872-8444 • www.nsepc.com October 10, 2005 Raleigh Regulatory Field Office US Army Corps of Engineers 6508 Falls of Neuse Road, Suite 120 Raleigh, North Carolina 27615 ~, ~.~.' Central Office NC Division of Water Quality 2321 Crabtree Boulevard Raleigh, North Carolina 27604 RE: Cedar Grove Subdivision Phase IV Chatham County, North Carolina NSE Project #: MAC0501-01-1219 Dear Agency Personnel: On behalf of MAC Development, we hereby submit the enclosed Pre-construction Notification Application to request verification of a Nationwide Permit 39 from the US Army Corps of Engineers and written concurrence of Water Quality Certification #3402 from the NC Division of Water Quality for the subject project. Cedar Grove residential subdivision is located on the southeast side of Jones Ferry Road (SR 1540) approximately 1.3 miles southwest of the Chatham-Orange county line southwest of Chapel Hill, Chatham County, North Carolina. Phase IV of the subdivision primarily involves construction of an access road across two stream channels totaling 174 linear feet of permanent stream channel impact. Projects with cumulative stream impacts exceeding 1 SO linear feet require mitigation. MAC Development proposes payment to the NC Ecosystem Enhancement Program to satisfy these mitigation requirements. If you have any questions regarding this application package, please contact Jennifer Burdette at (919) 623-7875. Sincerely, NATURAL SYSTEMS ENGINEERING Jennifer A. Burdette Project Scientist Enclosure D ~~~~~~ ocr ~ 1 1 2005 ~ENR - WATER aU%~LITY ~T~SAND sr0~yti'ArER 6RgnK;H c: Mr. Chuck Lewis Office Use Only: Form Version March OS USACE Action ID No. o~A~~~~Ul ~ DWQ No. 2 ~ ~ 5 ~ 8 9 0 (If anv particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: If your project is located in any of North Carolina's twenty coastal counties (listed on page 4}, and the project is within a North Carolina Division of C Manement Area of Environmental Concern (see the top of page 2 for further details) ~~ D II. Applicant Information OCr ~ 1 zoos Owner/Applicant Information w~rw~~ps ~R QuA~irY Name: MAC Deveplopment '~~~ e~c~, Mailing Address: Contact: Chuck Lewis 124 Hidden Oaks Drive Chapel Hill North Carolina 27517 Telephone Number: 919-542-9534 E-mail Address: NA 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jennifer A. Burdette Company Affiliation: Natural Sxstems Engineering Mailing Address: 3719 Benson Drive Raleigh North Carolina 27609 Telephone Number: 919-878-5444 Fax Number: 919-872-8444 E-mail Address: jburdette nsepc com Fax Number: 919-967-5917 Page 1 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Cedar Grove Subdivision Phase IV 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 9746-85-2552 4. Location County: Chatham Nearest Town: Carrboro Subdivision name (include phase/lot number): Cedar Grove Phase IV Directions to site (include road numbers/names, landmarks, etc.): The project is located on the southeast side of Jones Ferry Road SR 1540) approximately 3200 feet northeast of Crawford Dairy Road (SR 1956 and approximately 1.3 miles southwest of the Chatham- Oran eeL county line southwest of Chapel Hill, Chatham County, North Carolina. Fi u.~ re 1, attached to the PCN shows the location of the property on a USGS topo raphic map. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.8526998 °N 79.1737309 °W 6. Property size (acres): 7. Name of nearest receiving body of water: UT to Meadow Branch 8. River Basin: Cade Fear (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at htta://h2o.enr.state.nc.us/admin/maps/.) 1. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: After recent timber harvesting, the property sparsely Page 2 of 9 forested with an understory of Elaeagnus Undeveloped woodland and earlier phases of this residential subdivision are located adjacent to the subject property 2.Describe the overall project in detail, including the type of equipment to be used: The project involves construction of a central access road and installation of small utility lines using heavy equipment such as dozers excavators and graders. 3.Explain the purpose of the proposed work: The purpose of the proposed work is to provide access to areas of high ground on the~roperty for residential development. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Jason Hall of Central Carolina Soil Consulting conducted a delineation of surface waters and wetlands on the property in July 2005. Data forms and a Chatham County Soil SurveX mad are attached to support the delineation. Phases I through III have already been constructed adjacent to Jones Ferry Road (SR 1540) and did not involve any impacts to jurisdictional areas V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permit requests are anticipated for this project VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for Page 3 of 9 wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The project involves construction of two road crossings across one perennial Impact 2) and one intermittent stream channel (Impact 3) One culvert in each road crossing, will be centered on the channel and buried one foot below the stream bed and any additional culverts will be installed as floodplain culverts to maintain aquatic life passage. Additionally aseptic utility line will be installed adjacent to the roadw~ at Impact 2 resultin ig n temporarypact to the stream channel (Impact 1). Please refer to the Jurisdictional Impact Map sheets 1-3) for the locations and details of each impact proposed 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, CP11aTatP1V 11Ct imparts clue to hnth structure and flOOdlri~. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) NA Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0.05 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams meet ha inrlnrlerl Tn calnnlate acreage multiply length X width_ then divide by 43.560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact (indicate on map) Before Impact (linear feet) (acres) 1 UT to Meadow Branch etin perennial 4 16 0.001 cavation permanent/ 2 UT to Meadow Branch culvert-plunge perennial 4 66 0.006 pool permanent/ 3 iJT to Meadow Branch culvert-plunge intermittent ~ 108 0.012 pool Total Stream Impact (by length and acreage) 190 0.019 Page 4 of 9 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on map) Name of Waterbody (~ applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) NA Total Open Water Impact (acres) 6. List the cumulative im act to all Waters of the U. S. resultin from the ro'ect: Stream Impact (acres): 0.019 Wetland Impact (acres}: NA Open Water Im act (acres): NA Total Impact to Waters of the U. S. (acres) 0.019 Total Stream Impact (linear feet): 190 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ~ No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. No impacts are proposed to isolated stream channels present on-site. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Current land use in the vicinity of the pond: NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction Page 5 of 9 techniques to be followed during construction to reduce impacts. The applicant requested a delineation of wetlands and surface waters to facilitate avoidance of impacts and to minimize unavoidable impacts. Road crossing impacts are unavoidable due to stream channels that bisect the propertX These road crossings were designed to cross the channel perpendicular)~at a ,point on the stream channel with the fewest meanders to minimize the impact to the channel. Headwalls and plunge pools were also used to further minimize impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htt~://h2o. enr.state. nc.us/ncwetlands/strmgide. html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Because~ermanent stream channel impacts of 174 linear feet are proposed for the project mitigation is required. The applicant proposes a compensatory mitigation payment to the NCEEP. NCEEP's letter of acceptance to provide compensatory mitigation in excess of that required is attached. Based on the quality of the stream channels at the proposed crossin s~ the applicant proposes a 2:1 mitigation ratio for Impact 2 66 LF) and a 1:1 ratio for Impact 3 (108 LF) for a total mitigation amount of 282 linear feet. A Stream Quality Page 6 of 9 Assessment Worksheet is attached to the PCN in support of the mitigation ratio proposed for Impact 3 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http~/Ih2o enr state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 282 Amount of buffer mitigation requested (square feet): NA Amount of Riparian wetland mitigation requested (acres): NA Amount ofNon-riparian wetland mitigation requested (acres): NA Amount of Coastal wetland mitigation requested (acres): NA IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC Page 7 of 9 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2 If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. NA XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Phase IV does not currently contain anv impervious surfaces Based on the large lot size required for on-site septic systems, the total proposed impervious surface should not exceed 20% of the property. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will be disposed via on-site septic systems approved by Chatham County. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No Page 8 of 9 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis- in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http _//h2o,enr_ state: nc,us/ncwetlands. If no, please provide a short narrative description: The infrastructure .proposed for the subdivision will serve only the proposed development. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~~~ Applicant/~ (Agent's signature is ~~~,~Gs ~ignature LdlC only if an authorization letter from the applicant is provided.) Page 9 of 9 i ~ dry ~t~ ~ v ~ ~ ~ y'~ ~ i ~aa ~ ~ ~ .A ... ~ 1 i- _~~_~ it '~ ~"k `. ~ ~,' ~-.,J '' ~ ,f i ' ~ `_ . ~ j ~.. - x~b l~ >x. F~3°F e~ i ~~\~ ""`!~r"`~ Cr ~17~1 5 ~ _ - ~, . --~ ~l .~. l ~ ~~ ~~ ~ ~ ) J ~ A 1 ~ ~ ~~ .. - ~ - _ , ~ ~ - <v ~ l _ m - ~~ , ,.. c ~~ ,~ ~ 1 ~ i ~ ~ ~ , ~'r h ~ ' s..r - ~ ~ ~' '.r ~ ~ - ) ~' ll v J ~ ,~ ,~~ a~ _~i z 1 is Q4~ ~~ ~ '~~ i\ \ I f ti-~, /` _ ,'~ / J ~ ~..~ ~. ~< ~ ~ i f'i ~" tit ~ i ~'~; ,~,_ f~~ -J ~~' ~ u~> ~~ ' /1 ~~ ~ ~ ;~ J ~ ~ " ~~ . O `. `d`-l~ ! ~ ~. `: ..~~, tit t~\ `i} 1~~ r ! j ~~` ~~ /- ~ ~ - ~ s ~ ~ i ~' ~..... ~ ~ /'~~~ e ~, ~ = Z ~, ri. ~~ mG" ~~~ ~ ~i! ~ ;bN~ ~~~~_ ~. ~ ~ wit "~i ~ ~~~~~ ~- ~ _. ~~ j k r / f I /. 1( ~• r ~_ '~ , Y ~ ~ ~ _~., '' ~ ._' f'" '~, r j~ l / J i { / --r_ (~, j ~ art.....---,~ ' ~{/"`".~.~ i <~ ~ r ~ ~~~y ~~ ; ~~ ~ ,r a ~ ~~.-- ~ ~`' < - ' ~~ ~~ t\~_! \ ,'~~' ; ri -~ f { ~ ~ ~( ~', 1 .-~11 ~ ~i ~ tt~ ' t ~ ~~„ }a,'~,/ ~ " ~~~~ ` t~. ~ VWIn4 / .~. ` 1 ~ ~~~Q,~ 1 / ~.; ~ ~ ~\~ ~ ~ ~...' ~ t , ~` ~ ~ ~ ~ ~~. - ~ - ~\ t 3 f e i ~ ~,~i,; i~ ~ , i . ~ ~ ~ l Jl ~~_ A\ _ v tb~ FIGURE 1 ~, NATURAL SYSTEMS SITE MAP E N G ~ N E E R i N ~ CEDAR GROVE SUBDIVISION PH IV CHATHAM COUNTY, NC ~ Raleigh, North Carolina (919) 878-5444 www.nsepc.com DATE: AUGUST 2005 y - ~ I .: i. ~ a ~R. ~ s '. ~ ~~ K ~ }~ i . o- ~ ' ~ a Y k , ~ ~~ ~~ M \', t Ya ~, • ~ it ~~ z fi ~ ~ '~ ~~~ .b a. ~ ~ ~ 1 ( ~i ~ ~ ~ 3~ r" v e '~+ ;~ a t ~ ~ ~ ~ j ~ ~,: 5 iji ~i3~ .k_~. y. P ti.~4~ %f ~y~ ~TT~ntt ~ + ~. `' ~k~ a~ -1 ~ ~r. ~`,~ ,. * ~,~~ - ~. 1 CL ~ P TF` G, ~ F ~E 5 ~1'~ a ` .:~ ~ i w-~ ~y5y~ ` ~ r i t r~` ~~ ~~ 'i~ C ` .,~ ~ 'lf~"IL g ~ iT L3T' 1 ~ -~,e 's" ~. )Jt ~ ~'~- ` ~ ~., + , to r f ~ ~: ~ i - /. L ~ ~ 1r[y ~ ..: „'~ ~ ` i'1 { 121 1"' 4} IX" is .' ~ .~ ~/fr ~+~:"~d atJ' 'HUH +~1~`i ~i.~_ W/" ~ ~ ~1 ~~. f'?-, ?- ~~ ~ ~..,. _ p .~ Y. - Y I / `4C ~' .k F~- r .it; yI'~l? SniiJ ~ ~ ~41.,~ ~ ~- i ~ ~~ ~ ~'~ J '. "~ "'o~co... ~, T ~Y}.s„ ~ ~. r }~ s yy. y ~ '4 ~~ 9 r^w,,,.,~'".r ~ t J~, a. ~- k 5 ~; S ~ -~~n # ~ sr 1 ,, . . 1 p - ~ yp,` J ~~ z, d _ - ~ ~ 1 Y,^,~ ~.-«~ '~r ~ ~ ~" ~ r` Figure 2 3 - - ~, ;,~ ~ ~ ~ ~' ~, „~ Chatham County Soil Survey Map ,~ ~r r ~~ ~ ~ ~ ,~ .~~ d ~ ~ ~ ~~ m~`~ ~ ~~ ~ ~~~ ~ ;~ 4 ~,} ~~;~ ~e~,~ Cedar Grove Subdivision, Phase IV 1 `~~ ~ r .~`~ ; ~ ~ °. a F r~,r ;,w,._, -.~1 Chapel Hill, Chatham County, NC ~; _~~~.,. ~ ~~ ~ a' ~~~~, y -.~ Date: August 2005 :. R 0' ~ ~ ~, ;~.< ~ .1 Scale: 1' - 200 :-. d ~~~ r i ~ ~~ ,~ ~ r n- , ~~ -; _ - _, ~, •~. _ . ~ F ~ Z \ ~ yJti b~ a \ \ W ~ , ~ f ~~ ~ I ~ ,~ / ~ ~ I~ I Z ~' I ' ~ ~ ~ I p N_ 01 / ~ ~ Q 8 ~ p ° I C O O C / ~ ~ ~ ~ ~ I G. ~ ~ ~' W m t0 ED O .--1 I a Z ~o~ ~ C ~^ G ~ ~ d d I _ ~-+ ~ q w d li ~ ~ N M \ ° .-. Q Q 6 < < ~ ( ~" ~ ~ ~ ~ Z ~ ~~Z o ~ z~~ N ~ ~ o \ ~ _ _1 V) N ~ ~ ~ \ ~~ W ~ ZQ -- `° C M _ _- ~ I J r M p --- '' JQHH ~ ~ w o~vv ~~~ I ,, a a ~N I w Waa ~~0 1 -~ v o~~ ~m~ ~~a ~, ~ ~NM " ~ I f/ ~~Z WWW m ~ g~~ ~ \ ~ ~~~ ~ WWW ~ r ___ ~ ' I to cn cn ~ ~ ~ ~~ `~ Wa I i '~ / '" ~ ° i f / I \ / I / , I g O~ m y~~~ '' N o~ ~ ~ ~ " ~n ~ ~~ ~u ~ \ w ~ ZZpZZQ ~WZ N /F~1i ~ V pQ ~~ WSaF ~ Q ~Wy v ~ N p° Wp U Z>Z U ZZ Z (-i}~~QQ~~W~K OV Q ~ ~KUpmWd' ~ 2OP ~: Z~. z_MYZmfA asa WO ! \_ a p Z ~~ p a o~~~ W 2 t M ~OJ >po3WW°v~ ~ ~° ~~ \ G e,, O~N030ZF~m °~ as ~~P~ ~' ~' sZ~~pzd.~oo o ~~ $~ ~ G 1 ~~ F- _ ~ N ~ ~°UOZ~N~~O~Vj ~ ~^ R Z pa>a~p~~.l~~v 3Zrn ~ '..I ~ao \ t\ W O F Z ~ ~~~E~~~O~°~ ~j41 ~~FFFF4i \ Z ~v°iu~~c°i~~0d~a°v 3c°i'z ~V° ~" ----- ~.,,_,_ \~.. C9 N ' ~ ~~ woo~~dasu~ennw~ 4444-SL816 L6) 609LZ eU1lae'J 4YON '46ia~ey enud uosua9 6LLE ~ ~S Q ~ ~ ~r~~O~~ ~~ON `~~0~ ~~i j~,j,~'~j~ R ~ E ~J N I ZI 3 3 N I ~J N 3 ~ p = ! ~ ®~ ~ ° ~ o~ '~ .J.N~~ao7~'~Q ~d~ o S W 3 1 S Jl S -1 d ?~ I"I 1 d N ~ E ~ ~ ~ Q ~ ~ ~~~~~ m ~ m '° Z s ;, ni as~a Noisiniasns anoxo ~aao ~ ~~~~~ ' `~ ~ ~ W ••E d~dW l~~ddWl ~~dNOIl~IaSRifl( o o ~3 a ~ItlLLINI ONtl 31tl0 'SNOISW3LI wo~~~dasu•MnU+ 444S-BL8 ~6 t6) 609LZ eupae~ yyoN '46ie~ab soup uosueg 6lLE 2 ~S R o ~ ~ ~~~0~~ ~~ON ~~~NnO~ I~dII.~dH~ ~J N I ZI 3 3 N I ~J N 3 e e~ ~ ~~~~~ ~ ~ ~ ® ~ ~ ~ ~ EI ~ ~ .' ' ,L1~I~Y~idO'I~A~Q O~'Y~I ~ ~ S W31SJlS 1`dZIf11b~N ~ N. ~ ~? ~ ~ ~ ~ r ~ 8 AI ~SdIId I~IOISIAIQHIIS ~AO2IJ 2I~'Q3~ ~ N ~®~~ `~' ~ ~ 8 m U~ .. ~ . (.. [// ~ ~ E dt~W l~ddWl ~~dNOil~IaSRlflf ((( „~ ]] ~IdLLINI ONV 31V0 'SNOISIA321 0 o a ., J /~ \ \`'~ / ~ ~' J~ ~/ ~~ Q ~~ ~, ~, it ~~ ~ r Q ~~ ~ ~~ ~~ ~ 50' ~ ~ -~ i wQ C..,> i ~~ ~ 1 ~ ° ~ o~ ~ o ~` ti U ~... ~~--' W - ~ Q ~' ~ ~ v tp d w ~ ca ~ ~°~,, ~ ~ I U ~ ~ ~ I ~ Q,~ ~ ~~ ~~ ~ ~ ~~ ~~ ~ i ~ ~ d~~ ~ ~~ ~ ~ ~~ ~~ ~~ ~ ~ ~ ~' ~ a \ v~ N ~~ +/ ~~ B N 1 ~ I ~~ CCC ))) ~~ J/ / ~~ J 4Lc,/ --a '~`~ ~ o // ~ U1 w M // U ~ ~~ // ~- .~ ~ ~ // 1/ / // // ~ // // 0 // // // // // j // / // wo~~odesu~~nn+ 444S-8LB l6 L6) 609LZ eupae0 yyoN 'yBla~ab enup uosueg g «g ~ ~ N ~ ~ ~ ~ ~ ~ ~I~II'I02i~'~ I'I.L2IOrI A,LNf10~ I~H,LHH~ ~ N I a 3 3 N I ~ N 3 ~ 1 ~ ~ ~' €~ ~~ ~ ~ ~ ~~~~~ ~ ~ 8 ~ E ~' ~ ZI~I~I~idO'IdA~Q ~dY~I ~ ~ S W 31SJ1 S 1`d ~I r11`dN u z ~ ~ ~ ~~~" ~ .. } ~~ o S AI dSdHd I~IOISIAIQHfIS dA02IJ 2IF~Qd~ ~ •• d~dW l~b~dWl ~b~NOIl~IaSRlfl~ ~ _ E ~IdLLINI ONV 31V0 'SNOISI~321 0 o v a o+ 1 1 M i M w w tom- / t- ~ M s~ t M 1 ~~ W~ 1 Ls- Y J ~ ~ ,~ 1..~-~ /~/ 1 l.~-~ 1.X-- r~ V ~ J~•`` I ,r.."I ~~ ~ ~ ~ ~. Z I~ ~ ~ ~} t~ l `~ ~ ~ ~ ,~ ~, ~~. ~,.- ~~ ~'~~ 1 ~© Q7~ I~ I~ l ~ ~I ~ I II II 1 II II 1 II ~~ r L~ W ~- ~I ~ J IV ~ N W ~ O r \ t0 ~./ + W ~ F O W @7 ~ ~ II - -I x z ,~ ^ v ~ ~ V ~~ ,8 T ~I I~ I~ DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) Project /Site: Cedar Grove Subdivision Date: 8/10/05 Applicant /Owner: MAC Development County: Chatham Investigator: Jason Hall & Jennifer Burdette State: NC Do normal circumstances exist on the site? Yes X No Community ID: Is the site significantly disturbed (Atypical situation)? Yes No X Transect ID: Is the area a potential problem area? Yes No X Plot ID: WL ~ #149 (explain on reverse if needed) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Fraxinus pennsvlvanica Tree FACW 9. 2. Liquidambars, raci ua FAC+ 10. 3. Fraxinus pennsvlvanica S/S FACW 11. 4. Liquidambar stvraci ua FAC+ 12. 5. Lindera benzoin FACW 13. 6. Smilax rotundifolia Vine FAC 14. 7. Saururus cernuus Herb OBL 15. 8. Eulalia viminea FAC+ 16. Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 100 Remarks: More than 50% of the dominant species are OBL, FACW, or FAC excluding FAC- indicating the hydrophytic vegetation criterion is met. HYDROLOGY Recorded Data (Describe In Remarks): Wetland Hydrology Indicators Stream, Lake, or Tide Gauge Aerial Photographs Primary Indicators: Other Inundated Saturated in Upper 12" X No Recorded Data Available Water Marks Drift Lines Field Observations: Sediment Deposits x Drainage Patterns in Wetlands Depth of Surface Water: NA (in.) Secondary Indicators: x Oxidized Roots Channels in Upper 12" Depth to Free Water in Pit: NA (in.) x Water-Stained Leaves Local Soil Survey Data Depth to Saturated Soil: NA (in.) x FAC-Neutral Test Other (Explain in Remarks) Remarks: The presence of primary and secondary indicators at this location confirms the wetland hydrology criterion is met. SOILS Map Unit Name (Series and Phase): Wedowee sandy lo am, 10-15% slones Drainage Class: well drained Taxonomy (Subgroup): Typic Hanludults Confirm Mapped Type? Yes No Profile Description: Depth Matrix Colors Mottle Colors Mottle Texture, Concretions, (inched Horizon (Munsell Moistl (Munsell Moistl Abundance/Contrast Structure. etc. 0-2 A l OYR 4/2 NA NA silt loam 2-14+ B lOYR 6/1 7.SYR 5/8 man / rominent silty clay loam Hydric Soil Indicators: Histosol _ Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed On Local Hydric Soils List Reducing Conditions _ Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: The presence oflow-Chroma colors immediately below the A horizon indicate the presence of hydric soils. WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes X No Is the Sampling Point Wetland Hydrology Present? Yes X No Within a Wetland? Yes X No Hydric Soils Present? Yes X No Remarks: This location meets the criteria for a jurisdictional wetland based on the presence of hydrophytic vegetation, wetland hydrology, and hydric soils. DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Determination Manual) Project /Site: Cedar Grove Subdivision Date: 8/10/05 Applicant /Owner: MAC Development County: Chatham Investigator: Jason Hall & Jennifer Burdette State: NC Do normal circumstances exist on the site? Yes X No Community ID: Is the site significantly disturbed (Atypical situation)? Yes No X Transect ID: Is the area a potential problem area? Yes Wo X Plot ID: UP na, #149 (explain on reverse if needed) VEGETATION Dominant Plant Soecies Stratum Indicator Dominant Plant Saecies Stratum Indicator 1. Ulmus americana Tree FACW 9. 2. Platanus occidentalis FACW- 10. 3. Acer negundo FACW 11. 4. Lindera benzoin S/S FACW 12. 5. Aesculus glabra FACU 13. 6. Lonicera japonica Vine FAC- 14. 7. Eulalia viminea Herb FAC+ 15. g, 16. Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 71 Remarks: More than 50% of the dominant species are OBL, FACW, or FAC excluding FAC- indicating the hydrophytic vegetation criterion is met. HYDROLOGY Recorded Data (Describe In Remarks): Wetland Hydrology Indicators Stream, Lake, or Tide Gauge Aerial Photographs Primary Indicators: _ Other Inundated Saturated in Upper 12" X No Recorded Data Available Water Marks Drift Lines Field Observations: Sediment Deposits Drainage Patterns in Wetlands Depth of Surface Water: NA (in.) Secondary Indicators: Oxidized Roots Channels in Upper 12" Depth to Free Water in Pit: NA (in.) _Water-Stained Leaves Local Soil Survey Data Depth to Saturated Soil: NA (in.) x FAC-Neutral Test _ Other (Explain in Remarks) Remarks: This location does not meet the criterion for wetland hydrology due to the lack of primary and insufficient secondary indicators. SOILS Map Unit Name (Series and Phase): Wedowee sandy loam, 10-15% slopes Drainage Class: well drained Taxonomy (Subgroup): Typic Hapludults Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Colors Mottle Colors Mottle Texture, Concretions, (inches) Horizon fMunsell Moist) (Munsell Moistl Abundance/Contrast Structure, etc. 0-3 A 7.SYR 3/2 NA NA silt loam 3-12 E lOYR 4/4 NA NA silt loam 12-14+ B lOYR 5/4 7.SYR 4/4 few/distinct loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed On Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: Soils at this location do not meet any of the criteria for hydric soils. WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes X No Is the Sampling Point Wetland Hydrology Present? Yes No X Within a Wetland? Yes_ No X Hydric Soils Present? Yes No X Remarks: This location does not meet the criteria for a jurisdictional wetland due to the lack of wetland hydrology and hydric soils. USACE AID# ~ DD~ ~OOI ~ DWQ # Site # (indicate on attached map) ..t STREAM QUALITY ASSESSMENT WORKSHEET h f 11 'n information for the stream reach under assessment: Provide t e o owt g ~~' '~ _`~ `:f ~ f ' ~ 1. Applicant's name: ~` ~~ ~ ! ~. .. 2. Evaluator's name ~ ~- ~ ~ ~ ` ~ =-'` ~ _ - ~ - f ~' 3. Date of evaluation: `/ '~ ~ r -- --- 4. Time of evaluation: "~ ' ~ ~ ~ !~ `~~` ~ - r~'`~~~r~ 5. Name of stream: ,l,L ~ ~r =` ~;~ ~r`'.' ~~!`~'' ~"~ ' "~ ~ 6. River basin: +~% ' ., 7. Approximate drainage area: t-'% r ''1~ ~ ~`~'' 3 / 8. Stream order: ~tFT 9. Length of reach evaluated: ~~ ~ `F~ 10. County: ~~ g ~~ i~"j 11. Site coordinates (if known): prefer in decimal degrees. 12. Subdivision name (if any): °"' Latitude (ex. 3x.872312): ~~ - ~~c~ ~ ~ ~:~ _ _. c ~ - ,~ . Longitude (ex.-77.556611): <,"r ~ { _ _ ,~ ~ Method location determined (circle): GPS ~ Topo Sheet; Ortho (Aerial) Photo/GIS Other GIS Other 13. Location of reach under evaluation (note nearby roads and landmarks and attach map identifying stream(s) location): s ~ .; .~ 14. Proposed channel work (tf any): d~, ~'~ ° ~ ~'~` ~ '~' ~' ~ "~=f ~ ~ ~~ ~ ~~ ~ ~~ ~1 ~~~ ~~ ~ ~~ ~p tr { /~. Recent weather conditions: ;ie ' 15 ~, -` ~ ' ° ~ `' "";. ~ . 16. Site conditions at time of visit: '~ ~ ~/ ~~ ~ ~ ~ ,, j ,' -~ ~ t ~ ~`~ ~"~'' ~ ~' ~-~ra > ~ f 17. Identify any special waterway classifications known: -Section 10 -Tidal Waters -Essential Fisheries Habitat Trout Waters -Outstanding Resource Waters ~ Nutrient Sensitive Waters -Water Supply Watershed (I-IV) - 18. Is there a pond or lake located upstream of the evaluation point? YES s O ' If yes, estimate the water surface area: 19. Does channel appear on USGS quad map? YES ~ O 20. Does channel appear on USDA Soil Survey? YES NO 21. Estimated watershed land use: _% Residential _% Commercial _% Industrial _% Agricultural " % Forested =% Cleared /Logged _% Other 22. Bankfull width: '~ , 23. Bank height (from bed to top of bank): 24. Channel slope down center ofstream: -Flat (0 to 2%) Gentle (2 to 4%) -Moderate (4 to 10%) -Steep (>10%) 25. Channel sinuosity: Straight ~~ Occasional bends -Frequent meander -Very sinuous -Braided channel Instructions for completion of worksheet (located on page 2): Begin by determining the most appropriate ecoregion based on location, terrain, vegetation, stream classification, etc. Every characteristic must be scored using the same ecoregion. Assign points to each characteristic within the range shown for the ecoregion. Page 3 provides a brief description of how to review the characteristics identified in the worksheet. Scores should reflect an overall assessment of the stream reach under evaluation. If a characteristic cannot be evaluated due to site or weather conditions, enter 0 in the scoring box and provide an explanation in the comment section. Where there are obvious changes in the character of a stream under review (e.g., the stream flows from a pasture into a forest), the stream may be divided into smaller reaches that display more continuity, and a separate form used to evaluate each reach. The total score assigned to a stream reach must range between 0 and 100, with a score of 100 representing a stream of the highest quality. Total Score (from reverse): Comments: Evaluator's Signature axle This channel evaluation form is intended to be used only as a guide to assist landowners and environmental professionals in gathering the data required by the United States Army Corps of Engineers to make a preliminary assessment of stream quality. The total score resulting from the completion of this form is subject to USACE approval and does not imply a particular mitigation ratio or requirement. Form subject to change -version 06/03. To Comment, please ca11919-876-8441 x 26. STREAM QUALITY ASSESSMENT WORKSHEET r. . .. :: . ~ t ,~y~ ~ ~ _ . Yy 3~-f'H ~ .y •_ + .. .. ' ~ 1 Presence of flow /persistent pools in stream 0 5 4. U 0 :~ (no flow or sahlration = D; strop flow = inax Dints) - - - ~'. ,~ Evidence of past human alteration 0 - 6' ~ ~ 0 - 5 0 5 ,_ (extensive alteration = 0; no alteration = max Dints) - »} ,~. 3 Riparian zone 0-b 0-4 0-5 } ~ no buffer-= 0; contiguous, wide. buffer = max otnts) ~ Evid@iee of nutrient or chemical discharges 0 - 5 0 - a ~ - ~ ;' r extensive dischar es = 0; no dischar es ~ max Dints) r~ ~ Groundwater discharge ~ ~ 3 0 - 4 0 - -1 ~` (no dischar re = 0; s rip s; see s, wetlands, etc. = max points) - ~ 0 Presence of adjacent floodplain 0- 4 0- 4 0- 2 (no floodplain = 0; extensive flood lain = max points) p ~ Entrenchment /floodplain access 0- 5 0- 4` 0- Z ~ ~' (deep[ entrenched = 0; fre uent floodin = max Dints) ~„ 8 Presence of ad j acent wetlands 0- 6 0- 4 0- 2 rr: (no ~~~etlands = 0; large adjacent wetlands = max point_q) c f~ 9 Channel sinuosity 0- ~ 0- 4 0- 3 v ~_ (extensive channelization = 0"natu'ral meander = max Dints) ~ `~ 5edl-neot input 10 extensive de osition= 0; little or cio sediment = max Dints 0-5 0-4 0-4 ~; 1 I S[ze & diversity of channel bed substrate _ 0 :} 0 5 „- (fine homy` enous = 0; 1a;ge, diverse sizas = max o:ints) ., F ' ~ ~ [2 Evidence of channel incision or widening 0-5 0-4 0-5 ~ ~' (dee 1 incised = 0; stablebed & banks = max Dints} ' 13 Presence of major bank failures 0-5 d-5 0-5 (severe erosion = 0• no erosion, stable banks= max omts) .: 14 Root depth and density. on banks ' ©-3 0-4 0-5 (no visible roots = 0; dense roots throw out. = max Dints ~' 15 Impact by agriculture; livestock, or timber production 0-5 0-4 Q-5 (substantial impact =0; no evidence = max points) 1 b Presence ofriffle-pooUripple-pool complexes 0- 3 0- S 0- 6 Ey no riffles/ri les or pools = 0• well-develo ed = max points) ~, 1 ~ Habitat complexity 0- 6 0- 6 0- b ~ (little or no habitat = 0; ire went, varied habitats = max points) Canopy coverage over streambed 18 (no shadin vegetation = 0; continuous canopy = max points) 0-5 0-5 0-5 19 Substrate embeddedness ;' ~~* 0 - 4 0 - 4 (dee ly embedded = 0; Ioose structure = max) 20 Presence of stream invertebrates (see page 4) 0 - 4 0 - 5 0 - (no evidence = 0; common, numerous es = n~ax points) 21 Presence of amphibians 0- 4 0- 4 0- 4 O (no evidence = 0; common, numerous es = max Dints O 22 Presence of fish: 0-4 0-4 (1-4 ~ (no evidence- O; common, numerous es = max Dints) 23 Evidence of wildlife use 0 - 6 0 - 5 0 - 5 no evidence = 0; abundant evidence = max Dints Total Points Possible 100 1OD 100 TOTAL SCORE (also enter on first page) * These characteristics are not assessed in coastal streams.