Loading...
HomeMy WebLinkAbout20110180 Ver 1_More Info Received_20110413Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 April 13, 2011 S&EC Project # 9929.P1 DWQ #: EXP 11-0180 NC Department of Environment and Natural Resources Division of Water Quality Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WebSCaPe) Attn: Ian McMillan/Lia Gilleski 512 N. Salisbury Street (9th floor) Raleigh, NC 27604 Re: Request for More Information Response-EXPRESS REVIEW Generation II Commercial Center Fuquay-Varina, Wake County, NC To Mr. McMillan and Mrs. Gilleski: APR 1 3 2011 DENR - wATER QUkn WETLANDS ANDSTORMWATERWA W The purpose of this letter is to respond to your Request for More Information letter dated April 6, 2011. The original questions/requests are copied below as they appear within the letter and are then responded to by the project engineer within a Memorandum dated April 12, 2011. Additional Information Requested. 1. Culvert Outlet Plunge Pool. Please provide another design option to reduce the 5-foot plunge pool depth. In particular, since the design must also meet sediment & erosion control requirements, we request that you evaluate the outlet plunge pool design using the NC Division of Land Quality's design guidance in Sections 6.41 and Appendix 8.06 of the Erosion and Sediment Control Planning and Design Manual, available at: http://www. dlr. enr. state. nc. us/pages/publica tions. html. See attached memorandum and letter provided by project engineer. 2. Wet Detention Ponds: a. Revise the temporary pool elevation and forebay volume on the East Pond Supplement form. b. Per our calculation both the 4-inch and 3-inch orifices draw down their respective water quality volumes in less than 2 days. Please choose appropriate sizes and revise the supplement forms and the affected plan sheets. Please see attached memorandum and revised supplemental forms provided by project engineer. Charlotte Office: Greensboro Office: Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 We anticipate that this answers all of the DWQ's questions in order to complete the final review process requested for the written concurrence of Water Quality Certification 3821 and Riparian Buffer Authorization. If you have any further questions or any additional explanation is needed, please don't hesitate to call. Sincerely, SOIL & ENVIRONMENTAL CONSULTANTS, PA tw Debbie Edwards Environmental Specialist Attachments: 1) Project Memorandum-dated April 12, 2011 2) Stormwater Design Memo-re: Outlet Protection Pad 3) Revised Wet Pond Supplement Forms 4) Revises sheets 5 & 7 of the PCN 5) Revised Site Plan Maps-signed & sealed 04-12-11 6) Data CD George Finch I Boney and Associates, P.A 309 North Boylan Avenue Raleigh, NC 27606-1402 Post Office Box 10472 gf lba Raleigh, NC 27605-0472 T 9191833-1212 F 91 9 1 8343203 April 12, 2011 Project Memorandum Project: Generations II Commercial Center 7416 Sunset Lake Road Fuquay-Varina, NC DWQ #: Exp11-0180 Re: Response(s) to DWQ's Request for Additional Information We are submitting the following in response to the request for more information letter that was sent out by DWQ on April 6th, 2011. Letter Item # 1: Please see the attached letter addressing the different outlet protection options considered. Letter Item #2: A: Please see the attached supplemental forms. B: The controlled outlet pipes for each pond have been reduced to extend the draw down time for each pond to meet the 48+ hour requirement. See the revised supplement forms. Sincerely, Don Wiggins and Daniel Woods 0504 1 -Trans-S&EC-DWQ-401 ExpSubl-03231 1 -dw cc: Julie Zalkind-Generations II-via US Main-CD & 11" x 17" Plan Sets gf Iba April 12, 2011 George Finch I Boney and Associates, P.A. 309 North Boylan Avenue Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 F 9 1 9 1 834-3203 Generations II Commercial Center Stormwater Design North Carolina Department of Natural Resources Raleigh Regional Office Raleigh, NC Attn. Joseph Gyamfi Ref. Outlet protection at Stream Crossing Mr. Gyamfi This letter has been developed to provide the requested narrative relating to the design and final development of the Outlet Protection Pad as it is currently proposed within our resubmitted Site Plans, at the Product's Drive Stream Crossing within the center of this Project's Site. A significant amount of study, design and consideration has been put into how to properly introduce a Velocity Reduction Pad in this application and we hope this will provide what is necessary to meet the requests of the North Carolina Department of Environmental and Natural Resources (NCDENR) where this Project can receive its Permit. As an introduction, this Project is required to cross the Site's existing wetlands and designated stream, with Product's Drive, a 41 ft Thoroughfare Roadway within a 60ft. ROW. A 60 inch concrete pipe and culvert is proposed at the crossing of this existing stream. The stoned dissipation pad studied is located at the outlet of this Crossing, to prevent any potential downstream erosion from the development of the Project's Roadway Crossing. As requested by NCDENR Staff, the design of the Pad was based upon a 10 year storm event where the upstream watershed was at a potential full build- out. The outlet is an at-grade free discharge pipe with minimum tail water driven by the stream flow depth. As required by NCDENR, the invert of this pipe has been designed so it is 12 inches below the top of the stream elevation that was provided in the existing conditions survey of the Site, at the location of this crossing. The estimated flow depth below the culvert is less than 12 inches within this relatively shallow stream detailed within the on-site survey, which is surrounded by a large expanse of designated wetlands. gf lba George Finch I Boney and Associates, P.A. 309 North Boylan Avenue Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 F 9 1 9 1 834-3203 NCDENR staff expressed a concern about the large length of Velocity Reduction Pad proposed in the Project's pre-submittal meeting, so the Pipe and Culvert size was reduced to the current 60" size, using the existing upstream wetlands as a temporary storage. The standard at grade rip-rap pad was incorporated into the Project's original submittal to NCDENR, producing a permanent stream impact of 40 If. As an alternative, we submitted in our supplementary data an alternate design of a Pool Type Pad as a substitute to the standard rip-rap pad. The purpose of the request was an attempt to reduce the length of the permanent impact to the stream, and requested we provide additional information and design as how those systems could be applied in this location. In response, a number of Velocity Reduction Pad designs have been evaluated, studied and considered at this stream crossing, for their inclusion into this Project's Permit Submittal. They include a typical, at grade, stoned pad and three "pooled" designs, similar a pre- formed scour hole. The pooled methods include a free discharge outlet protection derived from the State of Maine's erosion control manual, a submerged pipe outlet protection derived from NCDENR manual and a submerged outlet design by the Federal Highway Administration (FHWA). Both NCDENR and FHWA have other pool pad designs, but they are designed for elevated-cantilever pipe, which did not seem to be applicable to this project. The State of Maine's design was considered because it closely mimicked the proposed conditions, at grade with minimal tail water discharge. Utilizing this method the length of the pad was reduced from 40 If to 30 If. However, it did generate a 5 ft deep pool at the outlet. The pool depth was not desirable to NCDENR. As a result the NCDENR and FHWA methods were considered. The next method was the NCDENR submerged plunge pool design. The pool depth includes a logarithmic formula based on the flow, pipe size, tail water and stone size. Using the excel spread sheet, available on the NCDENR Sedimentation website, with an 8" average diameter stone, a 5' pipe, flow of 105 cfs (estimated flow through the pipe) and a tail water of I' the calculations provide a dissipation pad length of approx. 30 If. However, it also required a pool depth of 12.8'. gf lba George Finch I Boney and Associates. P.A. 309 North Boylan Avenue Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 F 91 9 1 834-3203 We determined that to use this design where a "shallower" pool was created, the conditions dictated that the stone diameter must be reduced to 3". By our calculations, this produced a shallow pool, at the depth of 3.3', but the total length of the required Pad was 45', which would have been longer than the pad length in our initial submittal (rejected based upon its length). In addition, we determined in our study that the use of 3" stone would not provide the appropriate protection in this application. Therefore, this alternative was not proposed, or submitted for NCDENR consideration. The limited tail water seemed to provide the extreme results in this application. Finally, the FHWA method for a rip-rap basin on a mild slope was considered in our Study. The design for this Method, as it is applied to the conditions in this Project, produced a "negative" pool depth, primarily affected by the pipe diameter and minimal tail water. We determined that this method would not be applicable for this Project's application. The results of this Study determined that the Pool type Pads developed by the Methods studied above, which included the NC-Div. of Land Quality's design guidelines in Sections 6.41 and Appendix 8.06 of the Erosion and Sediment Control Planning and Design Manual, did not produce a Pad where the Depth of Pool was less than our designed 5ft, and/or length of Pad was less than the 40ft submitted in the Project's first submittal. The findings of the above studies and designs were submitted and reviewed with NCDENR Staff after we received the NCDENR April 6th Request for More Information Letter. Subsequently, and at the direction of NCDENR Staff, the Pool type Pad that is included within this Project's current submittal is 35ft long and the pool depth is 3ft. We believe this letter adequately address's the Study that was undertaken to determine how to best provide a Velocity Reduction Pad in this Project at the Stream Crossing. Meeting the requests and requirements of NCDENR We will be available for any additional phone discussion/review on this issue. Sincerely, Daniel Woods, PE George Finch/Boney and Associates Permit -WA A A WDEHR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be fixed out printed and submitted. The Required Items Checklist (Part Ill) must be printed, fixed out and submitted along with aN of the required information, (to be provided by DWQ) o1a0F?W?AT?c9 pG 77 kP lqii? < I. PROJECT INFORMATION Project name Generations II Carolina, LLC Space Parcells Contact person Don wiggins Phone number 9194311212 Date 3121/2011 Drainage area number 2 U, DESIGN INFORMATION Site Characteristics Drainage area 287,496 its Impervious area, post-development 233,046 ft % impervious 81.06 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 18,680 ft3 OK Volume provided 19,307 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft1 Minimum volume required ft3 Volume provided tt3 Peak Flow Calculations Is the prelpost control of the 1yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm irVhr Pre-development 1-yr, 24-hr peak flow 1292 ft3/yam Post-development 1-yr, 24-hr peak flow 18.33 lf/sec Pre/Post 1-yr, 24-hr peak flow control 5.41 ft3/sec Elevations Temporary pool elevation 384.75 fmsl Permanent pool elevation 383.50 find SHWT elevation (approx. at the perm. pool elevation) AVG=83.88 frnsl Top of 10ft vegetated shelf elevation 384,00 imsl Bottom of 1 Oft vegetated shelf elevation 383,00 b d Sediment deanDut, top elevation (bottom of pond) 378.50 hd Sed rnent cleanout, bottom elevation 377.50 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? Y (Y or N) Elevation of the top of the additional volume 384.8 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) U. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Av„y,,, Area, bottom of 1 Oft vegetated shell, Abe dw Area, sediment deancut, top elevation (bottom of pond), Abaw,d 17,250 ft 11,787 ft2 4.10 (unitless) 12,276 a OK 8,774 ft2 3,093 ft2 Volumes Volume, temporary pool 19,307 fe Volume, permanent pool, Vp,,,,,_.,, 30,584 f? Volume, foreIM (sum of forebays if more than one forebay) 5,552 fe Forebay % of permanent pool volume 18.2% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp,._,,,, Area provided, permanent pool, A,,,,, Average depth calculated Average depth used in SAIDA, da, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap._ ,,, Area, bottom of 1 Oft vegetated shelf, Abm ,tw Area, sediment cieanout, top elevation (bottom of pond), Abo,yo,d 'Depth' (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,,(Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (H,) Drawdown through weir? Weir type Coeffkient of discharge (C j Length of weir (L) Driving head (H) PreAevelcpment 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: OK OK 90 % n (Y or N) y (Y or N) 4.10 (unitless) n (Y or N) 30,584 fe 12,276 fe ft Need 3 ft min. ft y (Y or N) 12,276 fe 8,774 ft2 3,093 ft 4.50 it 3.47 ft OK 3.5 ft OK y (Y or N) 2.50 in in2 0.60 (uni(less 0.38 ft (Y or N) _ (unitless) _ (uritless) ft _ft 12.92 fetsec 18.33 ft3lsec 0.10 f 2.20 days OK, draws down in 2-5 dirs. 3 :1 OK 10 :1 OK 10.0 ft OK 5 :1 OK 5.0 :1 OK y (Y or N) OK 1.0 ft OK y (Y or N) OK y (Y or N) OK y (Y or N) OK Pump Forth SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & It. Design Summary, Page 2 of 2 Permit No H=NR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filed out, pirated and submitted. The Required Items Check id (Part I//) must be printed, filed out and submitted along with all of ft required information. (to be provided by DWQ) O-?F?W A?T?c9oG a lqiiii? s I. PRMCI 11MROTION Project name Generations II Carolina, LLC Space Pwwlls Contact person Don Waggins Phone number 919-833-1212 Date 30/2011 Drainage area number 1 Ill. DEEM INFORMATION Site Characteristics Drainage area 664,333 fe Impervious area, post-development 545,414 f? % impervious 82.10 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 43,680 ft3 OK Volume provided 43,916 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Cakulatfons Is the pre/post control of the 1yr 24hr storm peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in Rational C, pre-development (unitless) Rational C, post- development (unitless) Rainfall intensity: )-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow 31.64 ft3/sec Post-development 1-yr, 24-hr peak flow 27.80 ft3/ceo Pre/Post 1-yr, 24-hr peak flow control -384 ft3/sec Elevations Temporary pool elevation 384.63 fmsl Permanent pod elevation 383.00 fmsl SHWT elevation (approx. at the perm. pool elevation) AVG=82.84 imsl Top of 1 Oft vegetated shelf elevation 383.50 imsl Bottom of 1 Oft vegetated shelf elevation 382.50 frrasl Sediment deariout, top elevation (bottom of pond) 378.00 fmsf Sediment cleanout, bottom elevation 377.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? y (Y or N) Elevation of the top of the additional volume 384.6 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17109 Parts I. & 11. Design Summary, Page 1 of 2 Permit (to be provided by DINO) 11. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A,,,,,_pw Area, bottom of 10ft vegetated shelf, AW ,1, Area, sediment deanout, top elevation (bottom of pond), Abdo 23,732 fe 23,252 If 3.50 (unitess) 23,712 ff OK 20,731 ff 14,205 ff Volumes Volume, temporary pool 43,916 113 Volume, permanent pool, V,,m_pw 86,833 ft Volume, forebay (sum of forebays if more than one forebay) 16,025 ft3 Forebay % of permanent pool volume 18.5% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA rata Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V?,,,,_md Area provided, permanent pool, Ap,,,,_,,W Average depth calculated Average depth used in SAIDA, dam„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pod, Ap.._,w Area, bottom of 1 Oft vegetated shelf, Ab,t , w 90 % n (Y or N) y (Y or N) 3.50 (unit ess) n (Y or N) 86,833 ff3 23,712 ff It ft y (Y or N) 23,712 ff 20,731 ff Area, sediment deanout, top elevation (bottom of pond), Aem-11d 14,205 fe 'Depth` (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice ('If circular) Area of orifice (uf-non-circular) Coefficient of discharge (Cc) Driving head (HQ) Drawdown through weir? Weir type Coefficient of discharge (C j Length of weir (L) Driving head (H) PreAevelopment 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf dope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 4.50 ft 4.28 ft 4.5 It y (Y or N) 3.00 in in2 0.60 (unitless) 0.50 ft (Y or N) (unidess) (unitless) ft ft 31.64 felsec 27.80 fetsec 0.17 ft3/sec 3.00 days OK OK Need 3 It min. OK OK OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 2 :1 Insufficient flow path to width ratio. Must not shat-circuit pond. 2.0 :1 OK y (Y or N) OK y ft OK y (Y or N) OK y (Y or N) OK y (Y or N) OK Pump Form SW401Met Detention Basin-Rev.8-W17/09 Parts I. & II. Design Summary, Page 2 of 2 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number - Type of jurisdiction Permanent (P) or Type of Type of wetland Forested (Corps - 404, 10 Area of impact Temporary T impact if known DWQ - non-404, other acres W1 ®P ? T Fill-Culvert & Bottomland ® Yes ® Corps 0.38 Dissipater Hardwood ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.38 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact number - Type of Stream name Perennial Type of jurisdiction Average Impact Permanent (P) or impact (PER) or (Corps - 404, 10 stream length Temporary (T) intermittent DWQ - non-404, width (linear (INT)? other) (feet) feet) S1 ®P ? T Culvert & UT to Terrible ® PER ® Corps 3' 143 Dissipater Creek ? INT ? DWQ S2 ? P ® T Construction UT to Terrible ® PER ® Corps 3' 20 Corridor Creek ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 163 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? 131 ®P ? T Road Crossing UT to Terrible Creek ®Nos 8,401 5,147 B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No B4 ?P?T ?Yes ? No 6h. Total buffer impacts 8,401 5,147 6i. Comments: Page 7 of 12