HomeMy WebLinkAbout20110310 Ver 1_Approval Letter_20110407
Beverly Eaves Perdue
Governor
?FK
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins Dee Freeman
Director _ Secretary
April 7, 2011
Franklin County
NCDWQ Project No. 20110310
Maintenance Yard Access Road
State Project No. 2100003867
APPROVAL of 401 WATER QUALITY CERTIFICATION and TAR-PAMLICO BUFFER
AUTHORIZATION, with ADDITIONAL CONDITIONS
Mr. J.W. Bowman, P.E., Division Engineer
NCDOT, Division 5
2612 North Duke Street
Durham, NC 27704
Dear Mr. Bowman:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
a new access road for the DOT Maintenance Yard in Franklin County:
Stream Immicts in the Tar-Pamlien River Racin
Site Permanent Fill in Perennial
Stream linear f[ Riprap to Perennial '
Stream linear ft Temporary Dewatering
Perennial Stream linear ft Total Stream Impact
linear ft
1 65 20 85 (Concurrent) 85
2 0 28 28 (Concurrent) 28
Total 65 48 113 (Concurrent) 113
I otat stream Impact for Project: 113 linear feet.
Tnr_Pamlirn Rina rim nnfir- Imoorf?
Site Zone I minus = Zone I Zone 1 Buffer Zone 2 minus = Zone 2 Zone 2 Buffer
Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers Mitigation
(sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using
(sq ft) (sq ft) (using 3:1 ratio)
(sq ft)
wetlands)
1.5:1 ratio)
s ft
I - 4500. .. Q-, 4500. N/A 4?, . _2880, 0._.. 2880, ,. ._...__ N/A ..
2 3000 0 3000 N/A ;111 0 0 0 N/A
Totals 7500 0 7500 0 2880 0 2880 0
nia =.1 otai for site is less man us acre and uU linear feet of impact, no mu mgation required
Total Buffer Impact for Project 10,380 square feet.
Transportation Permitting Unit
Wetlands 8 Stormwater Branch
1650 Mail Service Center, Ralegh, North Carolina 27699-1650
Phone: 919-807-63991 FAX: 919-807-6494
Internet: http:llh2o.enr.state.nc,uslnmetlandsl - - - -
NorthCarolina
JVaturallr? ,
An Equal Opportunity 1 Affirmative Action Employer
The project shall be constructed in accordance with your application dated received April 5, 2011. After reviewing
your application, we have decided that these impacts are covered by General Water Quality Certification Number
' 3820. This certification corresponds to the Nationwide Permit 1`4 issued by the Corps of Engineers. This approval
is also valid for the Tar-Pamlico Riparian Buffer Rules (15A NCAC 213.0259). In addition, you should acquire any
other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
___accompanying 404 permit _. _ _
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWQ and submit anew application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC.0242(9). For this approval to remain valid, you must adhere to the conditions listed in
the attached certification(s) and any additional conditions listed below.
Conditions of Certification:
1. Placement of culverts and other structures in open. waters and streams, shall be placed below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter
for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and
placement of culverts and other structures including temporary erosion control measures shall not be conducted in a
manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down
stream of the above structures. The applicant is required to provide evidence that the equilibrium is being
maintained if requested in writing by NCDWQ. If this condition is unable to be met due to bedrock or other limiting
features encountered during construction, please contact NCDWQ for guidance on how to proceed and to determine
whether or not a permit modification will be required.
2. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed.
3. For any streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction
contours and revegetated with appropriate native species.
4. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum
extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation
responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to stream
channel shall be temporary and be revegetated with native riparian species.
5. All stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless
otherwise approved by this certification.
6. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
--- - -°â€˘- -'maintenance activities including mdwing`The'area with non-maintained•bufferssliall be permanentlyrevegetated°"=''-" `--
with native woody species before the next growing season following completion of construction.
7. Pursuant to NCAC 15A 28.0259(6), sediment and erosion control devices shall not be placed in Zone I of any
Tar-Pamlico Buffer without prior approval by NCDWQ. At this time, NCDWQ has approved no sediment and
erosion control devices in Zone I, outside of the approved project impacts, anywhere on this project. Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone I is not
compromised and that discharge is released as diffuse flow.
8. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills..
V
9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers.
10. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions.
1 1 _The_Permittee shall ensure that the.final.design drawings adhere to the-permit.and to the permit drawings
submitted for approval.
12. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water.
13. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream.
14. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
15. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification.
16. Discharging hydroseed mixtures and washing out hydroseeders and other-equipment in or adjacent to surface
waters is prohibited.
17. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and
any other appropriate requirements of State and Federal law. IfNCDWQ determines that such standards or laws are
not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being
violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this
certification.
18. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,'
the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division
Engineer and the on-site project manager.
19. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to
areas within the fencing are prohibited unless otherwise authorized by this certification.
20. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc.
21. The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of
discovery.
- .--22: Upon' completion of the project (including any impactsatassociated borrow 6r'waste'site5), the NCDOT-
Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ
when all work included in the 401 Certification has been completed.
23. Native riparian vegetation (i.e., trees and shrubs native to your geographic region) must be reestablished within
the construction limits of the project by the end of the growing season following completion of construction.
24. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities.
?a -
25. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
_ControlPlanning and.Design Man:ml._._-__-___-__ _..____-_..__...__._____.._..__...._...___..
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased
borrow pits associated with the project.
C. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
26. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered.
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except
for official state holidays. The original and one (I ) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-733-2698, Facsimile: (919)-733-3478
A copy of the petition must also be served on DENR as follows:
Ms. Mary Penny Thompson, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you
have any questions, please contact Rob Ridings at 919-807-6403.
Sincerely,
?olColeen H. Sullins
Director
Cc: Chris Murray, Division 5 Environmental Officer
Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
File Copy