Loading...
HomeMy WebLinkAbout20110300 Ver 1_More Info Received_20110405Mcmillan, Ian From: Richard (Rick) A. Moore [RAMoore@mckimcreed.com] Sent: Tuesday, April 05, 2011 11:34 AM To: Mcmillan, Ian Cc: Bailey, David E SAW; Shelley G. Stevenson Subject: DWQ#11-0300 / SAW-2010-01945 Attachments: 1013_001.pdf Ian- Per our conversation this morning, please find attached the revised sheet 6 of 12 of the previously submitted PCN. The revisions to Section 3 include: removing the check mark on "intermittent"; adding a check box for "ephemeral"; adding 1,533LF to the total impact cell (LF and acres both shown); and adding "ephemeral" to the comments. Also based upon our conversation, the permit fee for this is $240, therefore no additional permit fee is required. Last, the copy of your return letter I received was an unsigned copy via e-mail. Is it safe to assume the entire application package is on its way to me in the mail by now? Or do you still have the package in your office and you can just insert this revised sheet in the PCN application itself? If it is already in the mail on the way here, should I resubmit it to you with this revised sheet or take it directly to the regional office? Thank you for the help- Rick Richard (Rick) A. Moore, PE, LEED AP Senior Project Manager McK M&CREED 243 North Front Street Wilmington, NC 28401 910.251.6665 x214 910.251.8282 fax 910.512.4506 mobile http://www.mckimcreed.com Follow us on: YouTube I twitter I facebook I Linkedln A Please consider the environment before printing this e-mail. To send me a file larger than l OMB please click here This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of 1 the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. 2 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ®T Construction of a by-pass Pocosin ® Yes ® Corps 0.03 stormdrain system ? No ?DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DW Q W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.03 2h. Comments: Impact to the wetlands will be temporary impacts for the installation of stormwater drainage pipes. Existing grades will be reestablished using existing soils. Disturbed area will be stabilized with shrub/scrub wetland species. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Fill in tributary for S1 ®P ? T vehicular access UT to Northeast ? PER ® Corps 10 5 1 533 and building Creek ? INT ® DWQ . , construction. ® C_ 9AfMO'z AL- S2 ? P ? T ? PER ? Corps ???++??+++u??y, ? INT ? D W Q ?.. CARO ?'•. S3 ? P ? T ? PER ? Corps O ? ?e ? INT ? DWQ l S4 ? P ? T ? PER ? Corps 5543 r _ ? INT ? DWQ 02 S5 ? P ? T ? PER ? Corps %,? 'p/ F7?1Gtt ? ? INT ? DWQ .,• `??. S6 ? P ? T ? PER ? Corps ''??r,unuaa+++! ? INT ?DWQ 3h. Total stream and tributary impacts 1,533 LF; 0.37 acre 3i. Comments: The feature is an ephemeral, seasonal RPW & manmade tributary that doesn't perform the function and value of a stream. Page 6 of 12 PCN Form - Version 1.3 December 10, 2008 Version