Loading...
HomeMy WebLinkAbout20110176 Ver 1_Approval Letter_20110328.41 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary March 28, 2011 DWQ Project # 11-0176 North Lenoir Water Corporation Mr. John Pope, President 904 North Queen Street Kinston, NC 28501 Subject Property: Phase X Water System Improvements, Lenoir and Green Counties Authorization of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Mr. Pope: Lenoir County You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to temporarily impact approximately 200 ft2 of Zone 2 of the protected Neuse River Riparian buffers for the purpose of constructing and interconnecting water lines as described within your application dated January 19, 2011 and received by the N.C. Division of Water Quality (DWQ) on February 24, 2011. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Buffer Authorization are met. No other impacts are approved including incidental impacts: North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Phone: 252-946-6481 1 FAX: 252-946-9215 Internet: vuww.ncwaterqualitv.orq An Equal Opportunity 1 Affirmative Action Employer NorthCarolina ;Vaturallff Amount Approved (Units) Plan Location or Reference Stream (feet) 404/CAMA Wetlands (acres) Waters (acres) Buffers 200 (square ft.) Ut to Wheat Swam 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 3. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions please call Roberto Scheller in the Washington Regional Office at (252) 948-3940. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. Enclosures: Certificate of Completion cc: Richard Moore P.E, McDavid Associates, Inc. DLR Washington Regional Office DWQ 401 Oversight/Express Unit File Copy Division of Water Quality Washington Regional Office