Loading...
HomeMy WebLinkAbout20201842 Ver 1_ePCN Application_20210112DWR Division of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20201842 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Central Office - (919) 707-9000 Information for Initial Review 1a. Name of project: Cleveland Bluffs 1a. Who is the Primary Contact?* David Syster 1b. Primary Contact Email:* david.syster@segi.us Date Submitted 1/12/2021 Nearest Body of Water Middle Creek Basin Neuse Water Classification C, NSW Site Coordinates Latitude: Longitude: 35.57206-78.54280 Pre -Filing Meeting Information ID# 20201842 Pre -fling Meeting or Request Date* 12/2/2020 Attach documentation of Pre -Filing Meeting Request here:* DWR Pre -Filing Meeting Request Form.pdf Version#* 1 What amout is owed?* r $240.00 r $570.00 Select Project Reviewer* Rick Trone:eads\rvtrone 1c. Primary Contact Phone:* (910)452-2411 Version 1 51.78KB A. Processing Information C^U County (or Counties) where the project is located: Johnston Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 29 - Residential Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: KG Plaza, LLC 2b. Deed book and page no.: Book 04670 Page 0878 2c. Responsible party: Jack Carlisle 2d.Address * r Yes r No r Yes r No Street Address 8620 River Road Address Line 2 city Wilmington Postal / Zip Code 28412 2e. Telephone Number: (919)818-7078 2g. Email Address:* e85jack@gmail.com 4. Agent/Consultant (if applicable) 4a. Name: David Syster 4b. Business Name: Southern Environmental Group, Inc. 4c.Address Street Address 5315 South College Rd Address Line 2 Suite E City Wilmington Postal / Zip Code 28412 4d. Telephone Number: (910)452-2711 4f. Email Address:* david.syster@segi.us Agent Authorization Letter* Cleveland Bluffs Agent Authorization Form 11-13-19.pdf State / Rovince / Ifgion NC Country USA 2f. Fax Number: State / Rmince / Ffgion NC Country USA 4e. Fax Number: (910)452-2899 56.71 KB C. Project Information and Prior Project History O 1. Project Information 1b. Subdivision name: (d appropriate) Same 1c. Nearest municipality/ town: Cleveland 2. Project Identification 2a. Property Identification Number: 37101-163600-44-9493, 37101-163600-63- 2b. Property size: 0003 27.24, 36.12 2c. Project Address Street Address 2459 Cornwallis Rd Address Line 2 City State / province / P gion Cary NC Postal / Zip Code Country USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Middle Creek 3b. Water Resources Classification of nearest receiving water:* C, NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202010903 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project is a subdivision currently being developed. Work started in approximately 2015-2016. The surrounding land is generally residential and agricultural. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Cleveland Bluffs Topo Map 101519.pdf 516.35KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Cleveland Bluffs Soils Map 111319.pdf 169.71 KB 4f. List the total estimated acreage of all existing wetlands on the property: 1.25 4g. List the total estimated linear feet of all existing streams on the property: 2541 4h. Explain the purpose of the proposed project:* The overall project purpose is to complete a residential subdivision. The proposed impacts include road crossings, dam improvements, aerial sewer crossings and stream restoration. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The majority of the work has been completed at this time. Various elements such as the stream restoration, an additional aerial sewer crossing and site stabilization will occur once authorization has been obtained. Work will be completed utilizing heavy equipment and hand tools as necessary. Site stabilization will be emphasized during all aspects of future construction. 4j. Please upload project drawings for the proposed project. Permit Drawings 01-11-2021.pdf 1.75MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: A site visit by the Corps is anticipated on 1/19 or 1/20/2021. The Corps did verify that Pond 2 was non -jurisdictional and I've included that PJD below 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2019-0096 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): David Scibetta Agency/Consultant Company: Southern Environmental Group, Inc. Other: 5d9. Jurisdictional determination upload SAW-2019-00964letter.pdf 1.68MB 6. Future Project Plans 6a. Is this a phased project?* r Yes 0 No 7b. If yes, explain. The project is a Planned Unit Development (PUD) and the general density etc. was approved by Johnston County in approximately 2015. The subdivision is broken into several phases, however this permit and the lots shown include all impacts, existing and future. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No, this permit wil cover all proposed activity within wetlands and waters. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries W Open Waters W Pond Construction 2. Wetland Impacts r Buffers 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested * 2f. Type of Jurisdicition*(?) Headwater Forest UT2 No Both 29. Impact area* 1B Road Crossing P 0.012 (acres) 4 Road Crossing/ Dam I P Headwater Forest UT3 Yes Both 0.016 (acres) 5 Aerial Sewer ��T Headwater Forest UT3 Yes Both 0.004 (acres) 6 Aerial Sewer T Headwater Forest UT3 Yes Both 0.021 (acres) Aerial Sewer T Headwater Forest UT3 Yes Both 0.029 (acres) 2g. Total Temporary Wetland Impact 0.054 2g. Total Wetland Impact 0.082 2h. Comments: Please see attached impacts maps for the location of each impact above. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.028 F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * Type of 3g. S. width* 3h. Impact (?) �3f. Jurisdiction* length* S1 Road Crossing 9 Permanent Culvert UT2 - Im act 1 B P Perennial Both 2 38 Average (feet) (li �r feet) S2 Restoration Tem orar P Y Other UT1 - Impact 3 p Perennial Both 2 289 Average (feet) (linearfeet) H Dam Construction Permanent Dam construction UT3 - Impact 4 P Perennial Both 4 54 Average (feet) (lir�rfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 92 289 31. Total stream and ditch impacts: 381 3j. Comments: Impact labels on the map correspond to the impact labels denoted within the "Stream Name" column. 4.Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area Bank Stabilization P Pond 1 Reshaping _11 Pond 0.19 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.19 4h. Comments: 5. Pond or Lake Construction 4g. Total permanent open water impacts: 0.19 5a. Pond ID number 5b. Proposed use or purpose of 5c. Wetland pond impacts (acres) Flooded Filled P1 Other P2 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? r Yes r No If yes, permit ID no: 5i. Expected pond surface area (acres): 1.96 5k. Method of construction: Excavation E. Impact Justification and Mitigation 1. Avoidance and Minimization 5d. Stream Se. Upland impacts (feet) (acres) Excavated Flooded Filled Excavated 0.09 5j. Size of pond watershed (acres): 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Unavoidable wetland impacts were limited to the minimum extent practicable. This is evident in dam construction as the width was kept as narrow as possible. Aerial sewer crossings were also designed to avoid any footings within wetlands or the stream bed. The project was also designed to utilize existing road crossings to minimize impacts (the road to the amenities center and the road across the dam). While these were widened the existing footprint was utilized. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: In order to limit secondary impacts or sedimentation in downstream waters, best management practices were utilized during road construction and pond maintenance. This included, sediment basins, silt fence and similar practices. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): W DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? W Mitigation bank r Payment to in -lieu fee W Permittee Responsible program Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: RES Neu -Con Umbrella Bank - Meadow Spring 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.10 Attach Receipt and/or letter 0.09 3c. Comments Credits have been requested and reservation letter will be forwarded upon receipt 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan including mitigation credits generated. Applicant proposes to restore approximately 456' of t1T1 to include 289' that had previously been a tributary (now piped) and 167' that had been impounded in a 0.29 acre shallow pond. Please see attached restoration plan. 5b. Mitigation Plan Upload v Cleveland Bluffs Stream Restoration Plan V1 with attachments.pdf 13.34MB 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. r Yes f No 6b. If yes, then identifythe square feet of impact. 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 0 0 Zone 2 0 0 6f. Total buffer mitigation required 0 6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed? r Yes r No 6j. Comments: Please see Johnston County Buffer Request Package attached. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? W Level Spreader W Vegetated Conveyance (lower SMWT) F Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen W Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: W Local Government r State Local Government Stormwater Programs W Phase II r NSW r USMP F Water Supply Please identify which local government stormwater program you are using. Johnston County Comments: The overall site received approval for a SMP from Johnston County. As each Phase or expansion is designed it is reviewed and additional approval from Johnston County is obtained. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r' Yes C No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 2b Provide an explanation of the violation(s): The project was issued a Notice of Violation from NC DWR, USACE and Johnston County for impacts to streams, wetlands and buffers. This PCN has been submitted in an effort to resolve all outstanding violations. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 31b. If you answered "no," provide a short narrative description. The Applicant has utilized and plans to continue to utilize best management practices to avoid any secondary impacts to water quality. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Johnston County Public Sewer 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC Consultation Documentation Upload T&E Species List_ Raleigh Ecological Services Field Office 011121.pdf 151.18KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC State Historic Preservation Office 7c. Historic or Prehistoric Information Upload Cleveland Bluffs NC State Historic Preservation Office HWO 2 011121.pdf 4.55MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA Flood Map Service Miscellaneous Comments This PCN Application has been compiled to address all items outlined in the current NOV's from the NC DWR, USACE and Johnston County. Attached to the permit application are a number of documents that were utilized to address the items in the NOV's including the Buffer Request for Johnston County and the Stream Restoration Plan. Additionally, LiDAR and aerial photography were utilized to help determine the previous pond edge. This images are also attached for reference. I have also included soil a copy of the soil and erosion plan Mich depicts the lot layout and road configuration as well. Miscellaneous attachments not previously requested. 01-Cleveland Bluffs Buffer Authorization Request_20201224 - Final.pdf 1.85MB Cleveland Bluffs 2014 LiDAR and Current Pond Edge and Approx. Wetlands 2020 Aerial 010421.pdf 1.84MB Cleveland Bluffs 2014 LiDAR Conditions 010421 v2.pdf 1.34MB C00-Cleveland Bluffs —Next Phase_ CD_20201202.pdf 3.09MB EC00-Cleveland Bluffs_Pond_ESC_CD_20201202.pdf 10.55MB Signature * W By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: David A. Syster Signature Date 1/12/2021