HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 40954 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Wednesday,January 13, 2021 1:45 PM
To: Jay.Ratliff@duke-energy.com
Cc: Gamble,Aana C; Kim.Gerald@duke-energy.com; Paul.Smith@duke-energy.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for BNP New Warehouse was not accepted for the following
reason:
A7/A8: The coordinates that were entered are in the Atlantic Ocean. Please enter correct coordinates for the site
A15c/A15d: Please do not list the River Basin. Only the most immediate receiving waterbody should be listed.
D8: All of the boxes on the NOI Certification Form must be checked.
Please submit a new NOI. To pre-populate the new NOI, select Yes for the first question and enter NOI 940954.
Contact aana.gamble@ncdenr.gov with questions.
Please contact The Stormwater Program Administrative Assistant for more information at(919) 707-
3640. Please reference NOI application no. 40954 and Project ID NCC-BRUNS-2021-BNP New Warehouse.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i