Loading...
HomeMy WebLinkAboutNCC210103_ESC Approval Submitted_20210113ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality 19 November 2020 LETTER OF APPROVAL WITH MODIFICATION Whitnel Pentecostal Holiness Church of Lenoir ATTN: Mr. Keith Gilliam 1890 Connelly Springs Rd Lenoir, NC 28645 RE: Project Name: Worship Center & Children's Building Living Hope Church Acres Approved: 7.6 Project ID: CALDW-2021-001 County: Caldwell City: Cajah's Mountain Address: Connelly Springs Road River Basin: Catawba Stream Classification: Gunpowder Creek - C Submitted By: Mr. Todd Poteet, P.E. Date Originally Received by LQS: July 30, 2020 Date Current Revision Received by LQS: November 4, 2020 Plan Type: Institutional Dear Mr. Gilliam, This office has reviewed the subject revised erosion and sedimentation control plan and hereby issues this Letter of Approval with Modification. The modification is attached. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at QNorth� Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources EAsheville Regional Office 12090 U.S. Highway 70 j Swannanoa, North Carolina 28778 NCftTFE CAAdJNR � oeoadmant of Emlronmenul M14 828.296.4500 Letter of Approval with Modification Whitnel Pentecostal Holiness Church of Lenoir ATTN: Mr. Keith Gilliam November 19, 2020 Page 2 of 3 deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 1SA NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, l Mic ael Smith Assi ant Regional Engineer Division of Energy, Mineral, and Land Resources Letter of Approval with Modification Whitnel Pentecostal Holiness Church of Lenoir ATTN: Mr. Keith Gilliam November 19, 2020 Page 3 of 3 Enclosures: Modifications ec: Mr. Todd Poteet, P.E. tpoteet@west-consultants.com cc: Regional Office file MODIFICATION REQUIRED FOR APPROVAL Project Name: Worship Center & Children's Building Living Hope Church ProjectID: CALDW-2021-001 Ccunty: Caldwell For final plan approval, on or before Tuesday, December 4, 2020, please provide to this office the requested documents listed below. 1. Because this measure has been removed from the plans, please review or revise the reference title " CONSTRUCTION SEQUENCE FOR TSB#3" near the top of the sheet on plan sheet C6 (Phase 2 Grading and Erosion Control Plan). Please provide to this office a copy of the plan sheet. {G.S. 113A-57 (3)1. Ref: GS.113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities