Loading...
HomeMy WebLinkAboutNCC200192_NOT Closeout Documents_20210113Town of c�etcd 1887 o0 uthern ines North Carolina The Mid South Resort Internationaliv Recognized for Program Excellence Marcel Goneau PO Box 4839 Pinehurst, NC 28374 Public Works Department 140 Memorial Park Court • Southern Pines, NC 28387 January 11, 2021 RE: Soil Erosion and Sediment Control Plan Certificate of Compliance TSPE #R5 Cottage — 360 NE Service Rd. To whom it may concern: A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project has been conducted. All requirements of the plan have been met and properly completed. You are reminded of the requirement to maintain any permanent structures of this plan. Receipt of this letter is notification that the erosion control project plan is completed and is being removed from our active file. Any further development will require the submittal of a new plan for review and approval. If I can be of further assistance, please contact me at 910-692-1983. Sincerely, James Michel, PE Town Engineer cc: Eddie Garner, Chief Building Inspector Phone:910-692-1983 Fax:910-692-1085