HomeMy WebLinkAboutNCC200192_NOT Closeout Documents_20210113Town of c�etcd 1887
o0
uthern ines
North Carolina
The Mid South Resort
Internationaliv Recognized for Program Excellence
Marcel Goneau
PO Box 4839
Pinehurst, NC 28374
Public Works Department
140 Memorial Park Court • Southern Pines, NC 28387
January 11, 2021
RE: Soil Erosion and Sediment Control Plan Certificate of Compliance
TSPE #R5 Cottage — 360 NE Service Rd.
To whom it may concern:
A final inspection of the Soil Erosion and Sediment Control Plan for the above referenced project
has been conducted. All requirements of the plan have been met and properly completed.
You are reminded of the requirement to maintain any permanent structures of this plan.
Receipt of this letter is notification that the erosion control project plan is completed and is
being removed from our active file. Any further development will require the submittal of a new
plan for review and approval.
If I can be of further assistance, please contact me at 910-692-1983.
Sincerely,
James Michel, PE
Town Engineer
cc: Eddie Garner, Chief Building Inspector
Phone:910-692-1983 Fax:910-692-1085