HomeMy WebLinkAbout540049_Plan of Action_20210104PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERM- NC
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID) : Martha Smith Date:
State University
A&T State University
COOPERATIVE
EXTENSION
Empowering People • Providing Solutions
1/4/2021
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker
b. Designed 25 yr/24 hr. storm & structural freeboard
c. Line b - line a (inches in red zone)
d. Top of dike surface area according to design
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft3)
17
19
2
62500
77916.7
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural de
g. Volume of waste produced according to design
h. Actual waste produced=
(current herd #/certified herd #) x line g
current herd: 1928 certified herd
2240
180
302400
260280
i. Volume of wash water according to structural design
j. Excess rainfall over evaporation according to design
k. (line h + line i + line j) x 7.48 x (30 days/line f) =
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated
M M/ D D/YYYY
m. (lines e + k)/1000 x (line I) =
11/28/2020
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
0
15120
343332
1.39
585.535647
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
Ib/1000 gal
lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT
1. structure ID: line m=
2. structure ID: line m=
3. structure ID: line m=
4. structure ID: line m=
5. structure ID: line m=
6. structure ID: line m=
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
585.535647
585.535647
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII
o. tract # p. field # q, crop r, acres s. PAN balance t, total PAN u. application
(lb/acre) column r x s window
2580
1
overseed
4
50
200
MAR-SEPT
2580
2
overseed
8
50
400
MAR-SEPT
2580
3
overseed
9.9
50
495
MAR-SEPT
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
1095
585.535647
1095
-509.46435
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility
provide information regarding the herd population and lagoon freeboard levels at the receiving
facility.
NARRATIVE:
Irrigation equipment is under repair. Irrigation will resume as soon as equipment is fixed and
fields are dry enough.
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed:
1/4/2021
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
-Y
DD.