Loading...
HomeMy WebLinkAbout20021055 Ver 1_General Correspondence_20020806 ` Ailichael Easle ?jGovemor: ; William G.,,Ross Jr.; 'Secretary NorthCarolina Department of Environment and'Naturai Resources Alan W. Klimek, P.E. Director Division of Water Quality Mr. Tommie Little P.O. Box 979 Greenville, NC 27835 August 6, 2002 SUBJECT: Approval of 401 Water Quality and Additional Conditions Echo Farms Subdivision Lots # 124,189 and 190 DWQ Project # 021055 New Hanover County Dear Mr. Little: You have our approval, in accordance with the attached conditions (WQC # 3362) to do the following activity with the Echo Farms Subdivision at lots # 124, 189 and 190 in Wilmington in New Hanover County. This approval allows you to: 1). Fill approximately 0.20 acres of jurisdictional wetlands for building pads on lots # 124, 189 and 190; 2). Cut a 20-foot wide corridor. at the common property boundary between lots #189 and 190 to access the uplands at the back portion of those properties. The access shall be a pile-supported structure that will not have associated wetland fill. This approval is only valid for the purpose and design that you described in your Pre-Construction Notification (PCN) application dated May 21 2002 and the additional information dated August 1, 2002 received by the Division of Water Quality (DWQ). After reviewing your application, we have determined that General Water Quality Certification Number 3362 covers this activity. This Certification can also be found on line at: hl!p://h2o.enr.state.nc.us/newetlands/certs.html. This Certification allows you to use your 404 Permit when the Corps of Engineers issues it. Please keep in mind that there may be additional Federal, State or Local regulations applicable to your project, such as (but not limited to) Sediment and Erasion Control, Non-Discharge and Water Supply Watershed regulations and Coastal Stormwater. In addifio>a, this approval will ex*e when the accompanying 404 Permit expires unless otherwise specified in the General Certification. Please be aware that if you change or modify your project, you must notify the Division (DWQ) in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner- must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional conditions listed below. 1). The fill must be stabilized by the use of slopes and vegetation, bulkheads or some such mechanism so as not to impact additional wetlands outside the permitted footprint; 2). All lots must be buildable without additional wetland impacts; A RA DEW Ex127 Cardinal Drive L, Wilmington, NC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer nnrffe Little august 6, 2002 3). Any remaining wetlands and waters on the property need to be placed in a deed notification or similar mechanism to notify the state in order to assure compliance for future wetlands and/or waters impacts. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 permit (whichever is later). A sample deed notification can be downloaded from the 401[Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands. Please provide this Office a copy of the recorded plat; 4). The attached Certificate of Completion (COC) must be submitted to the Division upon final construction of the site. Please notify this Office at the number listed in the footer on the previous page if any problem arises during the construction of the project that may affect water quality. Please read the attached conditions. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This. letter completes the review of the DWQ Permit # 021055. If you have any questions, please telephone Joanne Stcenhuds or Rick Shiver at 910-395-3900. Sincerely, Alan W. Klimek, P.E. Director, Division of Water Quality Attachments: GC # 3362 Certificate of Completion cc: Corps of Engineers Wilmington Field Office - Angie Pennock Wr-RO- Joarme Steenhuis Stroud Engineering, Wihrrington - Jimmy Fentress 401/Wetland Unit, Central Office - Cyndi Karoly -' ' Central Files> c'Y?: , ci7 T?v, O d c?CZ:.Y ? .j •.3'