Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG551126_Modification_20201119
A/C(6-54,7/Z iW /4 P.O.Box 129 \li e� ( 501' arcade Pointe Lane Morrisville,NC 27560 P. Suite 103 `♦�t� Raleigh,NC 27513 919-467-1239 Fax 919-319-6510 MACCONNELL &ASSOCIATES,P.C. November 16, 2020 Mr. John Hennessy Laserche Supervisor NC DEQ - Division of Water Resources Compliance and Expedited Permitting Unit-NPDES 1617 Mail Service Center Raleigh,North Carolina 27699-1617 RECEIVED Re: Steven and Lisa Feierstein(Buildsense) NOV 19 2020 Oak Pointe Lot 49, Deerfield Lane Discharge Modification with E-Z treatment system NCDEQIDWRINPDES Project No: A84601.00 Dear Mr. Hennessy: Please find submittal of Discharge Modification with E-Z treatment system application for Oak Pointe Lot 49, Deerfield Lane, Raliegh,North Carolina. This project is for the modification of an existing discharge system. Please find enclosed one original and two copies of the Notice of Intent and Authorization to Construct application package for the above referenced project. With this letter, we are requesting coverage under NCG550000 and authorization to construct for the house located at Oak Pointe Lot 49, Deerfield Lane, Raliegh,North Carolina The following is included for your review: • One original letter requesting coverage under NCG550000 and Authorization to Construct(This letter) • One original copy of the Notice of Intent Application • Existing permit letter from North Carolina Division of Environmental Quality (NCDEQ) • A check for$60.00 to NCDEQ—Division of Water Quality • One set of plans, calculations, specifications and operation and maintenance plan of proposed treatment system • One electronic copy of the entire submittal as requested We feel that this submittal is sufficient for you to complete your review. If you have any questions or require additional information, please contact me or David Barcal at (919) 467- 1239. Thank you for your assistance. Sincerely, Gary S. MacConnell, PE President cc: Matthew Szymanski—Architect, Steven Feierstein—Owner Lisa Feierstein—Owner Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Person County, North Carolina RECEIVED NOV 19 2020 Application Package NCDEQ/DWRINPDES Project No.: A84601.00 Date: November 16, 2020 SEAL <; ./ 17069 1.i��y'��G1NE�•' • ,�'"4•.M a cGO0 /00.0ZI/ 1191!!!11 Prepared By: MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 P.O. Box 129 Cary, NC 27513 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Table of Contents • NPDES Application for Coverage (Notice of Intent) and Supporting Documents • Existing Permit • Project Narrative • Project Specifications • Calculations • Equipment • Operation and Maintenance Plan Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System NPDES Application for Coverage (Notice of Intent) And Supporting Documents • • SEAL • 17069 r ��'Q••F▪ iL v� P.�<N/A• 4acGO ,,,‘"\\* /OCZo MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: 919 319-6510 National Pollutant Discharge Elimination System FOR AGENCY USE ONLY (NPDES) Division of Water Resources Date Received Application for SURFACE DISCHARGE Year Month Day Environmental Certificate of Coverage (COC)Under Quality General Permit NCG550000 Certificate of Coverage(COC) For Single-Family Residences and Similar Discharges N C G 5 5 100%-domestic wastewater-<1,000 gallons per day Check# Amount Assigned to: The Division of Water Resources will not accept an application package unless all instructions are followed. Failure to submit all required items may result in the application being returned. For more information, visit the Water Quality Permitting Section's NPDES Permitting Unit website. (Press TAB to navigate form) 1. Regional Office Contact: Please contact your DWR Regional Office before submitting this application. If you have not met with your appropriate DWR Regional Office Representative,the application will be returned. Please list the DWR Regional Office representative(s)with whom you have discussed this project: Name(s): Denard Derek Date: 11/16/2020 2. Owner's Contact Information: Applicant Type: ® Individual n Corporation n Partnership Owner Name and Title: Steven and Lisa Feierstein Street Address: 204 Crawley P1 City: Raleigh State: NC Zip: 27615 - Telephone#(H): Telephone#(W):Click here to enter text. Cell/Mobile#: Click here to enter text. Email: steve@activehealthcare.com 3. Location of Facility Producing the Discharge: Please list the address of the facility. If facility is not yet constructed,give street address or lot number. Street Address: Oak Pointe Lot 49,Deerfield Lane City: Semora State: NC Zip: 27343 - County: Person Telephone#: Cell/Mobile#: Click here to enter text. Website: 4. Site-Location Narrative: Please describe how to get to the facility from the nearest town,major highway or identifiable roadway intersection(use street names, state road numbers,and/or distances and directions). From Roxboro,take Chub Lake Rd north to Country Club Lane.Take a left onto Edwin Robertson Road.Take a Right on to McGhees Mill Rd. Left onto Oak Pointe Dr. Left on to North Page 1 of 6 Revised:A. Orlando NPDES 21Sept201 7 Application for Certificate of Coverage (COC) and/or Authorization to Construct(ATC) under General-Permit NCG550000 Plantation Road.Left onto Deerfield Lane.Property is located at the end of Deerfield Lane on the Left 5. Describe the nature of the project. ["New"means has not yet been physically constructed, "existing" means system already physically exists.Please see 15A NCAC 02H .0103(11) for further clarification]. ® Installation of a New Wastewater Treatment System(If yes, skip to Number 9.) ❑ Expansion of an Existing Wastewater Treatment System (for example,adding bedrooms) (If yes, skip to Number 9.) ❑ Replacement of an Existing Wastewater Treatment System(If yes, go to Number 6.) 6. Describe the Existing Wastewater Treatment System: ❑ Conventional Septic Tank/Leach-field—Discharge to Sub-Surface Soils. If previously permitted, please attach a copy of the permit, or enter the permit number If you are not aware of an existing permit,check here. ❑ ❑ Sand filter—Discharge to Surface Waters [or other,as defined 15A NCAC 02H.0103(11)1 If previously permitted, please attach a copy of the permit, or enter the permit number NCG551126_,If you are not aware of an existing permit,check here. ❑ ❑ Filter Media System(Pod System)—Discharge to Surface Waters [or other, as defined 15A NCAC 02H.0103(11)]. If previously permitted, please attach a copy of the permit or the permit number. If you are not aware of an existing permit,check here. ❑ ❑ Other ❑ Check here if submitting proposal for a new system or if no treatment system exists. 7. Check all EXISTING wastewater treatment components: ❑ Septic tank ❑ Dosing tank ❑ UV disinfection ❑ Primary sand filter ❑ Secondary sand filter ❑ Recirculating sand filter(s) ❑ Chlorination ❑ Dechlorination ❑ Other components: ❑ Self-Contained POD system [describe] ❑ Leach Field ❑ Post Aeration (sped type) 8. Provide Details of Single-Family Residence(SFR)or Similar Facility: a) Type of facility: ®Residential ❑ Commercial ❑Other: b) Amount of wastewater discharged: - Residential:Number of bedrooms Click here to enter text. x 120 gallons per bedroom=Click here to enter text. gallons per day(flow) Page 2 of 6 Revised:A. Orlando NPDES 21Sept201 7 Application for Certificate of Coverage(COC) and/or Authorization to Construct(ATC) under General-Permit NCG550000 - Commercial: How many employees?(25 gpd/person) c) Is your existing treatment system failing? Yes ❑ No ❑ d) Has the Health Department formally condemned your existing system "unsuitable for repair?" Yes 0 No ❑ If yes,please name the Health Department[local,county,or state],and provide the site- inspection date [attach Health Department's judgement letter,if available]: Click here to enter text. Click here to enter a date. If previously permitted [state],provide permit number and date issued [attach copy, if available]: Click here to enter text. 9. Check all PROPOSED new system components ® Septic tank ❑ Dosing tank ® UV disinfection ❑Primary sand filter n Secondary sand filter 0 Recirculating sand filter(s) ❑ Chlorination ❑ Dechlorination ® Other components: Recirculation Tank Z Self-Contained POD system [describe]E-Z Treat Pod Filter System 0 Post Aeration(speck type) 0 Proposed Modifications to Existing Treatment System-Explain in detail the nature of the modification.Attach all site maps,plans and specifications,signed by an NC Certified Engineer. If prepared by others,plans must conform to 15A NCAC 02H .0139. ® Proposed New Treatment System for Surface Discharge(not constructed)-Attach all site maps, plans and specifications,to be signed by an NC Certified Engineer. If prepared by others,plans must conform to 15A NCAC 02H.0139. Expanding Flow?-Do you propose to increase permitted or existing flow? 0 Yes ® No Provide details of the Proposed NEW Discharge [Flow and Source Water]: ❑ Check if same as 6. Existing: Amount of wastewater currently discharged: Number of bedrooms 4 x 120 gallons per bedroom= 480 gallons per day to be permitted(design flow) Expanding: Amount of wastewater proposed to be discharged:Number of bedrooms Click here to enter text.x 120 gallons per bedroom= gallons per day to be permitted(design flow) 10. Evaluate Alternatives to Discharge to Waters of the State.Please address the feasibility of discharge alternatives as instructed in the NCDEQ Engineering Alternatives Analysis(EAA) Guidance Document found here. (Note:Evaluation for endangered species is not required) Page 3 of 6 Revised:A. Orlando NPDES 21Sept2017 Application for Certificate of Coverage (COC) and/or Authorization to Construct(ATC) under General-Permit NCG550000 a) Connection to an Existing Wastewater Treatment System-Provide the distance to the nearest connection,such as a regional or municipal sewer system,and the estimated cost per foot to connect including fees. 60,000 feet at$65 per foot. b) Land Application—Assess the land application disposal alternatives such as spray irrigation,drip irrigation,individual/community onsite subsurface systems,and/or innovative ground-absorption. Questions to consider: (1) Are on-site soils suitable for land application? Yes ❑ No (2) Is there sufficient area on-site? Yes ® No ❑ c) Wastewater Reuse—Evaluate reusing all or a portion of the wastewater generated, such as for golf course irrigation,crop irrigation(e.g.,hardwood or pine plantation,grasses),athletic field irrigation, landscape uses,and/or commercial/industrial uses. d) On-Site Soil Evaluation—Submit an evaluation of the soils on-site, documented by a certified report from a NC Professional Soil Scientist,or by your local or county health department report(if available).Attached e) Cost of Alternatives—Provide an estimation of the cost of each discharge alternative or combination of alternatives. Attached 11. Provide Regional Information: Please provide the following information. If you need assistance in obtaining this information,please contact your local DEO regional office. a) Stream Classification-Verify the stream classification for the nearest downgradient named waterbody. The NC Surface Water Classification map can be found by clicking here. Stream Classification: WS-V,B b) Is it a High-Quality Water?If so,check if it is by definition or by designation?In order to check this,ask the Planning Unit. Not High-Quality Water. c) Map-Provide a map locating the nearest downstream waters-of-the-State(i.e.where the effluent reaches an unnamed tributary,creek,stream,river,or lake via any surface-water conveyance). Existing permitted discharge to remain. d) Site Evaluation-Contact DEQ's local Regional Office for a site evaluation to confirm the proposed discharge flow path to the nearest waters-of-the-State.The wastewater/stream confluence and stream class must be verified in the field by DEQ's Regional Staff. Please list the Regional Office staff member you contacted for the inspection. Click here to enter text. e) Flow Path-Display graphically the flow path of the discharge to the nearest surface Waters of the State. Document any potential hydrologic trespass or right-of-way infringement on any neighboring property(i.e.note all properties encountered prior to reaching waters-of-the-State). Existing permitted discharge to remain. Page 4 of 6 Revised:A. Orlando NPDES 21Sept2017 Application for Certificate of Coverage (COC) and/or Authorization to Construct (ATC) g ( ) under General-Permit NCG550000 f) 7Q10/3002 Estimate-Contact USGS J. Curtis Weaver(919-571-4043)to provide the estimated 7Q10 and 30Q2 stream-flow estimates for the first downstream point-of-contact with waters-of- the-State. 11. Certificates of Coverage/Notices of Intent to Discharge/Authorizations to Construct-Check ALL of the following information has been provided. Incomplete Applications will be returned. ® An original letter[two(2)copies]requesting coverage under NCG550000. ® This application [two(2)copies].Your signature on this application,certifies that you are legally responsible for the proposed treatment system(see page 6 of 6)for the COC/NOI/ATC. ® A check or money order for$60.00 permit fee made payable to NCDEQ. 12. Additional Application Requirements a) Narrative Description of the treatment system.This narrative should present treatment components in order of flow—influent to outfall,including anti-erosion structures and sample-port location(s). b) Final Plans and Specifications for a wastewater treatment system shall be signed by a North Carolina-registered Professional Engineer,or if prepared by others,must conform to 15A NCAC 02H.0139. All documents are to be stamped"Final Design-Not Released for Construction." Submittal shall include a site map showing the proposed outfall and the effluent proposed path to surface waters-of-the-State.(see Item 1 for location verification by DWR Regional Office staff) c) Submittals by a Consulting Engineer or Engineering Firm shall include: 1. A copy of your written authorization to represent,signed by the legal permit Applicant; and 2. Upon completion of proposed work,a signed copy of DWRs Engineer's Certification form attesting that the project was completed in accord with the DWR approved COC/ATC,as issued. ******************************************************************************* CERTIFICATION I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true,complete,and accurate. Printed Name of Person Signing: Gary S.MacConnell Title: President,Mac onnell&Ass•ciates,P`t N C A R /A (Please review 1 i2H .0 J. e f. .-fink�g@�',a ife�d it g officials) SEAL October 30,2020 (Signature t) 17069 J (Date Signed) 7�y'�NG I NE; 411 NOTE: Treatment System Maintenance is Requite• d n I.pSh`receiving a Certificate of Coverage/Authorization to Construct(COC/ATC),the Division recommends that the Permittee solicit manufacturer-certified training,or solicit a qualified contractor or service to regularly inspect and Page 5 of 6 Revised:A. Orlando NPDES 21Sept2017 Application for Certificate of Coverage(COC) and/or Authorization to Construct(ATC) under General-Permit NCGS50000 maintain this treatment system.The Permittee is responsible under this COC/ATC to maintain all components of the approved treatment system,designed to meet Surface Water Quality Standards. Compliance duties include: • paying your annual fee [due on the anniversary of COC/ATC effective date], • following the manufacturer's guidelines, • conducting and documenting inspections, in compliance with General Permit NCG550000, • establishing sources for OEM spare parts and supplies, • taking discharge samples for analysis,and logging the results, • making necessary repairs,documenting said maintenance in logs,and • keeping logs onsite for the life of the permit,available for DWR inspection. North Carolina General Statute& 143-215.6B provides that: Any person who knowingly makes any false statement representation,or certification in any application,record, report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article,shall be guilty of a Class 2 misdemeanor which may include a fme not to exceed ten thousand dollars($10,000). 18 U.S.C. Section 1001 provides a punishment by a fme or imprisonment not more than 5 years,or both,for a similar offense. Application must be accompanied by a check or money order for$60.00 made payable to: NCDEQ . . . . . Mail this application and one copy of the entire package (with check) to: NCDEQ/DWR/NPDES Attention: John Hennessy, Supervisor Compliance and Expedited Permitting Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Attn: John Hennessy Note: Submission of this document insures DWR's consideration, but does not guarantee issuance of a Certificate of Coverage/Authorization to Construct. Page 6 of 6 Revised:A. Orlando NPDES 21Sept2017 P.O.Box 129 1111/141r1501 Cascade Pointe Lane Momsville,NC 27560 Suite 103 `_�. Raleigh,NC 27513 919-467-1239 ��� Fax 919-319-6510 MACCONNELL & ASSOCIATES,P.C. October 28, 2020 I(Steven and Lisa Feierstein give MacConnell &Associates authorization to represent myself for application for SURFACE DISCHARGE General Permit NCG550000 for the property located at Oak Pointe Lot 49 Deerfield Lane, Semora,NC 27613. SXeSigned lV/ lVV/ VVV Date 10/28/2020 (Steven and Lisa Feierstein) Il � 12 C3 0 • Y. r" ------•/ i ' "'r' 11 1 I Y........,.. Cs,,,,,, _._ - 4.9.......„../1..".222•;',,, 1 1 22 ,27 ,3.7 6........ 2.22.- 1 i • I ,6002.333 118,811.0108 . ,,,A 1 ;11 1 a F..i'ili?..k.11'31.1.11E44225:-.T AL.- OAK POINTE (‘<, - 28 ,,1 1 it ' r...-,=,, co ..... ::::::•=:::::::::.',1 -, / „•':%.,.,I..02 A. t ___ ...•-•.---- a-‘ „..... VICINITY MAP / , 29 I ..„- \ ' -- Cunningham Tap, Person Co.. N.Caroline ••s, "''''''''''•••".„. ..4y`r7 •.°0'.-,,..3,.•, 17.a..e..,.m..g.-,0 e,.9340 0.i. fi-v.- -----.....,,„... ...... -.". .4.044.4.4444 .. 4151 1986Sc a a A. 4 2.0Ac. -A2s-s-10 °c Hamlett RLS 2465 i 3 0°.414 A. OS. Ze,''• a .„.042 • 09 ; .'./,. .3 2 0 33 xig r24a letr.4 V.. 2.0355 A I'6'IS0A'c ___„....---••-li\14 I1t\c„e-.-1•- ..t..--D...------- ......-- ---------- ..--• 1 *I *Go-- I, PS 10° - \ . \\ 1- a , A. . 4.•......, 1 i .....-.26-1.1 , CV 33 .86r , 37 sif \../' .;',, ...„„, /0 34 ;V '0 e, , 1.59 A. .•am xVC.0 ,I.NE / 4 5' ..... -----\\„...•,.. 2.22 A. Pi• 3 7 • N.a. '4. • ,i.a. 4, . I \ . . - ' .,....„..., 1 ia. 41111 . . , . etes?` i e 40 2.20 Ac. L.N 1 45 1 '139 a. 0.92 Ac.,, 1.74 Ac. 68'I • • '• , 3 I 2.46 At. us}ra.:1 eyhm,a yur ...)474 42 ' IJI_R_IVATE ROAO L...."----. \ //' 12 ! .. 06.6.="6•••••!Ala 4 2sx 6$ 4,' 44 44 66 I . 4.610 00.60 . L44 Ac. .. 21 sta.... :4.844- ,/ • .aa • cc ...621 9 1 RIVER END LANE 46 CONTOUR DATA , 1.05 Ac. ...,. C3---- 7- -----21--2/•';:•:;';-:"‘.44-1-: 'N: /;.$'.'-•.-'• , 7.-' \, 42 / ..........„ ,/... ' 132.1 I L24 A e, L97 Ac.47 Ie ,,,,e ,,,,,,‘ 33,33.3, LIKE 52011.24 016736C2 I i 1 A k .... ... " z t-.5-32-..-. 145.96• . 4'3...„.9-9-,.._...3"' :I..; 472," I IN.Z.26 3 6-76-35-111-6 77.79' " 4-.'-"..-...-.. '"•3'.. , I • 3 3-36-.46. 313.90• . .'33'33.3'. .•33. 43 i i ,, 1 :, ,L0744,... ` , ,,,,......„, m.,.• AS 6-10-33494 35.73. . 7 2-61-50-00-2 171.10• 2' 3424242. ''''.2. c. ...‘ 66 f ! 48 , „_,,„_„_. „.„. 51 3-30-394. 37.90• 2 I 9 2-36-35-644 411.67. " 2-3243-22-2 22.22. A S 2. 0.90 Ac. \Am. sa ',...P.:',i1...5..,.• e..,y. 33 3-35-05-194 66.93, NYCO ,...13, I y, g.gg.ga.ey_g ,,,, 3.1 6-064001-3 31.33. 3,3•33. 53 144-30-014 13.05. 67 • 13 6-74-06-144 13.2.89. 39 24343-2,2 107.3. IA 2-37-39-51-2 ma. 2-2243-32-2 222-22. \ / 63 1.22 Ac. .. i AA..,CC1^y P.-"Cs•.rce 33 3-3,3,33, .3.33. 38 3-N-04-354 12,.... .„33. 5. 9-31-511.54.4/ 108.35' \ 68 17 2-734.64 106.03. . 2-2.23-2"2 22'2' i 7, 41112 0.92 Ae. 92.51' \ / 52 33 349.471-53-2 94.91. 22 .22-.42' 22'2k' ...... 2\ 990. 33 640-19-3114 136.53.' . 242-22-2k-2 k".". \ rk 63 2 0.99 A. _Sse.a-C.,a4.1.C=Z,..228.8 33 5-37-3.14 107.93. 22 2-2".".-2 2k.22' ROAD DATA 70.30. ; TS n.,",-..,..,21re.,............. 25 1211-10-384 53.A. 22 24'-'2-32-2 22.22' • / 2 ‘7/.* .92.0 WM AC..91i-.CA/CA.1NA,PERSC. 110.19' / 70' iri 't il.•.. 12XX 01126 116.15186 1316121 LAG COO ‘77 / ., 132/631.L9292 6086 as .._33,3.,... 33„„. 71 2-37-33-074 93.75' • 22 115•16- 192.05' 75.71• 3-13-35-36-1 75.2.3• • 4 \ I" ....,,,,,, 33,, 73 2-69-31464 104.40' 5 11 War 513.3.3• 103.0. 94,30-364 103.37. 50 ,.. •caa C.61/../7.7 30 243-13-034 85.W " 2-.-22-"-2 "k'2' C 13 03•047 313.33' 316.78. 248-0.. 116.53. NYCO LANE , 51 N., N..... ... 7. 549-5.34 75.3•• 31 2-79-10-364 106.37' 2 10"'sr 513.33• 17.24• 2-46-59-48-11 97.79• .s.„ v... 38'58' 513.32' 123.29' 8-59-17,8-8 122.60• ' 71 , 0.97 A. 0.90 Ac. 33 2-66-16-5. 143.W . "k". P Al 31•69. 193.03. 143.91. 133.43, 3, .....33_33„, 33,3. 77 6-19-33-37-6 100.17' 4 46 3.3. 377.33' 31,93. 9-66-10-30-3 316.61. 76 . 8.8131 35 2-39-93-37-2 63.91. " 2-22-23-222 ".". 2 12 30.50- 377.6,.79 38-6.74.7'4 .0.•.71, J 2563 11.55. 690.6229' 3057033...6059 35--213,-4151--3061--68 30301..0105•. 3. 3_33_33_33, 3,,,,, 81 943-4345-2 A21' 8 06 33.397 309.33. 33.71. 2-33-36-524 31.69k 39 24,57-37-2 63.10' kk' 2.2"-2"22-2 "•". L 37 6.07 309.73. 149.63' 11-13-38-06-5 121.33. / k \ "6 224.6.9'.....9.... V.,8.1.XXX98,611 K..4''''.2M-- 40 246-3,33-2 LiT X• .,‘,.3. .'''-"-.-3 "... X 162 45.49. 319.68. 429.82' 3-69-12.14-1 374.86• i . at 343-0.14 137.43. 2-22-22-"-2 22.". k \ -,,.4,7,4302,1•-•- •45 4, ,4,,,,......... ...... . la 1.3.43-334 71.16. • "k2 322." av .-as-sa-ri-al loa.00.. 1 • Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Existing Permit • _ SEAL 1. 17069 i, 'fit/ ltv- MacGO „;° /7/4/200o 'ittlll1‘0‘‘ MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 oFWATF9 Michael F.Easley Governor jr William G.Ross Jr.,Secretary 0 Department of Environment and Natural Resources Kerr T.Stevens,Director Division of Water Quality July 20, 2001 Mr. Steve Feierstein 204 Crawley Place Raleigh, NC 27615 Subject: General Permit NCG550000 Cert. of Coverage NCG551126 Authorization to Construct Steve Feierstein Residence Person County Dear Mr. Feierstein: In accordance with your application for an NPDES discharge permit received March 8, 2001 by the Division, we have issued the Certificate of Coverage under the state-NPDES general permit for Steve Feierstein. Authorization is hereby granted by this letter for the construction of a 480 GPD wastewater treatment system consisting of a 1250 gallon septic tank,2,400 gal (min) pump chamber, distribution box with adjustable caps, two 210 square foot (6'X 35') primary sandfilters in parallel, with a loading rate of not more than 1.15 GPD/square foot for each filter, 210 square foot(6'X 35') secondary sandfilter with a loading rate of not more than 2.30 GPD/square foot,chlorinator, chlorine contact tank and rip rap aeration with a discharge of treated wastewater into Hyco Lake classified B waters in the Roanoke River Basin. All elbow piping must be of the long sweeping type. All cleanouts are to be housed in meter boxes below the surface. This system must be at least 10 feet from the dwelling and property lines and at least 100 feet from water supply wells on and off the site. The system must also be constructed and located above a 100 year flood. The trench must be lined with a minimum 30 mil polyethylene. If any parts, measurement frequencies or sampling requirements contained in this general permit are unacceptable to you, you have the right to submit an individual permit application and letter requesting coverage under an individual permit. Unless such demand is made,this decision shall be final and binding. Please take notice this permit is not transferable, Part II, E.4. addresses the requirements to be followed in case of change of ownership or control of this discharge. The Authorization to Construct is issued in accordance with Part III, Paragraph 2 of NPDES Permit No. NCG550000, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCG550000. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Raleigh Regional Office,telephone number 919/571-4700, shall be notified at least forty-eight(48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received certifying that the permitted facility has been installed in accordance with the NPDES Permit, the Certificate of Coverage, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Stormwater and General Permits Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. TA R ENR Customer Service Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 (919)733-7015 1 800 623-7748 w6f " r Michael F.Easley Governor William G.Ross Jr.,Secretary O Department of Environment and Natural Resources Kerr T.Stevens,Director Division of Water Quality A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The sand media of the sandfilters must comply with the Division's sand specifications. The engineer's certification will be evidence that this certification has been met. A leakage test shall be performed on the septic tank and dosing tank to insure that any exfiltration occurs at a rate which does not exceed twenty(20) gallons per twenty-four(24) hour per 1,000 gallons of tank capacity. The engineer's certification will serve as proof of compliance with this condition. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be required by the Division of Water Quality or permits required by the Division of Land Resources,the Coastal Area Management Act or any Federal or Local other governmental permit that may be required. If you have any questions or need additional information, please contact Mack Wiggins, telephone number 919/733-5083. Sincerely, MAIL err T. Stevens. cc: Central Files Raleigh Regional Office,Water Quality Roosevelt Childress, EPA Point Source Compliance Enforcement Unit Person County Health Department rtrR Customer Service Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 (919)733-7015 1 800 623-7748 we "PtfeMichael F.Easley Governor 7 William G.Ross Jr.,Secretary Department of Environment and Natural Resources Kerr T.Stevens,Director Division of Water Quality Engineer's Certification , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe(periodically, weekly,full time)the construction of the project, , for the Project Name Location Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. Date Fa Customer Service Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 (919)733-7015 1 800 623-7748 _ STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY CERTIFICATE OF COVERAGE GENERAL PERMIT NO.NCG551126 TO DISCHARGE DOMESTIC WASTEWATERS FROM SINGLE FAMILY RESIDENCES AND OTHER DISCHARGES WITH SIMILAR CHARACTERISTICS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act,as amended, Steve Feierstein is hereby authorized to operate and construct a wastewater treatment facility that consists of a septic tank, pump chamber, distribution box, dual primary sandfilters, secondary sandfilter, chlorinator, chlorine contact tank, rip rap aeration and associated appurtenances with the discharge of treated wastewater from a facility located at the Steve Feierstein Residence Oak Pointe Subdivision,Lot#49 northwest of Roxboro Person County to receiving waters designated as Hyco Lake in the Roanoke River Basin in accordance with the effluent limitations,monitoring requirements, and other conditions set forth in Parts I II III and IV hereof. ' This certificate of coverage shall become effective July 20,2001 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 20,2001 .j."AaCICLIA160411; Kerr T.Stevens,Director Division of Water Quality By Authority of the Environmental Management Commission I — - Duane K.Stewart do Associates Date:February 15,2000 %%%},nCA�I ,�`o�N Rpt,�'', Sand Filter Discharge %%GA • For the Single Family Residence of: Steve Felerstein _ AL •; / Oak Pointe Lot 49 025449 r. Hyco Lake f Q. Person County ,9 FNGIN •� i(/ SEPTIC TANK tt,►ttHo%%% PROPOSED # OF BEDROOMS = 4 4 BEDROOMS * 120 GALLONS/DAY/BEBROOM = 480 GALLONS/DAY 480 GALLONS* 2 DAYS STORAGE = 960 GALLONS OF STORAGE STANDARD SIZES OF SEPTIC TANKS; 900 GALLONS (2 BEDROOM) 1000 GALLONS(3 BEDROOM) 1200 GALLONS (4 BEDROOM) USE A 1200 GALLON SEPTIC TANK OR EQUAL PRIMARY FILTER BEDS SUBSURFACE FILTER TRENCH OR BED (PRIMARY) = 1.15 GPD/SF 480 GALLONS/DAY FROM DWELLING/ 1.15 GPD/SF = 417.4 SF REQ. 2 BEDS x 6 FILTER BED WIDTH x 34.78 LENGTH 417.4 SF REQ. 2 BEDS x 6 FILTER BED WIDTH x 35 LENGTH 420.0 SF PROV. SECONDARY FILTER BED SUBSURFACE FILTER TRENCH OR BED(SECONDARY) = ,'23 GPD/SF 480 GALLONS/DAY FROM DWELLING/ 2.30 GPD/SF = 208.7 SF REQ. I BED x 6 FILTER BED WIDTH x 34.78 LENGTH 208.7 SF REQ. 1 BED x 6:FILTER BED WIDTH x 35 LENGTH 210.0 SF PROV. 2X . ; col �-4 m 7mn i 4:_ , wt)ttunirrrrrri amissisom Pump Size Calculation ,.% Q.��$ 4'*3!'1�� QQO _�/4 Job Description: Oak Pointe,Lot 49,Hyco Lake,Person Co.,N — �E A - Contact: Steve Feicrstein — - B F.Staley,P.E. - 025449 ; Prepared b5" D� Y S Date: • 3t2 l tp/ 4 Eeror ) iN p $.1 0) Minimum pump capacity 25.00 gpm hirlN.*d /0#ihi. tan 71'47 C, 2 i/o fesVil y P) *fir pipe size 2 inch Q) Pressure loss in 100 ft.of pipe 0.36 psi R) Friction head in 100 ft.of pipe 0.83 ft. S) Static head i) Height from pump to tank outlet Z ,ft. ii) Elevation increase or decrease ..Mi,, . ;it. T) Total static head 24.5 ft. U) Friction head i) Equivalent length of fittings 4.'#i ci ft. JY, ii) Distance from pump to field .i,.:; -- ,__•-•;ft. iii)Total equivalent length of pipe 260 ft. iv)Total effective feet 2.16216 ft. v) Head required Merpoo 4 ft. ''; t.::�: vi) Headloss through filter or Headwork 0 ft e:: ,. „psi vii Head loss through zone valves 0 ft- psi V) Total friction Head 6.16216 W) Total dynamic head 30.66216 ft. X) Minimum pump capacity 25.00 gpm Y) Choose the pump MW SERIES (MWHO) SINGLE SEAL SEWAGE PUMPS SPECIFICATIONS SEWAGE PUMPS - Pump(s) shall be F. E. Myers MW series sewage pumps selected in accordance with the following design criteria: Number of Pumps: Primary Design Flow: 26'-30 gprh Primary Design Head: 31 ft, Minimum Shut-off Head: Motor Horsepower: 1/2 Motor Speed: Electrical: S' PUMP-The pump shall be designed to handle raw sewage and be capable of passing 2 inch spherical solids. The pump shall be capable of handling liquids with temperatures to 140°F intermittent and shall be capable of running dry without damage to the seals or bearings. MOTOR -The pump motor shall be of the submersible type rated 1/2, 1, 1-1/2 or 2 hp as required. Motor shall operate at 3450 RPM and shall be for 208 or 230 volts single phase,or 208,230,460,or 575 volts, 3 phase, 60 cycles. Single phase motors shall be of the permanent split capacitor type with no relays or starting switches. Three phase motors shall be squirrel cage induction type. Stator wind- ing shall be of the open type with Class B insulation rated for 130°C maximum operating temperature. The winding housing will be filled with clean dielectric oil to lubricate bearings, seals,and transfer heat from the windings to the outer shell. The motor assembly shall be of the standard frame design and shall be secured in place by four threaded fasteners allowing for easy field servicability. The motor shall be capable of operating over the full range of the performance curve without overload- ing the motor and causing any objectionable noise or vibration. The common motor pump shaft shall be of 416 stainless steel and shall be heat shrunk into the die cast motor rotor. The motor shall have two bearings to support the rotor; an upper ball bearing to accommodate radial loads and a lower ball bearing to take thrust and radial loads. Ball bearings shall be designed for a B-10 life of 50,000 hours. A heat sensor thermostat and overload shall be attached to the top end of the motor windings and shall be wired in series with the windings to stop the motor if the motor winding temperature reaches 266°F. The overload thermostat shall reset automaticallywhen the motor cools to a safe operating tempera- ture. g P ture. Three phase motors shall be protected by 3 leg overload relay in control box. Overload shall be of the quick trip ambient compensated type and shall have manual reset button. POWER CORD -The motor power cord shall be SOW/SOWA. The cable Jacket shall be sealed at the motor entrance by means of a rubber compression washer and compression nut. A heat shrink tube filled with epoxy shall seal the outer cable jacket and the individual leads to prevent water from entering the motor housing. SHAFT SEAL -The motor shall be protected by a rotating mechanical shaft seal. The seal shall have carbon and ceramic seal faces lapped to a tolerance of one light band. Metal parts and springs for seals shall be 300 series stainless steel. I i I I I I 1 I I I l I tg I } ' EXISTING WELL (APPROX. LOCATION) ,kvv ! `, • 4 I P A. 60' ROW �.�.• o� OO I\ LOT 50 itiOAK POINTE C) \ O I ' � SE ANDARY SAND J **ITER I VENTS Lj W (411111111r18\, VENTI CHLORINATOR 440I CONTACT CHAMBER O I . �� CLEANOUT EVERY 75' MIN. IDISTRIBUTION \ I BOX y (2) 6' x 35' ' PRIMARY SAND \ �d-r FILTERS X S6, PIPE SLOPES TO BE--�� 4. 2X MIN. BUT NOT GREATER THAN 5X �� O - 5: 0 Ili (1) 6' x 35' 1- i \, 0Ei.91.217DARY SAND LA :AK •_ I� f VENT In 4" CHLORINATOR O 440 I_- - 4,. CONTACT CHAMBER O �I . CLEANOUT EVERY SDISTRIBUTION I BOX 4, (2) 6' x35' ' PRIMARY SAND FILTERS c - PIPE SLOPES TO BE ' 2X MIN. BUT NOT I GREATER THAN 5X i . ',' LOT 49 y.�;.�� \i'" / OAK POINTE iv.' 4. c..v * \ Y \ • . \ , c'A`9N 6`• . \ • LOT 48 OAK POINTE I.- ____ ...-----"" ,N ..„,,,,,, /, ..x 85 <, ,,,,..,\ ,.., ,,, ,,, • --- c, , -,), , - ,,, .. __ , „ .• . . ... ._ c,c, • - ,-<. , L l ,(7,,,, se) A • �, /�k�x [7` X?• TO V ' . \, I N' \ : \ . LOT 48 OAK POINTE 1 7 r\ G it 0J \," 3L'7 m 6, TJ SITE v PLA\ u_ L.,y, . L. SCALE: 1'-30' c 'm 0rn...1.11.."1 16 30 3 80 Li H i L'1 Lgt1113Z i. , f . 430 N4. �f — y I co 4? 10• SETBACK FROM )•0 A I AQJACpir PROPERTY "Ytti APPROXIMATE 1111 o LOCATION PROP. • - 4 BEDROOM \O 0SE ��� -,,A2 c4,0t4e i I \ ,, \ c:44• S 5.29 ._, .5 6+ 6,4„, 'ti., A 46•2 �!us,' 441. :0.7, \-Th,s, pA�'4, p A'c20A1O - s cq�r ti0 IN3,\,...- - * - • ,-.;!: t•. j41 \ ,� \ \,�.�, • \ \ .0c/s ` - \- - \ \%doF / ` ��, `- ` Q: \ -- / \\\--- rtiA ‘- . ,\,. .,_ • . --- \,, \ '--- -__ -,,N5,„ - - 7 /1 \14 , \,__ 1,:i. .0).-:,...1 \ . / ,/ \\,....\>.! '' .— ,,,,:ektirtre,* , 10,k4....• .1,„%\r, \ N./ /c ,. / . \ :4'17,180::::: / �\ \ \) These drawings are instruments off on service and as such remain the property of the engineer, 1 No copies or reproductions of these drawings ore permitted 1 without consent of the engineer. Upon completion of the work all dr wings(except the contract copies) are to be returned to / the engineer. Copyright © 2001 SITE McGeheee Mill cmaiminimmEn N. HYCO LAKE i-rfj....- - f rci.\(\2 t VICINITY MAP NOT TO SCALE Duane K. Stewart & ASSOCIATES, INC. CONSULTING ENGINEERS TYPICAL)WITH NON-VENTED, THREADED PVC CAP. FLLUSHE SH CAP SHALL BE TIGHTLY SECURED AT AU. TIMES. Civil • Sanitary • Environmental Planning • Design • Survey 1_I11= 11_1 =•1 I I� �!1 I----I 1po, 1 I��1 3715 University Drive --- `a.;•,_` ,,..•f;.... Durham, N.C. 27707 :Y isS: :t:::�: % •. I 1 I-i (919) 490-2999 _ i I I I fax (919) 490-6165 J i I---I I� I l e-mail: infoOdksa-tsi.com 1_-7-1I ---1I1111I- I1I; 1 www.dksa-tsi.com ;1II_ _IIL. III: APPROVE - 1 I�iisI'° talhor,..749 SEAL C Dote , 2 Lit/ .r, T.S. S J / '2 •' caR • ' OR GRATING I 4" DIA. • 2:•.i�o A ' . t Sy�L �_ : 025449 BAFFLE • to: tuTLET Gl•N *441•. REVISIONS i Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Project Narrative • SEAL 17069 ; N 7'Ay••`c GINE�e'����: j Zc Mai GG ,dti� // l/ G MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Project Narrative General The site at Lot 4 Deerfield Lane, Semora, North Carolina consist of a 0.92-acre lot with a proposed 4-bedroom single-family home. The site has previously been permitted for a 480- gallon per day direct discharge waste permit in 2001 by the North Carolina Department of Environmental and Natural Resource (NCDENR). A copy of the original permit from the NCDENR is included with this report. The proposed treatment system includes a new septic tank, combined E-Z Treat recirculation/discharge tank, E-Z Treat treatment unit, ultraviolet disinfection unit, and the necessary appurtenances. The system is designed to treat and discharge 480 gallons per day of domestic wastewater. The design flow of 480 gallons per day is based upon a four-bedroom house(120 gallons per day per bedroom). Septic and Recirculation/Discharge Tanks The proposed wastewater treatment system will provide both anaerobic treatment and solids p p Y removal in a 1,000-gallon septic tank. This tank willprovidegreater than 2 days of detention g p Y providing for adequate anaerobic treatment and solids removal from the wastewater. Septic tank effluent will drain into the recirculation chamber of the E-Z Treat recirculation/discharge tank as wastewater flows into the septic tank. The septic tank will contain a Polylok PL-68, SimTech Brush Filter, or approved equal effluent filter to prevent solids from reaching the recirculation chamber. The E-Z Treat recirculation/discharge tank is a new 1,850-gallon tank which will be provided by David Brantley & Sons or approved equal by engineer. The E-Z Treat recirculation chamber will serve as a holding tank for both the septic tank effluent and E-Z Treat treatment unit effluent. An effluent bypass valve located in the E-Z Treat recirculation chamber will separate the flow once the E-Z Treat treatment unit is dosed. The effluent will be returned to the E-Z Treat recirculation chamber until the bypass valve is closed, the remaining effluent will then flow through the ultraviolet disinfection unit into the discharge chamber. Effluent will be recirculated through the E-Z Treat treatment unit until additional septic tank effluent enters the E-Z Treat recirculation chamber causing the bypass valve to close. Effluent from the ultraviolet disinfection unit will flow by gravity into the discharge chamber. The treated and disinfected effluent will flow by gravity via a new 4" Sch. 40 PVC pipe to Hyco Lake. Steven and Lisa Feierstein(BuildSense) Discharge Modification E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 1 E-Z Treat Treatment Unit The E-Z Treat treatment unit will be used to provide additional treatment to the septic tank effluent as well as remove any suspended solids not removed by the septic tank. The E-Z Treat treatment unit includes housing, piped distribution system, sprinkler heads, and styrene media. The underdrain system will transport the E-Z Treat treatment unit effluent back through an effluent bypass valve into the recirculation chamber or to the ultraviolet disinfection unit. Ultraviolet Disinfection The effluent from the E-Z Treat treatment unit will be disinfected by ultraviolet light prior to being discharged into the stream inside the property line. The ultraviolet disinfection unit shall be by E-Z Set Company(Model UV-102 Dual Lamp) or approved equal by engineer. Steven and Lisa Feierstein(BuildSense) Discharge Modification E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 2 Project Contacts Names, addresses,phone and fax numbers of the homeowners and engineer are as follows: Homeowner: Steven and Lisa Feierstien 204 Crawley P1 Raleigh,North Carolina 27615 Engineer: Mr. Gary S. MacConnell, PE MacConnell & Associates,P.C. 501 Cascade Pointe Lane, Suite 103 Cary,NC 27513 P.O. Box 129 Morrisville,North Carolina 27560 Phone: (919)467-1239 Fax: (919) 319-6510 Steven and Lisa Feierstein(BuildSense) Discharge Modification E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 3 Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Project Specifications SEAL • 17069 i 9•••�FNG I N��Q •� w s maccoo,` 0/e,,oec, MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Project Specifications Excavation and Backfilling 1. Excavated materials acceptable as backfill shall be stockpiled in a location approved by the Owner. The materials shall be located away from the edge of any excavations. Excavated materials shall not be stored within the driplines of existing trees. 2. All open excavations shall be barricaded when construction in the area has stopped. Night barricading should include posted warning lights. 3. Protect existing structures, utilities, sidewalks, pavement, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. Protect root systems from damage or dry-out to the greatest extent possible. 4. Soil materials shall be free of boulders,roots, sod, organic matter, and frozen material. 5. Bedding materials for pre-cast concrete structure installation shall be#57 washed stone to the dimensions and depth shown on the construction drawings. 6. All excavation is unclassified and includes excavation to subgrade elevations indicated on the construction drawings regardless of character of materials and obstruction encountered. In the event that rock is encountered, the Contractor shall remove it at no additional cost to the Owner. 7. Stability of excavations shall be maintained by sloping of the sides and shall comply with local codes, ordinances, and requirements of agencies having jurisdiction. Where space restrictions prevent sloping of the sides, shoring and bracing of the walls shall be employed in full compliance with OSHA requirements. In the case of pipe installations, sheeting shall remain in place until backfilling progresses to a stage where no damage to the pipe will result from removal. 8. The Contractor shall attempt to prevent surface and subsurface water from flowing into excavations. The Contractor shall provide equipment, materials, and work necessary to dewater any accumulation of water in the excavation to prevent softening of the soils, undercutting of footings, and changes to the soils detrimental to the stability of the improvements. 9. Excavations for structures shall conform to dimensions and elevations shown on the construction drawings within a tolerance of plus or minus 0.10 feet and to the standards of ASTM C891-90. 10. Backfill shall be installed to excavated spaces in 8-inch lifts and tamped by hand or pneumatically around pipe or structures. Tamping shall be performed evenly on both sides Steven and Lisa Feierstein Discharge Modification with E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 1 of pipe and around sides of structures to a depth such that damage to the pipe or structures is avoided as a result of subsequent methods of compaction. Extreme care shall be exercised in backfilling operations to avoid displacement of pipe and structures either horizontally or vertically. Backfill consolidation by ponding water is not permitted. Compaction of each layer of backfill and the top 6 inches of subgrade shall achieve a 90 percent maximum dry density as measured by AASHTO method T-99. 11. Remove all waste materials including unacceptable excavated material, trash, and debris and legally dispose of it off Owner's property. Where settling is measurable or observable at excavated areas during project warranty period, the Contractor shall remove surface finish, add backfill material, compact, and replace surface treatment to a quality and appearance matching adjacent areas of previous work. Pre-Cast Septic and Recirculation Tank Installation and Testing 1. Septic tanks shall conform to criteria in 15A NCAC 18A .1952-.1954. The septic and recirculation tanks should be installed on a 12-inch minimum layer of No. 57 washed stone aggregate. 2. Place bell ends of pre-cast sections or the groove end of the concrete facing down. In preparation for making joints, all surfaces of the portion of the section to be jointed and the factory-made jointing materials shall be clean and dry. Each joint, seam, and pipe penetration inside and outside of joints shall receive liberal applications of non-shrink grout as well as liberal amounts of bitumastic waterproof sealant. 3. Lifting holes and other penetrations of the pre-cast structure wall shall be sealed with nonshrinking grout. Pipe connections shall be made so that the pipe does not project beyond the inside wall of the structure. Grout connections as necessary to make smooth and uniform surfaces on the inside of the structure. 4. Before placing any tank into operation, remove any dropped grout, sand or other imperfections and obstructions from the interior of the structure. Specifically, the inside walls of the tank shall be smooth and uniform. Smooth-finish inverts so that wastewater flow is confined and directed through the inlet and outlet pipes with easy transition. 5. Tanks shall be backfilled in accordance with the applicable specifications herein before described. 6. All pipe penetrations shall be through Press-Seal Cast-A-Seal 402 rubber connectors or approved equal. PP q 7. All joints (mid-seam, top-seam) shall be sealed using Concrete Sealants butyl sealant #CS- 102 meeting ASTM C-990. Steven and Lisa Feierstein Discharge Modification with E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 2 8. All service access openings will be a minimum of 24 inches. Exceptions may be made on a case by case basis with E-Z Treat's and Engineer's prior written approval. All access openings shall be fitted with E-Z Set riser assemblies unless otherwise shown. 9. A 24-hour static water test or vacuum test, in accordance with ASTM standards, shall be performed on all precast tanks in order to ensure they are watertight. a. The testing shall be performed in the presence of the engineer or his representative. b. Each tank shall be filled with water and the initial water level shall be measured. c. At the end of the 24-hour period, the level of the water shall be measured again. d. The engineer shall pass the tank if the water level did not drop more than 0.5 inches or if the total volume of the displaced water is less than 1 percent of the total effective liquid capacity of the tank. e. Tanks may also be leak-tested by applying a vacuum of 5-inches of Hg with riser assemblies in place. f. Each failed tank shall be tested again. In the event that the tank does not pass the second test, the Contractor shall remove and replace the tank at no additional cost to the Owner. 10. Septic Tank and E-Z Treat Recirculation/Discharge Tank shall meet the following additional criteria: a. Minimum liquid depth of 36 inches. b. Minimum airspace of 9 inches. c. Length shall be at least twice as long as the width(septic tank only). d. Septic tank shall be constructed with a baffle wall dividing the tank interior 2/3n1 to 1/3'd. The baffle wall shall be constructed to permit passage of effluent through a slot or holes located between 45 and 55 percent of the interior depth. 11. Septic tank shall be fitted with a Polylok PL — 68 effluent filter, SimTech Brush Filter, or Engineer approved effluent filter that extends down to 50 percent of the liquid depth of the tank. Steven and Lisa Feierstein Discharge Modification with E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 3 Piping Installation and Testing 1. Piping shall be PVC and of type and size as shown on the construction drawings. Piping shall be installed with a minimum of three (3) feet of cover unless shown otherwise on the construction drawings. 2. Piping shall be installed to be able to meet a pressure test whereby the pressure remains constant for a minimum of two hours, and the allowable leakage is not more than 10 gpd/inch of pipe diameter/mile. 3. Any line installed under a driveway shall be sleeved in Class 52 Ductile Iron Pipe and extend a minimum of 5 feet on either side and as shown on the construction drawings. 4. Forcemains installed through ephemeral streams shall be sleeved in Class 52 Ductile Iron Pipe as shown on the construction drawings. E-Z Treat Recirculation Pump and Control Panel 1. The E-Z Treat recirculation pump shall be a Sta-Rite (Catalog Number STEP 30) %2 horsepower multi-stage submersible 30 gallons per minute pump for operation on a single phase, 115 Volt service. 2. The control panel shall be an E-Z Treat simplex panel. The panel shall have a recirculation pump load sensor/alarm, on/off timer, high water alarm, dose enable, and low water level/run dry pump protection. 3. The control panel shall be in a NEMA 4X enclosure, installed in accordance with the manufacturer's recommendations, and within 10 feet of the E-Z Treat treatment unit. 4. No splices may be placed in the pump tank or riser. All splices shall be made above ground in a NEMA 4X junction box. 5. Control and alarm circuits shall be on separate circuits. 6. The audible/visual alarms shall be external to any structure. 7. Treatment unit recirculation ratio shall be set between 4.0 and 7.0 times per day. Steven and Lisa Feierstein Discharge Modification with E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 4 E-Z Treat Treatment Unit Installation 1. The E-Z Treat treatment unit shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. Effluent Bypass Valve 1. The effluent bypass valve shall be by E-Z Treat and installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. Ultraviolet Disinfection Unit 1. The ultraviolet disinfection unit shall be installed in accordance with the manufacturer's recommendations and as shown on the contract drawings. The unit shall be by E-Z Treat (Model UV-102 Dual Lamp) or approved equal by engineer. 2. A visual alarm shall be provided that alerts the homeowner when the primary bulb fails. After primary bulb failure, the backup bulb shall be good for 10,000 hours. Control/alarm panel shall be mounted within 6 feet of ultraviolet disinfection unit. 3. Casing shall be filled with water prior to powering up lamps. Steven and Lisa Feierstein Discharge Modification with E-Z Treatment System MacConnell&Associates,P.C.Project No.: A84601.00 5 Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Calculations • SEAL _ 17069 = M a CC°320‘‘‘/0 /2° ° MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 MacConnell&Associates,P.C. Project: Discharge Modification with E-Z treatment system Owner Name: Steven and Lisa Feierstein Project Number: A84160.00 Location: Person County Subject: E-Z Treat Treatment Calculations Date: November 16,2020 Assumptions And Calculations: Note: Input Calculated 1. Treatment flow is based on unadjusted flow. 2. Irrigation flow is based on reduced flow Number of Bedrooms: 4.0 Rooms Given Average Daily Flow per Bedroom: 120 GPD 15A NCAC 18A.1949 Unadjusted Design Flow: 480.0 GPD Flow Reduction: 0 % 15A NCAC 18A.1949 Adjusted Flow: 480.0 GPD Sizing Calculations Per Innovative Approval Table 1-Model 600 and Tank Volumes Minimum Septic Design Daily Tank Volum Minimum Recirculation/Pump Tank Flow(gpd) (gallons) Volume(gallons)** Number of Media Pods <480 1,000 1,250 1 Model 600 pod 4 Bedrooms 1,000 1,800 1 Model 600 pod 5 Bedrooms 1,250 2,000 1 Model 600 pod 6 Bedrooms 1,500 2,200 2 Model 600 pod 601-1,500 V=1.17Q+500 V=1.17Q+500 1 Model 600 pod per 600 gallons 1,501-3,000 V :.75Q+1,125 V :1.75Q+1,125 1 Model 600 pod per 600 gallons **Recirculation/pump tank minimum size based on total internal tank volume. Recirculation/Pump Tank Volume=Recirculation Tank(Chamber)Volume+Pump Tank(Chamber)Volume SEPTIC TANK DESIGN: Minimum Septic Tank Volume Required: 1000.0 Gallons Existing Septic Tank Volume Provided: 1000.0 Gallons E-Z TREAT DESIGN: Pod Dimension-Length 7.3 Feet Given Pod Dimension-Width 4.0 Feet Given Pod Dimension-Height 3.3 Feet Given Pod Surface Area 28.9 ft2 L x W Rated Loading Rate per Pod 700.0 GPD Given E-Z Treat Pods Required: 0.7 ADF/Pod Loading Rate E-Z Treat Pods Used: 1 Pod E-Z Treat Dose per Pod: 34.0 Gallons Given E-Z Treat Volume per Dose 34.0 Dose per Pod x Number of Pods Re-Circulation Timer On: 2.5 Minutes Given Re-Circulation Timer Off: 16.0 Minutes Given E-Z Treat Re-Circulation Cycles per Day: 77.8 Cycles Time per Day/Time per Cycle Total E-Z Treat Flow per Day: 2646.5 Gallons E-Z Treat Volume/Dose x Cycles/Day E-Z Treat Re-Circulation Ratio: 5.5 E-Z Treat Flow per Day/ADF Denitrification Gallons Returned: 778.4 GPD Denitrification Return Setting: 4.0 GPM E-Z Treat Surface Area: 28.9 ft2 E-Z Treat Loading Rate: 16.6 GPD/ft2 ADF/Surface Area E-Z Treat Recirculation Pump Selection Shall Be As Shown On Drawings. Minimum Pump/Re-Circulation Tank Volume Required: 1800.0 Gallons Minimum Recirculation Tank Volume Available: 1800.0 Gallons Recirculation Tank Volume Provided: 1800.0 Gallons Pump/Re-Circulation Tank Volume Provided: 1800.0 Gallons Recirculation Tank storage and effective volume calculations: Recirculation Tank Total Void Volume=L*W*D: Tank length: 9.6 foot Tank Width: 4.9 foot Tank Depth: 5.1 foot Total Void Volume: 1784.1 Gallons Recirculation Tank Effective Volume=L*W*Lowest Invert To Tank Bottom: Tank length: 9.6 foot Tank Width: 4.9 foot Lowest Invert To Tank Bottom: 4.3 foot Effective Volume: 1520.9 Gallons Recirculation Tank Effective Volume to Pump Off=L*W*Lowest Invert To Pump-Off Elevation: Tank length: 9.6 foot Tank Width: 4.9 foot Lowest Invert To Pump-Off: 2.8 foot Effective Volume: 994.4 Gallons Recirculation tank is an all-time-filled storage/pump tank. Total System Effective Storage= 2494.8 Gallons MacConnell&Associates,P.C. Project: Discharge Modification with E-Z treatment system Owner Name: Steven and Lisa Feierstein Project Number: A84160.00 Location: Person County Subject: E-Z Treat Treatment Calculations Date: November 16,2020 Assumptions And Calculations: Notes: Input Calculated Influent Characteristics: BOD(5-Day): 300 mg/I From EPA Design Manual TSS: 300 mg/I From EPA Design Manual NH3: 25 mg/1 N-Organic: 34 mg/1 TKN: 59 mg/1 N-Organic+NH3 NO3+NO2: 1 mg/I TN: 60 mg/I TKN+NO3+NO: Total Coliforms: 75,000,000 Number From NSF 350 Approval Effluent Limits: Carbonaceous Biochemical Oxygen Demand(CBOD): <10 Proposed Effluent Limit per 15A NCAC 18A.1970 Total Suspended Solids(TSS): <10 mg/I Proposed Effluent Limit per 15A NCAC 18A.1970 Ammonia Nitrogen-NH4-N <10 mg/1 Proposed Effluent Limit per 15A NCAC 18A.1970 Total Nitrogen(TN) <20 mg/I Proposed Effluent Limit per 15A NCAC 18A.1970 Fecal Coliform: <1000/100 ml Proposed Effluent Limit Geometric Mean per 15A NCAC 18A..1970 Septic Tank: DISI¢n: BOD Removal: 60.0 Percent Given TSS Removal: 70.0 Percent Given Nib Removal: 0.0 Percent Given N-Organic Removal: 35.0 Percent N-Organic Converted to NH3: 50.0 Percent NO3+NO2 Denitrified: 90.0 Percent Total Coliforms Removal: 50.0 Percent Septic Tank Effluent Concentrations: BOD(5-Day): 120.0 mg/1 Concentration-Percent Removed TSS: 90.0 mg/1 Concentration-Percent Removed NH3: 42.0 mg/I Concentration-Percent Removed+N-Organic Converted to Nib N-Organic: 17.0 mg/I Concentration-Percent Removed-N-Organic Converted to NH3 TKN: 59.0 mg/I N-Organic+NH3 NO3+NO2: 1.0 mg/1 Nh+NO2 Effluent+Return from Recirc Tank-Denitrified TN: 60.0 mg/I TKN+NO3+NO: E.Coliforms: 37,500,000.0/100 ml Concentration-Percent Removed Media Filters(E-Z Treat Pod): BOD Removal: 95.0 Percent Given TSS Removal: 95.0 Percent Given NH3 Removal(to Air): 2.0 Percent Given NH3 Nitrified to NO3+NO2: 95.0 Percent Given N-Organic Converted to NH3: 95.0 Percent NO3+NO2 to Septic for Denitrification: 90.0 Percent E.Coliforms Removal: 50.0 Percent E-Z Treat/Re-Circ.Tank Effluent Concentrations: BOD(5-Day): 6.00 mg/1 Concentration-Percent Removed TSS: 4.50 mg/1 Concentration-Percent Removed NH3: 2.87 mg/1 Concentration-Percent Removed+(S.T.Conc.+(N-Organic to NH3)Nitrified) N-Organic: 0.85 mg/I Concentration-N-Organic Converted to NH3 TKN: 3.72 mg/I N-Organic+NH3 NO3+NO2: 2.05 mg/1 NO3+NO2 S.T.Effluent+Nitrified NH3-Return to Septic Tank TN: 5.76 mg/I TKN+NO3+NO2 Total Coliforms 18,750,000.0/100 ml Concentration-Percent Removed Ultraviolet Disinfection: UV Dosing Rate: 25.0 gpm Flow Rate Number of Units: I Units Pump Flow/Dosing Rate BOD Removal: 0.00 Percent Given TSS Removal: 0.00 Percent Given NH3 Removal: 0.00 Percent Given N-Organic Removal: 0.00 Percent Given NO3+NO2 Removal: 0.00 Percent Total Coliforms Removal: 99.999000000 Percent Ultraviolet Disinfection Effluent Concentrations: BOD(5-Day): 6.00 mg/1 Concentration-Percent Removed CBOD: <6.00 mg/I CBOD<BODs as CBOD only measures oxidation of carbons. TSS: 4.50 mg/I Concentration-Percent Removed NH3: 2.87 mg/I Concentration-Percent Removed+(S.T.Conc.+(N-Organic to NH3)Nitrified) N-Organic: 0.85 mg/1 Concentration-N-Organic Converted to Nth TKN: 3.72 mg/1 N-Organic+NH3 NO3+NO2: 2.05 mg/1 NO3+NO2 S.T.Effluent+Nitrified NH3-Return to Septic Tank TN: 5.76 mg/I TKN+NO3+NO2 Total Coliforms: 187.50/100 ml Concentration-Percent Removed Fecal Coliforms: <187.50/100 ml Fecal Coliforms<Total Coliforms<200 colonies/100m1=Okay Steven and Lisa Feierstein (BuildSense) Oak Pointe Lot 49, Deerfield Lane Discharge Modification E-Z Treat Treatment System Equipment wit,, SEAL Pr• t -_ 0 17069 • /NE 2.•' ti /14;. C. ON CNN /// zcz ` MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH INNOVATIVE WASTEWATER SYSTEM APPROVAL INNOVATIVE WASTEWATER SYSTEM NO: IWWS 2015-03-R2 Issued To: E-Z Treat Company PO Box 176 Haymarket,VA 20168 703-408-2911;Fax: 703-753-5043 Contact: Carl Perry,President Michael Stidham,Vice President For: E-Z Treat Model 600 Pretreatment Systems Approval Datc: April 24,2015 June 15,2015 Tank Size and Sampling Revisions January 6,2017 Addition of Single Bulb UV Unit In accordance with General Statute 130A-343, 15A NCAC 18A.1969 and.1970,a proposal by E-Z Treat Company for an approval of subsurface wastewater systems utilizing the E-Z Treat Pretreatment systems has been reviewed,and found to meet the standards of an innovative system when all of the following conditions are met: I. General A. Scope of this Innovative Approval 1. Design,installation,use,and operation and maintenance guidelines for E-Z Treat Pretreatment systems to meet TS-I and TS-II effluent standards pursuant to Rule 15A NCAC 18A.1970. Refer to Rule.1970(a)Table VIII—Effluent Quality Standards for Advanced Pretreatment Systems for treatment performance levels. 2. Operation,maintenance and monitoring requirements for E-Z Treat Pretreatment systems and associated subsurface systems to ensure the treatment performance standards are met. B. This Innovative System Approval is applicable to domestic strength sewage systems (non-industrial wastewater)utilizing E-Z Treat Pretreatment Systems that have a design flow not exceeding 3,000 gallons per day(gpd). Use of E-Z Treat Pretreatment systems for facilities with an influent waste strength that exceeds domestic septic tank quality effluent standards pursuant to Rule 15A NCAC 18A.1970(b)may be proposed by E-Z Treat Company and a North Carolina Professional Engineer to the Department for review and approval on a case-by-case basis,prior to permitting by the local health department(LHD).The system design must include the proposed raw wastewater strength (BOD5,COD,TN,TSS,fats,oils and grease,etc.),the expected organic loading rate(in pounds IW W S-2015-03-R2 January 6,2017 Page 2 of 10 of BOD),and hydraulic loading rate on the pretreatment system,and the calculations,references, and any other needed information to support the proposed design. C. Any site utilizing these systems shall have wastewater with sufficient alkalinity to facilitate biological treatment processes. The influent shall not have a pH or toxins that significantly inhibit microbial growth. D. Use of E-Z Treat Pretreatment systems that have a design flow exceeding 3,000 gallons per day may be permitted after approval by the Department on a case-by-case basis in accordance with the Large Systems State Review/Approval Process(Rule 15A NCAC 18A.1938). II. System Description The E-Z Treat Pretreatment system consists of the following components: a Department approved septic tank; a recirculation tank (or chamber); single or multiple E-Z Treat Pretreatment pods; and a final dosing tank (or chamber). Additional treatment may be used to ensure that treatment performance standards shall be met. The E-Z Treat Pretreatment system can utilize either a two tank configuration or a three tank configuration. The two tank configuration has the following components: the first tank is a septic tank and the second separate tank has a recirculation chamber and final dosing chamber. The three tank configuration consists of three separate tanks: a septic tank, a recirculation tank, and a final dosing tank. III. Siting Criteria The E-Z Treat Pretreatment systems and associated dramfields shall be sited and sized in accordance with Rule .1970 for TS-I and TS-II systems. Drip irrigation systems used with E-Z Treat Pretreatment systems shall be sited and sized in accordance with the manufacturer specific drip approval. The E-Z Treat Pretreatment systems and associated drainfields shall meet all applicable horizontal setback requirements and be located to prevent surface/subsurface water inflow/infiltration. IV. System Sizing The system sizing criteria shall be based upon the long term acceptance rate specified in the appropriate portion of the rules or the Innovative and Experimental system approval for the type of ground absorption system to be used. V Special Site Evaluation A special site evaluation may be required based on the proposed ground absorption system. Refer to manufacturer specific drip approvals and Rule .1970(p). VI. Design Criteria A. The E-Z Treat Pretreatment system shall be designed in accordance with the following criteria. 1. All tanks, septic, recirculation, and dosing, must be approved by the Department and E-Z Treat Company specifically for use with the E-Z Treat Pretreatment system. 2. The E-Z Treat Pretreatment system can utilize either a two tank configuration or a three tank configuration. The two tank configuration has the following components: the first tank is a I W W S-2015-03-R2 January 6,2017 Page 3 of 10 septic tank and the second separate tank has a recirculation chamber and final dosing chamber. The three tank configuration consists of three separate tanks: a septic tank, a recirculation tank,and a final dosing tank. 3. The E-Z Treat Pretreatment system consists of a septic tank, a recirculation tank/chamber, a final dosing tank/chamber,and E-Z Treat media pod(s)as specified in Table l below. Table 1 —Model 600 and Tank Volumes Design Daily Minimum Minimum Number of Media Flow Septic Tank Recirculation/Pump Pods (gpd) Volume Tank Volume (gallons) (gallons)** <480 1,000 1,250 1 Model 600 pod 4 Bedrooms 1,000 1,800 1 Model 600 pod 5 Bedrooms 1,250 2,000 1 Model 600 pod 6 Bedrooms 1,500 2,200 2 Model 600 pods 601 —1,500 V= 1.17Q*+ V= 1.17Q+500 1 Model 600 pod per 500 600 gallons 1,501 —3,000 V=0.75Q+ V=0.75Q+ 1,125 1 Model 600 pod per 1,125 600 gallons *Q—design daily flow **Recirculation/pump tank minimum size based on total internal tank volume. 4. Septic tanks will have an inlet sanitary tee and a Department approved, appropriately sized effluent filter on the outlet end approved by the E-Z Treat Company for use with the E-Z Treat. 5. The minimum required volume in the recirculation chamber/tank prior to discharge to the dosing tank/chamber shall be the design daily flow. 6. The recirculation tank/chamber will contain the recirculating splitter valve or an external splitter box may be used. The recirculation tank/chamber shall have an inlet sanitary tee. The sanitary tee shall he visible and reachable from the riser opening to serve as the influent sampling point. 7. When the recirculation tank and dosing tank are combined,the baffle wall between chambers shall extend to the top of the tank and shall be constructed so that the liquid levels in either compartment are independent. Liquids will not by-pass between compartments except as designated by the system's treatment flow path. 8. The final dosing tank must meet the minimum size requirements of Rule .1952(e)(1). For drip irrigation systems,the requirements of the manufacturer specific drip approval for dosing tanks shall also be met. 9. A drainback configuration without a pump check valve is required for the force main supplying the media pod. 10. Recirculation pump shall be either Sta-Rite Model number STEP 20 or manufacturer approved equal. 11. The E-Z Treat media pod is constructed of a polymer suitable for use in contact with wastewater. The Model 600 pod is approximately 7 ft 4 inches x 4 ft with a surface area approximately of 30 square feet and is 42 inches in depth. The pod is fitted with a weatherproof cover properly secured. The pod is designed and constructed to create channels down the sidewalls to facilitate air flow. The sidewall channels provide airspace to the bottom of the pod. The bottom of the vessel is designed to provide total drainage of the treated effluent back to the recirculation tank/chamber. IW W S-2015-03-R2 January 6,2017 Page 4 of 10 12. As the effluent enters the recirculation tank/chamber, this tank/chamber acts to further separate the septic tank effluent. The effluent entering the recirculation tank/chamber is charged by the recirculation pump to the media pod(s). The effluent is sprayed over the media mattress(es) using a spray manifold of evenly spaced wide-angle spray nozzles. The nozzles are manufactured with a free passage of 0.0625 inches in diameter. The system is set to recirculate effluent through the media pod on an average of 4 to 6 times prior to discharge. 13. The effluent is sprayed on mattress(es) measuring a total area of 30 square feet. The mattress(es) are fabricated from a non-biodegradable, chemically resistant, loose weave polypropylene material. The openings in the weave allows for effluent and air flow while containing the media. The media inside the mattress(es) are made of a styrene material. The specific gravity of this material meets the following criteria: light enough to prevent compaction which results in a loss of effective surface area, and provides a reduction in channeling across the media(short-circuiting). 14. Effluent passes through the media and enters a schedule 40 pipe located at the bottom of the pod. The effluent than gravity feeds back to the recirculation tank/chamber and the process is repeated. 15. The effluent bypass valve or splitter box is piped to intercept filtered wastewater and deliver it to the recirculation tank/chamber or the dosing tank/chamber,based on liquid volumes. 16. The Control Panel for the E-Z Treat System will consist of: recirculation pump on/off timer, discharge pump alarm,and high/low water alarm. Control panels shall meet the requirements of.1952 and shall be approved in writing by E-Z Treat Company for use in their systems. 17. Separate control and alarm circuits will be provided. The E-Z Treat systems will utilize a device for the recording of measurements of daily water flows. The device shall provide a means for determining at least the daily, 7-day,and 30-day flow monitoring requirements of Rule .1970. This information will be stored in the data logger for drip irrigation systems (provided by the manufacturer of the drip irrigation control panel).For pressure manifold and LPP systems,the Aquaworx control panel or manufacturer approved equal shall be used. The operator in responsible charge (ORC) of the system authorized in writing by E-Z Treat Company must be able to access the panel directly on site and shall be available to the LHD with 24-hour notice in the event a direct connection is necessary. 18. The UV disinfection system shall be rated for the appropriate discharge rate from the E-Z Treat pod. The UV disinfection system will be one of the following: a. E-Z Set UV-1000S(single bulb); b. E-Z Set UV-1000(dual alternating bulbs);or c. Other UV systems specifically approved by the Department and E-Z Treat Company. 19. All access riser hatches shall be secured by approved tamper-resistant hardware approved by the manufacturer or by other means approved by the manufacturer as equal. Riser construction, attachment to tanks and security systems shall be pre-approved by the Department and E-Z Treat Company in accordance with the E-Z Treat specific approvals for the septic tanks and pump tanks,as applicable. 20. Buoyancy calculations shall be completed by a NC Professional Engineer if any parts of the tanks, pods, or other system components are installed in a seasonal high water table. Additional ballast may be required. 21. Influent samples shall be taken from the inlet sanitary tee into the recirculation tank. Effluent samples shall be taken from the final pump doing tank or a spigot or sampling port that is placed on the force main from the final dosing tank. B. E-Z Treat Pretreatment systems shall be designed by a designer authorized in writing by E-Z Treat Company or a NC Professional Engineer. Systems over 1,000 gallons per day shall be designed by a NC Professional Engineer. IW W S-2015-03-R2 January 6,2017 Page 5 of 10 VII. Installation and Testing A. A preconstruction conference shall be required to be attended by the designer authorized in writing by E-Z Treat Company,engineer(if applicable),installer authorized in writing by E-Z Treat Company,and LHD prior to beginning construction of the E-Z Treat Pretreatment system. B. All E-Z Treat Pretreatment systems shall be installed according to directions provided by E-Z Treat Company. Additionally,all E-Z Treat Pretreatment systems and components used with,but not manufactured by E-Z Treat Company shall be installed in accordance with all applicable regulations and manufacturer instructions. C. All individuals/companies installing E-Z Treat Pretreatment systems shall be in possession of all necessary permits and licenses before attempting any portion of a new or repair installation. The company/individual must be a Level IV installer and authorized in writing by E-Z Treat Company. D. Watertightness of the tanks shall be tested by either of the following protocols: 24-hour hydrostatic test or a vacuum test. 1. Hydrostatic Test''2 a. Temporarily seal the inlet and outlet pipes. b. Fill tank with clean water to a point at least two inches above the pipe connections or the seam between the tank and the riser,whichever is highest. c. Measure the water level. d. Allow the tank to sit for 24 hours. e. Re-measure the water level. f. If the water level change is''-inch or less or one percent of the liquid tank capacity,the tank passes the leak test. g. if the water level change is greater than %-inch,any visible leaks can be repaired and the tank may be topped off with water and allowed to sit for a minimum of one hour. h. The tank passes the leak test if there are no visible leaks(flowing water or dripping in a steady stream)and no measureable drop in water level after one hour. Otherwise,the tank fails the leak test. 2. Vacuum Tests a. Temporarily seal the inlet and outlet pipes. b. A vacuum of four(4)inches of mercury should be pulled on the tank and held for five(5) minutes. c. During the testing,the tank manufacturer or their representative can seal the tank if it is found to be leaking. d. If the tank is repaired,the vacuum must be brought back up to four inches and held for five minutes. E. The distribution of flow to the E-Z Treat Pretreatment system and to the septic tank shall be measured during start-up and set to be in accordance with the system design with start-up settings recorded. Victor D'Amato and Ishwar Devkota,Development of Prefabricated Septic and Pump Tank Construction and Installation Standards for North Carolina. National Precast Concrete Association,Best Practices Manual Precast Concrete On-Site Wastewater Tanks,Second Edition,October 2005,24. National Precast Concrete Association,Best Practices Manual Precast Concrete On-Site Wastewater Tanks,Second Edition,October 2005,24. IWWS-2015-03-R2 January 6,2017 Page 6 of 10 F. Specified site preparation steps and construction specifications for the ground absorption system shall be strictly adhered to,including specified depth of trenches in relation to site limiting conditions,cover material specifications(if needed),trench installation method,etc. G. The installer authorized in writing by E-Z Treat Company,the engineer or designer authorized in writing by E-Z Treat Company,and the ORC authorized in writing by E-Z Treat Company shall conduct an inspection/start-up of the E-Z Treat Pretreatment system and all associated system components. The LHD personnel will attend and observe the inspection/start-up. During the inspection/start-up to include: 1. System watertightness testing. 2. Control panel operation and alarm settings. 3. Pump model numbers and time clock settings. 4. Pressure head on the E-Z Treat pod wastewater distribution system. 5. Return flow to the septic tank set per design and recorded,when applicable. 6. Riser hatches have tamperproof bolts,and/or riser lock ring. VIII. Operation,Maintenance,Monitoring,and Reporting A. E-Z Treat Pretreatment systems shall be classified,at a minimum,as a Type Va system in accordance with Table V(a)of Rule.1961(b). Management and inspection shall be in accordance with Rules.1961 and.1970. B. All E-Z Treat Pretreatment systems require an operation and maintenance agreement between the system owner and E-Z Treat Company, Inc., its authorized representative, or with an operator authorized in writing by E-Z Treat Company as per Rule .1970. The system shall be inspected according to Rule .1961 by a certified subsurface operator authorized in writing by E-Z Treat Company according. The ORC shall be either an employee of E-Z Treat Company or authorized in writing by E-Z Treat Company to operate and maintain the system.The operator authorized in writing by E-Z Treat Company must have proper equipment and training to access and program the control panels on site. C. All E-Z Treat Pretreatment systems shall be operated and maintained according to the latest version of E-Z Treat Company's O&M manual. D. At each E-Z Treat Pretreatment system inspection the ORC authorized in writing by E-Z Treat Company shall,at a minimum,observe,monitor,and record the following: I. Wastewater level in all the tanks. 2. Sludge,scum,and grease levels in all the tanks. 3. Clogging of effluent filter. 4. Watertightness of tanks,risers,and pipe penetrations at the tanks. 5. Operation of pumps,floats,valves,electrical controls,and alarms. 6. Drainfield pump delivery rate(drawdown test),determination of the average pump run time, and drainfield dosing volume. 7. Any structural damage, accessibility issues, adequate ventilation, excess odors, ponding of effluent,insect infestations,vegetative growth over the drainfield,or surfacing of effluent on the drainfield area. 8. Sample of E-Z Treat Pretreatment system effluent collected from the sampling point to check for effluent clarity and odor and a sample of influent,as required. IWWS-2015-03-R2 January 6,2017 Page 7 of 10 9. Readings from pump cycle counters and run time meters and any water meter readings, as applicable. 10. Current operational set up for TS-II nitrogen removal enhancement(percent returned to septic tank),and recommendation for modifications(if needed). 11. System operating conditions, from the review stored data for indication of 7-day and 30-day flows and flow variances or other abnormal conditions. E. The ORC authorized in writing by E-Z Treat Company shall also conduct other additional observations,measurements,monitoring,and maintenances activities as specified in the Operation Permit and as recommended by the manufacturer. F. Sampling and Testing 1. All sampling shall be done in accordance with Rule .1970(n)(3) and (5). E-Z Treat systems shall be sampled annually (semi-annually for systems with a design flow of 1,501 to 3,000 gpd). 2. TS-II systems influent shall be analyzed for TKN. 3. Effluent for all systems shall be tested for effluent CBOD5 and NH4-N. Systems specified to meet the TS-II standard shall also have the effluent analyzed for TN (TKN and NO3-N). Systems designed to meet the TS-If standard with design flows of 1,501 gpd to 3,000 gpd shall have the effluent analyzed for fecal coliforms. 4. Additional sampling of effluent or influent may be determined to be necessary by the ORC authorized in writing by E-Z Treat Company during a system inspection to assist with troubleshooting or to verify system performance. 5. Effluent samples shall be taken from the final dosing tank/chamber or a sampling port located downstream from the final treatment process. 6. Influent samples shall be taken from a sampling port located between the septic tank and recirculation tank/chamber. 7. Adjustments in the monitoring schedule and number of parameters sampled may be proposed by E-Z Treat Company and approved by the Department pursuant to Rule .1970(nX3)(B) or (C). G. Notification and Performance of Maintenance and Repairs 1. The ORC authorized in writing by E-Z Treat Company shall alert E-Z Treat Company, the LHD, and the system owner within 48 hours of needed maintenance or repair activities including but not limited to landscaping, tank sealing, tank pumping, pipe or control system repairs,media replacement,and/or adjustments to any other system component. 2. System troubleshooting and needed maintenance shall be provided to maintain the pump delivery rate and average pump run time within 25% of initial measurements conducted during system startup. The ORC authorized in writing by E-Z Treat Company shall notify the system owner, E-Z, Treat Company, and the i,HI) whenever the pump delivery rate efficiency or average pump ran times are not within 25% of initial measurements conducted prior to system start-up. 3. The septic tank will be pumped as needed upon recommendation of the ORC authorized in writing by E-Z Treat Company and in accordance with the E-Z Treat Pretreatment system operation and maintenance instructions. However, at a minimum, the septic tank will be pumped whenever the solids level exceeds 25% of the tank's total liquid working capacity or the scum layer is more than four inches thick. 4. The tanks shall be pumped by a properly permitted septage management firm,and the septage handled in accordance with 15A NCAC 13B .0800. 5. The ORC authorized in writing by E-Z Treat Company shall notify the LHD, E-Z Treat IWWS-2015-03-R2 January 6,2017 Page 8 of 10 Company, and the system owner in writing whenever repairs are indicated. All maintenance activities shall be recorded in the ORC reports provided to the system owner,LHD, and E-Z. Treat Company. H. Reporting 1. The ORC authorized in writing by E-Z Treat Company shall provide a completed written report to the system owner, E-Z Treat Company, and the LHD within 30 days of each inspection.At a minimum this report shall specify. a. The date and time of inspection, b. System operating conditions according to Section VII.D,VII.E,and VII.F. c. Results from any laboratory analysis of any influent and effluent samples, d. Maintenance activities performed since the last inspection report, e. An assessment of overall system performance, f. A list of any improvements or maintenance needed, g. A determination of whether the system is malfunctioning,and the specific nature of the malfunction, h. Any changes made in system settings,based on recommendations of the manufacturer, and i. A summary report of data retrieved from the control panel verifying actual daily,7-day, and 30-day flows,flow variances,and other operating conditions. IX. Responsibilities and Permitting Procedures A. Prior to the installation of an E-Z Treat Pretreatment system at a site,the owner or owner's agent shall file an application at the LHD for the proposed use of this system.After the LHD conducts a soil and site evaluation,the LHD may issue an Improvement Permit or Authorization to Construct or amend a previously issued Authorization to Construct allowing for the use of a E-Z Treat Pretreatment system. B. The Improvement Permit and Authorization to Construct shall contain all conditions the site approval is based upon, including the proposed used of the Innovative system. The Operation Permit will include all conditions specified in the Improvement Permit and the Authorization to Construct. C. When a special site evaluation is required pursuant to Rule .1970(p)(1) or a drip approval, as applicable, an evaluation and written, sealed report from a Licensed Soil Scientist regarding the site shall be provided to the LHD. The report shall contain the information as specified in Rule .1970(p)(2) and"Requirements for Submittals of Soil Reports and Pretreatment and/or Dispersal System Designs". The LHD may request the assistance of their Regional Soil Scientist in evaluating this report prior to permit issuance. D. The E-Z Treat Pretreatment system shall be designed by one of the following: a designer authorized in writing by E-Z Treat Company or a North Carolina Professional Engineer. Systems over 1,000 gallons per day,or as otherwise required for drip irrigation systems,shall be designed by a North Carolina Professional Engineer. E. Prior to issuance of an Authorization to Construct for an E-Z Treat Pretreatment system,a design submittal prepared by a designer authorized in writing by E-Z Treat Company or a North Carolina Professional Engineer shall be submitted for review and approval by the LHD. The IW W S-2015-03-R2 January 6,2017 Page 9 of 10 design submittal shall include the information required in "Requirements for Submittals of Soil Reports and Pretreatment and/or Dispersal System Designs". F. It is recommended that local authorized environmental health practitioners attend a design training session offered by the manufacturer/authorized representative prior to permitting the system. Also,at the request of the LHD,a Regional Engineer will review the design. G. The designer authorized in writing by E-Z Treat Company shall certify in writing that the E-Z Treat Pretreatment system was installed in accordance with the approved design prior to Operation Permit issuance. H. A North Carolina Professional Engineer shall certifyin writingthat a system designed byan gi 8n engineer was installed in accordance with the approved plans and specifications prior to Operation Permit issuance. I. For sites required to be evaluated by a Licensed Soil Scientist or Professional Geologist (see Section V and IX.C), the health department may specify as a condition on the Improvement Permit and Authorization to Construct that a Licensed Soil Scientist or Professional Geologist oversee critical phases of the drainfield installation and certify in writingthat the installation was in accordance with their specified site/installation requirements prior to the Operation Permit issuance. J. The ORC authorized in writing by E-Z Treat Company shall be present during the final inspection of the system prior to the issuance of the operation permit. The ORC shall be certified as a NC Subsurface Operator and authorized in writing by E-Z Treat Company. K. The LHD issues the Operation Permit after the following: 1. Field verification of installation completion; 2. Receipt of written documentation from the designer authorized in writing by E-Z Treat Company or the engineer,as applicable,that the system has been designed,installed,and is operating in accordance with the approved plans;and 3. All necessary legal documents have been completed,including the contract between the system owner and the ORC authorized in writing by E-Z Treat Company. K. On an annual basis,E-Z Treat Company shall provide a report to the On-Site Water Protection Branch including the number and location of new system installations during the previous year, and effluent data and operator reports for each operational E-Z Treat Pretreatment system installed in North Carolina under this Innovative Approval. Effluent data should be compiled and submitted electronically. If available,a web-based system for data posting of laboratory results should be utilized. These reports shall provide information to the Department based upon the monitoring data and observations made from the Innovative systems installed pursuant to this Approval. This should include an assessment of system performance in relation to the established treatment performance standards;an assessment of physical and chemical properties of the materials used to construct the system,in tenns of strength,durability,and chemical resistance to loads and conditions experienced,recommended areas of applicability for the system;and any conditions and limitations related to the use of the system. The report shall also include an updated list of authorized designers,installers,and ORCs. X. Repair of Systems IWWS-2015-03-R2 January 6,2017 Page 10 of 10 The provisions of 15A NCAC 18A.1961(1)shall govern the use of the E-Z Treat Pretreatment System for repairs to existing malfunctioning wastewater systems. Approved By: Date: NSFInternational789 N.Dixboro Road Arn Arbor, MI 48105 USA RECOGNIZES E-Z Treat Haymarket, VA AS COMPLYING WITH NSF/ANSI 40, 245, 350 AND ALL APPLICABLE REQUIREMENTS. PRODUCTS APPEARING IN THE NSF OFFICIAL LISTING ARE AUTHORIZED TO BEAR THE NSF MARK. NsF �tiflrS � .. "a°" " .31Cii ,,a,tian Pnert Cendflww H +rotte Ar n Ac cmdned Dy the American NatlonN At:er°di4d lay the S1,nderde Manlier &evderd,Connell of(.limn This certificate is the property of T:SF tnteraational and must be returned Upon request This certificate remains valid as long as this client has products in Listtg for the referenced standards.For the most earn;nt and complete Listing informetion,please access NSF's webeite (www.nafo=g). sCY December 18,201 S —2 ZSI-e/1 Certificate#C01 73848-02 Lori Bestetvelt Executive Vice President&CTO • NSFNSF International OFFICIAL LISTING NSF International Certifies that the products appearing on this Listing contorn to the requirements of NSF/ANSI Standard 245 - Wastewater Treatment Systems - Nitrogen Reduction This is the Official Listing recorded on December 18, 2015. B-Z Txsat Y.O. Box 176 Haymarket, VA 20618 703-753-477D Facility: Rocky oat, NC Rated Capacity Model Nuabar aallone/Day 1f600 600 #1200 1200 Note: Additions shall not be made to this document without prior evaluation and acceptance by NSF International. 1 of 1 C0173848 789 N.Dixboro Road,An,Arbor.Michigan 4105.9723 USA 1-SOU-NSF-M ARK/734-769.8010 wwecnsf org NSF International OFFICIAL LISTING ASP International Certifies that the products appearing on thin Listing conform to the requirements of NSF/ANSI Standard 350 - Onsite Residential and Commercial Water Reuse Treatment System This is the Official Listing recorded on December 1S, 2015. k-Z Treat P.O. Box 176 Haymarket, VA 20616 7D3-753-4770 Facility: Rocky Mount, NC Rated Capacity Model Number Gallons/Day Classitication Type $600 60D Class R Wastewater f1200 1200 Class R Wastewater NOTE: Class R Single family residential dwellings Note: Additions shall not be made to this document without prior evaluation and acceptance by NSF International. 1 of 1 C0173848 789 N.Dixbam RaJ.Ann Arbor.Michinan 46105-9123 USA 1-800-TES F-MARK/734-7b9-6010 wwwnsf.org 11:.1 `, CAST-A-SEAL® 402/402F PRODUCT 1. / SPECIFICATION and SELECTION Submittal Specification A flexible pipe-to-structure connector shall be employed in Ile torquesetthg wrench avalsbie from the connector manufacturer. connection of the sanitary sewer pipe to precast structures.The connector Selection of the proper size connector for the structure and pipe shall be CAST-ASLEALe 4021402E as manufactured by Press-Seel requirement end installation thereof,shall be in strict conformance with the Corporation,Fort Wayne,Indiana,or approved equal.The connector shay recommendations of the connector manufacturer.Any dead end pipe stubs be the sol6 element rated on to assure a led*,watertight seal of kw pipe Inslafred in connectors she/be restrained from movement per ASTM C 923. to the precast structure.The oo'tnedor shall consist of a rubber gasket and The finished connection shall provide sealing to 13 psi(n11ni- an external take-up damp. mum)and shall accommodate deflection of the pipe to 7 degrees(mini- The rubber gasket element shaft be constructed solety of eyn- mum)without loss of seal. Meths or naturei rubber,end shell meet or exceed the physical property Vacuum testing shall be conducted in strict conformance with requirements of ASTM G 923. ASTM C 1244 prior to backlit. Other testing shall be conducted in strict The external take-up damp shelf be constructed of Series 303 conformance with the requirements of the connector ma-ufachurer. nonmagnetic stainless steel and shall utilize no welds in its conshuo• Ilan.The damp shall be Irate/ad by torquing the adtisting screw using a CAST-A-SEAL 402 PPE SLUE PIPE 0.0 RANGE WALL THICKNESS APPLICATION 462.0250 1.25'-2"(31-S1mm) 1.S-2.75'(38-70mrr) 2.5'-6' (64-75Onun) STANDARD /1,;°;''` .tF " • . .` 44' :7•iop,:ias-mt11) 23'.lC 4.164: 1 •. - STAripfR 5 . 452.0402F1 4•(100 mm) 4.2•-4.7•(107-119 min) 2.5"•4.0•(84-102 MI) Closed Face ' - .' gzA = -Jr ii! • ;; -.p:r(Ts7--T7o.inm). z.3'-.6'(s4;.lso urn) ' Sima3Ai _- ` CAS ADAPTER ] 3"05 rood3.2'.3.6'(al-at min) -- ,L Use with 4'CAST-A-SEAL PRODUCT PERFORMANCE TYPICAL TEST RESULTS ear CAST-A-SEAL 4024102F(aIn ASTY C 1544.C D23,aria C 147a)CAST,A-SEAL402J402F meets andlor exceeds all requirements of ASTM C 923,Including physical prop- last 1 ASTM Test Method Test Requirements Tyjiral Result erties of materials and performance testing,including: _ 13 psi minimum In straight alignment CHEMICAL RESIS- NO WEIGHT TANCE;1N SULFURIC D 534,AT 22°C FOR NO WEIGHT LOSS LOSS •10 psi at minimum Tangle ACID and 1N 48 HRS NO WEIGHT WSS NO WEIGHT •10 psi minimum under Shear load of HYDROCHLORIC ACID LOSS 150 Ihs/in.pipe diameter TENSILE 5 rrtttGTH D 412 1200 PSI.MIN. 2100 PSI ELONGATION AT D 412 350%.MIN. 52596 CAST-A-SEAL 402/402F meets andlor exceeds the BrzlAls requirements of the following Standards SpecD 2240(SHORE A *s FROM THE Q 8 r A HARDNESS DUROAfETER) MANUFACTURER'S <2 Lions,Codes,and Test Methods: SPECIFIED HARDNESS •ASTM C 923 Standard Specification for Resilient Connectors DECREASE OF 15%, Between Relnduroad Concrete Manhole Structures,Pipes, MAX-OF ORIGINAL 13%TENSILE ACCELERATED D 573,70*1`C TENSILE STRENGTH,Oh- errd Laterals CHANGE.•14% • ASTM C 1644 Standard Specification for Raetlranr OVEN AGING FOR 7 DAYS CREASE OF 20%,MAX. ELONGATION OF ELONGATION CHANGE Connectors Between Reinforced Concrete On-Site Wastewater Tanks end Pipes D 395,METHOD B, DECREASE Of 25%, •ASTM C 1476 Standard Spacincetron for Storm Drain Resiftent COMPRESSION TEST AT 70'C FOR 22 HRS MAX.OF ORIGINAL DE 73% Connectors Between Reinforced Concrete Storm Sewer ELECTION Sinlefyes,Pipes and Laterals D 471 IMMERSE 0,75 •ASTM C 1244 Standard Test Method for Carrtste Sewer BY 2-IN SPECIMEN WATER ABSORP71oN MAX.LCREASE OFINAL BY 3 50% Manholes by the Negative Ab Pressure(Vacuum)Test 1N DISTILLED WATERWEIGHT •IAPMC ANSI 21000 Standard for Prefabricated Septic Teaks _ AT 70°C FOR 48 firs •IAPMQ/ANSI Z1001 Standard for Prefabricated Gravity OZONE RESISTANCE 01171 RATING 0 r PASS ' Grease interceptors LOW-TEMP, •NPCA Best Practices Manual for Precast Concrete On-Sire BRITTLE POINT D 746 NO FRACTURE Al-40•C PASS Wasteweter Tanks •NOWRAModel Code Framework TEAR RESISTANCE n S24.METHOD B 200 LBFIIN-WON.) 450 LernN. Press-Sa&believes aT information In accurate es U Its publication dale.Information,specifications,and prices are ell subject to change without notice.Press-Sul Is not responsible for any inadvana.Tt errors.Copyright 2012. 63 Phone:800-34B-7325 PRESS-SEAL CORPORATION Erma salts@press-sea).eom e Bun(260) Protecting n Our Planet's Clean Wafer Supply Web:www.preess-scaicom • ISO 9001.26471 a. tad•7S(YIEC Mil ArcrdS,d ' ?"' `, CAST A SEAL:402/402F i 1 .. CAST-IN BOOT-TYPE ,, ' CONNECTOR for 1.1/4"to&"PVC Pipe (32 mm- 150 rnm) What It Is - .t-� J CAST-A-SEAL 402/402F is a watertight flexible connector that is cast into the structure when the concrete is poured. The connector is folded into the casting position and placed on the reusable heavy-duty solid plastic mandrel that is installed directly to the form.After the concrete is f'• ' cured, the form is opened, removing the mandrel - ` s. ' from the gasket,but leaving the CAST-A-SEAL 402/402F connector embedded in the concrete. The gasket is then simply unfolded at the jobsite and is tightened around the pipe using the sup- }SOW it Perfgrms plied stainless steel take-up clamp, CAST-A-SEAL 402/402F meets or exceeds Why It's Better all requirements of the following Standards, Codes, Specifications and/or Test Methods: • Simple cast-in design provides flexible watertight connection. ASTM C 1227 IAPMO Z1000 •Eliminates infiltration and exfiltration. ASTM C 1844 IAPMO Z1001 Improves on-site system performance ASTM C 923 NPCA Best Practices and minimizes maintenance. ASTM C 1244 NOWRA Model Code •Protects groundwater from unintended ASTM C 1478 discharges. •Use in on-sfte treatment structures, grease interceptors, manholes, wet wells, pump and lift stations,stormwater structures,or Sam NI- n dick) ;—fin. and 0 On Ms Woeuct On The Web1 }"-�• l� any application requiring a flexible , +' •,! watertight connector. ID . n.0, u. f/ i)r L. II imam r f . .1'.. 114: . // 44. 01..2..1-:. ' 7141111 v •w Attach mandrel Invert gasket Place gasket Strip tomend Invert gasket to outside to outside farm Into casting and mandrel in mandrel,leaving of tank,insert pipe and wall. position. form and pour. gasket in place. tighten take-up camp. _ PressSe4 balievea all'urto'ma;i;n Is accurate as of ik pubfoallon date.Information.aperih ons.and prices are a.subject to change About notice-Press-Seel Is not responsible for any Inadvertent eaars.Copyright 2D12. 62 Phaar.800-348-7325 PRESS-SEAL CORPORATION Email:sales@press-seal- , t Fax (260)436 1908 Profecling Our Planet's Clem Water Supply Web:www.press-seal.com I Fa ISO 9001.W1J Rr,Lgnnl.150/111'I747i,TmnekA 0 EZset by INFILTRATOR w EZset by Infiltrator risers and lids are made from glass reinforced polypropylene, providing superior strength and durability.They come in green or black and in 20",24",and 30"diameters making them ideal for use with any concrete or plastic tank.The slip resistant lids are fastened using stainless steel screws and can be further secured by installing locking rings. 20" Riser System 24" Riser System y s y 30" Riser System • 20"x 6" Risers (Green or Black) •24" x 6" Risers (Green or Black) •30" x 12" Risers (Green or Black) • 20" x 12" Risers (Green or Black) •24" x 12" Risers (Green or Black) • 30" Lids (Green or Black) ■ 20" Lids (Green or Black) • 24" x 18" Risers (Green or Black) • 24" Lids (Green or Black) 20"x 6" Riser 24" x 6" Riser • 4111110 20"x 12" Riser 24" x 12•' Riser 30" Lid - Adhesive Sealant - 20" Locking Rings 20" Lid 24"x 18" Riser - 20" Safety Pans 24" Locking Rings - 24" Safety Pans - 24" Adapter Rings - 30" Locking Rings Adapter Flange 24" Lid Contact Infiltrator Water Technologies'Technical Services Department for assistance at 1-800-221-4436 Riser Specifications by INFILTRATOR 2'— .17ST9. WA I 20' ..-- �- WAIL THIDOEEB 1 .125 NP.^1 wALl Tr w llCfr55 1 I _. IL r.121 12.p5' .121 saS L.. 1 1 SeCTIONA:a A J SECTION A-A --_.. _._. SCALE 1 .305 SCALE 1:6 .300 - -223M'-. . 20"x 6" Riser Cutaway 20"x 12"Riser Cutaway .11STYP. �"- -- 2A'— .17aTYP. ..--._�. -_- WA1lmatrEna WALLTHCI0€$S- r-.. - -1 1- L 121 NOV - - L. uos SECTION -.— SCALE 1::6 a .too-1 L _„..i SECTIOr16 --N .. --_ Z6.31.`-_ SCALE 1:- .J00 24"x 6"Riser Cutaway L__. 26270'— - 24"x 12'Riser Cutaway 26' .125 TYP. 24• I WALL. WA THICKNESS 1 I• .+. a7' .1251 _W. 30'- -- - WALL 1NICIS 3S 1 I 1205'[ i AA SECTION CTION Afi wr•duE 1 J a•Ar 3 1:e .500 J SCALE 1:6 300 2a]3Y 24"x 18"Riser Cutaway 30"x 12"Riser Cutaway INFILTRATOR WATER TECHNOLOGIES,LLC(°Iolfilirator°) (d)THIS LIMITED WARRANTY IS THE EXCLUSIVE WARRANTY GI rYh. BY INFILTRATOR AND SUPERSEDES ANY PRIOR. EZset by Infiltrator LIMITED WARRANTY CONTRARY,ADDITIONAL,OR SUBSEQUENT REPRESENTATIONS,WHETHER ORAL OR WRITTEN,INFILTRATOR ONE(1)YEAR MATERIALS AND WORKMANSHIP LIMITED WARRANTY DISCLAIMS AND EXCLUDES TO THE GREATEST EXTENT ALLOWED BY LAW ALL OTHER WARRANTIES,WHETHER EXPRESS OR IMPLIED.OR STATUTORY,INCS USING ANY WARRANTY OF MERCHANTABILITY.FINESSE FOR A la;Too tooled WWH l is extended 10 Ina end LTA'of an EZsry by Infiltrator Year And Id system and other acme/One.. PARTICULAR PURPOSE AND ANY IMPLIED WARRANTIES OTHERWISE ARISING FROM COURSE OF DEALING. An EZset system menufeatued by Infiltrator,when Irata!ie I and operated In accordance with Inblrelore neialatlon COURSE OF PERFORMANCE.DR USAGE OF TRADE.NO PERSON(INCLUDING ANY EMPLOYEE,AGENT,DEALER.OR Instructions and local rope.%ton by a licensed istal°r,ffi warranted to you 4 Ogefret deleodve matedel*and w0l0066075 REPRESENTATVO IS AUTHORIZED TO MAKE ANY REPRESENTATION OR WARRANTYCO.NCFRNINO THIS PRODUCT. for one(it yeas afar installation.Infltretr will,at on option.I)repek the/elective product or(1)replace the deleclivo EXCEPT TO REFER YOU TO THS LIMITED WARRANTY.EXCEPT AS EXPRESSLY SET FORTH HEREIN.THIS WAFiUWs'TY malelas.I.ttl'rator's liobilny speafroaly exoludee the coal of mrprel andbr hetalotloe of to EZest system. IS NOT A WARRANTY OF FUTURE PERFORMANCE,BUT ONLY A WARRANTY TO REPAIR OR REPLACE. IN In order In exercise Is...MY right;you mute notS MUM.'in wdtiv9 at iN corporate headquarters In Cd SAyhock le'YOU MAY ASSIGN THIS LIMITED WARRANTY TO A SUBSEQUENT PURCHASER OF YOUR HOME. Cornadiold w,:hin Meer(1b)days of the alleged°Moot p'NO REPRESENTATIVE OE INFILTRATOR HAS THE AUTHORITY TO CHANGE THIS MATED WARRANTY W ANY In)YOUR EXCLUSIVE REMEDY Will I RESPECT TO ANY AND ALL LOSSES OR DAMAGES RESULTING FROM ANY MANNER WHATSOEVER.OR TO EXTEND THAT LIMITED WARRANTY. CAUSE WHATSOEYEH SHALL BE SPECIFIED IN SUBPARAGRAPH(a)ABOVE INFILTRATOR SHALL IN NO EVENT BE LIABLE FOR ANY CONSEQUENTIAL OR INCIDENTAL DAMAGES OF ANY SEND.HOWEVER OCCASIONED.WHETHER BY CONDITIONS AND EXCLUSIONS NEGLIGENCE OR OTHERWISE.SOLE STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR Them ere certain cond'tloss or applicator.over which In0llrator nee net control.Defects or problems as a re/,Mel'soon CONSEQUENTIAL DAMAGES SO THIS UMTATbN OR DICWSION MAY NOT APPLY TO YOU.TIAS WARRANTY GIVES conditions or eppfeations are not toe resporreibCly of IoR Polar and em NOT carom/under toe warranty.They include faiLxe YOU SPECIFIC LEGAL RGf TITS AND YOU NAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE W install the EZa"'system ir,accordance with inetnrnbora or epplicebh regulatory requke'ne•te or guidance,elating the E mot system ootrany to the installation irstrucdo'o and disposng of choraloah or other materiels co'Yuery to rx,mral EZse1 sysem.cmrc. The atayn reoasenu the Stoner°Undo Warranty offered by IoTlmtor.A limited number oI stales and cot:fties neve %horonl warranty requiz^.erts.Any purchaser-of an E7rol system should corded k15l elor s coryma%headquarters in Old �_ 4 Badness Park Road Saybrook,Connecticut,prior to euoh purchase tc obtain a oopy of the apppcable warranty,and should carefully reed that ''r" P.O.Box 768 warranty prior In the purdneae of en lase!system. Old Saybrook,CT 06475 INFILTRATOR 86�0 221-436 860-57/-7031 1systems Inc. www.ktfiltratorwater.com U.S.Patents:4,759,8131;5,017,041;5.156,488;5,336,017;5,401,116 5,4Ct,459;5,511,903;5,716,163;5,588,778:5,839,844 Canadian Paterts:1,328,958;2,604,584 Met patents pending.Infiltrator, Equalizer,QuIck4.and SideWfrider are registered trademarks of Infltretor Water Technologies.Infiltrator is a registered trademark in France.Infiltrator Water Technologies,Is a registered trademark In Mexico, Contour.MicroLeaching.PolyTuff.C ltamberSpacer,MuhiPort,PosiLock.QulckCul QuickPlay.SnapLock and SLaightLock arc trademarks of Infiltrator Water Technologies. PolyLok is a tradernedc of PdyLok,Inc.TUF-7TTE Is a registered trademark of TUF•11TE.INC.Ultra-Rib Is a trademark oI UPEX Inc. ®2013 Infiltrator Water Technologies,LLC.Alf rights reserved.Printed in U.S.A. SETOI 06131SI Contact Infiltrator Water Technologies'Technical Services Department for assistance at 1-800-221-4436 ...,.........i , 41. ... ,, ,, J 1raa.. �_J rl Toll Free: 888-999-3290 F!ILTERf Bristle Filter Instructions For STF-110 4" (Installation & Maintenance) Instructions for installation in standard 4" outlet "Tee" of septic tank. ,'i liE • Orient the filter so that the wire handle faces opposite the discharge outlet. • Push filter into top of"Tee"until the 90 degree wire handle touches the top of the "Tee". The filter is now"installed",as shown in the picture to the right. • The flexibilityof the STF-110 bristle filter allows it to be used in about anysitua- just lion. If you need help with a custom installation please call Sim/Tech Filter toll free at 888-999-3290. Installed Filter Recommended maintenance schedule For maximum protection,it is recommended that the filter be replaced annually. If not,it should be inspected at least once per year. The filter is capable of lasting three years under normal conditions. Such factors as garbage disposals,pets,laundry,etc.may cause the need for more frequent ins pection or service. Instructions for performing maintenance in standard 4" outlet "Tee" of septic tank. Before removing filter,one of two options must be performed. These options need to be performed to prevent any outflow of unfiltered effluent from the to tank while the filter is removed. Option 1 '. Insert a STF-130 maintenance sleeve(sold separately)with the handle coupling on the same side of the"Tee"as the outlet hole. Push the sleeve 41,f"° into the"Tee"until the handle coupling hits the top of the"Tee". Do not $ remove the sleeve until a filter has been put back in the"Tee". Option 2 vow, Have the tank pumped down by a professional septic service company. • After performing one of the options above,remove filter by pulling up on the Maintenance t filter handle. Sleeve partially (' F • PIace the used filter in the provided plastic bag for proper disposal.it inserted into • Install a new replacement filter as described in the installation instructions at Tee STF-130 the top of the page. Maintenance • If a maintenance sleeve was used(option 1),remove the sleeve from the outlet U.S.Patent# Sleeve "Tee". 6,811,692 The STF-110 series Effluent Filters 5-fr. . • ia. It's Superior Superior to slatted. uniform designs. • Fie.t ible I tit fs-ltyp,f 1.4?a k firer- a:. Versatile-resilient"•:crfiffi far s(filLtU' 4 +a'9r! -- ° 4- ni7,- • 1-6W dia. tt<►.aka Bi 1-4471 'tSf<- `yi44 t y ePlare- l ' The Best ,;k fT -� a taWt ,t g;;- nst rnrnuiun debris. rF-1,04711 11,171ha., It's Simple 21Ropto r se only choice in effluent fitters. F. 1-8B RILTrER 5TF-1113 series Effluent Filers STF-110-6B ; • Supterior filtration of the most common ids STF-11D-7R r ftijt•'Z in tadairs wastewater susterrls STF-110-6W o Starmki 1e> demisji has applications tar • neaafitiratizi, corns ertial and industrial $TF-110 • slid fit dirrererin null �, �S Alalt� �'� Web and housings i Le simple to install and ser V ce, even in ta a wiith Omitted a= n diae/f-Isw*I ap b Ill ei hold the fitter ftit rr lit tin place with no need for receiv+erb or canisgmm and eliminate Liter fiaat-rap * fiIr !'s aeslaivition arms rusturalig sorts solids according to size and mass far lamer fitter Ribs • Allen bioleiplical snatw*f 7 race in vieeftewater t ripattner,u,filfiliteMb 9alriebileellIPJgh tO he 01101Viioed and ecnnamtcal enough to ii. repinuml • Erassomical isolutlkon for protecting end bemiring atil t :)cif t1'Eltlileatftiettpr sil_''erm et a tres`ttr.cfro of the tc` of Inferior designs Designed after our proven 5TF-110 effluent filler that currently protects residential septic systems all over the world, the latest additions to this series of fitters were designed with more demanding residential, commercial and industrial systems with larger housings and pre-cast tanks with built in square baffles in mind. We achieve superior filtration of the most common solids found in today's wastewater systems with our non-uniform bristle design.This design is much more efficient than uniform I slotted designs which can pass larger more harmful debris into the system. The flexible self-locking bristles make it simple to install and service,even in systems with limited access. They also hold the filter firmly in place with no need for receivers or canisters a and eliminate filter float-up. The filters employs a debris separation space which naturally sorts solids according to size and mass.This makes the filter function more efficiently and greatly increases its life-span. e It also allows for biological maturing which is necessary in all wastewater treatment systems. The STF-110 series filters use triangular polypropylene bristles wound together with a 31t3 stainless-steel core. This makes them durable enough to be serviced and c economical enough to be replaced.This provides an economical solution for protecting and servicing ell types STF-110-7R In e,-6, i of wastewater systems at a fraction of the cost of inferior sanitary Tee(cut-a-way) designs. STF-110 7R in pie-castSTF-13t)changing sleeve is requited to Wank effluent aow while servicing septic fink with square without the need to pump down the tank. 5TF-NO in 4'senitary baffle. G Tee(cut-a-way view) WAIL I I A Its of/iv ti, (AU detail H tlra►ings in R.rF tonnes in covey exit curvoiew product taw. Far the protect-inn and performance of wastewater sylitems by 1 prvuctly made In the t.1SA 7 I f , r, . i 1. uwt'v, gag t roger .._.t 888-s9..3_--,C US Patent 6,811,692 r1LT �. 5.7'F-11IJ Liao bfidalla4- is nr FEATURES ,. Easy, affordable solution for servicing • septic tanks01111111 ri S Designed with non-directional bnstles for unrestricted flow of effluent 4. Allows biological maturing and sloughing to maximize septic tank efficiency 4 Provides well over'A mile of filtration media with over 319 cu in of open area to eliminate dogging 4 2,215 sq in.of filtering surface allow a flow rate of over 1200 GPD.filtering to 1/16"diameter 3 Filtenng surface is achieved with unique triangular bristle that more than doubles the filtering surface,with no uniform holes or slots to plug • 90 degree handle for easy installation and removal ❖ Adapts to all types of 4"pipe 4 Self-locking bristles hold the filter firmly in place, eliminating 'fitter float up' •i Flexible design makes it easy to install in hard to reach places and makes replacing the filter a breeze • Constructed of polypropylene bristles, wound together with a 316 S S. core • The filters designed shape creates a debris separation space which naturally sorts debris according to size and mass, i13 Inc PIPE ensures even filter usage for a long - lifespan and maximizes circular flow # r $TF-+3 20 i I wANTrr NCE .11 A.. SLEEVE 49 A Order part No STF-11 D ao STF-130 an 2525 ATP-1T0 CAD detail drawing available in DXF format 12 1Z5 STFATEE Eeprrc TEE RELATED PRODUCTS STF-11D-6W page 4 STF-110-7R page 4 STF-110-B13 page 4 ,,,a„ , a r STF-130 page 14 ` 95 STF-4TEE page 14 U S Patent*6 811.692 PAGE 3 Toll Free 888-999.3290 Office 231-582-1020 Fax 231-582-7324 Email simtech@freeway.nel Web www.gag-simtedl corn THIRD PARTY VERIFICATION '` GARY B. JOHNSON J�i MICHIGAN#32831 WISCONSIN# E-25985 MINNESOTA#41217 SIM/TECI'I FILTER NEW STF-110 DISPOSABLE SEPTIC TANK FILTER THIRD PARTY VERIFICATION The Disposable Septic Tank Filter is constructed as a twisted wire brush with 26"long brush body, 1"tip and 2%"long handle end with 90 degree bend. Brush body will have a major diameter of 4.313"for a length of 9'A"starting VI"from the 90 degree handle bend,then will transition down to 3 I"diameter over the next 2'I"and held at 3 'h„ diameter for the next 14". There will be a scallop cut into the O.D.in the major diameter beginning 2 A"from the top,transitioning down to 3 A"over the next 2",and then transitioning up to the major diameter over the next 2". The stem will be 11-gauge stainless steel and the fill material will be.012 yellow polypropylene. The filter has a total of 2,962 lineal feet of bristle equaling 35,544 lineal inches of bristle. By calculating the total length x the total perimeter of Simrrech's uniquely shaped bristle,it gives us a filtering surface of 2,215 square inches. Volume of a 4"x26"Septic Tee 326.7 cubic inches Volume of the STF-110 Filter -4.265 cubic inches Volume as open for fluid 322.435 cubic inches 4.4 sir Nrl,r _`S DN • ► GARY B. 61q* iZtF� JOHNSON *E� E-25985 p Na o c111 p t MIDLAND ; 32831 .6t, P Se MICH *sv .01 �9"EfSi*0+ • ���0. JRI THIRD PARTY VERIFICATION OF FIL'IRATION ON THE STF-110 AND THREE OTHER GRAVITY SEPTIC TANK FILTERS • Test was checking for filtering qualities with particulate that could be found in septic tank effluent • This test used five types of particulate added to a clean tank • The five types of particulate were hair,seeds,tissue paper,lint,and chain saw chips(see table A below) • Test tank was riled manually every five minutes while performing tests to represent a large influx of water • Water was introduced into the test tank at 210 gallons per hour • Test was run to a 2"head height above outlet flow • Recorded length of time to achieve a 2"head height(see table B below) • Recorded what was caught in a 1500 micron sieve during the total run time(see table B below) • Recorded what was caught in a 600 micron sieve below the 1500 micron sieve during total run time(see table B below) • Recorded particulate caught while changing filters 15 minutes after ending test using manufacturers recommended instructions(see table B below) • Recorded particulate removed with filters themselves(all filters were removed slowly)(see table B below) • Ail particulate was recorded in grams using a OHAUS Scout II Scale(Serial#BI380398)with capacity 400 times 0.1 g(purchased war 11/17/01) TABLE A Grams Human hair 2 Horse hair 2 ,a CON 1E Sr Micy Cat hair 1 �"••.. *to GARY B. '' Tomato seeds 2 � ARY B. ; JOH •N *• Pepper seeds 2 / JOHNSON I , Cucumber seeds 2 '* E-25985 EER No. MIDLAND �+� Dill Seeds 222 7a Dog hair' '4032831 4: Charmin tissue paper 2 O MICR °°°�`�,.. 0°ESE%C*p` Scott tissue paper 2 • At�AIAL � j Northern tissue paper 2 Lint 2 Chainsaw chips 4 TABLE B Sim/Tech Tuff-Tite Zabel Zoeller Time to achieve 2"head height 1 hr.40 man. 7 min. 6 min. *2 hrs_ Particulate caught in 1500 micron sieve 0 0 0 0 Particulate caught in 600 micros sieve 0 0.2 0.3 1.2 Particulate caught while changing filter 0 0.3 0 0 Particulate contained within or on filter itself 15.0 6.3 2.2 2.3 •Ended test at 2 hours,total head height was at 1 3A." Note:All filters except Sim/Tech caught seeds in 1500 micron sieve but was not recordable in 1/10g scale JRi THIRD PARTY VERIFICATION OF FLOW RATES ON THE STF-110 AND THREE OTHER GRAVITY SEPTIC TANK FILTERS • Test done with clean water and no particulate • Filters placed in a standard outlet tee of S&D type with a 1T'tailpiece to outlet level • Test tank was a plastic 55 gallon drum • There was an accurate method to measure head height above outlet level • Test was done for a 1/s"and 1"head height above outlet level • All filters tested using the above conditions FILTER FLOW RATES Sim/Tech Tuff-Tite Zabel Zoeller %" head height above outlet flow 1, 800 GPD 1, 440 GPD 1, 195 GPD 900 GPD 1" head height above outlet flow _5, 040 GPD 4, 680 GPD _4, 858 GPD 1, 800 GPD E of et icy 6 Q (PIP1.1".11644141i GARY B. # 17 • GARY B. 11_ la N 11 JOHNSON E-25$8'3 � NO. n MIDLAND • ic 32831 ' go% MICH 10NAL•t It is my opinion that the Sim/Tech filter will prove to be a superior septic tank filter because of it's basic design;bristles to catch any"paper likes debris on the outside surface (guided there because of the bristle's bending at the ends under pressure of the flow). A dead zone near the center to collect small particles as they fall out of the flow.Plus the - • incalculable water paths through,and around,the filter fibers. Clary B.Johnson P.E. 363 Silver Creek Rd Petoskey,Ml 49770 es 1 *S GARY B. r • • le If 1 Oq 32831 +�lEiiN.o PZilla 1-OK Inc. Innovations it Precast Drainer Zabel" PL-68 Effluent Filter &Wntawatar Products A oiviion d Polylok Inc. PL-68 Filter and Tee PL-68 is much more than just an effluent filter.The housing can also be used as an inlet baffle(tee)or an outlet baffle.The housing is designed to accept Polylok's snap in gas deflector to deflect gas bubbles away from the tee and to keep the solids in the tank. Features: 1/16"Filtration Slots Accepts 3/4"PVC • Offers 68 linear feet of 1/16" filter slots, which f"1 Extension Handle significantly extends time between cleaning. 800 GPD ;, • Accepts 3/4"PVC handle. • Locks in any 360°position when used with PL-68 Tee. • PL-68 Housing can be used as an inlet or outlet tee. Fits Any Tee ...Or- On The Market • Gasket prevents bypass. PL-68 Installation: Gasket Prevents --Sr68 Linear Ft.of ]deal for residential waste flows up to 800 gallons per day 1 Bypass . 1/16"Filtration (GPD).Easily installs in any new or existing 4"outlet tee. Slots C. 1.Locate the outlet of the septic tank. Easy Installation 2.Remove the tank cover and pumptank if necessary. Accepts 3"&4 Filter conkLock >n Any rY (SCHD 40 & 36D°Position 3.Glue the filter housing to the outlet pipe,or use a SDR 35 Pipe) Polylok Extend&Lok if not enough pipe exists. 4.Insert the PL-68 filter into tee. 4 11 5.Replace and secure the septic tank cover. PL-68 Maintenance: The PL-68 Effluent Filter will operate efficiently for several years under normal conditions before requiring cleaning.It is recommended that the filter be cleaned 16"&18" Cart+fled to every time the tank is pumped,or at least every three years. Available NSFIAWSI Staesda�r d 46 1.Do not use plumbing when filter is removed. 1 f B„ S 2.Pull PL-68 out of the tee. 3.Hose off filter over the septic tank.Make sure all solids - Filter fall back into septic tank. Concrete 4.Insert filter back into tee/housing. Optional Gas —ice.. Baffle Deflector Related Products: PL-68 Filter Concrete Baffle Extend&LokTM t % WO 11111 Extend&LokT" Spacer Bushing Spacer Bushing 2"Extender Easily installs 4"SCHD 40 4"SCHD 40 into existing tanks. to SDR 35 to 110mm Pipe Polylok,Inc. 3 Fairfield Blvd. Wallingford,CT 06492 Toll Free:877.765.9565 Fax:203.284.8514 www.polylok.com 4.28 [10.9 cm] 7.04 3.94 4.60 [17.9 cm] .� [10.0 cm];` [11.7 cm] —~ SOCKET ACCEPTS . 1 4"SCHD�O E21 ,, ., 4. _. t10.7 cm] � m 1.(1--"\;,\_ 1 L o ��, 1%ii 0 I I I I 4.24 ' MIMI EINNIIII WATER LII E_._ r 1 \ Y .15 E.4 cm] — OPTIONAL BUSHING (FOR 4"THIN WALL PIPE) PART NO.30142-R 16.09 [40.9 cm: 's 22.01 % [55.9 cm] 18.09 [46,0cm] WITH EXTENSION S 3,91 [9.9cmj --I' DIA. i 1.77 ` 1111 [4.5 cm] ' - - — \! . END ACCEPTS 4"SDR-35 F 1 FOR EXTENSION SOCKET ACCEPTS POLYLOK PL-68 HOUSING 4" OPTIONAL GAS SECTION A-A OPTIONAL 2"EXTENSION PART NO. 30142-68-4 DEFLECTOR PART NO.30142-68X MATERIAL—ABS PART NO.3025 COLOR—BLACK it 68 FT.(20.73 METERS OF 1/16"(.158 CM SLOTS) /%``'#//�//��/� NEOPRENE GASKETS -�_ _ /���, ,,,,,,,,,,, //�/�///// - 11 f \1 - i 1 ' ltlI ' l I Ii 1 rIIi _ —1' ...4 ] r ■ ,I J,U G EI I' 1. tA I 4.20 DIA.I _ L .1 - li , eirIAIP ��1 101 a-1 i i �. I��g[ui u � Vd Il u iI 11 _ — f t � i� i ____ 22.09[56.1 cm] ACCEPTS 3/4"PIPE 20.63 r522.4 cm] FOR HANDLE 14.24[36.2 cm] 7.00[17.8 cm — .38[1.0 cm]--•-- --- I I. 1�11 . 1' I; i 1 I?II I JI'IIIIIII iI II 1,1 II w,I III I I'I II Il I /oa 'I- - I IIII I I' I II', III I 1 'III IIIIII III I� 1 I'1 a Orr %/eo k .i a L1 I �'r, 1 j, ( 3.62DIA. - „\\;\ fil47-1-1"IElf,.,-;-: � _ :ICJ' ---- _ 44 _ '�ll�[�l �;oo� r ad� + l '' 11 11,-� it IIIII,� I I,1 li I I,I i I. ilili I. _. _. sikk�� ,.-iloAse d 1�1I I . f_� I' I 1'I I'X II II1 1 1 1 Ih LI II! 4i IIIIII II 1 _ I 7•00 4,, I [17.8cm- L L PL-68 FILTER CARTRIDGE (FOR USE IN A CONCRETE BAFFLE) PART NO.-30130-CB MATERIAL - POLYPROPYLENE i.mIIi\ 44i \_.,'. y , / ..,,,,,,,,, ibbi 4'' * III➢ ��//////�i .; full/��� / Nmeo 68 FT.(20.73 METERS:::1 CM SLOTS)4.25 )101 u] DIA GASKET4Iltr '�, 1 , 1 , yid iI r I I t �''It Id' e,,,,,,,,. .. - 4.20L10.7cm] \ 1 1ti' 1 I , l p i ,,. ! 1 ,1 1 I f 'rmaw..iww�ow 4....,,..r 7 DIA. � i� y ACCEPTS 314"PIPE FOR HANDL —i �— 22.09[56.1 cm] -+ `11- _ 20.63 L52.4 cm- -I 114,38[36.5cm] JIV .1' 1 if iLL i -- ) 3.63[9.2 an, , �, II _ 'Ii��Ihl ru lip® i- �w i. M". J: „ IIII i 11 PL-68 FILTER CARTRIDGE �� (_ PART NO.-30130 4 I , MATERIAL -POLYPROPYLENE COLOR-RED SECTION A TOTAL FILTER AREA- 1.1 SQ.FT.(1021 SQ.CM) The Public Health and Safety Organization NSF Product and Service Listings These NSF Official Listings are current as of Wednesday,April o6,2O16 at 12:15 a.m.Eastern Time.Please contact NSF International to confirm the status of any Listing,report errors,or make suggestions. Alert:NSF is concerned about fraudulent downloading and manipulation of website text.Always confirm this information by clicking on the below link for the most accurate information:http://info.ns£org/Certified/Wastewater/Listings.asp? 5tandard=o46&Cornpauv=7o5So& NSF/ANSI 46 Evaluation of Components and Devices Used in Wastewater Treatment Systems Polylok Inc. 3 Fairfield Boulevard Wallingford,CT 06492 United States 877-765-9565 203-265-6340 Facility:Cheshire,CT Septic Tank Effluent Piltersft] PL-122 PL-25o P1r525 PL-625 PL-68 [1] Performance tested using bead size 0.338 cm ± 0.005 cm (1/8" ± 0.002"). Meets the full requirements of NSF/ANSI 46-2010. Facility:Evansville,IN Septic Tank Effluent Filter Components[t] A101-12x2o A101-12x28 Ato1-12x36 Aio1-8x18 A1o1-8x26 A1o1-8x32 A1801-4x18[4] A1801-4x22[4][51 A301-12x20 A301-12x28 A3o1-12x36 A301-8x18 A301-8x26 A301-8x32 [1] Septic Tank Effluent Filter Components are exempt from bearing the NSF Component Mark and shall bear the NSF Unit Mark. L 14? Filter cartridges Certified in ABS and PVC materials. [5) Failure sensing and signaling equipment of this product not evaluated by NSF Septic Tank Btlluent Fllters[aj(3) A100-12x2o M00-12x20-VC A100-i2x20/BALL. Aioo-12x28-VC A1oo-32x36-VC Aioo-8xi8-VC Moo-8x26-VC At00-8x32-VC A1800-4x18-30142-68 A1800-4xt8-VT-B35 Al800-4x18-VT-B4o A1800-4x18-VTF-B35A1800-4x18-VTF-B4o A1800-4x22-30142-68Ai800-022-VT-B35 At800-4x22-VT-B40 A1800-4x22-VTF-B35Ai800-4x22-VTF-B4o A3oo-12x2o A300-12x20-VC A300-12x20/BALL A300-12x28-VC A300-12x36-VC A300-8x18-VC A300-8x26-VC A300-8x32-VC A600-12x2o A600-12x20/BALL A600-12x28-VC A600-12x36-VC A600-8xi8-VC A600-8x26-VC A600-8x32-VC [2) Suffix VC denotes a filter cartridge with Versa-Case assembly. [3] Performance tested using bead size 0.338 cm ± D.005 cm (1/8" = 0.002") . Meets the full requirements of NSF/ANSI 46-2010. NOTE: All filters come Smartfilter ready. Number of matching Manufacturers is i Number of matching Products is 52 Processing time was o seconds r V O a P w —_1 co, . ' f 1 l 1 0 L. m av 0 0 __.. CD H ,.1—O 0 al an 5N W A z Z W 0 U. [ f --� n CO il. m D Z 0 DA VID BRANTLEY&SONS "n'YFD To "ii1..'�'r`°i' `E NO. DATE lH.NRtf TANK WOOL age Rd be�.nip Si OrIgked �° "� �` ' 1,000 ST 502 37 Pine RI m+:,c VW Zebu NC 27597 VI, +►.n 104 Office 252-478-3721 , : "nY°2 Fax 919-573-0443 -,IMMO _s 91-EET humeER in.f,ae.•Qneltcom 1 of 1 tr 1..._. A A Li FO CO OD IV 0 fT Ill 1 7 1 , O w O A O O _A A co N r - . , • N U tr 01 CO S.) O , Li _Li_ cx to m D 33 Z 0 DAVID EP.4JTLEY k SONS ROM FOR 0if 1i1ry16i' 110.6 DAN "'"saTIMMOa �� 37 PM Rd n n• u aN w wr �It10001 PT 2 7 Ridge rwa a m� �� Zebulan,NC 27S7 as:ya n.ia. Oflfce252-47/-9721 mace *Aim2 Fax 91-673-0443 can wrur raw.,3 SHEET NUMBER 1nd.br•vad,vom WNW IN - 1 of 1 on A r A Ul C. {' 131CO CO Co Lo N 010 0, =mak 71 o W 0 A O-- 0 _Ar f8 AP n"Tj Lin —� P 1 w _ IrL. lr2 mro O U; Z 0 T� _.1.1j 14.1_ TX T11 11 n m > 3 Z 0 RAPID BRANTLEY c2 SONS RPM �. a„ d q.11 t�a4 TAW 1°�O 7 Pile Ridge Rd. tC� ,,,m, 1,000 PT 237 zwM ,NC 27M DOE:hol II.]014 Office 252-478-3721 p"~' WlfhCf Fax 919-573-0443 Dun WAVILY Rollie,3 $T M1PB6i `oh,S" -- 1 of 1 1netalsr ,ei.com -— E Z 4rimsga Re-Circulating Synthetic Filter E-Z Treat is a modular system with proven performance in residential and commercial applications. E-Z Treat is prepackaged in a "pod"featuring synthetic media encapsulated in a flexible mesh container.E-Z Treat protects sensitive watersheds through removal of nitrogen and other constituents. The f:-7_Treat system is a re-circulating synthetic filter featuring unique media and water aelivery r,rec_hanism.The media provides an optimized ecosystem for uniform hiafhn growth that is to the advanced treatment process,The rr,edra properties enhance the flow;�i rr iygnn and the movement o''wat._'-t. E-Z Treat offers flexible configuration options for residential,community,and comrnerciitl applications,including water reuse, E-Z TREAT Re-Circulating Synthetic Filter Why Choose E-Z Treat? 0 Produces water reuse quality effluent o Certified to NSF/ANSI Standards 40.245,and 350 o Proven results for over 15 years through third party field testing o Spray nozzles maximize oxygen contact through small water droplet size P Y xY9 o Simple to use and suitable for wide range of applications o Prepackaged,lightweight pod for easy installation Applications o Synthetic media: Residential -Resists biological clogging -Provides large.open surface area Commercial or community -Allows free ale flow Intermittent or seasonal use Requires no media cleaning Space constrained sites Harsh climates Nitrogen sensitive areas r. Water Reuse ---,,- `-. 1 • �.... *1 •._cr44i.wi�rr,.by n..: :t e. Ltii I...•. or',..S7:3. !,il Call. 703.753.4770 or visit. eztreat.net 02017 E-Z Treat Engineering & Te=chnical Specifications E-Z � A T Re-Circulating Synthetic Filter 1.Collection Sewage flows from the home or facility into a watertight primary tank or chamber. The solids settle and the liquid effluent flows by gravity through an effluent filter to the system. 2.Treatment The E-Z Treat Re-circulating - - - . Synthetic Filter provides Pre-assembled Pod passive biochemical treatment through an active biofilm matrix.The styrene media is very uniform and provides for biologicalgrowth,Thestyrene media contains Flexible configurations ample surface area g owt , y many voids to accommodate optimum air and liquid flow.The spray nozzles create Multiple sizes available very small water droplet size(mist),thereby maximizing oxygen contact. Lightweight pods 3.Dispersal Non-clog media The re-circulation chamber contains a float ball by-pass valve and re-circulation - — pump.The by-pass valve connects to the 4"return line from the E-Z Treat pod. High level denitrlflcation The by-pass valve allows the effluent to be constantly re-circulated through Optimized for water reuse the styrene media.Treated effluent exits the by-pass valve and flows into a gravity drainfield or into a pump chamber for dosing LPP,drip irrigation,or other pressurized NSF Testing Performance Summary drainfields.Effluent is suitable parameters Effluent,Avg. for reuse.UV disinfection may be required. GODS z mgn TSS 2 mg/I DO 3.3 mg/I Turbidity 2 NTU E.coil 2 MPN/100m1 pH — 6.8-1.5 Total Nitrogen Reduction 64% *with optional UV disinfection Call.703.753.4770 or visit! eztreat.net 02017 E-Z Treat Standard Model Package: Item Description — 1 STEP-20 Re-circulation Pump.1/2 HP 1 12 2 Float By Pass Valve 3 Control Panel s 4 Styrene Media `Septic tank effluent filter is supplied by others I i 41 Please Note pump is changed to SI STEP-30 1/2 hp by E-Z Treat See pump curve and frictionftDH calculations attached in this section. 1 ;111t " 131 [J .`.. , . I, Model 600 I i; - i 1 ..-- ,----- ----- •--%-,= ,-.......-J . .....___ .....,. wg tkil de11200 a,„4-. t< -V' .a • VALVE It S"e 6 PRESSURE I CF II�� - • GAUGE. • l F 'I'YLLVAIVF, ' •-I^ t 1, Yew _'4=or . i 1...— ' , .... . •!: 1 Y.. ..^. 1"— tt . _ - `'SHAY NOM - - - i._t E-Z a 4. A T E-z T Re-Circulating Synthetic Filter Installation or Inspection Checklist ISE) Models bearing the NSF mark are certified Class I to one or more of the following standards: NSF/ANSI 40 NSF/ANSI245 NSF/ANSI 350 ©2017 E-Z Treat 2-2017 Pre-construction Meeting ❑ Pre-construction meeting held? { Personnel present at pre-construction meeting(check all that apply): ❑ Owner ❑ Builder ❑ Engineer or Designer ❑ Regulator ❑ Installer ❑ Service Provider Septic Tank ❑ Septic tank sized per code or certification criteria? ❑ Is septic tank installed per manufacturer's requirements? 411 ❑ Does septic tank,riser(s),and access cover(s)meet applicable structural standards? ❑ 1/16"commercial effluent filter/screen installed on outlet? III ❑ Is effluent filter/screen able to be removed for cleaning? r+ ❑ Is septic tank accessible? r• O ❑ Are septic tank,risers,and access covers watertight? z O Re-circulation Tank Re-circulation tank sized per code or certification criteria? V) ❑ Is re-circulation tank installed per manufacturer's requirements? e cover(s)meet applicable structural standards? (� ❑ Does re-circulation tank,riser(s),and access pp ❑ Is re-circulation tank accessible? O ❑ Are re-circulation tank,risers,and access covers watertight? All piping from septic tank to re-circulation tank installed per code? n El Is the by-pass valve installed in the re-circulation tank properly? (1) ❑ Is the by-pass valve inlet connection from E-Z Treat pod installed properly? [i Is the by-pass valve outlet connection to gravity drainfield or to drainfield pump tank/basin installed properly? Pump ❑ Is pump installed per manufacturer's requirements and code? ❑ Is pump accessible and removable? ❑ Is quick disconnect method(union,camlock,or pitless adapter)installed?(Don't install a check valve!) [l Is 1/8"drainage and anti-siphon hole drilled in the PVC pump supply pipe just above the discharge end of the pump? ( 1 Is pump installed,connected,and tested? (type,gauge and length of wire,connected using water-proof connectors and the conduit sealed-off) Call: 703.753.4770 or visit: eztreat.net e2017 E-Z Treat Ford Mai, r Y ❑ Is force main been installed with pressure rated fittings/pipe and per code? : ;` [ Are PVC fittings and pipe cleaned,primed,and glued properly? [ Is the force main sized according to manufacturer's recommendations? ❑ Is force main watertight? Is the force main installed to allow for drain-back to prevent freezing of piping,if applicable? E-Z Treat Pod iY [' Stone pad size large enough for pod to set on(6'W x 4'L x 4'H)? [! Stone pad depth sufficient and leveled for pod to drain towards 4"outlet? Is pod leveled and sloped 1"toward the bottom outlet drain? Is 4"return line to by-pass valve installed and per code? Are PVC fittings and pipe cleaned,primed,and glued properly? C Is the return line sized according to manufacturer's recommendations? [I Is return line watertight? DJ [ Pod lid secured and cleaned off? a 0 Soil Grading Around Pad 0 ❑ Is area covered with suitable topsoil(free from large stones or sharp objects)around the pod? [• Is suitable topsoil packed around pod? ❑ Is suitable topsoil been lightly compacted around lid of pod to prevent settling? L. Is the area been seeded and straw placed on top of topsoil for stabilization? TJD Control Panel and Electrical rt. 0 Check all that apply: Type of timer: ❑ Analog Digital Elapsed Time Meter: n Yes No Cycle Counter: ❑ Yes No Panel heater: ❑ Yes No r+ Is control panel installed per manufacturer's requirements and code? Is a NEMA 4Xjunction box used for all float and pump connections? Are floats installed,connected,and tested? (type,gauge and length of wire,connected using water-proof connectors,and the conduit sealed-off) Is power connected per code? (type,gauge and length of wire,and the conduit sealed-off) Is conduit used between control panel and re-circulation tank? Is the re-circulation pump timer set based on the manufacturer's criteria? Call:703.753.4770 or visit: eztreat.net ©2017 E-Z Treat E-Z ? TREAT Re-Circulating Synthetic Filter Design Guide and Installation Manual Models bearing the NSF mark are certified Class I to one or more of the following standards: N5F/ANSI 40 NSF/ANSI 245 NSF/ANSI 350 02017 E-Z Treat 2-2017 TABLE OF CONTENTS 1.0 Treatment Process Overview 2.0 Design*/* 2.1 Re-circulation Tank Sizing 1 2.2 Filter Performance 2 2.3 Operating Costs 2 2.4 E-Z Treat Loadin Rates 2 2.5 System Overview9 3 2.6 Spray Manifold System 7 {p 2.7 Filter Media Mattress Material 7 N 2.8 Decentralized Design Options for Commercial, L Community,or Large On-site Systems 8 C3.0 Installation Instructions 12 Q 3.1 Pre-construction Meeting 12 (D 3.2 Off Loading Treatment System 12 3.3 Excavating and Installing the Pod 13 3.4 Piping the E-Z Treat Pod Supply and Return 13 O. 3.5 Installing the By-Pass Valve 13 3.6 Installing the Re-circulation Pump 14 tit e-F 3.7 Setting Pump Control Floats 14 CIO 4.0 Start-up 15 111•1 O� Appendix 1: Model 600 Configurations 18 3 Appendix 2: Model 1200 Configurations 20 1,11 Appendix 3: Typical Commercial Configurations 22 GJ Appendix 4: High Strength Waste Case Study 24 1.0 Treatment Process Overview The E-Z Treat Re-circulating Synthetic Filter system operates as a fixed media,packed bed filter system. In these treatment systems,larger solids contained in the applied effluent are retained within the media by filtration,typically in the upper level of the filter media.A bacterial film forms on the surface of media grains and provides for removal of soluble organic material and small colloidal matter by absorption by the bacteria in the film. Decomposition of the absorbed material occurs during rest periods in the filter,when there is no application of effluent.The organic material becomes an energy source for the bacteria to maintain them- k i selves and produce new cells.Over time,as the filter matures,the film layer forms through- out the depth of the filter media and by-products of the biological process pass out of the fil- ter.Re-circulation of the water leaving the filter back through the filter surface provides for additional treatment by the bacteria in the media bed,as well as a mechanism for moving par- tially decomposed organic materials,bacterial waste products and other debris from the fil- ter.This keeps the pore spaces within the media from clogging.Treatment using recirculating media filtration systems is generally an aerobic process and re-aeration of the media,which CDVI occurs during the resting(non-dosing)periods,is essential for proper treatment. ID 0 Table 1 Recommended System&Re-circulation Chamber C Sizes for Residential Applications a 2.0 Design i}es+gn i ..r1T '6; rc NurnberolUnits ., (p tILw TSeptic "fan!. W Many types of media are i7'L'` `k:u cif,,,. - Model 600 11,->'s1 17',3 7 used in packed bed filters. 300 750 300 1 1 13- Washed,graded sand I 400 750 400 1 1 7 was the most common. i 500 900 500 1 1 Other granular media 600 900 600 1 1 d used include crushed 700 j 1000 700 1 1 glass,garnet,anthracite, 800 1000 800 2 1 rt. plastic,expanded clay, 900 1500 900 2 1 O expanded shale,open-cell 1000 1500 1000 2 1 7 foam,extruded poly- 1100 f 1500 1100 2 1 styrene,and bottom ash 1200 j 2000 1200 2 1 3 1300 2000 ; 1300 2 1 EU from coal-fired power 1400 2000 L 1400 2 1 7 plants. C Notes: as 1.i an<sizing are not exact and may vary(+or—1096)based on availability of locally — Media characteristics produced tanks. can limit the number of 2.For seasonal or interrnfttent use applicatbns.please contact us for design guidance. doses possible.Media re-aeration must occur between doses.As the effective size of the media decreases,the 2.1 Re-circulation Tank Sizing time for drainage and re-aeration of the media increases.The BOD5 loading should For single-family home systems,the re- decrease with decreasing effective size circulation tank is typically sized to be equal of the sand. to 0.75 to 1 times the design peak daily flow. Call 703.753.4770 or visit eztreat.net ©2017 E-Z Treat I 2.2 When treating domestic strength sewage Table 2 (300 mg/I BOD5 or less)up to the design flows NSF Testing Performance Summary and loads,a properly maintained E-Z Treat -- — Re-circulating Synthetic Filter will typically perform better than the 30-day average 2 mg/ requirements of NSF Standard 40 Class 1 TSS 2 mgll 00' (25 mg/I CBOD5 and 30 mg/I TSS). DO 3.3 mg/1 Turbld[ty 2 NTU Reductions in the CBOD5 and suspended E.toll` I 2 MPN1100m1 pH j 6.8-7.5 lbwsolids(TSS)influent concentrations will be Total Nitrogen Reduction 1 64% attained within a few weeks of commissioning and should be consistently achieved over the *with optional UV disinfection lifetime of the styrene media. v (D CBOD5 and suspended solids(TSS)treatment N performance in the styrene media is not LC1 subject to significant variation with ambient 7 air temperature fluctuations. C a (D 2.3 Operating Costs 2.4 E-Z Treat Loading Rates CU 7 Power costs for pumping at 3 to 4 kWh/day In accordance with the EPA Design Guidelines Q. are in the range of$9 to$12/month. and field testing of the E-Z Treat Re-circulating 3 Synthetic Filter Model 600 can be continuously fh The E-Z Treat Re-circulating Synthetic Filter loaded at 750 GPD and 2lb BOD.Model 1200 rt IdI system incorporates technology resulting can be continuously loaded at 1400 GPD and from years of independent research in 4 lb BOD. EPA research and testing has rPre-circulation sand bio-filtration.Our system proven that system designs,such as the E-Z 0� applies each area of this technology in a pre- Treat Re-circulating Synthetic Filter system, 7 packaged system.This ensures consistent will produce a high quality effluent at loading 3 field performance in reducing BOD,TSS and rates in excess of 25 gal/ft2/day. pI Total Nitrogen.The system addresses media 7 size and composition,drainage and ventilation, C optimum dosing cycles per hour,depth of MI filter media, pre-treatment of effluent, pre-filtering of effluent to ensure particle size, even distribution of effluent over the media, and piping design that optimize treatment within the system. Call. 703.753.4770 or visit• eztreat.net 92017 E-Z Treat Z 1 2.5 Systerr:Overvievi Prior to entering the re-circulating pump tank the pod.The float by-pass valve maintains a the effluent will be treated in an anaerobic constant liquid volume in the re-circulation chamber fitted with an effluent filter;this tank.The float by-pass valve allows the filter should remove any solids greater effluent to be constantly re-circulated through than 1/16".The second chamber will be a the synthetic filter discharging only the daily re-circulation chamber fitted with a float ball forward flow volume after it has passed by-pass valve and re-circulation pump.The through the pod. In designs using an external float ball by-pass valve connects,inside the splitter box the float by-pass valve would be lire-circulation tank,to the 4"return line from eliminated from the re-circulation chamber. v ✓ Standard Model 600 Package: cG Jlt ` besctipt on C) ® 1 1 Model 600 Pod e i M 2 STEP-20 Re-circulation Pump,1/2 HP 111—,""Iri• — I ' 3 Float By-Pass Valve ! ID 4 Control Panel ly 5 I Septic Tank Effluent Filter(supplied by others) II a dV Recirculation Pump is changed ( to STEP 30 1/2 hp by E-Z Treat I. Please see the pump curve and ,. ry, friction/TDH calculations provided e+ [ by E-Z Treat 3 r a c m Call 703.753.4770 or visit eztreat.net C)2017 E-Z Treat STEP-20 Re-circulation Pump Recirculation Pump is changed to STEP 30 1/2 hp by E-Z Treat Please see the pump curve and friction/TDH calculations provided Table 3 Pump Specifications by E-Z Treat Shell Stainless steel 0* Discharge 10,20 and 30 GPM models:fiberglass-reinforced thermoplastic; 50 GPM models:stainless steel Discharge Bearing Nylatron' it •, Impellers Delrin' r. .. Diffusers Polycarbonate Suction Caps Polycarbonate with stainless steel wear ring Thrust Pads Proprietary specification Shaft and Coupling Stainless steel 300 grade 0 Intake Fiberglass-reinforced thermoplastic M Intake Screen Polypropylene i/1 Jacketed Cord 300volt'S00W'jacketed 10"leads(2-wire with ground);optional 20",30",50"and 100"lengths avalable 3• Delrin'r Is a registered trademark of E.I.Dupont de Nemours 6 Company ICI Nylatrono is a registered trademark of Polymer Corporation 0 S.T.EP.Pius•is a registered trademark of Pentair Water C In order to provide the best products possble,specifications ar subject to change. 0. ro ly 3 it a 3 Table 4 Pump Performance—20 GPM e+ Capacity Liters per Minute Ol 0 25 50 75 100 La ::: 1 3 v d ,, 200 60 7 i 150 T 40 I 100 f" 20 'x 50 „4 0 10 20 30 Capacity Gallons per Minute Call 703.753.4770 or visit eztreat.net ©2017 E-Z Treat l L - 1 w H o , ::: sTEvEN & LisA FEIERsTEIN ( BuiLDsENsE ) W W o_ UO 1 V cn (OAK POINT L0T49 W u, DEERFIELD LANE) RECEIVED o Z W Oy NOV 19 2020 co_ ~} z DISCHARGE MODIFICATIONDoJ� aWZ ZF'Zn UZ i_ = NCDEQ/DWR/NPDES I�o o de ceZJZ 2Q O E .z TREAT TREATMENT SYSTEM LLYWo. Q y J oON V W W a 05 —F- Z 0 N W {yl PROJECT No. A84601 .00 W u) a 0 Ea. CI N a DEERFIELD LANE m° oT SEMORA, NC 27343 O Cy O CDW N 10 •= IllInCs/ Q 0 n M N Z PIN #: 18823 zz_ cc, ix = Q J N a X -TUTU = W . X Q SIT F- aoFLL • SCHEDULE OF DRAWINGS: o = moN A aI- UzT a Q Z d C-100 COVER SHEET V. U } C-101 SITE LAYOUT co a u, rn C-102 GRAVITY MAIN PLAN AND PROFILE 0 0 ec C-103 SYSTEM SCHEMATICS & i_ • MAINTENANCE SCHEDULE illi C...)D-101 DETAILS 1 OF 4 D-102 DETAILS 2 OF 4 h--.) A-4 D-103 DETAILS 3 OF 4 F-- D-104 DETAILS 4 OF 4 w CU VICINITY MAP E 101 ELECTRICAL DETAILS LOCATION MAP • = • cn 7 0 0• cn O F !. ' ` _ S6AL _ �ct ��yy 17069 _, _ "C� F ,<z:•-4 ` t�� ''C'r NGINE _;` COPYRIGHT ®2020 'i S. MAG , ZD lea \• • • \ \\ N\ ,v A vv vvv \\ vvt N\ vV A `\ • \ N \ \ \ \ PROPOSED POINT OF DISCHARGE. N \ \ \ \ o • \ \ \ \ \ INSTALL 1/4" S.S. WIRE MESH \ \ Q r- \ \\ \ \\ \\ \ \ \\ RODENT SCREEN (OR EQUAL) N \ \ \\ \\ >" O • AROUND DAYLIGHT END OF PIPE 1 \ q AND SECURE WITH HOSE CLAMP. \ \ \ \ \ \ \ STABILIZE OUTLET WITH RIP RAP. uJ \ PIPE OUTLET SHOULD BE A• \ •• I \ \ 1 MINIMUM OF 6" ABOVE AERATOR I \ \ • \ \ \ \\ TO ALLOW OR SAMPLE �V \ \ \ •• \\ \\ \\ V \ PROPOSEDECIRC 1.850 TANKA . ) 1 1 J I y • \ / Z \ PROPOSED SEPTICTANK �/ ,}/FLOOD�ZONEp Z W • 1 S39 8.51"E 10' PROPE TY 1 \ ..... / PROPOSED RIPRAP -I O CO8 SETBACK 4" SCH 40 PVC FROM / / / 0,� AERATOR m Wc'l Q y 2 — — _ DWELLING A MIN. 2%_ — — — - i.,; i::i�..i Z r` I- i __ J \ r T�•;�7 �, p N • \ ►:.lr� UV UNIT INSIDE 1!' EXISTING RIPRAP -oil J Z G i Z j \\ \ / / \, \ ' • ®�r RECIRC. TANK RISER 1• ,ALONG SHORE 2W Z 0 1- O • \ C) \ ' l / \ \ PROPOSED 600 MODEL �'r _ _ W a�OIL o V, O N \ i' d.• // I \\ f E-Z TREAT POD ,;� _._... a hew Qw W Q~ en _ �o p I CONTROL PANEL \ y EXISTING inn p�CO = ee I `' c. w \ N �1\ I I i V �l q> ! HOUA E of it i f' • �_ \ \ \ 2 I V PROPOSED \ _ / h 1EXISTING GRAVEL \ ' LuunuuuPIIIII11I1111111I1I > w \ ��, \\ I _ DWELLING y_m; 1--- DRIVE TO BE , %1.i \ V (___ �7 -- A REMOVED — rl I \ EXISTING 15" CORRUGATED I. ` i y __ _`' •\-"' 1I Q N _ o _• \ \ \ METAL PIPE STORM DRAIN J.PROPOSED II r .L/ ..�'► r .�^'..', —� �III N �a N N \ L_?4 N BE REPLACE CONCRETE '� � /\ _` c ..' '� a— ..V.... .-- TO N� 96g \ DRNEWAY I 1 l) \ /{ \ — __ jC9m a I .. f w ; -- ° . \ EXISTING CORRUGATED METAL Aid o coH • \ �• Lil/ v PROPOSEDGRALRIVE n / i , / 100' SETBACK WELL A \ Z M \ 7 --� \ A \ a ~Oz � : \ -- __ --_. / \ / \ \ U)2 us ‘- 1 N �/ / Q� � a it , / _ O w _ // \\\i I �i� \ \ \ \ i in ' \ ) \ • \ GRAPHIC SCALE: 1 = 4= : ^ i LEGEND 0 2 400 120 ���wJJJ N i BOUNDARY (PROPERTY) • CONTOURS - INDEX `........r r ,,, � i - - CONTOURS - INTERMEDIATE N . O Q = SUPPLY LINES O �! I• , �J W PROPOSED WATER LINE •NE i ADJACENT BOUNDARY - SEA `V = RIGHT OF WAY 17069 • CREEK 'i�'� '•.0 Fi�' 't. ��` �a�` •NGIN .•OCi��; / i SETBACK �i°9y •... .•• 0 `/ s ROAD ',,,,,S r rM A`JI,,a!,O�O �'P'�` 2 ... . • • • • • N eo ON . , ... • ,% = m _,. m — � z DO m 0 iiD D _ — C < � —I X1-I E -< U, DD E r — D D Z z m O I— -J • u uoi}Dna13 D ` O N Z \ r {{{/V/V//�^//J/ I \ m A A A -4., A � A A N A A A A N •' m I N 41 ' U 0, V 0) 10 al. - N W A 0 Cl, D f -i o N > D s Z O Z —I >m Z zn O 0 xA nCD o II + o o � I �4 , 0 , � + 0 T , ....,\ N 0 \ Z \ O 7 1 \v � o m � x z _ 0 0 pa N A 0 A n ® 00 \ Kx M co 0 m , .. Z O D x CO X 0 Z A Or d K ONX0 + • 0 b. r myy 7 Zmm-0 N -m-0 'd K0zco 8 -00 c� m m 0 O-0 x-0 O m m- ''' l rnDp-Z4 u I mmyOm 0A A A j A A A A A A A O�mDZ 0 O - N W A N O, V CO 10 NO N f.A A U Dm o o n 6)1 m A c Dp m-I y Dm 1,�c�7 c0 Do D m Elevation o x*-t_ 0- x-I 7a A-4> j D-0r mr r Z <`D 0 A o Om >I m-. m mcZm m�0 OMNc o mm r COc I x 00mx -c 0 r o z0,m • co 0 m Ln C) ZJ > -o _ O 5 `,,,,1„ ,,,, o q �r ^p, 0 r. - ..2 ' 0 n � I I9O <p - ti 'ti •,,,,, + o� s.•L , , � v ,,,,, O c,4 0 BY: GSM .6TEVEhTt� ISA1-EIERSTEIN(BUILDSENSE) 501 CASCADE POINTE LANE,SUITE 103 DB/PA (OAK DEERFOIELDINT LLANOT E) GRAVETY 1 MacCONNELL CARY, NORTH CAROLINA 27513 JOB SEMORA,NC 27343 MAIN PLAN 2.4,4p' p P.O. BOX 129 # AND PROFILE -� & Associates 1 . C. MORRISVILLE, NORTH CAROLINA 27560 A84601.00 DISCHARGE MODIFICATION M- TEL: (919)467-1239 FAX: (919)319-6510 DATE: E-Z TREAT TREATMENT SYSTEM C-102 11/16/2020 PERSON COUNTY,NC 06 W U 2 co Z J • MAINTENANCE SCHEDULE W P. Q = M ITEM FREQUENCY TASK } = -O • • SEPTIC TANK 3 - 6 MONTHS CHECK FOR SOUDS ACCUMULATION, W Z 0 0 • BLOCKAGES, OR BAFFLE DAMAGE, FORCE MAIN 2 Q • IN/EXFILTRATION, PUMP SEPTAGE. CLEAN E-Z TREAT 0 EFFLUENT FILTER. POD FILTER Cp CP GROUND - - - - • 12 MONTHS PUMP OUT ACCUMULATED SOLIDS IF GRAVITY LINE - NECESSARY. REPLACE EFFLUENT FILTER li • EACH TIME SEPTIC TANK IS PUMPED. FLOW DIRECTION 2 i RECIRCULATION TANK WEEKLY CHECK PUMPS, CONTROLS, ALARMS, W FIELD DOSING TANK ELAPSED TIME METERS. A z y 3-6 MONTHS CHECK FOR SOLIDS ACCUMULATION, 4" SCH. 40 PVC 1,000 GALLON 1,850 GALLON rn M ~ y z IN/EXFILTRATION. 1► UV --vZ M U r DWELLING - r I EXISTING SEPTIC TANK ORECIRCULATIO 4" SCH. 40 PVC TO z F-Q n LL z • 12 MONTHS PUMP OUT ACCUMULATED SOLIDS IF (10'-0" MIN. ) TANK DISCHARGE POINT AT W �� a o w z • NECESSARY. p U 2 AERATOR z_, Z 0 Q- p SUPPLY LINES, FORCE MAINS 6-12 MONTHS CHECK FOR EXPOSED PIPE AND LEAKAGE. W OLL R IllW U Et - o ° � ZO co • DISTRIBUTION FIELDS 2-4 WEEKS MOW VEGETATIVE COVER IF APPLICABLE.• -_ Q QIA W Q Q 1- LU • CHECK FOR EROSION, OR PONDING OF - - (I) U d • 3-6 MONTHS EFFLUENT. J O ~ wZ N 9 LU • PUMPS, FILTER SYSTEM, MONTHLY CHECK FLOW METER READOUT AND W Sc• DISTRIBUTION PIPING COMPARE TO RECORDED FLOWS, CHECK PUMPS AND FILTER SYSTEM FOR LEAKS. CD TREATMENT SYSTEM PLAN SCHEMATIC I- NTS QUARTERLY REMOVE FILTER COVERS AND INSPECT FOR O N Q o ACCUMULATION OF DEBRIS. CHECK fin. CV DIFFERENTIAL PRESSURE GAUGE BEFORE 0m a L. ,- i AND AFTER FLUSHING (D.P. SHOULD CO o I- ,- RETURN TO ORIGINAL OPERATING D.P.) CO O < �,- CHECK PUMPS FOR ABNORMAL VIBRATION, = TEST THE ALARM FUNCTIONS. r+, O O • SEMIANNUALLY REMOVE AND LUBRICATE 0-RINGS ON •• FILTER CANISTER, REPLACE IF DAMAGED, LU CI `D = CLEAN 1-1/2- FILTER SCREEN AT 1- rn ? HYDRAULIC UNIT. N N Z i ANNUALLY REMOVE FILTER SCREEN AND REPLACE, E-Z TREAT ui Q 71 CLEAN USED FILTER SCREEN IN MILD POD FILTER z Z a, ce rn • ACID SOLUTION AND STORE FOR NEXT FIN. GRADE ±424.4' INV.EL. < - N Q • ANNUAL REPLACEMENT, - GROUND EL. ±421.4' _1 0 '' U i - DWELLING - — — ±419.0' GROUND EL. ±420.4' w ce x Q • FLUSH FIELD SUPPLY AND RETURN F.F.E. ±425.4' — A I - _ _ _ _ _ z < m LL MANIFOLDS BY REMOVING (UNSCREWING) (ASSUMED) 4" SCH. 40 INV. EL. _ _ — — _ . . _ — p x • o ce M AIR/VACUUM BREAKERS. �pVC ® 2.00% MIN. ±418.9' EL. - Q I- O Z • INV.EL. BYPASS i E-Z TREAT TREATMENT MONTHLY INSPECT CONTROL/ALARM PANEL, PUMPING f421.4' (DWELLING) f418.7' f418 5' U INV.EL. p O a' W SYSTEM SYSTEM EFFLUENT FILTERS/PUMP SCREENS, Q Z J a • RECIRCULATION TANK, AND E-Z TREAT POD 1,000 GALLON ±418.3' U }• Fri FILTER. (TREATMENT UNIT) CO et u) ,- EXISTING SEPTIC TANK 1,850 GALLON Q rn • ANNUALLY CHECK AND/OR REPLACE BATTERIES IN RECIRCULATION TANK U U �" •• FLOW METER. (IF APPLICABLE) o O- W NOTES: 4" SCH. 40 PVC ' ~ ULTRAVIOLET DISINFECTION 3-6 MONTHS WIPE (CLEAN) UV LAMPS. 4" SCH. 40 PVC TO UNIT 1. TANK LOCATIONS ARE NOT TO SCALE SO AS TO DISCHARGE POINT AT L. • CHECK INTENSITY AND REPLACE LAMP CREEK • WHEN REQUIRED. SHOW EACH TREATMENT ITEM. ll n • ANNUALLY CHANGE BULB. 2. ALL GRAVITY LINES SHALL BE 2% SLOPE MIN. F--) w i 2 TREATMENT SYSTEM PROFILE SCHEMATIC 4..: C-103 NTS Ct `,,rrrlr// r`Nfo/i 00 ' � CAo : U 17069 = ,Q •FNG N• �.•O' y1 . G• ` �� k '10 S MAG ,.' • /Z0i0 riil NOTES 1. ALL PIPING SHALL BE SCH 40 PVC UNLESS J OTHERWISE NOTED ON PLANS. ALL PVC PIPES SHALL • rI BE BURIED A MINIMUM OF 3 FEET UNLESS SHOWN _ U_ Cl Cl 3/4" GATE VALVE (FIELD'A�pDJUST OTHERWISE. W• • TO 4 GPM FOR E-Z TREAT SPIN 2. ALL TANKS SHALL HAVE A MINIMUM 28-DAY • FILTER RETURN FLOW) 3/4" SCH. 40 PVC RECIRC. LINE CONCRETE STRENGTH OF 4500 PSI. • �___) 3. TANKS SHALL MEET REINFORCING REQUIREMENTS TO • TT ACCOMMODATE 300 POUNDS PER SQUARE FOOT. •• CLEAN Ak EITHER STEEL REINFORCING WIRE, REBAR OR N = OUT -- N: 4 D-101 APPROVED FIBER MAY BE USED. Z SEPTIC FLOW / \ 1,000 GALLON SEPTIC TANK /Vi `\\\ 40 PVC 4. ALL SERVICE ACCESS OPENINGS WILL BE A MINIMUM CO Z� FROM HOUSE � ' _ _ • OF 24 INCHES. EXCEPTIONS MAY BE MADE ON A 0 y BY DAVID BRANTLEY & SONS J _ - _ • " 'I -- 10 + 1,000 ST 502 - •�" 1 np a CASE BY CASE BASIS WITH E-Z TREAT'S PRIOR co� c+� f'y 0 • ov ` I'•''sz n WRITTEN APPROVAL. ALL ACCESS OPENINGS SHALL BE m�Z' U_F- / FITTED WITH E-Z SET RISER ASSEMBLIES. SERVICE Z Z ?- • �. , EFFLUENT (SEE D-102 FOR ACCESS OPENINGS FOR THE RECIRCULATION CYLINDER W0jN LLw Z • FILTER CONTINUATION) SHALL BE A 30-INCH OPENING AND FITTED WITH AN y Hp Z p =O • FILTER E-Z SET 30-INCH RISER ASSEMBLY. TRAFFIC RATED ce Z W 2 Q U • ��SC0' �O PVC SERVICE TANKS SHALL HAVE CONCRETE RISERS. 1.11 W 0ii R w 11 Z 1 24"0 E-Z SET RISER W/COVER CY • (TYP. UNLESS OTHERWISE NOTED) HANDLE 5. ALL JOINTS (TOP-SEAM) SHALL BE SEALED USING Q Qw W Q 0 IF BELOW DRIVEWAY OR PARKING LOT THEN CONCRETE SEALANTS BUTYL SEALANT # CS-102 y Up to =W w • MEETING ASTM C-990. J-- U • USE ONLY H-20 TRAFFIC RATED DEVICES to 0. • 6. TANKS SHALL BE LEAK-TESTED PRIOR TO SYSTEM Z 0IV I- _L _J START UP BY APPLYING A VACUUM OF 4-INCHES OF w w 4" X 1-1/41 MERCURY WITH RISER ASSEMBLIES IN PLACE OR WITH w REDUCER APPROVAL BY E-Z TREAT, A 24-HOUR STATIC WATER r TEST, IN ACCORDANCE WITH ASTM STANDARDS. `^ • 1" SCH 40 108" _ • PVC RETURN 7. NON-CONCRETE TANKS SHALL NOT BE USED IN o csi 0 FROM FIELD CONJUNCTION WITH THE E-Z TREAT SYSTEM WITHOUT Ma •• PRIOR WRITTEN APPROVAL BY E-Z TREAT. Epp o { 1 SEPTIC TANK 8. ALL PIPE PENETRATIONS THROUGH PRECAST CO coo 1- • • CONCRETE TANKS SHALL BE PRESS-SEAL m 0 < < • D-101 NTS CAST-A-SEAL 402 RUBBER BOOTS AND GROUTED. • • •• 24"0 E-Z SET RISER 9. THE FILTER POD INVERT OUT SHALL BE A MINIMUM co •• W/COVER (TYP. UNLESS OF 6" ABOVE THE INVERT IN OF THE RECIRCULATION ,- u •• OTHERWISE NOTED) TANK OR 1/4-INCH PER FOOT SLOPE, WHICHEVER IS w �"� N /--\ NOTE: FIELD VERIFY PRIOR n GREATER. I- N • Z M FLEX a TO ORDERING RISERS Z . , 10. CONTRACTOR MAY USE LARGER TANKS. z m i PVC • X • WATER TIGHT SEAL Ili< 0 _ • ¢ . X r ON RISER ASSEMBLY 11. MAXIMUM COVER OVER NON H-20 TANKS SHALL BE Z z rn �; GROUND EL ±421.4' � / • • ¢ %i -- 30" OR AS SPECIFIED BY MANUFACTURER. Q J < • i / z , % /? / � / \'i3/4 PVC " .'/ w CY X Q �`r Z `,GATE VALVE 1 L 0\ 12. SYSTEM INFLUENT SAMPLE SHOULD BE TAKEN FROM I- < 0 H LL 4' \ co \4 -- o 3/4" SCH. 40 PVC RECIRCULATION INLET TEE IN SEPTIC TANK RISER Z U m M _ • N y> \ \mil \ •\ •\�\ LINE FROM E-Z TREAT TEE 13. LENGTH, WIDTH, AND DEPTH OF TANKS WILL VARY 0- 0- 0 Z • ( . , co ` PER MANUFACTURER. w 0 0. w • o } 2" VENTS-'- SCH. 14. MAY USE COMBINATION SEPTIC TANKS AND a Z -� • • RECIRCULATION TANKS RATHER THAN SEPARATE IF U } j INV.•• IN rJ'Go _ (SEE D-102 FOR NECESSARY OR DESIRED BY OWNER. Q Q --Q, am • WATER LINE CONTINUATION) U U MIN. 18" BELOW LOWEST �`,. IY• INV. OUT 15. IN AREAS WITH LOW ALKALINITY WATER, INSTALL ±55 J • F.F.E. WITH WATER FIXTURE �� _ I 0 0 w I a a 1"-2" BELOW INVERT IN LBS. OF MARBLE ROCK (1"-3" DIAMETER) IN o 2 I- • w o-a 24"x24" MESH BAGS. USE 1 BAG PER E-Z TREAT i :. o o o POD. PLACE MARBLE ABOVE "BEAD" PILLOWS. • CAST-A-SEAL T 1 ,n p 402 RUBBER `,/ • " - .... BOOT (TYP.) ^^ • o] SIMTECH STF 110 SERIES, 3" • POLYLOCK PL-122 OR ^ MIN. ENGINEERS APPROVED EQUAL W CA z Z •c TANK FLOOR MIN. ��� ``1 U • MIN. �`.\IT O/ O • • I 1 C CA } (i) 1 1/3 TANK LENGTH • SEPTIC TANK SECTION i o69' CADNTS ��; �4 S M pA LyZ 00 7 lf4 • (SEE D-104 FOR LTO E-Z 1' SCH. 40 PVC • CONTINUATION) TREAT POD J V N - I FROM E-Z Q ly 0 • J i TREAT POD 1- o Q r• 1E oN 30• "m E-Z SET RISER RESTRICTOR TO 0 GPM E W/FLOW • W/COVER (TYP) 1 • f-314" SCH. 40 PVC RECIRC. UNE TO SEPTIC N i12' MIN. LENGTH �\ I 4" X 2' REDUCER w 2 CLEAN �-- FLEX PVC � • OUT i \� �!- C Zw cowM Qcco z i c ~_ (SEE D-101 FOR 11 �GI1 1IIrIIlol Z�Zei 0I- •• coNnNuanoN) ��,� ��� I 1 D-103 _ r w og N "w z • FLOW �p I \\ �� 1,850 GALLON RECIRCULATION/PUMP TANK ( illir • �� I rr ZW? 2 Q 6 i CO \ �i BY DAVID BRANTLEY & SONS 0 0 I D-102 wOa112 �� Z 1 1,850 PT 503 r�as, `= 1iw0 cg O • TURBINE PUMP I y00N =M W •• I SPIN FILTER 'I °ellp iv UV UNIT I I 4" X 2 REDUCER > w L (SEE 1/D-103 FOR DETAIL) I I w : — _i r i TO DISCHARGE < 0 l`i •• 126 POINT AT CREEK Nm o N I 0p m <o L. v 1 I W V-7 /-1 m o a o,- i o G • 1 RECIRCULATION TANK `" ALARM LIGHT o w o 8 D-102 NTS 30"0 E-Z SET RISER w'- w w I 'I W/COVER (TYP) CONTROL PANEL (LOCATED 5 Q M • PRECAST CONCRETE co 5 - WITHIN 10-FEET OF TANKS) N N Z rn i "DONUT" (OPTIONAL) 3/4" BALL VALVE * LLl Q ! (TIP.) a t �� 3/4' SCH. 40 • Z Z a'et PVC RECIRC. UNE - • 3/4" UNION1 / DIRECT BURY uj 0 X U i< • v ., �� GROUND EL. ±420.4' .►MIll II C.'1., / CABLE TO PANEL �� Fw- Q O F LL •• r...-4 4,Z\ Pl-t 1Q1.• r&V 'N'4741VN.,N%r I. 41-- '�t-1/2" PVC /'j 0. O i • O'��l��(4-4l (4. ° , CHECK VALVE •��`//`• Q Z a J I I��//••/.%.*/�/��I. :.r f ice 1-1/2' SCH. 40 PVC U} j rn rei •i,\•//`/t4•/4V4 9 • ! FULL UNION (TYP.) Q y s • ����i��j����j��j1�% } FLOAT TREE , o tx I '�/ .� .. . BRACKET Iltcb d 2 I-orSECONDARY TIMER= 1' SCH. 40 PVC UNE (SEE D-103 FOR • CAST-A-SEAL 402 r W� TO FILTER POD CONTINUATION) 4IG ABOVE FALAR r = RUBBER BOOT (TYP.) N HIGH WATER ALARM= -- NOTE: `/ 40" ABOVE FLOOR UV UNIT NOT SHOWN FOR 4" SCH. 40 PVC III CLARITY. SEE DETAIL 1, D-103 l ^ DROP TEE (TYP.) I I M--•i I+i tO EFFLUENT BYPASS DOSE ENABLE= --r VALVE BY E-Z TREAT r••� i N i 22' ABOVE FLOOR I i r T 1 C/) i 41 t SEE EFFLUENT BYPASS ^ Q,) _ v VALVE SECTION A, D-104 Ct _• , PUMP OFF= _ a - 3/16' ANTI-SIPHON ,.-1: 18" ABOVE FLOOR HOLE (TIP) ` ',,,,,•• ,,I i 3 Co MERCURY FLOAT •• 1-1/2" SCH. 40 SWITCHES (4) N O ` O Q PVC FLOAT TREE J cA 1. i z .r �fr -fz7'r w ••r�-�r-4 r eysFi r-� s�4"�r► -s• _ STA-RITE MULTI-STAGE 17069 Z • ALL TANKS REQUIRE A SUBMERSIBLE PUMP PART 3" PVC STAND v� 6' THICK #57 STONE NUMBER STEP 20 1/2 HP ' �'•.• :••• �(/� �y� i BEDDING (TYP.) OR EQUAL PER E-Z TREAT %"r •,F�('a1F1,F!�'• 4�` taw A RECIRCULATION TANK SECTION �'••,•,,5. •MAG})G ,',�, >./,��` D-102 NTS „r//�6! 1� 1 �pZO �f i • 100% 4" WELL CAP BACKUP DISCONNECT • EFFLUENT BYPASS PRIMARY LAMP LAMP UNION (TYP.) J M • VALVE BY E-Z TREAT i CD i FINISHED GRADE 4" 2" 2" 4" DIES: Q LL a- - - - ` ��If iliI [91;91 iliID 'l'� 1. ULTRAVIOLET LIGHT PURIFIER 1 j O 0 • UV-102 BY E-Z TREAT. p 4" x 2" 17" 4" x 2" • F REDUCER REDUCER 2. PROVIDE DUAL GFI RECEPTACLE is 4' 90 BEND 1/2" BALL FOR UNIT AND HEAT TAPE. FIELD • I__) I VALVE PVC ROUTCON CONE DUIT 120 VOLT3/4" id • TOP VIEW SINGLE PHASE 20 AMP BREAKER z = 4' FROM ALTER POD CONTROL AT HOUSE. N LU • 4' SCH. 40 PVC FLOW CONTROL 3. ORIENTATION PER SITE Z Fw- • CROSS (TYP.) WEIR 4" TO WITH ALARM REQUIREMENTS. _� Oy WATER LEVEL PLATE ULTRAVIOLET m v w v O y Z DISINFECTION 4. INSTALL I/2" BALL VALVE FOR Z M U F- 4• " SCH. 40 PVC Z F- r� UNIT SAMPLING DOWNSTREAM OF U.V. W Og N LT__W • FLOAT BALL REDUCING2 TEE• UNIT. y I-_I Z O O • 5. MAY LOCATE IN RECIRCULATION W?w W !• —— TANK IF ACCESS PROVIDED. LL YW ~ zz iim • NO�y =uaj w • ALL TANKS '�'• 4" 2" ''Ill,, mew ce ——2" III w p w REQUIRE A 6" 12" THICK STONE Li.: i II F BASE (TYP.) 4" x 2" 1 2" BALL "� • • MIN. REDUCER VALVE REDUCER o 0 i 30" DIA. z° a o + O E Z SET DISCONNECT 2a. Csi RISER UNION (TYP.) 0c0 o i PRIMARY 100% LAMP I BACKUP 'CO o ~ O Q Q� • RECIRCULATION TANK SECTION LAMP DD o z_ • CT) 10NTS ,- N F NON-CORROSIVE I- +n °' • REFLECTIVE AND SECTION VIEW 7 CA z "' • PROTECTIVE SLEEVE N Fri : Q ? N ce Q - 1 ULTRAVIOLET DISINFECTION J ° w < " = ti • D-103 NTS z U m o, : p = ° M dI- Oz - o ° a Ili. . Q Z J Tr • O } 5 rn ' +t QQ ce N-aa+ L.) • 30.0 E-Z SET RISER .�IN`/N%•I �/\`%\`\•�\1 j W/COVER (TYP) • ►-\14/4•-4 " • 3/4" BALL VALVE `4`,`��/h! fr.s,/`J`G4 3/4" UNION ` , 14/• ul • I� DIRECT BURY /•'/ `�i V�1 CABLE TO PANEL • CA • y 4kz.., • . i =1, ��`• V;A �,•`'������� 4" � ? 4S BEND ^ Q� • _.4:�_ - 3 ,un: v\,� '1-1/2" PVC !��!��!A J-F , ` ' ‘ CHECK VALVE 4''/, �� Ct I ' I / 1U1/2" SCH.(40 PVC MAIM + +++++i+ �< h FULL UNION TYP. .++ �`,, • 0 l • • FLOAT TREE BRACKET Q � '• V Cam/] _• GIs ; C F f ii • U 1" SCH. 40 PVC LINE - I f l TO FILTER POD 1. PIPING TO BE 4' SCH. 40 PVC. i70 DENITRIFICATION RETURN LINE CD GRAVITY CLEANOUT• �_D-103 NTS NTS ' •.. NG " '•2`�� ��