HomeMy WebLinkAbout710042_30 day poa_20210113PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 71-42
County: Pender
Facility Name: 3 Pig Farms
Certified Operator Name: Nate Farrior Operator Number: 16A'7 $?
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam -for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches)-
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1 2
N N
18 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off s to locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWO prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding animal units and dates for depopulation
'if animals are to be moved to another permitted facility, provide fac;lity number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
e Fqrrior Phone:
T
wner/Manager (print)
Date:
Facility Owner/Manager (signature)
910-289-5492
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 786,083 ftz
e. line c/12 x line d x 7.48 gallons/ft' 489992 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 5196001 ft3
h. current herd # 1170 certified herd #1 1200
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/20/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
506610 ft'
0 ft3
56058 1ft3
701459 gallons
1.42 Ibs/1000 gal.
1691.9 Ibs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon #2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.0 inches
19.0 inches
1.0 inches
786083 ft2
489992 gallons
180 days
g. volume of waste produced according to structural design 519,600 ft3
h. current herd # 1168 certified herd #1 1200
actual waste produced = current herd # x line g = 505744 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/20/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Oft3
64067 ft3
710364 gallons
1.42 Ibs/1000 gal.
1704.5 Ibs. PAN
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon#1
line m = 1691.9 lb PAN
2.
Structure ID: Lagoon #2
line m = 1704.5 lb PAN
3.
Structure ID:
line m = lb PAN
4.
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = lb PAN
6.
Structure ID:
line m = lb PAN
n.lines 1+2+3+4+5+6= 3396.4lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ D0 NnT I IST FIPI nS Tn WIdIrW PAID rntitinT RP ADDi icn nillDiikirr Twe ,2n nnv 1E21=c1nn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x is
u application window'
1611
1 S
Rye
9.76
23.62
230.5
10/1-3/15
2S
8.74
30.39
265.6
10/1 -3/15
3S
8.83
27.73
244.910/1-3/15
4S
9.12
282.06
2572.410/1-3/15
5N
7.93
9.68
76.8
10/1-3/15
5S
10.62
35.66
378.710/1-3/15
estate current crop enaing application aate or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3768.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 3396.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3768.9 Ib. PAN
y. Overall PAN balance (w - x) = -372 lb. PAN
PoA (30 Day) 2/21/00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permits. POA completed by
Jason Turner Pender SWCD 1/12/2021. Information was received on 1/10/2021 and given by Nate Farrior
through email.
PoA (30 Day) 2/21/00