HomeMy WebLinkAbout310612_30 day poa_20210113PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-612 Facility Name: Certified Operator Name: County: Dupl i n Boone Family Farms Stephen D Boone Operator #: AWA 27198 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): 1 (CB1) 2 (CB3) 3 (CB4) Spillway (Yes or No): No No No Level (inches): 30" 14" 18" 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions per mi t I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Christopher Boone Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) Cover Page Chris Boone (31-612) PoA30day (1-13-2021) (910) 284-9175 1/13/2021 Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Chris Boone #1 (C131) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 30.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) _ -11 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 11,968 ft2 e. line c/12 x line d x 7.48 gallons/ft3-82,061 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 9,829 ft3 h. current herd # 115 certified herd # 115 actual waste produced = current herd # x line g = 9,829 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 7,728 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 21,888 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/18/2020 0.04 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = -2 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Chris Boone (31-612) PoA30day (1-13-2021) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Chris Boone #2 (C133) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 49,5361 ft2 e. line c/12 x line d x 7.48 gallons/W 154,387 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 150 days g. volume of waste produced according to structural design 65,814 ft3 h. current herd # 770 certified herd # 770 actual waste produced = current herd # x line g = 65,814 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 30,625 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 144,272 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/18/2020 1.31 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 391.2 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 2 Chris Boone (31-612) PoA30day (1-13-2021) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Chris Boone #3 (C134) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 431161 ft2 e. line c/12 x line d x 7.48 gallons/W 26876 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 45669 ft3 h. current herd # 430 certified herd # 430 actual waste produced = current herd # x line g = 45669 ft' certified herd # i. volume of wash water according to structural design 30038.7 ft3 j. excess rainfall over evaporation according to design 32349 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 134711 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/18/2020 1.03 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 166.4 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 3 Chris Boone (31-612) PoA30day (1-13-2021) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Chris Boone #1 (CB1) line m = -2 Ib PAN 2. Structure ID: Chris Boone #2 (CB3) line m = 391.2 Ib PAN 3. Structure ID: Chris Boone #3 (CB4) line m = 166.4 Ib PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 555.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 71513 1 Small Grain 14.80 20.00 296.0 10/1 - 3/31 1957 1 Small Grain 15.14 20.00 302.8 10/1 - 3/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 598.8 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 555.3 Ib. PAN x. Crop's remaining PAN balance (line v from section III) = 598.8 Ib. PAN y. Overall PAN balance (w - x) _ -44 lb. PAN Summary Chris Boone (31-612) PoA30day (1-13-2021) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. This is to update last poa. Just not been able to pump much. Waste will be applied as soon as weather permits. Summary Chris Boone (31-612) PoA30day (1-13-2021) Page 2 of 2