HomeMy WebLinkAbout090210_Plan of Action (POA)_20201217e=�n
PLAN OOFACMN (POA) FOR MH FREEBOARD AT ANPGSi1AL FACUTES
1=ao61ity Number: � 1T) County: Ra � C3(,{,J^
FaciliRirDame: Dad id in - S&,i i
Certified Operator Name: Oaw(d
1. Current Muid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure e
Lagoon Name/Identifier (11)):
Spillway (Yes or No):
Level (inches): 1;�1S 2v /2//J ZO a1
0 s
2. Check all applicable items F A,ent%pn
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan__of.Actign iQ.i0tached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to -off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section 111 tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information,
Contact and secure approval from the Division of Water duality prior to transfer of waste
to a site not covered in the facility's certified animal waste management. plan,
Operation will be partially or fully depopulated. •
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility .
3. Earliest possible date to begin land application of waste: % o? — 0 7 0
I hereby certify that 1 have reviewed the information listed above and Included within the attached Plan
of Action, and to the best of my knowledge and ability, the information Is accurate and correct.
Davi nocLen
1Facility Owner/Manager (print)
OwnedManager (signature)
Phone:
Date: la
`�I t
PoA Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: David Gooden 1 12/15/20 POA line m =
2. Structure ID:. David Gooden 2 12/15/20 POA
3. Structure ID: David Gooden 3
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
117Z1N
line m = 249.6 lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
n. lines 1 +2+3+4+5+6= 249.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application
window'
4696
15A
overseed
3.30
50.00
165.0
Mar -Sep
4696
1513
overseed
1 3.301
50.00
165.0
Mar -Se
4696
15C
overseed
3.201
50.00
160.0
Mar -Se
4696
15D
overseed
1.801
50.00
90.0
Mar -Sep
** used only fields to meet
PAN needed. Guestimate on PAN remaining
these fields were notl
used on POA from 12/15/2020 for lagoons 1 and 2
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 580.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 249.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 580.0 lb. PAN
y. Overall PAN balance (w - x) = -330 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
IARRATIVE:
lumping will begin as soon as field conditions are acceptable.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JDavid Gooden 3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
27.0 inches
28.0 inches
1.0 inches
81600 ftz
50864 gallons
180 days
g. volume of waste produced according to structural design 96925 ft3
h. current herd # 2940 certified herd # 2940
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/2/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
96925 ft3
64033 ft3
51680 ft3
265089 gallons
0.79 1 Ibs/1000 gal.
249.6 lbs. PAN