HomeMy WebLinkAbout090209_Plan of Action (POA)_20201113K-eCi'eVeq ay Ego upgj2a
PLAN OF ACTM (PGA) FOR MH FREEBOARD AT ANIMAL FAMMES
FacRKY G�
Face➢ity l�a�eo �j1 t Il��.�,� ��i�'i �)
roa �' r errtuvued Operator Memo.t i. r"
�®a�nfyo � �C�GI'C�.ir1
DS operPatotrt,, Piu3
1. Current liquid level(s) in inches "as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways;, and from the current liquid level
in the lagoon to the bottom of the spillway for iagoons with spillways,
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
La'goon Name/identifier (ID): `
Spillway (Yes or No):
Level (inches): _
2. Check alQ applicable items ecei o �fl r �.
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are, within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secuve apprrovaD from the Division of Water Quality grior to transfer of waste,
to a site not covered in the facililtry's cerrt6fGed animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility r
3. Earliest possible date to begin land application of waste: L
0 herby certify that 0 lhave reviewed the information austedl above and linciuded within the attached Phan
of Action, and to the [best of my knowledge and abli ty, the information is accurate and correct.
P—n-0���t1t �`r ��t�lr�°` Phone-. CtO� ° �, 'Lt.
9aciflty owne imanagerr (Print)
Date:
Owner/Manager (signature)
PoA Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED ��i90TM STRUCTURAL FREEBOARD AND/OR 25 YRJ24
CAR. STORH STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Billups Nursery
line m =
293.4 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5. Structure ID:
6. Structure ID:
n. lines') + 2 + 3 + 4 + 5 + 6 =
line m = lb PAN
line m = lb PAN
293.4 lb PAN
III. TOTAL PAN .BALANCE REMAINING FOR AVAILABLE CLOPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rxs
u. application window'
Un
1
overseed
12.60
50.00
630.0
Oct -April
PAN balance is an estimate.
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sulrr`,t of column t) 0 630.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (fine n from section 11) = 293.4 Ib. PAN
x. Crop's remaining PAN balance (live v from section III) m 630.0 lb. PAVE
y. Overall PAVE balance (w - x) m -337 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
will begin pumping as soon as field conditions allow.
PoA (30 Day) 2/21 /00
PLAN OF AC71 OM (PDA) FOR HnH FREEBOARD AT AR9MNAL FACVL[17OES
30 DAY DRAW DOWN PER00
1]. TOTAL PAM TO BE LAVED APPLIED PER WASTE STRUCTURE
1. Structure fume/Identifier (ID): I Billups Nursery
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 26.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 56376 ft2
e. line c/12 x line d x 7.48 gallons/ft3 70282 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 46887 ft3
h. current herd # 6400 certified herd # 6400
actual waste produced = current herd # x line g = 46887 ft$
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines-h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/27/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECT�OM � FOR EACH WASTE STRUCTURE ON SITE.
(CI]ick our the next Stvucture tab shown bellow)
30976 ft3
37521 ft3
143845 gallons
1.37 Ibs/1000 gal.
293.6 lbs. PART
PoA (30 Day) 2/21/00