Loading...
HomeMy WebLinkAbout20201509 Ver 1_Information Letter_20110106 STATE OF NORTH CAROL] Wq ???1 DEPARTMENT OF TRANS PORTAT`,'grypw'^ BEVERLY EAVES PERDUE EuME A. CONTI, JR. GOVERNOR December 22, 2010 Brian Wrenn Transportation Permitting Unit, NCDWQ 2321 Crabtree Blvd, St. 250 Raleigh, NC 27604 Dear Mr. Wrenn: SECRETARY SUBJECT: STIP Project No. B53 k- Replacement of Bridge No. 126 on SR 2044 over Smith's Creek in Wake County The Project Development and Environmental Analysis Branch is in the process of project development, environmental and engineering studies for the replacement of Bridge No. 126 in Wake County. This project is included in the North Carolina State Transportation Improvement Program. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project including recommendation of alternates to be studied. Your comments will be used in the preparation of a federally funded Categorical Exclusion, prepared in accordance with the National Environmental Policy Act. It is desirable that your agency respond by March 22, 2011 so that your comments can be used in the selection of alternatives to be studied for this project. If you have any questions concerning this project, please contact Brenna Poole at (919) 431-1625. Please include the TIP Project Number in all correspondence and comments. Sincerely, MAILING ADDRESS: INC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS BRIDGE PROJECT DEVELOPMENT UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Brenna Poole Bridge Project Planning Engineer Project Development and Environmental Analysis Branch TELEPHONE: 919-431-2000 LOCATION: FAX: 919431-2001 PDEA ENVIRONMENTAL RESOURCE CENTER 4701 ATLANTIC AVENUE -SUITE 116 WEBSITE: WNW NCDOT.ORG RALEIGH INC 27604 -044 1 4 126 _. 3543 ?1 `?... F- j? 3542 ° .I- ---' ` 3541 Q; Ir4490 l••`,..4493 3546. ly 2183 \, } 4428 .99. i N i ¦: 6., t f I 4429 44 \ Kati-..._3679 •` T ti 3fi&1 a 36?$_ 2045 3677 2990 -.. , \ r .,. - ?.:'2044.3680 3609..,;'. •.? ? 3608 5523 ` 3610 366E 2045 Ip 366Z o^ 1 ` 3 n ... .: ..? - 1 6b _- _., 366 38 ai ? 36fi l? 3:663 ..1f 20 5 444 /,, ry0"TA\ 4h NORTH CAROLINA DEPARTMENT OF 1 TRANSPORTATION DIVISIONOFI'IIGHWAYS SRI 9 PROJECT DEVELOPMENT& `i \ ENVIRONMENTAL ANALYSIS BRANCH F ?OF TpPHS/ WAKE COUNTY REPLACE BRIDGE NO. 126 ON SR 2044 OVER SMITHS CREEK B-5318 Figure I ? 27-23-C•z? We t4 o ? ern NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Sevedy Eaves Perdue Coleen H. Sullins Governor Director January 10, 2011 MEMORANDUM TO: Brenna Poole, NCDOT Bridge Project Development Unit FROM: Rob Ridings, NCDWQ Transportation Permitting Unit R Dee Freeman Secretary SUBJECT: Scoping Review of NCDOT's Proposed Bridge Replacement Projects: B-5237 & B-5318 in Wake County In reply to your correspondence dated received January 6, 2011 in which you requested comments for the above referenced projects, the NCDWQ offers the following comments: Project-Specific Comments: B-5237, Bridge No. 248 over Mahler's Creek, Wake County 1. Mahler's Creek is class C; NSW waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to Mahler's Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCDWQ's Stormwater Best Management Practices. 2. This project is within the Neuse River Basin. Riparian buffer impacts shall be avoided and minimized to the greatest extent possible pursuant to 15A NCAC 2B.0233. B-5318, Bridge 126 over Smith's Creek, Wake County 1. Smith's Creek is class C; NSW; 303(d) waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that the most protective sediment and erosion control BMPs be implemented in accordance with Design Standards in Sensitive Watersheds to reduce the risk of nutrient runoff to Smith's Creek..NCDWQ requests that road design _ plans provide treatment of the storm water runoff through best management practices as detailed in the .: most recent version of NCDWQ Stormwater Best Management Practices. 2. This project is within the Neuse River Basin. Riparian buffer irppacts shall be avoided and minimized to the'greatest extent possible pursuant to 15A NCAC 2B.0233. Transportation Permitting Unit t?rOne t 1650 Mail Service Center, Raleigh, North Carolina 276991650 1? orthCaroitlld Phone 919-8h2oen1FAx:919-733-6893 .us/n etlan II.?????/?I' Internet. httpa/h2,encstate.ncdsl ... - ... _ . _ . - ..., ?- - ` J N An Equal Opportunity l Affirmative Acdon Employer r General Comments Regarding Bridge Replacement Projects 1. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDOT shall address these concems by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 2. If foundation test borings are necessary; it shall be noted in the document. Geotechnical work is approved under General 401 Certification Number 3687/Nationwide'Permit No. 6 for Survey Activities. 3. If a bridge is being replaced with a hydraulic conveyance other than another bridge, NCDWQ believes the use of a Nationwide Permit may be required. Please contact the US Army Corp of Engineers to determine the required permit(s). 4. If the old bridge is removed, no discharge of bridge material into surface waters is allowed unless otherwise authorized by the US ACOE. Strict adherence to the Corps of Engineers guidelines for bridge demolition will be a condition of the 401 Water Quality Certification. 5. Whenever possible, NCDWQ prefers spanning structures. Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment. The horizontal and vertical clearances provided by bridges shall allow for human and wildlife passage beneath the structure. Fish passage and navigation by canoeists and boaters shall not be blocked. Bridge supports (bents) should not be placed in the stream when possible. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of NC D W Q's Stormwater Best Management Practices. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 8. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted. When using temporary structures the area shall be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate naturally and minimizes soil disturbance. 9. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 10. All work in or adjacent to stream waters shall be conducted in a dry work area unless otherwise approved by NCDWQ. Approved BMQ measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 11. Heavy equipment shall be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 12. In most cases, the NCDWQ prefers the replacemgnt of the existing structure at the same location . with road closure. If road closure is not feasible, a temporary detour shall be designed and located to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks. If the structure will be on a new alignment, the old structure shall be removed and the approach fills removed from the 100-year floodplain. Approach fills shall be removed and restored to the natural ground elevation. The area shall be stabilized with grass and planted with native tree species. Tall fescue shall not be used in riparian areas. 13. Any anticipated dewatering or access structures necessary for construction of bridges should be addressed in the CE. It is understood that final designs are not determined at the time the CE is developed. However, the CE should discuss the potential for dewatering.and access measures necessary due to bridge construction. General Comments if Replacing the Bridge with a Culvert Placement of culverts and other structures in waters, streams, and wetlands shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 2. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation, floodplain benches and/or sills may be required where appropriate. Widening the stream channel shall be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 3. . Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures shall be properly designed, sized and installed. , 3. Any anticipated bank stabilization associated with culvert installations or extensions should be addressed in the Categorical Exclusion (CE) document. It is understood that final designs are not determined at the time the CE is developed. However, the CE should discuss the potential for bank stabilization necessary due to culvert installation. Thank you for requesting our input at this time. NCDOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and,designated uses are not degraded or lost. If you have any questions or require additional information, please contact Rob Ridings at 919-807-6403 , cc: Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office Chris Murray, Division 5 Environmental Officer Travis Wilson, NC Wildlife Resources Commission File Copy