Loading...
HomeMy WebLinkAbout20110016 Ver 2_Stormwater Info_20110207IIIIII VIII VIII VIII VIII IIII IIII FAST LANE PICKUP DATE PICKUP TIME 31$17 DRIVER _4 OF PIECES ? WEIGHT _ SAME DAY. BILL TO, SHIPPER RECEIVER 3RD PARTY_ NEXT DAY CAR VAN ROUND TRIP CHARGES FROM S & EC 11010 RAVEN RIDGE ROAD RALEIGH, NC 27614 846-5900 ; PROJECTi.? 11 SIGNATURE PRINT T; TO COMPANY NAME 11 828-08( Y'r STREET ADDRESS CITY ZIP CONTACT NAME t.:" ! 1 , !?. r, ?r` !, , ' "• i . I PHONE # "?'? !. ',J rr I` bATE_ TIME J Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com 1 ?- C) o 1 Lo U -?- February 07, 2011 S&EC Project # 7057.P1 To: N.C. Division of Water Quality 401 Oversight and Express Permits Unit i) D Attn: Ian McMillan/Annette Lucas 512 N. Salisbury Street-Floor 9 Raleigh, NC 27603 2011 From: Debbie Edwards DENR-wATERQUALITY Soil & Environmental Consultants, P.A. WETLANDS AND STORMWATER 10911 11010 Raven Ridge Road Raleigh, NC 27614 Re: The Astoria at Hope Mills Apartments Stormwater Management Plan Approval Cumberland County, NC On behalf of Mr. William H. Thorne, please find the attached Stormwater Permit No. SW6100802, Site Development Plans and the supplemental information for the project known as the Astoria at Hope Mills Apartments. This project is under notification thresholds for General Water Quality Certification 3821, specifically our impacts total 0.017 acres of wetlands impacts (i.e. < 0.10 acre), the proposed impacts are not adjacent to ORW, SA, WS-1, WS-II, Trout waters, or contiguous to waters designated as a North Carolina or National Wild/Scenic River, nor are there any proposed impacts to coastal or unique wetlands. Therefore written concurrence from the NCDWQ is not required. However, in order to meet condition #12 of General Water Quality Certification 3821 and the Protocol for 401 SMP Approval & Implementation, the applicant is required to send a copy of the Stormwater Management Plan along with a copy of it's Approval to the 401 Oversight/Express Permitting Unit for their files. Please contact me at (919) 846-5900 if you have any questions. Sincerely, Soil & Environmental Consultants, PA Lie Edwards Environmental Specialist CC: Scott Brown, P.E.-4D Site Solutions Inc. Attachments: 1) Stormwater Permit No. SW6100802 2) Stormwater Permit Application Form (signed and notarized) 3) Wet Detention Basin Supplement Form 4) Wet Detention Basin O&M Agreements (signed and notarized) 5) Stormwater Narrative, Easements, Subsurface Exploration & Geotechnical Analysis, copy of Deed and Stormwater Calculations 6) Site Development Plans Charlotte Office: Greensboro Office: Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 ?, A. r NCDEENR North Carolina DeVartment of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary Mr. William Thorne Atlantic Multifamily, LLC 116-A North Howe Street Southport, NC 28461 September 3, 2010 Subject: Stormwater Permit No. SW6100802 Astoria Apartments Hugh Density Commercial Wet Pond Project Cumberland County Dear Mr. Thorne: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Astoria Apartments on August 23, 2010; with additional information received September 1,.2010: Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW6100802, -fated-September 3, 2010, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until September 3, 2020, and shall be subject to the conditions and limitations.aa specked therein.. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unaccepptable, you have the right to request an adludicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you stave any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncdenr.gov. Sincerely, for Goleen H. Sullins Wetlands and Stomarrater Branch 1617 Mai Service center, Rakgh, Noo Cardin 27698-1617 Location: 512 N. Salisbury St. Raleigh. North Carolina 27601 Phone: 919-807-63001 FAX: 919-807.64941(uettomer Service:1$77-623-6748 Internet: www.ricwgenpft.org An Equal Oppoolu" 1 AARmative Action Employer w N0r`rthCarolina NVA(rallrY DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ? Coastal SW -1995 ? Coastal SW - 2008 ? Ph II - Post Construction (select all that apply) ? Non-Coastal SW- HQW/ORW Waters ? Universal Stormwater Management Plan ? Other WQ M t Plan: State of North Carolina I - C)o I Lo 0 a• Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Astoria Apartments 2. Location of Project (street address): Black and Decker Road between Legion and Hwy 301 City: Near Fayetteville County:Cumberland Zip:28306 3. Directions to project (from nearest major intersection): From the intersection of Legion & Black and Decker road follow Black and Decker road 0.28mi, site is on the left behind an existing church. 4. Latitude:35° 00' 08" N Longitude:78° 54'42" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ?Modification b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ®Not Started ?Partially Completed* ? Completed* *provide a designer's certification 2. Specify the type of project (check one): ?Low Density ®High Density ?Drains to an Offsite Stormwater System ?Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ?CAMA Major ®Sedimentation/Erosion Control: 23.6 ac of Disturbed Area ?NPDES Industrial Stormwater ?404/401 Permit: Proposed Impacts b. If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit: Fonn SWU-101 Version 07July2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: William Thorne for Cape Fear Multifamily LLC Signing Official & Title:Wil iam Thorne Manager b. Contact information for person listed in item 1a above: Street Address:116-A Noth Howe Street City: Southport State: NC Zip:28461 Mailing Address (if applicable): Same as above City: State: Zip: Phone: (910 457-9210 Fax: (910 ) 457-9211 Email: wthorne®firstoakland.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ? Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: William Thorne / Cape Fear Multifamily Signing Official & Title: William Thorne, Manager b. Contact information for person listed in item 2a above: Street Address: 116-A Howe Street City: Southport State: NC Zip: 28461 Mailing Address (if applicable): Same as above City: Phone: (910 ) 457-9210 State: Zip: Fax: Email: wthorne@firstoakland.com 457-9211 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Chris Pusey. Project Designer Signing Official & Title:Chris Pusey, President of 4D Site Solutions Inc b. Contact information for person listed in item 3a above: Mailing Address:409 Chicago Drive Ste 112 City:Fayetteville State:NC Zip:28306 Phone: (910 ) 426-6777 Fax: (910 ) 426-5777 Email: cpuse! Q4dsitesolutions.com 4. Local jurisdiction for building permits: Cumberland County Inspections Dept. Point of Contact:Tom Lloyd Phone #: (910-678-7600 ) Form SWU-101 Version 07July2009 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The site has been graded such that all of the storm runoff will drain to a wet pond via open and piped conveyances. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ? Approval of a Site Specific Development Plan or PUD Approval Date: ? Valid Building Permit Issued Date: ? Other: Date: b. Identify the regulation(s) the project has been designed in accordance with: ? Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 38.0 acres 5. Total Coastal Wetlands Area: 0.0 acres 6. Total Surface Water Area: 0.0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:38.0 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHW) line or Mean High Water (MHIM line, and coastal wetlands landward from the NHW (or LA line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 51.6 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Big Sandy Run Stream Class * C Stream Index Number * 18-31-25 Total Drainage Area (so 1,655,331 On-site Drainage Area (sf) 732289 Off-site Drainage Area (so 923,042 Proposed Impervious Area** s 854,621 % Impervious Area** total 51.6% Impervious- Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On-site Buildings/Lots (so 171,008 On-site Streets (so 237,683 On-site Parking (so above On-site Sidewalks (so 37,962 Other on-site (sf) - Future (so 0 Off-site (so 407968 Existing BUA*** (so 0 Total (so: 854621 * Stream Class and Index Number can be determined at: http://h2o.enr.state.nc.us/bims ftorts/reportsWB.html Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07July2009 Page 3 of 6 ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined? Provide documentation. The drainage area was delineated using some ground topo suplemented with LIDAR data Proiects in Union County: Contact DWQ Central ice staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B. 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from h!!p://h2o.enr.state.nc.us/su/-`-bmp _forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hgp://h2o.enr.state.nc.us/su/bmp_forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map athgp://h2o.enr.state.nc.us/su/"msi_maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htlp://h2o.enr.state.nc.us/su/`bmp_forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/ Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Ini u/a Form SWU-101 Version 07July2009 Page 4 of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 6S-1-7 l3Y 10. A copy of the most current property deed. Deed book: F6 2 Page No: &89- 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/sulbml2 forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Scott Brown PE Consulting Firm: 4D Site Solutions Inc Mailing Address:409 Chicago Drive Ste. 112 City:Fayetteville State:NC Zip:28306 Phone: (910 ) 426-6777 Fax: (910 ) 426-5777 Email: sbrown@4dsitesolutions.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) William Thorne certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) William Thorne with (print or type name of organization listed in Contact Information, item 1b) William Thorne to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/ Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of 'up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: ?? I, 61-1Z & 4A T9 • Sd S a Notary Public for the State of KIm e?Af PO&C, County of nd& 1 &A0 do hereby certify that &5 ;a ?R n4 )? • The P u& personally appeared before me this3) day of JA-A"^ y , 'W11 and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, P -L:- ^ A A _ w : NOTARY °?cn • * * * _ - PUBLIC 7CK CO\ ? ?\\ 00 W\0 SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) William Thorne certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date: JJ? I, IG ?i 1 j9-71? 4 • fia is a Notary Public for the State of Ka o-W 4 M County of do hereby certify that ZAJ' G,4,)4AW * Zha.- m+ personally appeared before me thisa L day of %%.ohla.d" IJ and acknowledge the due execution of the a plication for a stormwater permit. Witness my hand and official seal, cu. • NOTARY • - ,t * * - W ' PUBLIC ° ?i???k CO? A,'y 1! 1 SEAL My commission expires °Z a p) :W Form SWU-101 Version 07July2009 Page 6 of 6 X ? • '% t NA, iOPermit NO. Ito be provided by DWQ) :Q SEAL 027452 ''.?•••'?NGINS EP.• • `;'- ( O?OF wATFRQr NCDENR -s?orr BR STORMWATER MANAGEMENT P HTrAPPL'eATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Astoria Apartments Contact person Scott Brown Phone number 910-426-6777, ext 102 Date 23-Feb-10 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,655,331 ftz Impervious area, post-development 854,621 ftz % impervious 51.63 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume Form SW401-Wet Detention Basin-Rev.8-9/17/09 71,039 ft3 OK 149,989 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 3.0 in 0.20 (unitless) 0.64 (unitless) 0.13 in/hr OK 0.85 ft3/sec 3.16 ft3/sec 2.31 ft3/sec 200.66 fmsl 199.50 fmsl 199.00 fmsl 200.00 fmsl 199.00 fmsl Data not needed for calculation option #1, but OK if provided. 191.00 fmsl 190.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft y (Y or N) 201.5 fmsl Insufficient. Must equal the temp. pool elev. previously entered Parts 1. & II. Design Summary, Page 1 of 2 9 `# Permit (to be provided by DWQ) il. DESIGN INFORMATION Surface Areas Area, temporary pool 130,327 ftZ Area REQUIRED, permanent pool 72,835 if SAIDA ratio 4.40 (unitless) Area PROVIDED, permanent pool, Ap„„_Pw 116,664 ft` OK Area, bottom of 1 Oft vegetated shelf, Aboa spur 104,360 W Area, sediment cleanout, top elevation (bottom of pond), Ab tl.d 86,175 ft` Volumes Volume, temporary pool 149,989 ft3 OK Volume, permanent pool, VPermpooI 448,553 ft3 Volume, forebay (sum of forebays if more than one forebay) 97,551 ft3 Forebay % of permanent pool volume 21.7% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 4.40 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp--P d 448,553 ft' Area provided, permanent pool, A,-_,w 116,664 ft' Average depth calculated 3.84 ft OK Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) To it OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, A,„„_,,d 116,664 ft` Area, bottom of 1Oft vegetated shelf, Abo, ,,elf 104,360 ft` Area, sediment cleanout, top elevation (bottom of pond), Ab t_p d 86,175 e "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 8.00 ft Average depth calculated ft Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 3 &4 in Area of orifice (if-non-circular) in' Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.42 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Q (unifless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 0.85 ft3/sec Post-development 1-yr, 24-hr peak flow 3.16 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.42 ft3/sec Storage volume drawdown time 4.10 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 4.6 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1.5 ft OK Vegetated filter provided? n (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & IL Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. G 3 • x, 1. Plans (1" - 50' or larger) of the entire site showing: 66 mom w co SHeeTS) - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. VActte 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, 7, 7 - Maintenance access, 3-S - Permanent pool dimensions, 3,y - Forebay and main pond with hardened emergency spillway, 1,3 , 3 • L! -Basin cross-section, AccuR•.Te GOW10UT-5 PXC V1 De D - Vegetation specification for planting shelf, and -7. 7 -Filter strip. ,v/A T VNV_IU 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, GovTOO Z 5 17%0 7e p Pretreatment and treatment areas, and 3, 4 Inlet and outlet structures. 3.'Z, 3.,4 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. to, AL 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, ? 6T_ U.- to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 8.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 8.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Sediment Removal Bottom Permanent Pool Elevation 199.5 191.0 Pe anen ------------------ Volume 190.0 -ft Min. Sediment Storage FOREBAY Pool - - - Sediment Removal Elevation -191.0 Volume -- - - - - - ? Bottom Elevation 190.0 1 1-ft NYr Sedimei Storage MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Astoria BMP drainage area number: 01 Print name: William Thorne for Cape Fear Multifamily LLC Title: Member - Manager Address: 116-A North Howe Street, Southport, NC 28461 Phone: 919-457-9210 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 1-`? Li 2 I. So A-no s , a Notary Public for the State of 14,6p-7.4 4&toL,, , , County of I©ru na to t e.k, , do hereby certify that W i t,l a, m )?- `JI-w r-nA personally appeared before me this l 3 *4 day of , A.?* t 1 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, C- 4? at.&" X. -\ ?\?\\ U I I!///// L =w; ** _ PUBLIC SEAL My commission expires &44 r?ea yy > 0' ,ZC116' Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 4P,51TF ,50LuTioNS. INC. Astoria Apartments Storm Water Narrative The site is currently undeveloped. The site is being developed with the construction of a new apartment complex with the associated parking lot, drive aisles and buildings. The site is relatively flat with natural drainage to the eastern side of the property. i Drainage Area #1 This area drains all of the impervious surfaces from the new construction as well as some off site area. The storm water will be treated by a permanent wet pond to be located internal to the development as shown on the drawings. The storm water is conveyed from the new construction through grassed swales & pipe to the new pond. The pond is connected to a secondary pond that is extended onto the adjacent parcel where an existing ditch once drained the property. The second pond overflows into this ditch and drains the site. The second off site pond will serve this development as well as possible future development on the adjacent parcel to the north. The second off site pond is being put on its own lot and this lot will be in the name of an owners association that will operate and maintain the pond. The owners association will be controlled by both of the land owners that the pond will service. The first wet pond is the forebay for the pond systems initial treatment. The permanent pool elevation is controlled by a 3.0 inch orifice that is located on the riser for the pond. The pond is also designed with an emergency spillway to ensure that the pond is not breached. '}fir, t?°Ml",?r. ? ? » ?' .. ' ? ? ,?:. 's L?'_? ?`?. ?R9` }?S, z » » r A: > e4 • t n .. t T K?. ° "'11A ? fJV,? Y A aA ? d a toe •z c ell '? w t ! A a w ° - . ? ..- 14 - V- a e r . ' ??^'? H i y + s 9) N- 4t, E-4 ? -'??: a'#??? ? ?r r~ ?` ? ! s? ? * ?, ? "'.r ?;? r (/? '• 9°,..' ? ? fit ', .?1.?? a IR, YM' ? u • '?" ?p s?. 6r v. _..,- ,« r j' ,fit. Kw ilk r-I 49 W. • ¦A i ?; p' ¦ + t ' ` ( M c"'f- W a a, 1 _ fin„ " '1. Ire 'AL t ts ti JJ,, . ; - PP_ Ec,Iri)WAfZ. i 5Td2r`^ W,kTCS 2 L;Afw C- Al c: uT F("Al- VC-; Z5ro&j Ta C?? IZC: Go2?7G?"7 I N Cv?u'?Y Gav2T t+avSG EASEMENTS WITH COVENANTS AND RESTRICTIONS AFFECTING LAND Instrument Prepared By: Grayson G. Russell, Esq. (No title exam) Brief Description for Index: Parcel Identifier Nos.: 0425-77-0293 and 04252-66-9946 Mail after recording to: Grayson G. Russell Russell Law Group, PLLC P. O. Box 19001 Raleigh, N.C. 27619 STATE OF NORTH CAROLINA COUNTY OF CUMBERLAND THIS AGREEMENT (the "Agreement") made this day of August, 2010, by and between ATLANTIC MULTIFAMILY, LLC, whose address is 2840 Plaza Place, Suite 104, Raleigh, Wake County, North Carolina 27612 (hereinafter referred to as "Developer"), a North Carolina non-profit corporation whose address is ("POA"), and JOSEPH P. RIDDLE, III, whose address is 238 N. McPherson Church Road, Fayetteville, NC 28303 (hereinafter referred to as "Riddle") (Developer, POA and Riddle are collectively referred to as the "Parties", and individually as a "Party"). WITNESSETH WHEREAS, the Developer is the owner in fee simple of that certain property situated in Cumberland County, North Carolina and more particularly described on Exhibit A attached hereto and incorporated by reference herein (the "Atlantic Property"); WHEREAS, Riddle is the owner in fee simple of that certain property situated in Cumberland County, North Carolina and more particularly described on Exhibit B attached hereto and incorporated by reference herein (the "Riddle Property"); WHEREAS, the Atlantic Property, the POA Property and the Riddle Property are contiguous parcels; WHEREAS, the Developer desires to construct a certain apartment complex upon the Atlantic Property to be known as The Astoria (hereinafter the "Project"); WHEREAS, the Developer and Riddle formed POA and transferred certain of their real property to POA to facilitate the construction of the Project and any future development on the Riddle Property; WHEREAS, POA is the owner in fee simple of that certain property situated in Cumberland County, North Carolina and more particularly described on Exhibit C attached hereto and incorporated by reference herein (the "POA Property"); WHEREAS, the Developer intends to construct and maintain certain storm water facilities upon the POA Property to serve the Project and any future development on the Riddle Property; WHEREAS, the Atlantic Property, the POA Property and Riddle Property are located within the planning jurisdiction of the Department of Environmental and Natural Resources ("DENR") and are subject to certain stormwater requirements set forth in DENR's Stormwater Management Utility Ordinance (the "Ordinance"), as may be amended from time to time; and WHEREAS, as required by DENR, and in connection with the development of the Project and the Riddle Property, the Developer shall construct and install certain engineered stormwater facilities (the "Stormwater Facilities"), as shown on Developer's construction plans and drawings (the "Plans"), on the Atlantic property and the POA Property for the purpose of establishing a stormwater management system for the Project and any future development on the Riddle Property; WHEREAS, the Stormwater Facilities are required to comply with the Ordinance; and WHEREAS, DENR also requires that the Developer and POA grant to DENR certain access easements over and across the Atlantic Property and the POA Property for the purposes of inspecting the Stormwater Facilities as set forth in this Agreement. NOW, THEREFORE, for a valuable consideration, including the benefits the Parties may derive therefrom, the adequacy and sufficiency of which is hereby acknowledged, the Parties hereby agree as follows: I . Recitals. The foregoing recitals shall constitute an integral part of this Agreement, and shall be incorporated herein and made a part hereof. 2. Grant of Easements to DENR. POA hereby dedicates, bargains, sells, grants, and conveys unto DENR, its successors and assigns, a perpetual, non-exclusive and irrevocable right and easement of ingress, egress and regress over through and across the POA Property for the purpose of permitting DENR inspection of the Stormwater Facilities. Whenever possible, DENR shall provide advance written notice to POA prior to its entry on the POA Property. The Developer hereby dedicates, bargains, sells, grants, and conveys unto DENR, its successors and assigns, a perpetual, non-exclusive and irrevocable right and easement of ingress, egress and regress over, through and across the Atlantic Property to and from the POA Property for the purpose of permitting DENR inspection of the Stormwater Facilities. 3. Access, Construction And Maintenance Easement. POA grants unto the the Developer and Riddle, their heirs, successors and assigns (including, without limitation, their contractors, subcontractors and agents), a perpetual, non-exclusive right, privilege and easement in, upon, and across the POA Property for the purpose of constructing, maintaining, replacing, reconstructing, upgrading and repairing the Stormwater Facilities and their appurtenances. The Developer grants unto Riddle, his heirs, successors and assigns (including, without limitation, his contractors, subcontractors and agents), a perpetual, non-exclusive right, privilege and easement in, upon, and across the Atlantic Property for the purpose of constructing, maintaining, replacing, reconstructing, upgrading and repairing the Stormwater Facilities and their appurtenances, including but not limited to the lift station situated or to be situated on the Atlantic Property (the "Lift Station"). Upon completion of any activities of a Party which disturb the surface of the POA Property, the Atlantic Property or the Riddle Property, and any future improvements permitted by this Agreement, such party shall promptly restore the land and such improvements to the condition they were in immediately prior to such disturbance or as otherwise required by the Agreement, except as otherwise provided in this Agreement or as necessarily modified to accommodate the Stormwater Facilities. 4. Stormwater Discharge Easement. POA hereby dedicates, grants, creates, and establishes for the benefit of the Developer and Riddle, and their heirs, successors and assigns, the perpetual, non-exclusive easement to discharge storm water runoff originating on the Atlantic Property and/or the Riddle Property into the stormwater pond to be constructed on the POA Property pursuant to the Plans for drainage purposes, including retention and detention (the "Pond"). The Developer shall at all times be responsible for the quantity and quality of all waters discharged from the Atlantic Property into the Pond. Riddle shall at all times be responsible for the quantity and quality of all waters discharged from the Riddle Property into the Pond. POA shall at all time be responsible for storage of the storm water in the Pond, and for any discharge of such storm water from the Pond, including compliance with all applicable federal, state, and local requirements for the operation, use and maintenance of the Stormwater Facilities. Neither Developer nor POA shall cause or permit any alteration in the natural storm water run-off or other drainage flow onto the Riddle Property as a result of its construction of the Stormwater Facilities. If at any time Riddle, or his heirs, successors or assigns, determines that any storm water run-off or other drainage has caused or contributed to any damage to the Riddle Property, Riddle, his heirs, successors or assigns, may demand, and the Developer and POA shall immediately undertake, such measures as may be required to correct the condition causing or contributing to such damage and to bring the Riddle Property back to its original condition prior to the damage, and to compensate Riddle, his heirs, successors or assigns, for such damages. The provisions of this paragraph shall be specifically enforceable by Riddle, his heirs, successors and assigns, without the necessity of demonstrating an adequate remedy at law exists and any damage to the Riddle Property shall be presumed to be irreparable harm. In connection with any such action, Riddle, his heirs, successors and assigns, shall not be required to post a surety bond. 5. Construction of the Stormwater Facilities. The requirements pertaining to the construction and maintenance of the Stormwater Facilities are more fully set forth in the Ordinance. Developer agrees to construct the Stormwater Facilities in accordance with the Plans, the specifications approved by DENR, and all applicable federal, state and local requirements. Following the commencement of construction of the Stormwater Facilities, such construction shall be (a) performed in a good and workmanlike manner in accordance with all applicable laws, codes and ordinances, (b) completed in a diligent manner, prior to , 20_, subject to matters of force majeure, and (c) performed using good faith efforts to minimize the disruption to any owners and occupants of the Riddle Property. Developer shall ensure that construction of the Stormwater Facilities, as constructed, will be performed in full compliance with any and all local, state and federal laws, codes and regulations. Notwithstanding anything to the contrary herein, Riddle shall be under no obligation to construct or develop any improvements upon the POA Property, the Riddle Property or the Atlantic Property for the benefit of Developer or any other person or entity. 6. Operation of the Stormwater Facilities/Ex ansion. Without limiting the generality of the preceding paragraphs, the Stormwater Facilities shall meet or exceed all applicable requirements and specifications of all governmental agencies having jurisdiction of matters relating to storm water drainage in the area where the Pond is located to the end that all the Stormwater Facilities will be qualified to be accepted by any such storm water district, if otherwise appropriate. Neither the Developer nor POA shall construct or place any structure, building, or other surface improvements, whether temporary or permanent, or plant or locate any trees or shrubs on the POA Property, other than the Stormwater Facilities. Upon completion of the Stormwater Facilities according to the Plans, POA shall be responsible for maintaining the Stormwater Facilities in a safe and attractive condition and in compliance with all applicable governmental requirements. POA shall be further responsible for the maintenance, repair, reconstruction and replacement thereof, at its sole cost and expense, subject to contribution from its members to the extent required under the POA's organizational documents or as otherwise specifically provided in this Agreement. POA shall also be responsible for maintaining any vegetation on the POA Property in the manner specified herein and in strict compliance with the Plans, any approved construction drawings, the Ordinance, applicable laws, regulations and rules, and the directives of DENR. At all times, the Stormwater Facilities shall perform as designed and shall at all times comply with the Ordinance and all applicable laws, regulations, rules and directives of DENR. In the event Riddle, his heirs, successors or assigns, desire from time to time to develop all or a portion of the Riddle Property and such development requires improvements or modifications to the Stormwater Facilities, including the Lift Station, beyond those contained in the Plans, such that the Stormwater Facilities and said Lift Station can serve both the Project and the improved Riddle Property, or portion thereof, Riddle may undertake to make any such improvements or modifications to the Stormwater Facilities without any further consent or authorization from the Developer, POA or any third party, at Riddle's sole cost; provided, however, that the Parties agree that the costs of any upgrade, modification and/or expansion of the Lift Station deemed necessary by Riddle for the development of the Riddle Property, including with respect to the pump and propeller systems contained therein shall be borne solely by the Developer. Accordingly, the Developer shall, contemporaneously with the execution and delivery by the Developer of this Agreement, make a capital contribution to the POA in the amount of $ to be held in trust by POA and used by POA solely for said upgrades, modifications and expansion to said Lift Station. Upon receipt of Riddle's invoice for its respective portion of the costs of such upgrades, modifications and expansion of the Stormwater Facilities. POA and the Developer, as applicable shall, within thirty (30) days thereafter, reimburse Riddle for its share of the above-referenced costs. In the event POA or the Developer fails to perform any obligations under this Agreement within ten (10) days of written notice by Riddle, or POA fails to provide insurance or evidence of insurance as required by paragraph 8 below, Riddle may, but is not required to, perform any such obligation of POA at the sole cost and expense of POA and/or the Developer, as applicable. Except as may be necessary to prevent damage or injury on an emergency basis, Riddle shall not commence performance of any unperformed obligation of POA or the Developer as long as, within such ten (10) day period, POA of the Developer, as applicable, shall have commenced curative action and thereafter shall prosecute such curative action diligently to completion. performance by POA of all of the covenants, conditions, and provisions in this Agreement. This Guaranty shall be absolute, continuing and unlimited. (e) Indemnity. The Developer shall indemnify, defend, and hold harmless POA and Riddle, their heirs, successors and assigns, from and against any and all losses, claims, actions, damages, liabilities, penalties, fines, or expenses, of whatsoever nature, including, without limitation, reasonable attorney's fees and costs on account of mechanics' lien claims, injury to persons, the death of any person, or damages to property ("Claims") arising from Developer's use of the POA Property or any adjoining areas, or from the discharge of storm water onto the POA Property or the Riddle Property, or from the storage of storm water in the Pond, or the release or discharge of the storm water from the Pond, or from any activities contemplated by this Agreement, except to the extent any such Claim results from the wrongful acts or omissions or the negligence, gross negligence or willful and wanton acts of the party(ies) seeking indemnification. 9. Non-Obstruction. The easement herein granted is intended to, and shall be construed to permit free and unobstructed usage of the POA Property by the Parties as provided herein. Accordingly, except as specifically provided for herein, no charges may be imposed by the Developer or Riddle for such use, and no barriers or other obstructions may be placed thereon, except as provided in the POA's organizational documents. 10. License to Remove Dirt. POA hereby authorizes the Developer to grade and remove fill dirt ("Dirt") from the POA Property for use in constructing the Stormwater Facilities without charge; provided, however, that (a) the Developer shall remove only such Dirt from the POA Property as is reasonably necessary for the Developer to construct the Stormwater Facilities, and in any event, not to exceeds of 38,000 cubic yards, (b) the Dirt shall be used solely for the Project, (c) all such excavation operations shall be in an orderly and progressive manner, and (d) the Developer shall give due consideration to disturbances which will affect soil movement or impair and aggravate water movement. The Developer shall also be responsible for directing the flow of water arising from the excavation of Dirt into approved erosion control devices in a manner acceptable to DENR and other governmental authorities. During the term of this Agreement, or upon any termination or abandonment of the Developer's excavation activities, the Developer shall control drainage and reclaim all excavated areas disturbed by its operations in the manner required by DENR, all applicable laws of the State of North Carolina and the rules and regulations issued thereunder. Any existing road used by the Developer in connection with its activities on the POA Property that is damaged or injured beyond ordinary wear and tear through such use shall promptly be restored by the Developer to its original condition. The Developer shall protect property such as fields, fences, telephone, light and power lines, buildings, ditches, bridges, etc. on the POA Property and the Riddle Property against injury from its operations, and shall repair damage caused by the Developer by restoring them immediately to the condition found prior to change. Any materials moved from any borrow pit area but not removed from the POA Property shall be returned to a borrow pit area at the conclusion of the Developer's excavation activities. The Developer shall not deposit any materials of any nature whatsoever on the POA Property or the Riddle Property which do not originate from the POA Property or the Riddle Property, respectively. The Developer shall take all appropriate erosion prevention measures with respect all areas disturbed by the Developer at the POA Property, together with areas of the Riddle Property affected by Developer's operations on the POA Property, and shall leave all areas disturbed by the Developer's operations properly drained into erosion control devices at the termination of its activities, all of which shall be undertaken in a manner acceptable to DENR and in accordance with any reclamation plan submitted to DENR. The Developer, at its sole cost and expense, shall comply with all laws, ordinances, orders, rules and regulations of state, federal, municipal or other agencies or bodies having jurisdiction over the Developer's use of the POA Property. The Developer shall be responsible for obtaining all federal, state and local permits and approvals required for its Dirt removal operation at the POA Property at its sole cost and expense, and Developer shall furnish POA and Riddle a copy of all permits obtained by the Developer for its operations at the POA Property. The Developer covenants that it shall timely comply with all the terms and conditions of any reclamation plan required by DENR and any other governmental authorities. The Developer shall indemnify and hold POA harmless for claims, damages, liabilities, losses, costs and expenses of any kind or nature whatsoever (including, without limitation, attorneys' fees and expenses and court costs) arising out of or in any manner related to the Developer's failure to timely comply with any term, provision or condition of said reclamation plan. 11. Release. Developer accepts the condition of the POA Property and the Dirt (to the extent of any rights therein) in their "AS IS" condition. By entering this Agreement, the Developer waives and releases POA from any liability, obligation, damage, or claim of whatsoever nature relating to the condition of the POA Property and the Dirt, whether apparent or hidden. 12. Transfer of Ownership. In thee event of a transfer of the ownership of all or a portion of the POA Property, the Atlantic Property or the Riddle Property, the respective owner, as applicable, shall, within thirty (30) working days of such transfer of ownership, notify DENR Stormwater Department of such ownership transfer if such information is not otherwise contained in the instrument by which the transferee acquired such interest recorded in the land records of Cumberland County, North Carolina. 14. No Waiver of Right. This Agreement shall not in any way diminish, limit, or restrict the right of DENR to enforce any of its ordinances as authorized by law. 15. Notice. Written notice as required hereunder shall be provided to DENR , to POA at , Attention: to Riddle at 238 N. McPherson Church Road, Fayetteville, NC 28303, Attention: Joseph P. Riddle, III (with a copy to Richard A. Galt, Esq., 2533 Raeford Road, Fayetteville, North Carolina 28305), and to the Developer at 2840 Plaza Place, Suite 104, Raleigh, Wake County, North Carolina 27612. Written notice shall be deemed received four (4) days following its deposit, first class mail, return receipt requested, with the United States postal system. In the event notice to a Party is returned, the notifying Party may notify the other Party(ies) at either (i) the mailing address provided to the Cumberland County Tax Assessor; or (ii) the registered agent of the Party on file with the Corporations Division of the Secretary of State's Office. 16. Successors and Assigns. This Agreement shall bind and inure to the benefit of the Parties hereto, their respective heirs, representatives, lessees, successors and assigns; provided, however that no conveyance by Developer of all or a portion of the Atlantic Property shall relieve Developer of its obligations hereunder. 17. Covenant Running with the Land. It is understood and agreed that until this document is fully executed by POA, the Developer and Riddle and recorded in the Cumberland County, North Carolina Register of Deeds, there is not and shall not be an agreement of any kind between the Parties hereto upon which any commitment, undertaking or obligation can be founded. Once recorded with the Register of Deeds of Cumberland County, North Carolina, this Agreement shall constitute a covenant running with the land and shall be binding on the Parties, their administrators, executors, successors, heirs, and assigns. 18. Amendment. This Agreement (including exhibits) may be modified or canceled only by the mutual agreement of (a) POA, its successors or assigns, (b) Developer, as long as it has any interest in the Atlantic Property, and (b) Riddle, as long as Joseph P. Riddle, III, or his heirs, Trina T. Riddle or her heirs, a trust for the benefit of Joseph P. Riddle, III or Trina T. Riddle, or any of the members of their family, or any entity in which Joseph P. Riddle, III or Trina T. Riddle has any interest as either owner or lessor of the Riddle Property, or their successors-in-interest, has any interest in the Riddle Property. No amendment to this Agreement shall become effective until executed by the appropriate parties and recorded in the office of the County Register of Deeds. 19. Term. This Agreement shall continue as a servitude running in perpetuity with the Property. 20. Liability of Riddle. Notwithstanding anything to the contrary herein, it is specifically understood and agreed, such agreement being a primary consideration for the execution of this Agreement by Riddle, that if Riddle shall fail to perform any covenant, term or condition of this Agreement upon Riddle's part to be performed and, as a consequence of such default, another person or entity shall recover a money judgment against Riddle, such judgment shall be satisfied only out of the proceeds of sale received upon execution of such judgment (or rent profits, insurance proceeds, or consideration received by Riddle from the sale of all or any part of his interest in the Riddle Property if Riddle has failed to satisfy such judgment within the time period for an appeal for such judgment by such person or entity as prescribed by law) and levy thereon against the then right, title, and interest of Riddle in the Riddle Property, as the same may then be encumbered, and Riddle shall not be liable for any deficiency. It is understood that in no event shall any person or entity have any right to levy execution against any property of Riddle other than its interest in the Riddle Property as hereinbefore expressly provided. In the event of the sale or other transfer of all of Riddle's right, title and interest in the Riddle Property, Riddle shall be released from all liability and obligations under this Agreement. IN WITNESS WHEREOF, the parties have executed this Agreement the day and year first written above. [Signature page to follow] IN WITNESS WHEREOF, the Parties have executed this Agreement and under seal as of the day and year first above written. DEVELOPER: ATLANTIC MULTIFAMILY, LLC By: William H. Thorne, Manager (SEAL) RIDDLE: Joseph P. Riddle, III [POA] By: President Attest: (SEAL) (SEAL) NORTH CAROLINA COUNTY OF I, the undersigned Notary Public, certify that Joseph P. Riddle, III personally came before me this day and acknowledged the he voluntarily executed the foregoing instrument in his own name. WITNESS my hand and official stamp seal this the day of , 2010. (SEAL) , Notary Public My Commission Expires: STATE OF NORTH CAROLINA COUNTY OF I, the undersigned Notary Public do hereby certify that William H. Thorne personally appeared before me this day and acknowledged that he is the Manager of Atlantic Multifamily, LLC a North Carolina limited liability company, and that he as Manager, being authorized to do so, executed the foregoing instrument on behalf of said entity. This the day of , 2010. (SEAL) Notary Public My Commission Expires: [Add POA acknowledgement] {_ 8 ?f.IVt REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS THE ASTORIA OF HOPE MILLS HOPE MILLS, NORTH CAROLINA KAM PROJECT NUMBER 10-025 PREPARED FOR: FIRST OAKLAND PROPERTIES 2840 PLAZA PLACE, SUITE 104 RALEIGH, NORTH CAROLINA 27612 PREPARED BY: KAM ENGINEERING SERVICES, P.C. 610 SPRING BRANCH ROAD DUNN, NORTH CAROLINA 28334 PHONE: (910) 292-2086 • FAX: (910) 292-2087 FEBRUARY 4, 2010 PRELIMINARY REPORT Geotechnical Engineering Services Construction Material Testing Civil Quality Control February 4, 2010 First Oakland Properties 2840 Plaza Place, Suite 104 Raleigh, North Carolina 27612 Attention: Mr. Gary Brady Re: Report of Subsurface Exploration and Geotechnical Evaluation The Astoria of Hope Mills Hope Mills, North Carolina KAM Project No. 10-025 Ladies and Gentlemen: KAM Engineering Services, P.C. is pleased to present this report for the subsurface exploration and geotechnical evaluation for The Astoria of Hope Mills apartment complex located near the intersection of Legion Road and Black & Decker Road in Hope Mills, North Carolina. This report contains a description of the project information provided to us, a discussion of the general subsurface conditions revealed during our geotechnical exploration, and our geotechnical recommendations for the proposed construction. There are important limitations to this and all geotechnical studies. Some of these limitations are discussed in the information prepared by The Association of Engineering Firms Practicing in the Geosciences (ASFE). We ask that you please review this information and contact us should you have any questions. We have enjoyed working with you and appreciate the opportunity to serve as your geotechnical consultant on this project. If you need further information, or if we can provide additional services, please do not hesitate to contact us. Respectfully Submitted, KAM ENGINEERING SERVICES, P.C. Kurt A. Miller, P.E. - Senior Geotechnical Engineer www. KAM-Engineerinq.com r i kAIA TABLE OF CONTENTS PAGE 1.0 PURPOSE AND SCOPE OF SERVICES .........................................................................................2 Purpose of Study .................................................................................................................................. ..2 Scope of Services ................................................................................................................................ ..2 2.0 PROPOSED PROJECT DATA ....................................................................................................... ..4 3.0 EXPLORATION PROCEDURES ................................................................................................... ..5 Field Exploration ................................................................................................................................. ..5 Laboratory Testing .............................................................................................................................. ..6 4.0 SITE AND SUBSURFACE CONDITIONS .................................................................................... ..7 Site Conditions .................................................................................................................................... ..7 Regional Geology ................................................................................................................................ ..7 Subsurface Conditions ......................................................................................................................... ..7 Groundwater Conditions ..................................................................................................................... ..9 Laboratory Results ............................................................................................................................... ..9 5.0 ENGINEERING EVALUATION AND RECOMMENDATIONS ............................................... 10 5.1 General ....................................................................................................................................... 10 5.2 Site Preparation .......................................................................................................................... 10 5.3 Structural Fill Placement ........................................................................................................... 11 5.4 Cut and Fill Slopes ..................................................................................................................... 12 5.4.1 Slope Stability ............................................................................................................... 12 5.1.2 Slope Protection ............................................................................................................ 13 5.5 Excavation Recommendations ................................................................................................... 13 5.6 Foundation Support ................................................................................................................... 13 5.7 Estimated Settlement ................................................................................................................. 15 5.8 Floor Slab Considerations .......................................................................................................... 15 5.9 Pavement Recommendations ..................................................................................................... 16 5.10 Seismic Design Considerations ................................................................................................. 17 5.11 Dewatering Considerations ........................................................................................................ 17 5.12 Expansive, Dispersive, or Collapsing Conditions ..................................................................... 18 6.0 CONSTRUCTION QUALITY CONTROL .................................................................................... 19 Recommendations for Construction Monitoring ................................................................................. 19 Safety Precautions and Governing Authority ...................................................................................... 19 7.0 LIMITATIONS ..................................................................................................................................20 APPENDIX I SITE LOCATION PLAN BORING LOCATION PLAN APPENDIX II BORING LOGS APPENDIX III LABORATORY DATA I PRELIMINARY REPORT kPURPOSE AND SCOPE OF SERVICES Purpose of Study The purpose of this study was to obtain information regarding the general subsurface conditions encountered within the building and pavement areas of the new apartment complex. Additionally, this study was undertaken to conduct pertinent field and laboratory tests to assess the engineering characteristics of the subsurface materials and to provide general recommendations regarding the geotechnical aspects of site preparation and foundation design. This report contains the following items: • A discussion of the Planned Construction including structural loading information for the building and our assumptions regarding the loading of the proposed pavements; • Information regarding our subsurface exploration and laboratory testing; • a review of the existing subsurface conditions with comments on local geology; • Construction Recommendations, including • a general evaluation of the site considering the proposed construction and subsurface conditions encountered; • recommendations for site preparation and construction of compacted fills • recommendations for the design and construction of shallow foundation support systems; • recommendations regarding estimated foundation settlements; • recommendations for the design of slabs-on-grade including soil support characteristics; • recommendations for flexible pavement design; and • recommendations for quality control and testing during recommendations. Scope of Services The scope of service provided for this project was outlined in two separate proposals. Proposal Number PROP09-061 G identified an initial scope of work to include a series of 15 soil test borings to confirm that the soils at the site were conducive to support the planned construction. In order to meet HUD requirements, an additional 83 borings were needed to develop these final recommendations. The additional scope of work was identified in our Proposal 2010-011 G. 2 PRELIMINARY REPORT I , kAiA Our services included coordination of boring locations with Mr. Chris Pusey, P.E. of 4D Site Solutions to achieve the appropriate coverage. We understand that 4D Site Solutions is the project Civil Engineer of Record. Through this coordination, a subsurface exploration program was developed to include a total of 87 soil test borings. Eighty-five (85) of the soil test borings were performed in structural areas of the site, and two borings were advanced in permanent sediment basins to determine the infiltration rates for design. A Geotechnical Engineer classified the boring samples, and identified representative samples for testing in our laboratory. The information was compiled and analyzed with specific regard to the design information provided to us by 4D Site Solutions and Mr. Marc Mills, Architect of Planworx Architecture, P.A. The results of our evaluation, including recommendations as they pertain to this site and the anticipated construction, are provided in this report. 3 PRELIMINARY REPORT t?al? 2.0 PROPOSED PROJECT DATA The proposed project data is based on information obtained from e-mail correspondence from and conversations with Mr. Marc Mills of Planworx Architecture, P.A. and Mr. Chris Pusey, P.E. of 4D Site Solutions. This information included Sheet 1 of the Civil Design package dated November 16, 2009. This plan indicates the location of twelve, multi-story apartment buildings; 17 garage structures; the Clubhouse Building with pool and pool house, and all associated pavement areas. Mr. Pusey, P.E. has also provided finished floor elevations and cut/fill depths within the apartment buildings. Mr. Mark Mill also provided the standard foundation details for the building foundations. The subject site is located on the north side of Black & Decker Road, east of Legion Road. We have shown the location of the site on Figure 1, in the Appendix I. The site is currently undeveloped and covered with dense vegetation and small to medium sized trees. Site topography is generally flat with less than 2 feet of elevation change across the site. Based on the information provided to us, we understand that the proposed development will include the construction of twelve two and three story, apartment buildings. The apartment buildings will have slab-on-grade floor systems, and will be supported on a shallow foundation system consisting of continuous exterior wall footings, and thickened slabs for interior load bearing walls. The exterior edges of the slab will also be thickened and be designed to bear on the exterior wall footings. We presume that garage slabs and foundations will be designed in a similar manner. Flexible pavements will be designed to provide access to the site, site roadways and to provide additional parking areas. For residential Multi-family housing, we have used the following estimates for this development. The Apartment Complex is fully developed with no growth potential. 2. Multi-Family Housing averages 6.7 trips per day per dwelling. 3. 1 % of traffic volume will be heavy trucks, 4% will be light delivery type trucks, and the remainder will be automobile traffic. 4. Roadways are constructed in accordance with current NCDOT standards. 4 PRELIMINARY REPORT I Therefore our pavement design is based on 30 Equivalent (18K) Axle Loads per day. We also understand that maximum wall loads will be less than 2200 pounds per linear foot. We have further estimated that gross floor slab loads will be on the order of 350 pounds per square foot. If actually loading conditions are greater than these reported maximums, we will need to re-evaluate our recommendations. A site location map is included as Figure No.I in Appendix I, and a preliminary site plan to show the location of the building and the pavement areas is included as Figure 2 in Appendix I. 3.0 EXPLORATION PROCEDURES Field Exploration The soil test borings were performed at the approximate locations shown on the attached "Boring Location Plan", Figure No. 2, included in Appendix I. The soil test borings were located in the field using coordinates provided by 4D Site Solutions. The soil test borings were performed using hollow-stem, continuous flight auger drilling techniques in general accordance with ASTM D 6151 procedures. Standard Penetration Testing (SPT) was performed at selected intervals in the test borings to evaluate the strength, relative density and consistency of the soils encountered. During Standard Penetration Testing, the N-value of the soils sampled was recorded. The N-value represents the number of blows required to drive a split-barrel sampler 12 inches into the ground with a 140-pound hammer falling from a height of 30 inches. The sampler is driven three successive, 6-inch increments. The first 6-inch increment is referred to as the "seating drive". The second and third 6-inch increments of penetration-blows per foot (bpf)---are added to obtain the Standard Penetration Resistance value, commonly known as the N-value. When properly evaluated, the N-value provides an index for estimating soil strength and relative density. In conjunction with the Standard Penetration Testing, split-spoon samples were obtained in general accordance with ASTM D 1586 and were returned to our laboratory to be visually-manually examined and classified by a geotechnical staff professional in general accordance with ASTM D 2488 and the Unified Soil Classification System (USCS). Water level measurements were made at the termination of drilling. The boreholes were immediately 5 PRELIMINARY REPORT " backfilled at the termination of drilling using the soil cuttings from each borehole, making subsequent water level readings unobtainable. Laboratory Testing Once the test borings were complete, a representative bulk samples was retrieved from the soils boring cuttings. This sample was analyzed for moisture content by ASTM D-2166, moisture-density relationship by ASTM D-1557, particle size distribution by ASTM D-422 (using 200 wash data determined by method ASTM D-1140. Once our testing was completed, a sample of the bulk sample was transported to Geotechnics' laboratory in Raleigh, North Carolina for California Bearing Ratio (CBR) testing in general accordance with ASTM D-1883. In addition, representative samples were obtained from the split spoon samples for gradation and moisture testing. We have included the results of our testing in Appendix III. 6 PRELIMINARY REPORT 4.0 Site Conditions SITE AND SUBSURFACE CONDITIONS The project site is located on the north side of Black & Decker Road, east of the intersection of Legion Road in Hope Mills, North Carolina. The property is currently undeveloped, and is covered with heavy vegetation and small to medium sized trees. The general topography of the site is flat with less than 24 inches of relief in any direction. Based on the site topography, and information from Mr. Chris Pusey, P.E. at 4D Site Solutions, we understand that 1 to 5 feet of structural fill soils will be placed in the structural areas of the site to achieve the desired grades. Regional Geology Based on our review of the Geologic Map of North Carolina (Brown, 1985), the site is located in the Lakeland-Candor-Blaney Formation of the Sand Hills area of the Coastal Plain Physiographic Province of North Carolina. Soils in this area are generally marine sediments that were deposited during successive periods of fluctuating sea level and moving shoreline. The formations tend to dip ® Blue Ridge Belt [M Raleigh Belt Charlotte Belt Coastal Plain 0 Carolina slate Belt Kings Mountain Belt ® Inner Piedmont ® Triassic Basin ® Murphy Belt Eastern Slate Belt Milton Belt Site slightly seaward, and several are exposed at the surface in bands paralleling the coast. Many beds exist only as fragmented, erosional remnants with more continuous strata located above and below. The soils in this province are typical of those deposited in a shallow, sloping sea bottom; sands, silts, and clays. Some of the existing formations contain predominantly plastic clays interbedded with strata of sands and poorly consolidated limestones. Others contain predominantly sands with localized deposits of highly plastic clays. Subsurface Conditions General subsurface conditions encountered during our subsurface exploration are described herein. For more detailed soil descriptions and stratifications at the boring locations, the "Boring Logs" should 7 PRELIMINARY REPORT ?vr be reviewed. The "Boring Logs" represent our interpretation of the field logs based on an engineering examination. The horizontal stratification lines designating the interface between various strata represent approximate boundaries. Transition between different strata in the field may be gradual in both the horizontal and vertical directions. Surface: At the ground surface each test boring encountered topsoil at the ground surface. Additionally, test borings 501 through 507, 509, 511, 513 and 514 also encountered organically stained soil below the topsoil. The organically stained materials are generally clayey and also contain fine roots. Both the topsoil and the underlying organically stained materials are unsuitable for the support of the new construction. The depth of the unsuitable topsoil materials ranges from 8 to 20 inches thick. Additionally deeper topsoil depths should be expected in treed areas. It would not be unreasonable to expect topsoil depths upwards of 36 inches in isolated areas. All of this material is generally referred to as topsoil, but we note that no testing has been performed to verify that soils meet the requirements of topsoil. Natural Soil (Zone 1): Below the topsoil materials, naturally occurring soils which are typical of the Coastal Plains Province were encountered. These materials consist of clayey sand (USCS SC) and sandy clay (USCS CL). These materials are of moderate plasticity and do not drain well. The materials in this zone are above the material's optimum moisture content by 3 to 6 percent at the locations tested. Standard Penetration Resistances (N-values) in these soils ranged from 3 to 11 with an average SPT value of 6 blows per foot. The sofUloose soils encountered in Zone 1 were encountered to depths of 2 to 5 feet below the ground surface. Natural Soil (Zone 2): Below the Zone 1 soils, another layer of naturally occurring soils were encountered. These materials consist of clayey sand (USCS SC) and silty sand (USCS SM). The materials in this zone are saturated, but are fairly dense. Standard Penetration Resistances (N-values) in these soils ranged from 8 to 35 blows per foot, with an average SPT value of 8 to 13 blows per foot. The medium dense soils encountered in Zone 2 were encountered to an average depth of 17 feet below the ground surface. Natural Soil (Zone 3): Below the Zone 2 soils, another layer of loose, naturally occurring soils was encountered. These materials consist of silty sand (USCS SM) and with occasional layers of slightly 8 PRELIMINARY REPORT "silt or clayey sand (USCS SP-SM or SP-SC). The materials in this zone are saturated, and are loose. Standard Penetration Resistances (N-values) in these soils ranged from 3 to 6 blows per foot. The loose soils encountered in Zone 3 were encountered to an average depth of 28 to 30 feet below the ground surface. All of the test borings, except 507 were terminated Zone 3 at depths of 20 to 30 feet. Natural Soil (Zone 4): Below the Zone 3 soils, more dense naturally occurring soils was encountered. These materials consist of silty or clayey sand (USCS SM or SC), or silt or clay (USCS MH or CH). Standard Penetration Resistances (N-values) in these soils ranged from 11 to 40 blows per foot, with an average of 25 blows per foot. Boring 507 terminated in this zone at a depth of 100 feet. Groundwater Conditions Groundwater was encountered during drilling operations in all of the test borings at depth of 1.5 to 3.3 feet below the ground surface. Temporary piezometers were installed periodically, so that the stabilized depth to ground water could be determined. After a period of 24 hours, the depth to groundwater was measured at 1.6 to 3.1 feet below the ground surface. Please keep in mind that subsurface water levels within this region tend to vary with seasonal and climatic changes. Generally, the highest water levels are expected to be early spring; and the lowest levels in late summer and early fall. Therefore, water may be encountered during construction at depths not indicated during this study. Laboratory Results Laboratory testing was performed for selected soil samples obtained during our site reconnaissance. Two (2) bulk samples were secured from the site and transported to our laboratory for testing. These samples were prepared and tested to determine the moisture content in accordance with ASTM D-2166; the particle size distribution in general accordance with ASTM D-422; and the plastic indices in accordance with ASTM D-4318. The soils were then classified in accordance with the Unified Soil Classification System (USCS) in general accordance with ASTM D-2487. In addition, a moisture-density relationship was performed, and for one sample the California Bearing Ratio (CBR) was determined in general accordance with ASTM D-1883. The results of our testing, including our laboratory data, are presented in Appendix III. 9 PRELIMINARY REPORT "" Wk 5.0 ENGINEERING EVALUATION AND RECOMMENDATIONS 5.1 General Our evaluation and recommendations are based on the project information outlined previously and on the data obtained from the field and laboratory testing programs. If the structural loading, geometry, alignment, or elevation of the structures differs from those outlined herein, or if conditions are encountered during construction differ from those encountered at the soil test borings, KAM Engineering Services requests the opportunity to review the recommendations presented herein based on the new information and make any necessary changes. 5.2 Site Preparation The proposed construction area should be stripped of any topsoil, organic stained soils, roots, tree stumps, organic humus. Depressions or low areas resulting from this stripping operation should be backfilled with structural fill and compacted as recommended herein. Because the site is covered with trees and heavy vegetation, there are substantial portions that the stripping process will likely result in removal of 12 to 30 inches of unsuitable topsoil materials. During the clearing and grubbing phase of construction and grading, hidden features in the substratum, such as organic laden materials or other deleterious materials may be encountered within the proposed construction area. Depressions or low areas resulting from stripping activities should be backfilled with structural fill and compacted as recommended herein. Monitoring of site preparation activities by KAM Engineering Services personnel is recommended. After stripping and excavation activities are complete, and prior to placing structural fill, all structural areas should be moisture conditioned to within 3 percent of the material's optimum moisture content, and thoroughly compacted using a vibratory sheep's-foot roller. Structural areas include all building areas, access roads, parking areas, pool areas, and sidewalk areas. Once the surface materials have been densified, adequate density testing should be performed to confirm that the soils have been compacted to at least 95 percent of the standard proctor maximum dry density. Once this operation is complete, the compacted subgrade soils should be evaluated by our geotechnical staff professional. This evaluation should include observing a proof roll of the subgrade bearing materials and to confirm 10 PRELIMINARY REPORT their consistency with the subsurface characteristics encountered during our field exploration. The exposed subgrade should be proofrolled with a loaded tandem-axle dump truck or similar rubber-tired equipment with a minimum load of 15 tons. Any areas which rut, deflect, or pump excessively during the proofroll evaluation, and which cannot be densified by further rolling, should be undercut to suitable soils and backfilled as directed by our geotechnical engineer during the evaluation. The exposed subgrade should be sloped and graded to drain to minimize the accumulation of precipitation. If the exposed subgrade soils are not as anticipated, or become excessively wet, our geotechnical engineer should be consulted for guidance. Proofrolling should not be performed on saturated or frozen subgrades, or during wet weather conditions. 5.3 Structural Fill Placement Based on the results of our soil test borings, the on-site soils may be used as structural fill, if these soils are at moisture conditions which allow for "proper" placement and compaction as recommended herein. Material to be used as structural fill should be tested prior to its use, to determine its suitability and compaction characteristics. Structural fill should be free of organic material and other deleterious material. Materials which will be placed as structural fill should be free from roots and other organic materials, trash, debris, and cobbles larger than 3 inches in diameter. The following soils, as identified by their Unified Soil Classification System (ASTM D-2487) group symbols, will be suitable for structural fill: GC, GM, SP, SW, SC, ML and CL. The following soils should be considered unsuitable: PT, OH, OL, GP, GW, MH and CH. We recommend that fine grained soils which will be used for structural fill within the upper 18 inches of the finished subgrade elevation have a liquid limit of less than 50, with a plastic index of less than 30. In any case we recommend that the structural fill materials have a dry unit weight of at least 90 pounds per cubic foot. Representative samples of each engineered fill material should be collected and tested by KAM Engineering Services to determine the material's moisture-density characteristics-including, the maximum dry density, optimum moisture content, and plasticity index. These tests are needed for quality control of the structural fill and to determine if the fill material meets project specification requirements. Backfill in structural areas should contain no more than 2 percent (by weight) of organic 11 PRELIMINARY REPORT 1 I material and should have a maximum dry density not less than 90 pounds per cubic foot as determined in general accordance with ASTM D 698. Soil not meeting these criteria may be used in landscaped or non-structural areas. Once fill placement begins, KAM Engineering Services personnel should perform field density tests to document the degree of compaction being obtained in the field by the contractor. Fill material should be placed in loose lifts less than 8 inches thick. The moisture content of the fill soils should be within f3 percentage points of the optimum moisture content based on ASTM D 698. The in-place dry density should equal or exceed 95 percent of ASTM D 698, unless otherwise specified. However, the upper 12 inches of fill beneath the building slab and pavements should be compacted to 98 percent of the same index. The contractor should exercise care after the structural fill has been placed. If water is allowed to stand on the surface, these soils may become saturated. Movement of construction traffic on saturated subgrade causes rutting that may destroy the integrity of the subgrade. Once the integrity of the subgrade is destroyed, mobility of construction traffic becomes difficult or impossible. The fill surface should be sloped to achieve positive drainage and to minimize water from ponding on the fill surface. If the surface becomes excessively wet, fill operations should be halted and our geotechnical engineer should be consulted for guidance. Monitoring of site preparation, including fill placement and density testing by our engineering technician, is essential in verifying that adequate compaction is being achieved by the contractor. 5.4 Cut and Fill Slopes 5.4.1 Slope Stability Localized areas of soft or unsuitable soils not detected by our borings or in unexplored areas of the site may be encountered once construction commences. Vertical cuts in soft or unsuitable soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than four feet in height should not be steeper than one horizontal to one vertical (1HAV), and all excavated soils, equipment, building supplies, etc., should be placed away from the edges of the excavation at a distance equaling or exceeding the depth of the excavation. Excavations should be sloped or shored in accordance with local, state, and federal regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards. Slope safety should be the 12 PRELIMINARY REPORT sole responsibility of the grading (or utility) contractor. 5.4.2 Slope Protection Unbraced excavations may experience some minor localized instability (i.e., sloughing). To mitigate sloughing, all excavated slopes should be covered with polyethylene for protection from rainfall and moisture changes. It should be emphasized that continuous observation by qualified personnel is important during trenching or excavation operations at the site. Surface water runoff should be diverted away from the crest of the excavated slopes to prevent erosion and sloughing. Groundwater seepage may occur in the sides of an excavation after periods of heavy rainfall. Usually such seepage is minimal and can be handled by conventional pumping techniques. If groundwater is encountered during construction activities, KAM Engineering Services should be notified immediately. 5.5 Excavation Recommendations Based on the results of the soil test borings, we anticipate that generally medium dense sands and stiff to very stiff clays will be encountered during general site grading and installation of the foundations and utilities for the proposed building and pavement areas. We anticipate that these soils can be excavated using conventional equipment. Naturally occurring massive rock will not be encountered at this site. 5.6 Foundation Support Based on the results of our soil test borings, the proposed buildings can be supported on the firm natural soils or on newly placed structural fill, provided the recommendations outlined in this report are implemented. An allowable net bearing pressure of 3,000 pounds per square foot (psf) can be used for design of the foundations bearing on firm soils with Standard Penetration Resistance values of at least 10, or structural fill compacted to at least 95 percent of its Standard Effort Maximum Dry Density as determined by ASTM D-698. Based on the reported maximums discussed previously, and the results of our soil test borings, the shallow spread footings should extend to a minimum depth of 12 inches below external grade for embedment for bearing capacity and frost protection. Deeper embedment depths may be required if unsuitable subgrade bearing material is encountered once foundation construction begins. In addition, regardless of loading, continuous wall and column footings should have a minimum width of 24 inches, respectively. Adequately spaced control joints should be 13 PRELIMINARY REPORT incorporated in the design of footings and masonry walls at locations where any transition occurs between cut and fill areas. Other design considerations should be dictated by building loads and local building code requirements. The foundation bearing areas should be free of any loose or soft material, standing water, or debris. Concrete should not be placed on soils that have been softened by precipitation or frost heave. We recommend that the bearing surfaces be evaluated by KAM Engineering Services geotechnical staff professional prior to foundation installation. This evaluation may consist of hand auger borings with Dynamic Cone Penetrometer (DCP) testing equipment or other suitable methods. Materials that are not able to provide the required bearing capacity of 3,000 psf, should be undercut as directed by our geotechnical engineer. Because we anticipate that islolated areas of loose material will be encountered during the excavation of the footings, we suggest that the contract documents reflect this potential condition. The contract documents should estimate that 10 percent of the footing will require undercut and repair in order to achieve the design bearing capacity. The undercut and repair should be directed by our onsite representative during the construction of the footings. If loose/soft soils are encountered which do not yield a DCP value of at least 10 blows per increment, the soils should be removed to our field recommended depth or to a maximum of 24 inches below the bottom of the footing. For each foot of depth excavated, the width of the footing (wall or column) should be extended lateral at least 6 inches. The resulting excavation should be backfilled using washed NCDOT No. 57 stone. Exposure of the subgrade materials to the environment may weaken these soils at the foundation bearing level. If the foundation excavations remain open for long periods of time, or during inclement weather, re-evaluation of the subgrade materials by our geotechnical staff professional should be performed prior to steel, concrete, or stone placement. We recommend that individual foundations be concreted as soon after the evaluation as possible to minimize potential disturbance of the bearing soils. If the foundation excavation subgrade soils remain exposed overnight or during inclement weather, we recommend that a 2- to 4-inch thick mud-mat of lean (2,000 psi) concrete be placed on the bearing soils. 14 PRELIMINARY REPORT "Estimated Settlement Laboratory testing was not performed to determine the elastic characteristics of the in-place soils at this site. However, based on the general stratigraphy in the proposed construction areas, our past experience with similar projects, and the anticipated magnitude of the structural loads, it is our opinion that the estimated total settlement of the proposed buildings will be less than approximately 1 inch, if the recommendations presented herein are implemented and followed. Variations in the consistency of the soil will contribute to some differential settlement of the foundations, but we anticipate that the differential settlement will be on the order of 50 percent of the total settlement. 5.8 Floor Slab Considerations The slab-on-grade floor system for the proposed buildings can be supported on the low-plasticity natural soils, or the existing fill soils, or on newly placed structural fill placed in accordance with the recommendations presented herein. The floor slab should be completely isolated from the structural components to allow for independent movement of the floor slab and building foundations. A modulus of subgrade reaction of 100 pci may be used for design of the slabs bearing on undisturbed, soils as encountered by our borings, or on newly-placed, well compacted structural fill. Depending on weather conditions, construction activities, and the characteristics of the at-grade soils at the time of the floor slab construction, some undercutting and/or scarifying, drying, and re- compaction of these materials may be required immediately prior to constructing the floor slabs. The support capabilities of these materials should be evaluated by our geotechnical staff professional during proofrolling observations. The subgrade soils should be evaluated by our geotechnical staff professional immediately prior to placing stone, vapor barriers, and/or concrete. If each of these elements is placed several days apart, a separate evaluation should be performed. If a poly-vapor barrier is incorporated into the design, the concrete slab should be properly cured as outlined in Section 302 of the American Concrete Institute (ACI) Building Code Requirement. Proper drainage of the slab-on-grade is important to the integrity of the subgrade soils. When free water is allowed to stand on the subgrade, these soils can absorb water, swell slightly, and experience a reduction in their support capability. Therefore, we recommend that the subgrade surface be graded to 15 PRELIMINARY REPORT provide positive drainage away from the construction areas and towards suitable drainage handling areas, such as perimeter ditches, french drains, or culverts. 5.9 Pavement Recommendations Site preparation in drive areas and parking areas should be generally similar to that for the building area. However, the upper 12 inches of subgrade soils should be compacted to at least 100 percent of the standard Proctor maximum dry density. Should any delay occur between finished subgrade preparation in pavement areas and actual pavement construction, existing subgrade soils should be re- evaluated by the geotechnical engineer to determine whether or not significant subgrade repairs such as re-compaction or stabilization of subgrades are required. We strongly recommend that the drive and parking subgrades be covered with crushed aggregate base course stone (CABC) at completion of the grading operation. The use of compacted crushed stone will protect the soil subgrade and provide a staging area for construction equipment and supplies. The designer may consider overfilling the CABC stone depth by 1 to 2 inches to allow for soil contaminated stone to be removed in the fine grading prior to paving. The design pavement section is based upon anticipated traffic conditions and CBR testing to evaluate typical subgrade strengths beneath pavement sections. Based upon the results of our CBR testing, we have used a CBR of value of 4 percent. For CBR values in this range and traffic conditions discussed previously, the following pavement sections are presented for your consideration: Roadways and Heavy Duty Pavement Areas Surface Course 2" Bituminous Concrete Surface Course - Type SF-9.5B Binder Course 2" Bituminous Concrete Binder Course - Type 19.5B Base Course 8" Aggregate Base Course, Type ABC, NCDOT Parking Stalls and Light Duty Pavement Areas Surface Course 2" Bituminous Concrete Surface Course - Type SF-9.5B Base Course 8" Aggregate Base Course, Type ABC, NCDOT 16 PRELIMINARY REPORT ?l?lVo One of the most important factors in long-term successful performance of pavements is to prevent saturation of subgrade soils beneath the pavement structure. As such, suitably constructed roadway ditches should be installed along roadways and in pavement areas to intercept run-off and seepage before it can enter the pavement section. Groundwater should be maintained at a minimum depth of 30 inches below the finished subgrade elevation in all pavement areas. Asphalt pavements and bases should be constructed in accordance with the guidelines of the latest NCDOT Standard Specifications for Roadways and Structures. Materials, weather limitations, placement and compaction are specified under appropriate sections of this publication. We also recommend that the trash compactor, entrance drives, and approach area to any other dumpster pads consist of at least a 6 inch thick section of Portland cement concrete having a 28 day design compressive strength of 4,500 psi, or a flexural strength of at least 550 psi, placed over a 6 inch thick section of compacted CABC stone that has been placed on a prepared subgrade. The concrete pavement may be designed as a "plain concrete pavement" with no reinforcing steel, or reinforcing steel used at joints. Construction joints and other design details should be in accordance with guidelines provided by the Portland Cement Association and the American Concrete Institute. 5.10 Seismic Design Considerations The project site was classified with respect to seismic site classification in accordance with IBC 2006. Based upon the analysis of the profiles using standard penetration resistances, the site was determined to be a Site Class D. The soils at the site have a low liquefaction potential. Liquefaction of soils is attributable to particle size distribution of the soils and groundwater levels. The soils and groundwater conditions at the site are not conducive to soil liquefaction. 5.11 Dewatering Considerations During the drilling operations, groundwater was encountered in several of the test borings at depths that range from 1.3 to 3.2 feet below the ground surface. After a period of 24 hours, groundwater had 17 PRELIMINARY REPORT stabilized at a depth of approximately 1.6 feet. Based upon this information, and the topography in the vicinity of the site, it is our opinion that a dewatering plan will be required for this site. The dewatering plan should be designed in conjunction with the erosion control plan using best management practices. Maintaining groundwater at the site will be critical to the long term performance of the structures and the pavements. We are more than willing to assist in the development of the Dewatering Plan. 5.12 Expansive, Dispersive, or Collapsing Conditions The soils at the site are not expansive, dispersive or subject to collapsing conditions. 18 PRELIMINARY REPORT 6.0 CONSTRUCTION QUALITY CONTROL Our technical staff should work closely with you throughout the site preparation and foundation installation phases of construction. It is particularly important for our personnel to monitor placement and compaction of all engineered fills, and to witness the stripping and proofrolling of the subgrade soils. Additionally, all footing excavations should be reviewed by our geotechnical staff professional in order to compare the conditions evaluated with those found during our field exploration and to establish conformance with the project specification requirements. We look forward to the opportunity to provide these services, as well as construction monitoring and materials testing. Recommendations for Construction Monitoring We recommend that KAM Engineering Services be employed to monitor soil excavations and to report that the recommendations concerning foundation support are completed in a satisfactory manner. Our continued involvement on the project helps provide continuity for proper implementation of the recommendations discussed herein. The following is a recommended scope of services: • Review project plans and construction specifications to assess the interpretation of this report; • Observe the excavation process to document that subsurface conditions encountered during construction are consistent with the conditions anticipated in this report; • Observe the subgrade before placing fill and observe all footing excavations for conformance with recommended bearing stratum; and • Observe the placement and compaction of any engineered fill soils and perform laboratory and field compaction testing of the fill soil. Safety Precautions and Governing Authority • During construction of excavations, it is the contractor's responsibility to adhere to all approved and amended OSHA Safety Standards. In all open trench excavations where shoring is not required, the soil must be back sloped at a 45 degree angle with horizontal starting height of four feet above the bottom of excavation. Soil should not be stockpiled and equipment should not operate with five feet of the top of slope. _ 19 PRELIMINARY REPORT 7.0 LIMITATIONS This report has been prepared in accordance with generally accepted geotechnical engineering practice for the exclusive use of First Oakland Properties and their design team, specifically for this project. No other warranty, expressed or implied, is made. Our recommendations are based on the design information furnished to us, the data obtained in the field and laboratory testing programs, and our experience with soils in this geographic area. Regardless of the thoroughness of this subsurface exploration, there is the possibility that actual conditions will differ from those encountered at the boring locations during our field exploration, that conditions are not as anticipated by the designers, or that the construction process has altered the soil conditions. The recommendations do not reflect variations in subsurface conditions that may exist or in unexplored portions of the site. Should such variations become apparent during construction, the recommendations contained within this report will not be considered valid unless KAM Engineering Services is given the opportunity to review such variations and revise or modify our recommendations accordingly. In the event that changes are made in the design or location of the proposed structure, the recommendations presented herein shall not be considered valid unless the changes are reviewed by our firm and the recommendations of this report are modified or are verified in writing. No changes may be made to the recommendations contained herein without the written consent of KAM Engineering Services. If this report is copied or transmitted to a third party, it must be copied or transmitted in its entirety, including text, attachments, and/or enclosures. No single portion of this report shall be considered valid unless it is presented with and as an integral part of the entire report. We intend that the information presented within this report be interpreted only within the context of the report as a whole. 20 PRELIMINARY REPORT APPENDIX I err#ry1 ,? - J•? ell .y.- $ i V ? ??l1 . ?'?_ III 1 • • ,I. i i•-• A _ • • • ? ..+? •? • :?y ?!$ .' `T•? i? Gay, ? P - ice- -. J ?a 1 t .. ? Yi + t i yli?l !? ?" ?i.` ?E? 1{i?- ` ? T7'? tG 15 r?"•= • r'1 ' ,1 ?? • ' t• r i ?.+f ? ? +..s' 1. Ir' ? ? 4 +'? rfl?fi"- ?? • .Gt ls' ? i'i? _ _ fl ? '?? .rn'''?'\'? -.? ? ?, fr"7? ? ?' ?I J f ?.,'P;S fY ?• r j. -''?? i. • .,.aER. ',r .. .. i r ?1. 14i_/-..? i.`" . '?._ '?+t} Site Location Ma Client: First Oakland Prop ettics - Project, The: Astoria of t lope, Mills Location: F opc Mills. Nonhi Carolina K AM Project No.: 10-02 5 APPENDIX 11 KAM Project No: 10-025 Borehole Number: 500 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 1 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE C Description 0 Q N-Values Remarks a > 0 w Cl) can 0 10 30 50 0.0 203.8 Ground Surface TOPSOIL =- =1 1.0 (approximately 6 inches thick) S-1 2.0 201.6 NATURAL SOILS • Gray fine to medium sandy CLAY (CL) 3.0 Gray clayey fine to medium SAND (SC) - Groundwater encountered 4.0 y S-2 at 3.1 during drilling • operations. 5.0- 6.0- S-3 Groundwater encountered ?? • at 5.9 feet after 24 hours. 7.0- 8.0 195.8 Tan silty fine SAND (SM) S-4 9.0- 10.0- 11.0- 12.0- 13.0- S-5 14.0-- 15.0- 16.0- 187.0 17.0 18.0 Gray clayey fine to coarse SAND (SC) 19.0 S-6 183.8? PR • 20 0 . Boring backfilled upon End of Borehole completion 21.0 22.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/04/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 KAM Project No: 10.025 Borehole Number: 501 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 2 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 0 2 n N-Values Remarks CL (D 0 > u1 E o E 0 d) m 0 10 30 50 c ) 0.0 203.6 Ground Surface 202.9 TOPSOIL ry== y 1 0 (approximatel 7 inches thick) . y S-1 2.0 =Darkgray ne to mediumsandy CLAY i Groundwater encountered gan c staining and roots at 1.9 during drilling 3.0-- 200.1 NATURAL SOILS operations. 4.0 Gray fine to medium sandy CLAY(CL) S-2 Brown clayey fine tine to medium SAND 5.0 (SC) 6.0 ? S-3 7.0- 8.0-- 195.4 - Tan silty fine to medium SAND (SM) S-4 9.0 10.0- 11.0 12,0- - 190.8 13.0 Light gray silty fine SAND (SM) S-5 14.0- 15.0- 16.0-1 17.0 18.0 19.0 S-6 183.6 20.0 Boring backfilled upon 21.0 End of Borehole completion 22.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/06/2009 Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 502 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Clubhouese Building 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE C Description ? 0 a N-Values Remarks CL am M > E E M 0 w cn in 0 10 30 50 0.0 204.2 Ground Surface 203.4 TOPSOIL 1.0 (approximately 10 inches thick) S-1 202.6 2.0- Dark gray fine to medium sandy CLAY r • Groundwater encountered (CL) with organic staining and roots at 1.6 feet after 24 hours. 3.0 201.0 NATURAL SOILS Groundwater encountered 4.0 Gray fine to medium sandy CLAY(CL) S-2 at 2.3 feet during drilling. Brown clayey fine tine to medium SAND 5.0 (SC) 6.0 S-3 7.0 • 196.3 8.0 Tan silty fine to medium SAND (SM) S-4 9.0 • 10.0 11.0 12.0- 13.0- - S-5 14.0 • 15.0- 16.0- 17.0 187.2 Light gray clayey fine SAND (SC) 18.0 y? 19.0 y S-6 184.2 20.0 Boring backfilled upon 21.0 End of Borehole completion 22.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/04/2009 Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 503 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 3 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE C Description 0 a N-Values Remarks (D E E m o w cn cn ?: 0 10 30 50 1 1 1 1 1 1 0.0 203.9 Ground Surface TOPSOIL 1.0 (approximately 6 inches thick) S-1 T Groundwater encountered 2 0 . 200.9 Dark gra fine to medium sand CLAY % - at 1.1 feet after 24 hours. 3 0 y y . (CL) with organic staining and roots S 2 Groundwater encountered 4 0 - . NATURAL SOILS at 2.1 feet during drilling. 5.0 197.9 Gray fine to medium sandy CLAY(CL) y 6 0 . 7.0 Brown clayey fine tine to medium SAND S-3 (SC) 8 0 . 9 0 Tan silty fine to medium SAND (SM) S-4 10.0 • Temporary Piezometer 11.0 192.3 set to a depth of 10 feet. 12.0 13 0 190 9 Light gray slightly silty medium SAND SP SM . ( - ) 14.0 Gray clayey fine to medium SAND (SC) S-5 . 15.0 16.0 17.0 186.9 y 18.0 Gray silty fine to coarse SAND (SM) 19.0 -- S-6 20.0- 21.0-- 22.0: 23.0-- 24.0- S-7 25.0 26.0- 27.0-- 28.0- - 29.0 S-8 30.0 173.9 • Boring backfilled upon 31.0 End of Borehole completion. 32.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/04/2009 Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 504 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 12 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE C escription 0 (, Q -Values Remarks cu -0 E E d) o (D w cn U) m 0 10 30 50 0 0 203.4 Ground Surface . 202.8 TOPSOIL = 1 0 roximatel 7 inches thi k (a . 201 8 pp y ) c S-1 2.0 a rk gray fine to medium sandy CLAY Du / T Groundwater encountered ? CL) with organic staining and roots at 1.8 feet after 24 hours. 3.0 NATURAL SOILS 4.0 199.4 Gray fine to medium sandy CLAY(CL) S-2 J Groundwater encountered Brown silty fine to medium SAND (SM) . at 3.6 feet during drilling. 5.0 6.0 S-3 7.0- 8.0- - - S-4 9.0 10.0- 11 0 192.4 . Yellow tan silty fine to coarse SAND 12.0 (SM) 13.0 S-5 14.0- 15.0- 16.0- 17.0- 186.3 Light gray clayey-silty medium coarse 18.0 SAND (SC-SM) S-6 19.0 183.4 • 20.0 B i or ng backfilled upon 21.0 End of Borehole completion. 22.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/03/2009 Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 505 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 10 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description -0 0 a N-Values Remarks CL > E E o u.a) i >1 iD 0 10 30 50 0 0 203.0 Ground Surface . TOPSOIL =11-01 1.0 (approximately 6 inches thick) S-1 201 3 2.0 . Dark gray fine to medium sandy CLAY ' Groundwater encountered (CL) with organic staining and roots at 1.9 feet after 24 hours. 3.0 NATURAL SOILS 4.0 Gray clayey fine to medium SAND (SC) ? S-2 Groundwater encountered at 3.9 feet during drilling. 5.0 y 6.0 S-3 7.0- 8.0- S-4 9.0 10.0- 11.0- 12.0-- 190.8 Gray silty fine to medium SAND (SM) 13.0 S-5 14.0 • 15.0 16.0 17.0 186.0 Pink and tan slightly silty medium coarse 18.0 SAND (SP-SM) ! '. = S-6 19.0 183.0 20.0 Boring backfilled upon 21.0 End of Borehole completion. 22.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/03/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 506 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 9 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 0 Q N-Values Remarks o E E M 0 10 30 50 w cn U) 3: 0.0 202.8 Ground Surface TOPSOIL 1.0 201 2 (approximately 2 inches thick) ? S-1 2 0 Dark gray fine to medium sandy CLAY (CL) with organic staining and roots • 3.0 NATURAL SOILS Gray medium sand CLAY (CL) S-2 Groundwater encountered at 3 1 f t d i illi d 4.0 y . ee ur ng r ng. 5.0 197.3 6.0 Gray fine to medium sandy CLAY (SC) S-3 7.0- 8,0- 194.6 y Light gray slightly silty medium coarse ` S-4 9.0 SAND (SP-SM) • 1&0- 11.0 12.0 190.8 Gray and tan silty fine to medium SAND 13.0 (SM) S-5 14.0 15.0- 16.0- - 186.0 17.0 Tan clayey fine to medium SAND (SC) 18.0 MIN, 19.0 S-6 182.8 20 0 . Boring backfilled upon 21.0- End of Borehole completion. 22.0- Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/06/2009 Sheet: 1 of 1 1 4 KAM Project No: 10-025 Borehole Number: 507 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 11 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 0 Q N-Values Remarks E CL E a) m p uJ cn iD 0 10 30 50 0.0 203.4 Ground Surface 1.0 TOPSOIL S-1 2.0- (approximately 3 inches thick) F I • Groundwater encountered 3.0 200.4 Dark gray fine to medium sandy CLAY I JII?' at 2.1 feet during drilling. 4.0 (CL) with organic staining and roots S-2 Groundwater encountered 5.0 NATURAL SOILS at 2.3 feet after a period 6.0 Gray clayey fine to medium SAND (SC) S-3 of 24 hours. 7.0 Gray silty fine to medium SAND (SM) 8.0- 9.0 S-4 10.0 11.0 1 1 - 12.0 191.2 13.0 Gray clayey fine to medium SAND (SC) 14.0 S-5 15.0 16.0 17.0 18.0 19.0 S-6 20.0 21-0- 22.0 23.0 24 0 S-7 . • 25-0-7 177 4 26 0 . . 27.0 Tan silty fine to medium SAND (SM) 28.0 29.0 S-8 30-0- 31.0-::: 171.4 32.0 33.0 Tan slightly silty fine to medium SAND 34.0 (SP-SM)) S-9 35.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/05/2009 Sheet: 1 of 3 KAM Project No: 10-025 Borehole Number: 507 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 11 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description - 0 C N-Values Remarks . 0 B L S m o w cn U) c° 0 10 30 50 167.4 36 0 . 37 0 Blue gray plastic SILT (MH) . 165.6 i i 38.0 Gray silty fine to coarse SAND (SM) S-10 39.0-7- 40.0-= 41.0 42.0 43.0 44.0 S-11 45 0 • . 157.4 46.0 47.0 Blue gray clayey fine to coarse SAND INS 48.0 (SC) , 49.0 S-12 50.0 51.0 52.0 53.0-7- 54.0:: 55.0 S-13 • 56.0 y 57.0- 58 0 ? - - 59.0 S-14 60.0 61.0 141.7 y 62.0 Blue gray fine sand SILT (MH) 63.0 S-15 64.0 65.0 j • 66-0- 67-0- 68.0 69.0 S-16 70.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/05/2009 Hole Size: 6" Diameter Datum: Sheet: 2 of 3 I II KAM Project No: 10-025 Borehole Number: 507 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 11 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 0 ? Q N-Values Remarks o (D w cn in f° 0 10 30 50 71.0 131 4 72 0 . . 73.0 Blue gray silty fine to medium SAND 74.0 (SM) S-17 75.0 • 76.0- 77.0-Z 78.0 79.0 S-18 80.0- 81.0- 121 4 82 0 . . 83.0 Gray silty fine to coarse SAND (SM) 84.0 S-19 85.0- • 86.0 116.4 87.0- 88.0:: Blue gray silty CLAY (CH) 89.0 / S-20 90.0 91.0 / 92.0 93.0 4.0 9 95.0- ? S-21 96.0 / 97.0 / 98.0 99.0 S-22 00.0 103.4 • 01 0 End of Borehole Boring backfilled upon . completion. 02.0 03.0- 04.0= 05.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-114" HSA Datum: Drill Date: 12/05/2009 Sheet: 3 of 3 ' 1, KA Project No: 10-025 Borehole Number: 508 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 6 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o m Description 0 0 Q N-Values Remarks CL > B B Q) 0 w ci in m -Z.> 0 10 30 50 0 0 203.9 Ground Surface . Soil Sample 09-744 TOPSOIL 1.0 (approximately 4 inches thick) S-1 G d 2 0-7- • roun water encountered . NATURAL SOILS at 2.4 feet during drilling. 10 Gray clayey fine to medium SAND (SC) T 200.0 S 2 Groundwater encountered 4.0 Gray silty fine SAND (SM) . at 3.2 feet after a period 5 0 of 24 hours. . 198 2 6.0 Gray silty fine to medium SAND (SM) S-3 7.0- 8.0- 9.0 S-4 • 10.0 11.0 192.0 12.0 Gray and tan slightly silty fine to medium 13.0 SAND (SP-SM) 14.0 S-5 • 15.0 16.0 187.2 17.0 Tan clayey fine to medium SAND (SC) MY 18.0 with fine roots 19.0 S-6 20.0-- 21.0- 182.9 Tan silty-clayey fine to medium SAND 22.0 (SM-SC) 23.0- 24.0 S-7 178.9 25.0 Boring backfilled upon 26.0 End of Borehole completion. 27.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/05/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 It KAM Project No: 10-025 Borehole Number: 509 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 7 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 8 a) 0 a N-Values Remarks Q (D > a) w E n E - - 10 30 50 c 0.0 203.7 Ground Surface TOPSOIL 1 0- 202.6 i l . (approx mate y 6 inches thick) S-1 2.0 Dark brown silty CLAY (CL) with organic • staining and root matter 3.0 200.0 NATURAL SOILS ? S_2 Groundwater encountered 4.0 Gray fine to medium sandy CLAY (CL) at 3 3 feet during drilling • . . - Gray clayey fine to medium SAND (SC) 5.0 198.1 6.0 Gray silty fine SAND (SM) S-3 7.0 • 195.8 8.0 Light gray and tan clayey-silty SAND 9.0 (SC-SM) S-4 • 10.0 11.0 y 12.0 y 13.0 - S-5 14.0 15.0- y • 16.0- 17 0 y . 18.0 19 0 S-6 . 183.7 20 0 . Boring backfilled upon 21.0 End of Borehole completion. 22.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/06/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 ' It KAM Project No: 10-025 Borehole Number: 510 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 8 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 0 a N-Values Remarks w CL m > E E W W 0 10 30 50 0 0 203.3 Ground Surface . 202.7 TOPSOIL - Soil Sample 09-745 1.0 201-7 (approximately 7 inches thick) / S-1 2 0 SOILS = • sandy CLAY (CL) Brown 3.0 Gray clayey fine to medium SAND (SC) S 4.0 -2 Groundwater encountered . at 3.6 feet during drilling. 5.0 197.8 6.0 Gray silty fine SAND (SM) S-3 7.0 • 195.3 8.0 Light gray slightly silty SAND (SP-SM) S-4 9.0- 10.0- 11.0 191.6 12.0 Tan silty fine to medium SAND (SM) 13.0 S-5 14.0- 15.0- 16.0 17.0 186.1 18.0 Tan and gray clayey fine to medium SAND (SC) y S-6 19.0 y 183.3 • 20 0 . Boring backfilled upon 21.0 End of Borehole completion. 22.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/06/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 f I. KAM Project No: 10-025 Borehole Number: 511 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Building 5 610 Spring Branch Road Site Location: Hope Mills, North Carolina Engineer: K. Miller Dunn, North Carolina 28334 Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE s C Description ? 0 fl N-Values Remarks m B S M o w >1 (D M U) 0 10 30 50 0.0 204.3 Ground Surface TOPSOIL 1.0 (approximately 3 inches thick) S-1 2 0 Brown fine sandy CLAY (CL) with % T . Groundwater encountered . organic staining and root matter j/ ? at 1.6 feet after a period of 24 h 3.0 201. 1 NATURAL SOILS rs. ours. Gray fine to medium sandy CLAY (CL) S-2 Groundwater encountered 4.0 at 2 2 feet upon - Gray clayey fine to medium SAND (SC) • . completion of boring. 5-0 198.8 ? 6.0 Tan silty fine to medium SAND (SM) S-3 7.0 • 8.0 S 4 9.0 - 10.0- 11.0- 12.0- 13.0 14.0- S-5 15.0- 16.0- - 17.0 187.2 Tan and gray clayey fine to medium 18.0 19.0 SAND (SC) y S-6 184.3 ? • 20 0 . End of Borehole Boring backfilled upon 21.0 completion. 22.0-1 1 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/04/2009 Sheet: 1 of 1 r KAM Project No: 10.025 Borehole Number: 512 Project: The Astoria at Hope Mills Engineering Services Client: First Oakland Properties Enclosure: Building 4 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE ? ?o Description 75 0 N-Values Remarks E a E ? o w >1 M m 0 10 30 50 0.0 203.7 Ground Surface 202.8 TOPSOIL •! 3l 1.0 (approximately 10 inches thick) S-1 T 2.0- NATURAL SOILS • Groundwater encountered at 1.3 feet after a period 200.7 Brown clayey fine to medium SAND (SC) y of 24 hours. 3.0 Gray clayey fine to coarse SAND (SC) S_2 Groundwater encountered 4.0 y at 2.3 feet upon 5-0- 198.5 • completion of boring. Gray silty fine to medium SAND (SM) 6.0 S-3 7.0 • 8.0 195.4 9 0 Tan slightly silty fine to medium SAND S 4 . (SP-SM) • 10.0- 11.0- 12.0- 191.5 Tan and gray silty fine to medium SAND 13.0 (SM) S-5 14.0 • 15.0 16.0- 17.0--: 186.4 18 0 Gray clayey fine to medium SAND (SC) . with shell fragments S-6 190 y 183.7 • 20 0 . Boring backfilled upon 21.0 End of Borehole completion. 22.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/04/2009 Sheet: 1 of 1 r _ KAM Project No: 10.025 Borehole Number: 513 Project: The Astoria at Hope Mills Engineering Services Client: First Oakland Properties Enclosure: Sediment Basin #1 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE o Description 5 0 a, a -Values Remarks CL T p w cD ? 0 10 30 50 I I I I I I 0.0 203.6 Ground Surface TOP 1 1.0 202.3 SOIL S-1 2 0 (approximately 5 inches thick) . 3.0 200.3 Brown fine sandy CLAY (CL) with 4 0 organic staining and root matter S-2 = Groundwater encountered . 5 0 NATURAL SOILS • at 3.3 feet upon . Gray fine sandy CLAY (CL) completion of boring. 6 0 . 7 0 Gray silty fine to coarse SAND (SM) S-3 . 195.9 8.0 Gray slightly silty fine to medium SAND S-4 9.0 (SP-SM) 10.0 11 0 192.6 . 12 0 Tan and gray silty fine to medium SAND . (SM) Temporary piezometer 13.0 installed to a depth of 10 14.0 S-5 feet. 15.0 16.0 17,0- 18.0-- 19.0- S-6 20.0-- 21 0 182.5 . 22 2 0 0- Gray clayey fine to medium SAND (SC) . 23 0 y . 24.0 -- y ? ns S-7 25.0 177 6 y ? • 26.0- . 27.0 Gray silty fine to medium SAND (SM) 28.0 29.0 S-8 30 0 173.6 • . 31 0 End of Borehole Boring backfilled upon . completion. 32.0 Drilled By: Bore & Core, Inc. Hole Size: 6" Diameter Drill Method: 2-1/4" HSA Datum: Drill Date: 12/06/2009 Sheet: 1 of 1 KAM Project No: 10-025 Borehole Number: 514 Engineering Project: The Astoria at Hope Mills Services Client: First Oakland Properties Enclosure: Sediment Basin #2 610 Spring Branch Road Dunn, North Carolina 28334 Site Location: Hope Mills, North Carolina Engineer: K. Miller Phone: (910) 292-2086 SUBSURFACE PROFILE SAMPLE C Description 0 Q N-Values Remarks Y C E E o w cn (D 3: 0 10 30 50 0.0 203.2 Ground Surface TOPS I 1.0 O L S-1 (approximately 4 inches thick) l 2 0 Ev . 3 0 200.2 Brown fine sandy CLAY (CL) with i % _ . 4 0 organic staining and root matter S-2 Groundwater encountered , 5 0 197 7 NATURAL SOILS ' at 3.7 feet upon . . Gra fine sand CLAY CL l i f b 6 0 y y ( ) comp et on o oring. . S-3 7.0- Gray clayey fine to coarse SAND (SC) 8.0-Z Gray silty fine to medium SAND (SM) 9.0 S-4 • 10.0 Temporary piezometer 11.0 installed to a depth of 10 12.0 feet. 13.0-- 14.0- S-5 15.0-- 16.0 186.3 17.0 Tan clayey fine to medium SAND (SC) 18.0 19.0 S-6 20.0- 21.0- 22.0- 23.0 24.0 ? S-7 • 25.0 y 26.0 177.2 27.0 Gray silty fine to medium SAND (SM) 28.0-- 29.0- S-8 30.0 173.2 • Boring backfilled upon 31.0 End of Borehole completion. 32.0 Drilled By: Bore & Core, Inc. Drill Method: 2-1/4" HSA Drill Date: 12/07/2009 Hole Size: 6" Diameter Datum: Sheet: 1 of 1 r i?ILYI APPENDIX III t 140 _ ? 11 Moisture-Density Relationship DATE: 12/11/2009 - PROJECT NO.: 09-174 PROJECT: Do wood Villa e A artments 130 g p g I i 120 100% SATURATION CURVES I I FOR SPEC. GRAV. EQUAL TO: L_ _ 2.8 2 7 11 . 2 6 0 . 0 1 00 i 90 80 : I I : I ! I I I I I ! i I i I 70, 0 5 10 15 20 25 30 35 40 Water content, % No. LOCATION AND DESCRIPTION TEST SPECIFICATION 09-744 Location: Onsite 508, 3 1/2"-3'9" Grey Clayey sand ASTM D 698-00a Method A Standard No. USCS LL PI NAT. MOIST. OVERSIZE %< No.200 MAX. DRY DEN. OPT. MOIST. • 09-744 Sc 26 11 20.2 43.5% 111.9 pcf 13.8% Figure KA M C.,.,:.,ee.:.... ce...:..e? o n Particle Size Distribution Report 5 c c c? c G ?? 0 t0 t•1 N n ? M ? o 0 0 0 0 0 0 o a_ o ik ik ik ik it ik ik 100 90 80 70 W Z 60 L Z 50 W U W 40 Q_ 30 20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. %+3„ % Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 0.0 0.0 0.0 4.9 51.6 43.5 SIEVE PERCENT SPEC.` PASS? Material Description SIZE FINER PERCENT (X=NO) Grey Clayey sand #4 100.0 #10 100.0 Atterberg Limits (ASTM D 4318) #16 99.8 PL= 15 LL= 26 P1= 11 #40 j 95.1 #100 54.6 Classification #200 43.5 USCS= SC AASHTO= Coefficients D85= 0.3157 D60= 0.1758 D50= 0.1248 D30= D15= D10= Cu- cc= Date Tested: 12-8-09 Tested By: M. Boswell Remarks Weigbt of Sample=46.7 lbs Wet Prep (no specification provided) Sample No.: 09-744 Source of Sample: Date Sampled: 12-5-09 Location: Onsite 508, 3 1/2"-3'9" Elev./Depth: Checked By: K. Miller Title: Engineer KAM Engineering Service? Client: Retail Properties Project: Dogwood Village Apartments i _Fayetteville, NC Project No: 09-174 Figure 09-744 140 -- - ? - Moisture-Density Relationship T - DATE: 12/11/2009 PROJECT NO.: 09-174 PROJECT: Do wood Villa e A artments 130 g g p i 120 100% SATURATION CURVES t__- - FOR SPEC. GRAY. EQUAL TO: 4 - 4 - - 2.8 + 7 2 11 . 2 6 0 Q - . >; . - c ! I I i I a 0 10 0 I ? . 90 ? I ; 7 80 1 70 0 5 10 15 20 25 30 35 40 Water content, % No. LOCATION AND DESCRIPTION TEST SPECIFICATION • 9-745 Location: Onsite 510, 6 1/2"-5' Tan Clayey sand ASTM D 698-00a Method A Standard No. USCS LL PI NAT. MOIST. OVERSIZE %< No.200 MAX. DRY DEN. OPT. MOIST. 0 9-745 Sc 37 20 18.2 °/u>NoA=0.0 43.0% 110.4 pcf 16.3% Figure VA1u C.,.,:.,se.:.... C.....:...... o r L Particle Size Distribution Report C C G C O 100 90 80 70 x Z 60 LL Z 50 W U W 40 0- 30 20 10 ?- M ID fD t7 N n # # it # # # # 100 10 1 0.1 0.01 0-001 GRAIN SIZE - %+3" % Gravel % Sand Coarse Fine Coarse Medium 0.0 0.0 0.0 0.1 6.4 SIEVE SIZE PERCENT FINER ! SPEC.' PERCENT PASS? (X=NO) #4 100.0 #10 ( 99.9 #16 99.8 #40 93.5 #100 53.5 #200 i 43.0 I I % Fines Fine Silt 50.5 43.0 Material Description Tan Clayey sand Atterberg Limits (ASTM D 4318) PL= 17 LL= 37 P1= 20 Classification USCS= SC AASHTO= Coefficients D85= 0.3296 D60= 0.1818 D50= 0.1305 D30= D15= D10= CU= Cc= Date Tested: 12-8-09 Tested By: M. Boswell Remarks Weight of Sample=46.7 Ibs Wet Prep (no specitication provided) Sample No.: 09-745 Source of Sample: Date Sampled: 12-5-09 Location: Onsite 510, 6 1/2"-5' Elev./Depth: Checked By: K. Miller Title: Engineer KAM Engineering Services, P.C.?cient: Retail Properties -? Project: Dogwood Village Apartments Fayetteville NC -_j Project No: 09-174 Figure 09-745 .I % chnics :GRITY IN TESTING December 29, 2009 Project No. 2009-739-01 Mr. Kurt Miller KAM Engineering Services PO Box 1046 Fayetteville, NC 28302 Transmittal Laboratory Test Results Dogwood Villane Apts. Please find attached the laboratory test results for the above referenced project. The tests were outlined on the Project Verification Form that was faxed to your firm prior to the testing. The testing was performed in general accordance with the methods listed on the enclosed data sheets. The test results are believed to be representative of the samples that were submitted for testing and are indicative only of the specimens which were evaluated. We have no direct knowledge of the origin of the samples and imply no position with regard to the nature of the test results, i.e. pass/fail and no claims as to the suitability of the material for its intended use. The test data and all associated project information provided shall be held in strict confidence and disclosed to other parties only with authorization by our Client. The test data submitted herein is considered integral with this report and is not to be reproduced except in whole and only with the authorization of the Client and Geotechnics. The remaining sample materials for this project will be retained for a minimum of 90 days as directed by the Geotechnics' Quality Program. We are pleased to provide these testing services. Should you have any questions or if we may be of further assistance, please contact our office. Respectively submitted, Geotechnics, Inc. Michael P. Smith Regional Manger We understand that you have a choice in your laboratory services and we thank you for choosing Geotechnics. DCN: Data Yransmitta1Letter Date: //28/05 Rev.: SINGLE POINT CBR TEST ASTM D 1883-94 (SOP-S27) Client Client Reference Project No. Lab ID Test Type Molding Method Mold ID Wt. of Mold (gm.) Mold Volume (cc) Surcharge (lbs.) Piston Area (in2) Sample Height Sample Conditions Blows per Layer KAM ENGINEERING SERVICES DOGWOOD VILLAGE APARTMENT 2009-739-01 2009-739-01-01 STANDARD MECH. CBR-16 4219 2124 10 3 4.58 Soaked 65 e echnics INTEGRITY IN TESTING Boring No. NA Depth(ft.) NA Sample No. 09-745 Visual Description TAN CLAYEY SAND Density Before After Measurement Soaking Soaking Wt. Mold & WS (gm.) 8515.7 8535.3 Wt. WS (gm.) 4296.7 4316 Sample Volume (cc) 2124 2126 Wet Density (gm./cc) 2.02 2.03 Wet Density (pcf) 126.2 126.7 Dry Density (pcf) Dry Density (gm./cc) 107.1 106.8 1.72 1.71 Water Contents As Rec'd Begining Compaction After Compaction Before Soaking After Soaking Top 1" After Soak Tare No. K-7 816 301 301 307 303 Wt. of T+WS (gm.) 525.85 309.66 391.57 391.57 470.18 777.71 Wt. of T+DS (gm.) 481.29 282.74 344.96 344.96 413.59 670.38 Wt of Tare (gm.) 110.4 136.22 84.06 84.06 110.67 111.06 Moisture Content(%) 12.0 18.4 17.9 17.9 18.7 19.2 Piston Penetration Displacement Load Stress Swell (In.) (Ibs.) (psi.) Measurement 0 1.5 0.5 0.025 37.9 12.6 0.050 65.9 22.0 0.075 93.3 31.1 0.100 113.5 37.8 0.125 131.5 43.8 0.150 147.5 49.2 0.175 161.6 53.9 0.200 174.6 58.2 0.250 200.4 66.8 0.300 224.2 74.7 0.350 244.0 81.3 0.400 263.5 87.8 0.450 278.7 92.9 0.500 294.9 98.3 0.550 311.6 103.9 0.600 324.3 108.1 Elapsed Dial Percent Time Gauge Swell (hrs) (Div) 0.00 262 0.00% 117.27 266 0.09% 1Division = 0.001 in. Tested By TMS Date 1212812009 Checked By ANFf Date u -.2-9-0-p ,I • e echnics INTEGRITY IN TESTING SINGLE POINT CBR TEST ASTM D 1883-94 (SOP-S27) Client KAM ENGINEERING SERVICES Boring No. Client Reference DOGWOOD VILLAGE APARTMENT Depth(ft.) Project No. 2009-739-01 Sample No. Lab ID 2009-739-01-01 Visual Description O 12C 80.0 w a CBR VALUE (0.1") 3.8% CBR VALUE (0.2") 3.9% Penetration Stress vs. Penetration NA NA 09-745 TAN CLAYEY SAND 100.0 w m w N 60.0 c 0 w ?o a? c d a 40.0 20.0 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.0 4k- 0.000 Penetration (in) Tested By TMS Date 1212812009 Approved By ?j,,ge•-f Date page 2 Of 2 DCN: CT-S27 REVSION: 5 DATE: 11/15/05 11SERVERIData Drive12009 PROJECTS12009-739 K4MI12009-739-01-01 CBR 09-745.xls]SHEETI 8527 0134 06521 PG0134 Excise Tax: $3,068 PIN(s): 0425-66-9466 and 0425-65-5707 Prepared by: Grayson G. Russell (No Title Exam) Russell Law Group, PLLC P.O. Box 19001 Raleigh, NC 27619 After Recording: Mail to Grantee FILED CUMBERLAND COUNTY NC J. LEE WARREN, JR. REGISIER OF DEEDS FILED Nov 22, 2010 AT 10:25:00 am BOOK 08527 START PAGE 0134 END PAGE 0137 INSTRUMENT # 38015 RECORDING $28.00 EXCISE TAX $3,068.00 KSJ Brief Description for the Index 20.47 Acres: Lot 2 - Plat Book 122, Page 20 and Plat Book 127, Page 87. NORTH CAROLINA SPECIAL WARRANTY DEED THIS DEED made this day of November, 2010, by and between GRANTOR GRANTEE ATLANTIC MULTIFAMILY, LLC CAPE FEAR MULTIFAMILY, whose mailing address is: LLC, a North Carolina limited liability 116 A North Howe Street company Southport, NC 28461 c/o William H. Thorne 116 A North Howe Street South ort , NC 28461 Enter in wropnate block for each owtv: name, address m if , character ofentity, e. n or pwUmhip. The designation Grantor and Grantee, as used herein, shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that Grantor, for and in consideration of the stun of Ten and No/100 Dollars ($10.00) and other good and valuable consideration in hand paid at and before the 8527 0135 808521 PG0135 delivery of these presents, the receipt and sufficiency of which are hereby acknowledged, has granted, bargained, sold, transferred, conveyed and confirmed and by these presents does grant, bargain, sell, and convey unto the Grantee in fee simple, all that certain tract or parcel of land lying and being in Cumberland County, North Carolina, being more particularly described on Exhibit A (the "Property') attached hereto and incorporated herein by reference. The Property hereinabove described was acquired by Grantor by an instrument recorded in Book 7832, Page 580, Cumberland County Registry. All or a portion of the Property herein conveyed does not include the primary residence of Grantor. TO HAVE AND TO HOLD the aforesaid Property and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And Grantor covenants with Grantee, that Grantor has done nothing to title to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated. Title to the Property is subject to the following exceptions: 1. Taxes for the current year. 2. All matters of record. 3. All matters that would be revealed by a current and accurate survey of the Property. [Signature page follows] 8527 0136 8KO8521 PG013b IN WITNESS WHEREOF, Grantor has caused this instrument to be signed in its name this jtday of November, 2010, and delivered as of the date indicated on the first page of this Deed. GRANTOR: ATLANTIC MULTIFAMILY, LLC By: William H. Thorne, Manager STATE OF No, n_ v% COUNTY OF Wc, k.e. I certify that the following person personally appeared before me this day, acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: William H. Thorne. Manager DATE: BGeteber I0?' , 2010. iNotary Publi Printed Name: (!2- J VI G . ZA SSe. My Commission expires: [NOTARY PUBLIC STAMP OR SEAL] s C9 Notary Public ?r woke County My COMM18Sipn eXPlre 09/27/2(11 O?IH CARC???? (N.R SEAL) 8527 0137 508521 PG0131 EXHIBIT A THE FOLLOWING DESCRIBED TRACTS OF LAND LIE ON THE NORTH SIDE OF BLACK & DECKER ROAD, CITY OF FAYETTEVILLE. THE TRACTS ARE DULY RECORDED IN DEED BOOK 7832 PAGE 580, DEED BOOK 8332 PAGE 623 AND PLAT BOOK 122, PAGE 20 AND A RECOMBINATION SURVEY RECORDED IN BOOK 127, PAGE 87 OF THE CUMBERLAND COUNTY, NORTH CAROLINA REGISTRY, AND ARE MORE FULLY DESCRIBED AS FOLLOWS: BEGINNING AT A SET 5/8" REBAR IN THE NORTHERN RIGHT-OF-WAY MARGIN OF BLACK & DECKER ROAD, SAID REBAR ALSO BEING THE SOUTHWESTERN CORNER OF CHRISTIAN LIFE CHURCH WORLD MINISTRIES, INC. RECORDED IN DEED BOOK 5662, PG 267 AND RUNNING THENCE WITH SAID RIGHT-OF-WAY N78°43'43"W 102.14 FEET TO A SET 5/8" REBAR, THENCE LEAVING SAID RIGHT-OF- WAY N00°28'49"W 1,269.86 FEET TO AN EXISTING 1/2" REBAR, THENCE S78°39'40"E 1,335.86 FEET TO AN EXISTING 1/2" REBAR, THENCE S00°28'50"E 673.61 FEET TO AN EXISTING 1 1/2" IRON PIPE, THENCE N76°49'25"W 149.78 FEET TO AN EXISTING CONCRETE MONUMENT,THENCE N78°19'03"W 365.21 FEET TO AN EXISTING CONCRETE MONUMENT, THENCE N78°42'39"W 400.03 FEET TO AN EXISTING V IRON PIPE WITH A MAG NAIL, THENCE NII°18'44"E 124.05 FEET TO A SET 5/8" REBAR, THENCE N78°39'49"W 346.05 FEET TO A SET 5/8" REBAR, THENCE S00028'49"E 729.64 FEET TO THE POINT OF BEGINNING, CONTAINING 20.47 ACRES. t . North Carolina Secretary of State Page 1 of 2 ` North Carolina Ir Elaine E Marshall DEPARTMENT OFTHE _ Secretary SECRETARY of STATE PO Box 2%22 RiiWeoq . NG 2 626-0 t919 7-29 Date: 1/27/2011 Click here to: View Document Filings i Sign Up for E-Notifications ®A Pre-populated Annual Report Fillable PDF Form i File an Annual Report i Corporation Names Name Name Type NC CAPE FEAR LEGAL MULTIFAMILY, LLC Limited Liability Company Information SOSID: 1041183 Status: Current-Active Effective Date: 5/1/2008 Dissolution Date: Annual Report Due Date: Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Registered Agent Agent Name: THORNE, WILLIAM H Office Address: 116 A NORTH HOWE STREET SOUTHPORT NC 28461 Mailing Address: 116 A NORTH HOWE STREET SOUTHPORT NC 28461 Principal Office Office Address: 116 A NORTH HOWE STREET SOUTHPORT NC 28461 Mailing Address: 116 A NORTH HOWE STREET SOUTHPORT NC 28461 Officers Title: Name: Business Address: Title: Name: Business Address: MANAGER 116 A NORTH HOWE STREET SOUTHPORT NC 28461 MANAGER 300 S MAIN STREET MAULDIN SC 29662 Title: MEMBER Name: Q..-; ... oinn 1AITCDh1AT1nA1A1 DADL( IIDI\/F http://www. secretary. state.nc.us/corporations/Corp. aspx?Pitemld=8800894 1/27/2011 North Carolina Secretary of State Page 2 of 2 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 2766 http://www.secretary.state.nc.us/corporations/Corp.aspx?PitemId=8800894 1/27/2011 bOLUTIONb, INC wl'ww P-")&e'vLutiar L-, com ASTORIA APARTMENTS STORM WATER CALCULATIONS January 11, 2011 life# 1" .Q SEAL _ 027452 cp PO 7T B , Z.Z.i 1 4P,51TF- SOLUTION,5, INC. The Astoria at Hope Mills Required Storm Volume .? I Drainage Area: 38.0 acres Impervious Area: 854621 sf (19.61 ac) % Impervious: 51.63% 1 inch Storm Event: Rv = 0.05+0.009 I Rv = runoff coefficient I= percent impervious Rv=0.05+0.009 * 51.63 % = 0.515 For volume that must be controlled: Volume=3,630*Rd*Rv*A Volume = 3,630*(1 inch)*(0.515)*38.0 acres = 71039cf Average Depth of Pond: 3.84 SA/DA ratio: 4.4 Surface Area Required: 72832sf Surface Area Provided: 116664sf The Astoria at Hope Mills Drawdown Time Temporary storage volume = Orifice # 1 diameter = Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation= Riser elevation= Driving head (H) _ Discharge (Q) _ Drawdown time = 149,989 cf 4 in 1 0.0873 sf 3 in 1 0.0491 sf 0.60 199.50 ft 200.75 ft 0.42 ft 0.4239 cfs 353873 s 98.3 hr 4.1 days Astoria drawdown time.xls Printed 1/28/2011 4D Site Solutions, Inc. DESIGN REQUIREMENTS: A. Contain the 1 inch storm Drainage Area, (DA) = 21.84 acres Intensity, (I) = 0.13 inches/hr Composite Runoff Coefficient, (C) _> 0.30 Maximum Release Rate, (Qi) _> 0.852 efs Drainage Area, (DA) = 38.00 acres Intensity, (1) = 0.13 inches/hr Composite Runoff' Coefficient, (C) _> 0.64 Peak Release Rate, (Q I) _> 3.16 cts Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (sf) (cf) (cf) (ft) In (S) In (Z) Z est 199.4 - - - - 199.5 115,664 5,783 5,783 0.10 200.0 126,102 60,442 66,225 0.60 200.5 129,296 63,850 130,074 1.10 201.0 132,517 65,453 195,527 1.60 201.5 135,766 67,071 262,598 2.10 202.0 139,044 68,703 331,301 2.60 202.5 146,993 71,509 402,810 3.10 Regression Output: b= 1.23 (X Variable Coef ) Ks= 107,601 (e`""tercept) 8.66 11.10 11.78 12.18 12.48 12.71 's 12.91 's -2.30 ........................... -0.51 0.10 0.47 0.74 0.96 1.13 0.09 0.67 1.17 1.62 2.06 2.49 2.92 Stage - Storage Equation is of the form: S = (Ks)(Z)b printed: 1112120116:15 AM Page 1 of 19 4D Site Solutions, Inc. Barrel Number of Barrels = Dia. of Barrel = Area of Barrel, (Ab) _ Pipe Length, (L) _ Friction Coeff., (Kp) _ Inv. of Barrel = Riser Elev. of Riser Crest Rectangular Length Weir= 24 inches Total Weir Length= Area of Riser = Orifice in Riser Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) Inv. of Orifice = Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) _ Inv. of Orifice = Width Weir= 1 24 inches 3.14 sf 65.0 feet 0.01058 199.40 feet 200.75 feet 36 inches 10.00 feet 6.00 sq. ft. 4.000 inches 1 0.09 sf 0.60 199.50 feet 3.000 inches 1 0.05 sf 0.60 199.50 feet Width of Spillway (Approx.) = 40 feet Weir Coefficient = 3.3 Crest Elevation = 201.5 feet Maximum Release Rate, (Qt) = 0.852 cfs Release Rate, (Qt) = 0.658 cfs Normal Water Surface Elev. = 199.5 feet Water Surface Elev. co Outlet (Q1) = 200.66 feet printed: 1/1212011 6:15 AM Page 2 of 19 Peak Inflow, (Qp) => 3.162 cfs Time to Peak Calculation: CN= 84 P= 3.02 in Q*= 1.53 in. (depth of runoff) Vol= 121,516 cf (vol. of runoff) Time to Peak, (Tp) => 801.8 minutes (SCS TR-55) t/tp Q/Qp t Q min efs 0.00 0.000 0 0.00 0.01 0.000 8 0.00 0.02 0.001 16 0.00 0.03 0.002 24 0.01 0.04 0.004 32 0.01 0.05 0.006 40 0.02 0.06 0.009 48 0.03 0.07 0.012 56 0.04 0.08 0.016 64 0.05 0.09 0.020 72 0.06 0.10 0.024 80 0.08 0.11 0.029 88 0.09 0.12 0.035 96 0.11 0.13 0.041 104 0.13 0.14 0.047 112 0.15 0.15 0.054 120 0.17 0.16 0.062 128 0.19 0.17 0.069 136 0.22 0.18 0.077 144 0.24 0.19 0.086 152 0.27 0.20 0.095 160 0.30 0.21 0.104 168 0.33 0.22 0.114 176 0.36 0.23 0.124 184 0.39 0.24 0.135 192 0.43 S= 1.90 in. printed: 1I12/20I16 15 AM Page 3 of 19 4D Site Solutions, Inc. 025 0.146 200 0.46 0.26 0.157 208 0.50 0.27 0.169 216 0.53 0.28 0.181 224 0.57 0.29 0.193 232 0.61 0.30 0.205 240 0.65 0.31 0.218 248 0.69 0.32 0.231 256 0.73 0.33 0.244 264 0.77 0.34 0.258 272 0.82 0.35 0.272 280 0.86 0.36 0.286 288 0.90 0.37 0.300 296 0.95 0.38 0.315 304 0.99 0.39 0.329 312 1.04 0.40 0.344 320 1.09 0.41 0.359 328 1.14 0.42 0.374 336 1.18 0.43 0.389 344 1.23 0.44 0.405 352 1.28 0.45 0.420 360 1.33 0.46 0.436 368 1.38 0.47 0.451 376 1.43 0.48 0.467 384 1.48 0.49 0.483 392 1.53 0.50 0.498 400 1.58 0.51 0.514 408 1.62 0.52 0.530 416 1.67 0.53 0.545 424 1.72 0.54 0.561 432 1.77 0.55 0.576 440 1.82 0.56 0.592 448 1.87 0.57 0.607 456 1.92 0.58 0.622 464 1.97 0.59 0.637 472 2.02 0.60 0.652 480 2.06 0.61 0.667 488 2.11 0.62 0.682 496 2.16 0.63 0.696 504 2.20 0.64 0.711 512 2.25 0.65 0.725 520 2.29 0.66 0.739 528 2.34 0.67 0.752 536 2.38 0.68 0.766 544 2.42 0.69 0.779 552 2.46 0.70 0.792 560 2.50 0.71 0.804 568 2.54 0.72 0.817 576 2.58 0.73 0.829 584 2.62 0.74 0.840 592 2.66 0.75 0.852 600 2.69 0.76 0.863 608 2.73 0.77 0.873 616 2.76 0.78 0.883 624 2.79 0.79 0.893 632 2.82 0.80 0.903 640 2.85 0.81 0.912 648 2.88 0.82 0.921 656 2.91 0.83 0.929 664 2.94 0.84 0.937 672 2.96 0.85 0.944 680 2.98 0.86 0.951 688 3.01 0.87 0.958 696 3.03 0.88 0.964 704 3.05 0.89 0.969 712 3.06 0.90 0.975 720 3.08 0.91 0.979 728 3 ?? printed: 1 2011 6:15 AM Page 4 of 19 0.92 0983 736 3.11 0.93 0.987 744 3.12 0.94 0.990 752 3.13 0.95 0.993 760 3.14 0.96 0.996 768 3.15 0.97 0.997 776 3.15 0.98 0.999 784 3.16 0.99 1.000 792 3.16 1.00 1.000 800 3.16 1.01 1.000 808 3.16 1.02 0.999 816 3.16 1.03 0.998 824 3.16 1.04 0.997 832 3.15 1.05 0.994 840 3.14 1.06 0.992 848 3.14 1.07 0.989 856 3.13 1.08 0.985 864 3.11 1.09 0.981 872 3.10 1.10 0.977 880 3.09 1.11 0.972 888 3.07 1.12 0.966 896 3.06 1.13 0.960 904 104 1.14 0.954 912 3.02 1.15 0.947 920 3.00 1.16 0.940 928 2.97 1.17 0.933 936 2.95 1.18 0.924 944 2.92 1.19 0.916 952 2.90 1.20 0.907 960 2.87 1.21 0.898 968 2.84 1.22 0.888 976 2.81 1.23 0.878 984 2.78 1.24 0.868 992 2.74 1.25 0.857 1000 2.71 1.26 0.847 1008 2.68 1.27 0.836 1016 2.64 1.28 0.825 1024 2.61 1.29 0.814 1032 2.57 1.30 0.804 1040 2.54 1.31 0.794 1048 2.51 1.32 0.783 1056 2.48 1.33 0.773 1064 2.44 1.34 0.763 1.072 2.41 1.35 0.753 1080 2.38 1.36 0.744 1088 2.35 1.37 0.734 1096 2.32 1.38 0.725 1104 2.29 1.39 0.715 1112 2.26 1.40 0.706 1120 2.23 printed: 1/12/2011 6:15 AM Page 5 of 19 4D Site Solutions, Inc. 1.41 0.697 1128 2.20 1.42 0.688 1136 2.18 1.43 0.679 1144 2.15 1.44 0.670 1152 2.12 1.45 0.662 1160 2.09 1.46 0.653 1168 2.07 1.47 0.645 1176 2.04 1.48 0.637 1184 2.01 1.49 0.628 1192 1.99 1.50 0.620 1200 1.96 1.51 0.612 1208 1.94 1.52 0.604 1216 1.91 1.53 0.597 1224 1.89 1.54 0.589 1232 1.86 1.55 0.581 1240 1.84 1.56 0.574 1248 1.81 1.57 0.566 1256 1.79 1.58 0.559 1264 1.77 159 0.552 1272 1.74 1.60 0.545 1280 1.72 1.61 0.538 1288 1.70 1.62 0.531 1296 1.68 1.63 0.524 1304 1.66 1.64 0.517 1312 1.64 1.65 0.511 1320 1.61 1.66 0.504 1328 1.59 1.67 0.498 1336 1.57 1.68 0.491 1344 1.55 1.69 0.485 1352 1.53 1.70 0.479 1360 1.51. 1.71 0.472 1368 1.49 1.72 0.466 1376 1.47 1.73 0.460 1384 1.46 1.74 0.454 1392 1.44 1.75 0.448 1400 1.42 1.76 0.443 1408 1.40 1.77 0.437 1416 1.38 1.78 0.431 1424 1.36 1.79 0.426 1432 1.35 1.80 0.420 1440 1.33 1.81 0.415 1448 1.31 1.82 0.410 1456 1.29 1.83 0.404 1464 1.28 1.84 0.399 1472 1.26 1.85 0.394 1480 1.25 1.86 0.389 1488 1.23 1.87 0.384 1496 1.21 1.88 0.379 1504 1.20 1.89 0.374 1512 1.18 1.90 0.369 1520 1.17 1.91 0.364 1528 1.15 1.92 0.360 1536 1.14 1.93 0.355 1544 1.12 1.94 0.351 1552 1.11 1.95 0.346 1560 1.09 1.96 0.342 1568 1.08 1.97 0.337 1576 1.07 1.98 0.333 1584 1.05 1.99 0.329 1592 1.04 2.00 0.324 1600 1.03 2.01 0.320 1608 1.01 2.02 0.316 1616 1.00 2.03 0.312 1624 0.99 2.04 0.308 1632 0.97 2.05 0.304 1640 0.96 2.06 0.300 1648 0.95 2.07 0.296 1656 0 91z priided: 1 1 011 6:15 AM Page 6 of 19 4D Site Solutions, Inc. 2.08 0.292 1664 0.92 2.09 0.289 1672 0.91 2.10 0.285 1680 0.90 2.11 0.281 1688 0.89 2.12 0.278 1696 0.88 2.13 0.274 1704 0.87 2.14 0.270 1712 0.86 2.15 0.267 1720 0.84 2.16 0.264 1728 0.83 2.17 0.260 1736 0.82 2.17 0.257 1744 0.81 2.18 0.253 1752 0.80 2.19 0.250 1760 0.79 2.20 0147 1768 0.78 2.21 0.244 1776 0.77 2.22 0.241 1784 0.76 2.23 0.238 1792 0.75 2.24 0.234 1800 0.74 2.25 0.231 1808 0.73 2.26 0.228 1816 0.72 2.27 0.226 1824 0.71 2.28 0.223 1832 0.70 2.29 0.220 1840 0.69 230 0.217 1848 0.69 2.31 0.214 1856 0.68 2.32 0.211 1864 0.67 2.33 0.209 1872 0.66 2.34 0.206 1880 0.65 2.35 0.203 1888 0.64 2.36 0.201 1896 0.63 2.37 0.198 1904 0.63 2.38 0.196 1912 0.62 2.39 0.193 1920 0.61 2.40 0.191 1928 0.60 2.41 0.188 1936 0.59 2.42 0.186 1944 0.59 2.43 0.183 1952 0.58 2.44 0.181 1960 0.57 2.45 0.179 1968 0.56 2.46 0.176 1976 0.56 2.47 0.174 1984 0.55 2.48 0.172 1992 0.54 2.49 0.170 2000 0.54 2.50 0.167 2008 0.53 2.51 0.165 2016 0.52 2.52 0.163 2024 0.52 2.53 0.161 2032 0.51 2.54 0.159 2040 0.50 2.55 0.157 2048 0.50 2.56 0.155 2056 0.49 2.57 0.153 2064 0.48 2.58 0.151 2072 0.48 2.59 0.149 2080 0.47 2.60 0.147 2088 0.46 2.61 0.145 2096 0.46 2.62 0.143 2104 0.45 2.63 0.141 2112 0.45 2.64 0.140 2120 0.44 2.65 0.138 21.28 0.44 2.66 0.136 2136 0.43 2.67 0.134 2144 0.42 2.68 0.133 21.52 0.42 2.69 0.131 2160 0.41 2.70 0.129 2168 0.41 2.71 0.127 2176 0.40 2.72 0.126 2184 0.40 2.73 0.124 2192 0 Q primed: iT?1/20776:15 AM Page 7 of 19 4D Site Solutions, Inc. 2.74 0.123 2200 0.39 2.75 0.121 2208 0.38 2.76 0.119 2216 0.38 2.77 0.118 2224 0.37 2.78 0.116 2232 0.37 2.79 0.115 2240 0.36 2.80 0.113 2248 0.36 2.81 0.112 2256 0.35 2.82 0.111 2264 0.35 2.83 0.109 2272 0.34 2.84 0.108 2280 0.34 2.85 0.106 2288 0.34 2.86 0.105 2296 0.33 2.87 0.104 2304 0.33 2.88 0.102 2312 0.32 2.89 0.101 2320 0.32 2.90 0.100 2328 0.31 2.91 0.098 2336 0.31 2.92 0.097 2344 0.31 2.93 0.096 2352 0.30 2.94 0.095 2360 0.30 2.95 0.093 2368 0.30 2.96 0.092 2376 0.29 2.97 0.091 2384 0.29 2.98 0.090 2392 0.28 2.99 0.089 2400 0.28 3.00 0.088 2408 0.28 3.01 0.086 2416 0.27 3.02 0.085 2424 0.27 3.03 0.084 2432 0.27 3.04 0.083 2440 0.26 3.05 0.082 2448 0.26 3.06 0.081 2456 0.26 3.07 0.080 2464 0.25 3.08 0.079 2472 0.25 3.09 0.078 2480 0.25 3.10 0.077 2488 0.24 3.11 0.076 2496 0.24 3.12 0.075 2504 0.24 3.13 0.074 2512 0.23 3.14 0.073 2520 0.23 3.15 0.072 2528 0.23 3.16 0.071 2536 0.22 3.17 0.070 2544 0.22 3.18 0.069 2552 0.22 3.19 0.068 2560 0.22 3.20 0.068 2568 0.21 3.21 0.067 2576 0.21 3.22 0.066 2584 0.21 3.23 0.065 2592 0.21 3.24 0.064 2600 0.20 3.25 0.063 2608 0.20 3.26 0.062 2616 0.20 3.27 0.062 2624 0.19 3.28 0.061 2632 0.19 3.29 0.060 2640 0.19 3.30 0.059 2648 0.19 3.31 0.059 2656 0.19 3.32 0.058 2664 0.18 3.33 0.057 2672 0.18 3.34 0.056 2680 0.18 3.35 0.056 2688 0.18 3.36 0.055 2696 0.17 3.37 0.054 2704 0.17 3.38 0.053 2712 0.17 3.39 0.053 2720 0.17 3.40 0.052 2728 0 A? drd d 1 2011 p e : 6:75 AM Page 8 Of 19 3.41 0.051 2736 0.16 3.42 0.051 2744 0.16 3.43 0.050 2752 0.16 3.44 0.049 2760 0.16 3.45 0.049 2768 0.15 3.46 0.048 2776 0.15 3.47 0.048 2784 0.15 3.48 0.047 2792 0.15 3.49 0.046 2800 0.15 3.50 0.046 2808 0.14 3.51 0.045 2816 0.14 3.52 0.045 2824 0.14 3.53 0.044 2832 0.14 3.54 0.043 2840 0.14 3.55 0.043 2848 0.14 3.56 0.042 2856 0.13 3.57 0.042 2864 0.13 3.58 0.041 2872 0.13 3.59 0.041 2880 0.13 3.60 0.040 2888 0.13 3.61 0.040 2896 0.13 3.62 0.039 2904 0.12 3.63 0.039 2912 0.12 3.64 0.038 2920 0.12 3.65 0.038 2928 0.12 3.66 0.037 2936 0.12 3.67 0.037 2944 0.12 3.68 0.036 2952 0.11 3.69 0.036 2960 0.11 3.70 0.035 2968 0.11 3.71 0.035 2976 0.11 3.72 0.034 2984 0.11 3.73 0.034 2992 0.11 3.74 0.034 3000 0.11 3.75 0.033 3008 0.10 3.76 0.033 3016 0.10 3.77 0.032 3024 0.10 3.78 0.032 3032 0.10 3.79 0.031 3040 0.10 3.80 0.031 3048 0.10 3.81 0.031 3056 0.10 3.82 0.030 3064 0.10 3.83 0.030 3072 0.09 3.84 0.029 3080 0.09 3.85 0.029 3088 0.09 3.86 0.029 3096 0.09 3.87 0.028 3104 0.09 3.88 0.028 3112 0.09 3.89 0.028 3120 0.09 3.90 0.027 3128 0.09 3.91 0.027 3136 0.08 3.92 0.027 3144 0.08 3.93 0.026 3152 0.08 3.94 0.026 3160 0.08 3.95 0.026 3168 0.08 3.96 0.025 3176 0.08 3.97 0.025 3184 0.08 3.98 0.025 3192 0.08 3.99 0.024 3200 0.08 4.00 0.024 3208 0.08 4.01 0.024 3216 0.07 4.02 0.023 3224 0.07 4.03 0.023 3232 0.07 4.04 0.023 3240 0.07 4.05 0.022 3248 0.07 4.06 0.022 3256 0.07 4.07 0.022 3264 0 pdnted: 1 011 6:15 AM Page 9 of 19 4D Site Solutions, Inc. 4.08 0.022 3272 0.07 4.09 0.021 3280 0.07 4.10 0.021 3288 0.07 4.11 0.021 3296 0.07 4.12 0.020 3304 0.06 4.13 0.020 3312 0.06 4.14 0.020 3320 0.06 4.15 0.020 3328 0.06 4.16 0.019 3336 0.06 4.17 0.019 3344 0.06 4.18 0.019 3352 0.06 4.19 0.019 3360 0.06 4.20 0.018 3368 0.06 4.21 0.018 3376 0.06 4.22 0.018 3384 0.06 4.23 0.018 3392 0.06 4.24 0.018 3400 0.06 4.25 0.017 3408 0.05 4.26 0.017 3416 0.05 4.27 0.017 3424 0.05 4.28 0.017 3432 0.05 4.29 0.016 3440 0.05 4.30 0.016 3448 0.05 4.31 0.016 3456 0.05 4.32 0.016 3464 0.05 4.33 0.016 3472 0.05 4.34 0.015 3480 0.05 4.35 0.015 3488 0.05 4.36 0.015 3496 0.05 4.37 0.015 3504 0.05 4.38 0.015 3512 0.05 4.39 0.014 3520 0.05 4.40 0.014 3528 0.05 4.41 0.014 3536 0.04 4.42 0.014 3544 0.04 4.43 0.014 3552 0.04 4.44 0.014 3560 0.04 4.45 0.013 3568 0.04 4.46 0.013 3576 0.04 4.47 0.013 3584 0.04 4.48 0.013 3592 0.04 4.49 0.013 3600 0.04 4.50 0.013 3608 0.04 4.51 0.012 3616 0.04 4.52 0.012 3624 0.04 4.53 0.012 3632 0.04 4.54 0.012 3640 0.04 4.55 0.012 3648 0.04 4.56 0.012 3656 0.04 4.57 0.011 3664 0.04 4.58 0.011 3672 0.04 4.59 0.011 3680 0.04 4.60 0.011 3688 0.03 4.61 0.011 3696 0.03 4.62 0.011 3704 0.03 4.63 0.011 3712 0.03 4.64 0.010 3720 0.03 4.65 0.010 3728 0.03 4.66 0.010 3736 0.03 4.67 0.010 3744 0.03 4.68 0.010 3752 0.03 4.69 0.010 3760 0.03 4.70 0.010 3768 0.03 4.71 0.010 3776 0.03 4.72 0.009 3784 0.03 4.73 0.009 3792 0.03 4.74 0.009 3800 0 printed: i 2b11 6:15 AM Page 10 of 19 4.75 4.76 4.77 4.78 4.79 4.80 4.81 4.82 4.83 4.84 4.85 4.86 4.87 4.88 4.89 4.90 4.91 4.92 4.93 4.94 4.95 4.96 4.97 4.98 4.99 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 0.009 3808 0.03 0.009 3816 0.03 0.009 3824 0.03 0.009 3832 0.03 0.009 3840 0.03 0.008 3848 0.03 0.008 3856 0.03 0.008 3864 0.03 0.008 3872 0.03 0.008 3880 0.03 0.008 3888 0.03 0.008 3896 0.02 0.008 3904 0.02 0.008 3912 0.02 0.008 3920 0.02 0.007 3928 0.02 0.007 3936 0.02 0.007 3944 0.02 0.007 3952 0.02 0.007 3960 0.02 0.007 3968 0.02 0.007 3976 0.02 0.007 3984 0.02 0.007 3992 0.02 0.007 4000 0.02 0.007 4008 0.02 0.006 4016 0.02 0.006 4024 0.02 0.006 4032 0.02 0.006 4040 0.02 0.006 4048 0.02 0.006 4056 0.02 0.006 4064 0.02 0.006 4072 0.02 0.006 4080 0.02 0.006 4088 0.02 0.006 4096 0.02 0.006 4104 0.02 0.006 4112 0.02 0.005 4120 0.02 0.005 4128 0.02 0.005 4136 0.02 0.005 4144 0.02 0.005 4152 0.02 0.005 4160 0.02 0.005 4168 0.02 0.005 4176 0.02 0.005 4184 0.02 0.005 4192 0.02 0.005 4200 0.02 0.005 4208 0.01 0.005 4216 0.01 0.005 4224 0.01 0.005 4232 0.01 printed: 1/12120116:15 AM Page 11 of 19 Solutions, 14D Site WEIR ORIFICE 1st 2nd EMERGENC TIME INFLOW STORAGE STAGE RISER RISER ORIFICE ORIFICE SPILLWAY min cfs (Cf) iDt cfs cfs cfs cfs cfs 0.00 0.00 0 0.10 0.0 0.00 0.00 0.00 0.0 8.00 0.00 0 0.10 0.0 0.00 0.00 0.00 0.0 16.00 0.00 0 0.10 0.0 0.00 0.00 0.00 0.0 24.00 0.01 2 0.10 0.0 0.00 0.00 0.00 0.0 32.00 0.01 5 0.10 0.0 0.00 0.00 0.00 0.0 40.00 0.02 11 0.10 0.0 0.00 0.00 0.00 0.0 48.00 0.03 20 0.10 0.0 0.00 0.00 0.00 0.0 56.00 0.04 34 0.10 0.0 0.00 0.00 0.00 OA 64.00 0.05 52 0.10 0.0 0.00 0.00 0.00 0.0 72.00 0.06 76 0.10 0.0 0.00 0.00 0.00 0.0 80.00 0.08 106 0.10 0.0 0.00 0.00 0.00 0.0 88.00 0.09 143 0.10 0.0 0.00 0.00 0.00 0.0 96.00 0.11 187 0.10 0.0 0.00 0.00 0.00 0.0 104.00 0.13 240 0.10 0.0 0.00 0.00 0.00 0.0 11100 0.15 303 0.10 0.0 0.00 0.00 0.00 0.0 120.00 0.17 374 0.10 0.0 0.00 0.00 0.00 0.0 128.00 0.19 457 0.10 0.0 0.00 0.00 0.00 0.0 136.00 0.22 550 0.10 0.0 0.00 0.00 0.00 0.0 144.00 0.24 655 0.10 0.0 0.00 0.00 0.00 0.0 152.00 0.27 773 0.10 0.0 0.00 0.00 0.00 0.0 160.00 0.30 904 0.10 0.0 0.00 0.00 0.00 0.0 168.00 0.33 1048 0.10 0.0 0.00 0.00 0.00 0.0 176.00 0.36 1206 0.10 0.0 0.00 0.00 0.00 0.0 184.00 0.39 1380 0.10 0.0 0.00 0.00 0.00 0.0 192.00 0.43 1569 0.10 0.0 0.00 0.00 0.00 0.0 200.00 0.46 1773 0.10 0.0 0.00 0.00 0.00 0.0 208.00 0.50 1995 0.10 0.0 0.00 0.00 0.00 0.0 216.00 0.53 2233 0.10 0.0 0.00 0.00 0.00 0.0 224.00 0.57 2489 0.10 0.0 0.00 0.00 0.00 0.0 232.00 0.61 2763 0.10 0.0 0.00 0.00 0.00 0.0 240.00 0.65 3055 0.10 0.0 0.00 0.00 0.00 0.0 248.00 0.69 3367 0.10 0.0 0.00 0.00 0.00 0.0 256.00 0.73 3698 0.10 0.0 0.00 0.00 0.00 0.0 264.00 0.77 4048 0.10 0.0 0.00 0.00 0.00 0.0 272.00 0.82 4419 0.10 0.0 0.00 0.00 0.00 0.0 280.00 0.86 4811 0.10 0.0 0.00 0.00 0.00 0.0 288.00 0.90 5223 0.10 0.0 0.00 0.00 0.00 0.0 296.00 0.95 5657 0.10 0.0 0.00 0.00 0.00 0.0 304.00 0.99 6113 0.10 0.0 0.00 0.00 0.00 0.0 312.00 1.04 6590 0.10 0.0 0.00 0.00 0.00 010 320.00 1.09 7090 0.11 0.0 0100 0.00 0.00 0.0 328.00 1.14 7612 0.12 0.0 0.00 0.00 0.00 0.0 336.00 1.18 8155 0.12 0.0 0.00 0.00 0.00 0.0 344.00 1.23 8720 0.13 0.0 0.00 0.00 0.00 0.0 352.00 118 9307 0.14 0.0 0.00 0.01 0.00 0.0 360.00 1.33 9916 0.14 0.0 0.00 0.01 0.01 0.0 368.00 1.38 10547 0.15 0.0 0.00 0.01 0.01 0.0 376.00 1.43 11199 0.16 0.0 0.00 0.01 0.01 0.0 384.00 1.48 11873 0.17 0.0 0.00 0.02 0.01 0.0 392.00 1.53 12569 0.17 0.0 0.00 0.02 0.01 0.0 400.00 1.58 13286 0.18 0.0 0.00 0.02 0.02 0.0 408.00 1.62 14024 0.19 0.0 0.00 0.02 0.02 0.0 416.00 1.67 14783 0.20 0.0 0.00 0.03 0.02 0.0 424.00 1.72 15563 0.21 0.0 0.00 0.03 0.02 0.0 432.00 1.77 16364 0.22 0.0 0.00 0.04 0.03 0.0 440.00 1.82 17185 0.23 0.0 0.00 0.04 0.03 0.0 448.00 1.87 18026 0.23 0.0 0.00 0.04 0.03 0.0 456.00 1.92 18887 0.24 0.0 0.00 0.05 0.04 0.0 464.00 1.97 19768 0.25 0.0 0.00 0.05 0.04 0.0 472.00 2.02 20668 0.26 0.0 0.00 0.06 0.04 0.0 480.00 2.06 21586 0.27 0.0 0.00 0.06 0.05 OA 488.00 2.11 22523 0.28 printed: 01&0116: 16AQ.00 0.07 0.05 0.0 Page 12 of 19 496.00 2.16 23478 0.29 0.0 0.00 0.07 0.06 0.0 504.00 2.20 24451 0.30 0.0 0.00 0.08 0.06 0.0 512.00 2.25 25441 0.31 0.0 0.00 0.09 0.06 0.0 520.00 2.29 26447 0.32 0.0 0.00 0.09 0.07 0.0 528.00 2.34 27470 0.33 0.0 0.00 0.10 0.07 0.0 536.00 2.38 28509 0.34 0.0 0.00 0.10 0.08 0.0 544.00 2.42 29562 0.35 0.0 0.00 0.11 0.08 0.0 552.00 2.46 30631 0.36 0.0 0.00 0.12 0.09 0.0 560.00 2.50 31714 0.37 0.0 0.00 0.13 0.09 0.0 568.00 2.54 32812 0.38 0.0 0.00 0.13 0.09 0.0 576.00 2.58 33925 0.39 0.0 0.00 0.14 0.10 0.0 584.00 2.62 35050 0.40 0.0 0.00 0.15 0.10 0.0 592.00 2.66 36189 0.41 0.0 0.00 0.16 0.10 0.0 600.00 2.69 37340 0.42 0.0 0.00 0.16 0.11 0.0 608.00 2.73 38504 0.43 0.0 0.00 0.17 0.11 0.0 616.00 2.76 39678 0.44 0.0 0.00 0.18 0.11 0.0 624.00 2.79 40866 0.46 0.0 0.00 0.18 0.11 0.0 632.00 2.82 42064 0.47 0.0 0.00 0.19 0.12 0.0 640.00 2.85 43274 0.48 0.0 0.00 0.19 0.12 0.0 648.00 2.88 44495 0.49 0.0 0.00 0.20 0.12 0.0 656.00 2.91 45726 0.50 0.0 0.00 020 0.12 0.0 664.00 2.94 46967 0.51 0.0 0.00 0.21 0.13 0.0 672.00 2.96 48217 0.52 0.0 0.00 0.21 0.13 0.0 680.00 2.98 49475 0.53 0.0 0.00 0.22 0.13 0.0 688.00 3.01 50741 0.54 0.0 0.00 0.22 0.13 0.0 696.00 3.03 52015 0.55 0.0 0.00 0.22 0.14 0.0 704.00 3.05 53295 0.57 0.0 0.00 0.23 0.14 0.0 712.00 3.06 54582 0.58 0.0 0.00 0.23 0.14 0.0 720.00 3.08 55874 0.59 0.0 0.00 0.24 0.14 0.0 728.00 3.10 57170 0.60 0.0 0.00 0.24 0.14 0.0 736.00 3.11 58471 0.61 0.0 0.00 0.25 0.15 0.0 744.00 3.12 59776 0.62 0.0 0.00 0.25 0.15 0.0 752.00 3.13 61083 0.63 0.0 0.00 0.25 0.15 0.0 760.00 3.14 62392 0.64 0.0 0.00 0.26 0.15 0.0 768.00 3.15 63703 0.65 0.0 0.00 0.26 0.15 0.0 776.00 3.15 65014 0.66 0.0 0.00 0.26 0.16 0.0 784.00 3.16 66326 0.67 0.0 0.00 0.27 0.16 0.0 792.00 3.16 67637 0.69 0.0 0.00 0.27 0.16 0.0 800.00 3.16 68947 0.70 0.0 0.00 0.28 0.16 0.0 808.00 3.16 70255 0.71 0.0 0.00 0.28 0.16 0.0 816.00 3.16 71560 0.72 0.0 0.00 0.28 0.17 0.0 824.00 3.16 72861 0.73 0.0 0.00 0.29 0.17 0.0 832.00 3.15 74159 0.74 0.0 0.00 0.29 0.17 0.0 840.00 3.14 75451 0.75 0.0 0.00 0.29 0.17 0.0 848.00 3.14 76739 0.76 0.0 0.00 0.29 0.17 0.0 856.00 3.13 78019 0.77 0.0 0.00 0.30 0.17 0.0 864.00 3.11 79294 0.78 0.0 0.00 0.30 0.18 0.0 872.00 3.10 80560 0.79 0.0 0.00 0.30 0.18 0.0 880.00 3.09 81818 0.80 0.0 0.00 0.31 0.18 0.0 888.00 3.07 83067 0.81 0.0 0.00 0.31 0.18 0.0 896.00 3.06 84307 0.82 0.0 0.00 0.31 0.18 0.0 904.00 3.04 85536 0.83 0.0 0.00 0.31 0.18 0.0 912.00 3.02 86755 0.84 0.0 0.00 0.32 0.18 0.0 920.00 3.00 87961 0.85 0.0 0.00 0.32 0.19 0.0 928.00 2.97 89156 0.86 0.0 0.00 0.32 0.19 0.0 936.00 2.95 90338 0.87 0.0 0.00 0.33 0.19 0.0 944.00 2.92 91506 0.88 0.0 0.00 0.33 0.19 0.0 952.00 2.90 92660 0.89 0.0 0.00 0.33 0.19 0.0 960.00 2.87 93800 0.89 0.0 0.00 0.33 0.19 0.0 968.00 2.84 94924 0.90 0.0 0.00 0.33 0.19 0.0 976.00 2.81 96032 0.91 0.0 0.00 0.34 0.20 0.0 984.00 2.78 97124 0.92 0.0 0.00 0.34 0.20 0.0 992.00 2.74 98200 0.93 0.0 0.00 0.34 0.20 0.0 1000.00 2.71 99257 0.94 0.0 0.00 0.34 0.20 0.0 1008.00 2.68 100297 0.94 0.0 0.00 0.35 0.20 0.0 1016.00 2.64 101320 0.95 0.0 0.00 0.35 0.20 0.0 1024.00 2.61 102325 0.96 x.00 printed: 919/20116* 15 A 0.35 0.20 0.0 Page 13 of 19 1032.00 2.57 103313 0.97 0.0 0.00 0.35 0.20 0.0 1040.00 2.54 104282 0.97 0.0 0.00 0.35 0.20 0.0 1048.00 2.51 105235 0.98 0.0 0.00 0.35 0.21 0.0 1056.00 2.48 106170 0.99 0.0 0.00 0.36 0.21 0.0 1064.00 2.44 107089 1.00 0.0 0.00 0.36 0.21 0.0 1072.00 2.41 107991 1.00 0.0 0.00 0.36 0.21 0.0 1080.00 2.38 108877 1.01 0.0 0.00 0.36 0.21 0.0 1088.00 2.35 109746 1.02 0.0 0.00 0.36 0.21 0.0 1096.00 2.32 110600 1.02 0.0 0.00 0.36 0.21 0.0 1104.00 2.29 111438 1.03 0.0 0.00 0.37 0.21 0.0 1112.00 2.26 112260 1.04 0.0 0.00 0.37 0.21 0.0 1120.00 2.23 113067 1.04 0.0 0.00 0.37 0.21 0.0 1128.00 2.20 113859 1.05 0.0 0.00 0.37 0.21 0.0 1136.00 2.18 114637 1.05 0.0 0.00 0.37 0.21 0.0 1144.00 2.15 115399 1.06 0.0 0.00 0.37 0.22 0.0 1152.00 2.12 116147 1.06 0.0 0.00 0.37 0.22 0.0 1160.00 2.09 116881 1.07 0.0 0.00 0.38 0.22 0.0 1168.00 2.07 117601 1.07 0.0 0.00 0.38 0.22 0.0 1176.00 2.04 118307 1.08 0.0 0.00 0.38 0.22 0.0 1184.00 2.01 118999 1.09 0.0 0.00 0.38 0.22 0.0 1192.00 1.99 119678 1.09 0.0 0.00 0.38 0.22 0.0 1200.00 1.96 120343 1.10 0.0 0.00 0.38 0.22 0.0 1208.00 1.94 120996 1.10 0.0 0.00 0.38 0.22 0.0 1216.00 1.91 121635 1.10 0.0 0.00 0.38 0.22 0.0 1224.00 1.89 122262 1.11 0.0 0.00 0.39 0.22 0.0 1232.00 1.86 122876 1.11 0.0 0.00 0.39 0.22 0.0 1240.00 1.84 123477 1.12 0.0 0.00 0.39 0.22 0.0 1248.00 1.81 124066 1.12 0.0 0.00 0.39 0.22 0.0 1256.00 1.79 124644 1.13 0.0 0.00 0.39 0.22 0.0 1264.00 1.77 125209 1.13 0.0 0.00 0.39 0.22 0.0 1272.00 1.74 125762 1.14 0.0 0.00 0.39 0.23 0.0 1280.00 1.72 126304 1.14 0.0 0.00 0.39 0.23 0.0 1288.00 1.70 126835 1.14 0.0 0.00 0.39 0.23 0.0 1296.00 1.68 127354 1.15 0.0 0.00 0.39 0.23 0.0 1304.00 1.66 127862 1.15 0.0 0.00 0.39 0.23 0.0 1312.00 1.64 128359 1.15 0.0 0.00 0.40 0.23 0.0 1320.00 1.61 128845 1.16 0.0 0.00 0.40 0.23 0.0 1328.00 1.59 129320 1.16 0.0 0.00 0.40 0.23 0.0 1336.00 1.57 129785 1.16 0.0 0.00 0.40 0.23 0.0 1344.00 1.55 130239 1.17 0.0 0.00 0.40 0.23 0.0 1352.00 1.53 130684 1.17 0.0 0.00 0.40 0.23 0.0 1360.00 1.51 131118 1.17 0.0 0.00 0.40 0.23 0.0 1368.00 1.49 131542 1.18 0.0 0.00 0.40 0.23 0.0 1376.00 1.47 131956 1.18 0.0 0.00 0.40 0.23 0.0 1384.00 1.46 132360 1.18 0.0 0.00 0.40 0.23 0.0 1392.00 1.44 132755 1.19 0.0 0.00 0.40 0.23 0.0 1400.00 1.42 133140 1.19 0.0 0.00 0.40 0.23 0.0 1408.00 1.40 133516 1.19 0.0 0.00 0.40 0.23 0.0 1416.00 1.38 133883 1.19 0.0 0.00 0.40 0.23 0.0 1424.00 1.36 134241 1.20 0.0 0.00 0.40 0.23 0.0 1432.00 1.35 134590 1.20 0.0 0.00 0.41 0.23 0.0 1440.00 1.33 134930 1.20 0.0 0.00 0.41 0.23 0.0 1448.00 1.31 135261 1.20 0.0 0.00 0.41 0.23 0.0 1456.00 1.29 135583 1.21 0.0 0.00 0.41 0.23 0.0 1464.00 1.28 135897 1.21 0.0 0.00 0.41 0.23 0.0 1472.00 1.26 136203 1.21 0.0 0.00 0.41 0.23 0.0 1480.00 1.25 136501 1.21 0.0 0.00 0.41 0.23 0.0 1488.00 1.23 136790 1.22 0.0 0.00 0.41 0.23 0.0 1496.00 1.21 137071 1.22 0.0 0.00 0.41 0.24 0.0 1504.00 1.20 137344 1.22 0.0 0.00 0.41 0.24 0.0 1512.00 1.18 137610 1.22 0.0 0.00 0.41 0.24 0.0 1520.00 1.17 137868 1.22 0.0 0.00 0.41 0.24 0.0 1528.00 1.15 138118 1.22 OA 0.00 0.41 0.24 0.0 1536.00 1.14 138361 1.23 0.0 0.00 0.41 0.24 0.0 1544.00 1.12 138596 1.23 0.0 0.00 0.41 0.24 0.0 1552.00 1.11 138824 1.23 0.0 0.00 0.41 0.24 0.0 1560.00 1.09 139045 1.23 ( printed: 91&011 6:15 J•00 0.41 0.24 0.0 Page 14 of 19 1568.00 1.08 139258 1.23 0.0 0.00 0.41 0.24 1576.00 1.07 139465 1.23 0.0 0.00 0.41 0.24 1584.00 1.05 139665 1.24 0.0 0.00 0.41 0.24 1592.00 1.04 139858 1.24 0.0 0.00 0.41 0.24 1600.00 1.03 140044 1.24 0.0 0.00 0.41 0.24 1608.00 1.01 140223 1.24 0.0 0.00 0.41 0.24 1616.00 1.00 140396 1.24 0.0 0.00 0.41 0.24 1624.00 0.99 140563 1.24 0.0 0.00 0.41 0.24 1632.00 0.97 140723 1.24 0.0 0.00 0.41 0.24 1640.00 0.96 140877 1.24 0.0 0.00 0.41 0.24 1648.00 0.95 141025 1.25 0.0 0.00 0.42 0.24 1656.00 0.94 141166 1.25 0.0 0.00 0.42 0.24 1664.00 0.92 141302 1.25 0.0 0.00 0.42 0.24 1672.00 0.91 141431 1.25 0.0 0.00 0.42 0.24 1680.00 0.90 141555 1.25 0.0 0.00 0.42 0.24 1688.00 0.89 141673 1.25 0.0 0.00 0.42 0.24 1696.00 0.88 141785 1.25 0.0 0.00 0.42 0.24 1704.00 0.87 141892 1.25 0.0 0.00 0.42 0.24 1712.00 0.86 141993 1.25 0.0 0.00 0.42 0.24 1720.00 0.84 142089 1.25 0.0 0.00 0.42 0.24 1728.00 0.83 142179 1.25 0.0 0.00 0.42 0.24 1736.00 0.82 142264 1.25 0.0 0.00 0.42 0.24 1744.00 0.81 142343 1.26 0.0 0.00 0.42 0.24 1752.00 0.80 142418 1.26 0.0 0.00 0.42 0.24 1760.00 0.79 142487 1.26 0.0 0.00 0.42 0.24 1768.00 0.78 142552 1.26 0.0 0.00 0.42 0.24 1776.00 0.77 142611 1.26 0.0 0.00 0.42 0.24 1784.00 0.76 142665 1.26 0.0 0.00 0.42 0.24 1792.00 0.75 142715 1.26 0.0 0.00 0.42 0.24 1800.00 0.74 142760 1.26 0.0 0.00 0.42 0.24 1808.00 0.73 142800 1.26 0.0 0.00 0.42 0.24 1816.00 0.72 142836 1.26 0.0 0.00 0.42 0.24 1824.00 0.71 142867 1.26 0.0 0.00 0.42 0.24 1832.00 0.70 142893 1.26 0.0 0.00 0.42 0.24 1840.00 0.69 142915 1.26 0.0 0.00 0.42 0.24 1848.00 0.69 142933 1.26 0.0 0.00 0.42 0.24 1856.00 0.68 142946 1.26 0.0 0.00 0.42 0.24 1864.00 0.67 142955 1.26 0.0 0.00 0.42 0.24 1872.00 0.66 142960 1.26 0.0 0.00 0.42 0.24 1880.00 0.65 142961 1.26 0.0 0.00 0.42 0.24 1888.00 0.64 142958 1.26 0.0 0.00 0.42 0.24 1896.00 0.63 142950 1.26 0.0 0.00 0.42 0.24 1904.00 0.63 142939 1.26 0.0 0.00 0.42 0.24 1912.00 0.62 142924 1.26 0.0 0.00 0.42 0.24 1920.00 0.61 142905 1.26 0.0 0.00 0.42 0.24 1928.00 0.60 142882 1.26 0.0 0.00 0.42 0.24 1936.00 0.59 142855 1.26 0.0 0.00 0.42 0.24 1944.00 0.59 142825 1.26 0.0 0.00 0.42 0.24 1952.00 0.58 142791 1.26 0.0 0.00 0.42 0.24 1960.00 0.57 142753 1.26 0.0 0.00 0.42 0.24 1968.00 0.56 142712 1.26 0.0 0.00 0.42 0.24 1976.00 0.56 142668 1.26 0.0 0.00 0.42 0.24 1984.00 0.55 142620 1.26 0.0 0.00 0.42 0.24 1992.00 0.54 142568 1.26 0.0 0.00 0.42 0.24 2000.00 0.54 142513 1.26 0.0 0.00 0.42 0.24 2008.00 0.53 142455 1.26 0.0 0.00 0.42 0.24 2016.00 0.52 142394 1.26 0.0 0.00 0.42 0.24 2024.00 0.52 142329 1.26 0.0 0.00 0.42 0.24 2032.00 0.51 142262 1.25 0.0 0.00 0.42 0.24 2040.00 0.50 142191 1.25 0.0 0.00 0.42 014 2048.00 0.50 142117 1.25 0.0 0.00 0.42 0.24 2056.00 0.49 142040 1.25 0.0 0.00 0.42 0.24 2064.00 0.48 141960 1.25 0.0 0.00 0.42 0.24 2072.00 0.48 141878 1.25 0.0 0.00 0.42 0.24 2080.00 0.47 141792 1.25 0.0 0.00 0.42 0.24 2088.00 0.46 141703 1.25 0.0 0.00 0.42 0.24 2096.00 0.46 141612 1.25 94 PO 0.42 0.24 printed: 20116 :15 A 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Page 15 of 19 2104.00 0.45 141518 1.25 0.0 0.00 0.42 0.24 2112.00 0.45 141421 1.25 0.0 0.00 0.42 0.24 2120.00 0.44 141321 1.25 0.0 0.00 0.42 0.24 2128.00 0.44 141219 1.25 0.0 0.00 0.42 0.24 2136.00 0.43 141114 1.25 0.0 0.00 0.42 0.24 2144.00 0.42 141007 1.25 0.0 0.00 0.42 0.24 2152.00 0.42 140897 1.24 0.0 0.00 0.41 0.24 2160.00 0.41 140784 1.24 0.0 0.00 0.41 0.24 2168.00 0.41 140669 1.24 0.0 0.00 0.41 0.24 2176.00 0.40 140552 1.24 0.0 0.00 0.41 0.24 2184.00 0.40 140432 1.24 0.0 0.00 0.41 0.24 2192.00 0.39 140310 1.24 0.0 0.00 0.41 0.24 2200.00 0.39 140186 1.24 0.0 0.00 0.41 0.24 2208.00 0.38 140059 1.24 0.0 0.00 0.41 0.24 2216.00 0.38 139930 1.24 0.0 0.00 0.41 0.24 2224.00 0.37 139799 1.24 0.0 0.00 0.41 024 2232.00 0.37 139666 1.24 0.0 0.00 0.41 0.24 2240.00 0.36 139530 1.24 0.0 0.00 0.41 0.24 2248.00 0.36 139393 1.23 0.0 0.00 0.41 0.24 2256.00 0.35 139253 1.23 0.0 0.00 0.41 0.24 2264.00 0.35 139111 1.23 0.0 0.00 0.41 0.24 2272.00 0.34 138967 1.23 0.0 0.00 0.41 0.24 2280.00 0.34 138821 1.23 0.0 0.00 0.41 0.24 2288.00 0.34 138674 1.23 0.0 0.00 0.41 0.24 2296.00 0.33 138524 1.23 0.0 0.00 0.41 0.24 2304.00 0.33 138372 1.23 0.0 0.00 0.41 0.24 2312.00 032 138219 1.23 0.0 0.00 0.41 0.24 2320.00 0.32 138064 1.22 0.0 0.00 0.41 0.24 2328.00 0.31 137906 1.22 0.0 0.00 0.41 0.24 2336.00 0.31 137747 1.22 0.0 0.00 0.41 0.24 2344.00 0.31 137587 1.22 0.0 0.00 0.41 0.24 2352.00 0.30 137424 1.22 0.0 0.00 0.41 0.24 2360.00 0.30 137260 1.22 0.0 0.00 0.41 0.24 2368.00 0.30 137094 1.22 0.0 0.00 0.41 0.24 2376.00 0.29 136927 1.22 0.0 0.00 0.41 0.23 2384.00 0.29 136758 1.22 0.0 0.00 0.41 0.23 2392.00 0.28 136587 1.21 0.0 0.00 0.41 0.23 2400.00 0.28 136414 1.21 0.0 0.00 0.41 0.23 2408.00 0.28 136241 1.21 0.0 0.00 0.41 0.23 2416.00 0.27 136065 1.21 0.0 0.00 0.41 0.23 2424.00 0.27 135888 1.21 0.0 0.00 0.41 0.23 2432.00 0.27 135710 1.21 0.0 0.00 0.41 0.23 2440.00 0.26 135530 1.21 0.0 0.00 0.41 0.23 2448.00 0.26 135349 1.20 0.0 0.00 0.41 0.23 2456.00 0.26 135166 1.20 0.0 0.00 0.41 0.23 2464.00 0.25 134982 1.20 0.0 0.00 0.41 0.23 247100 0.25 134796 1.20 0.0 0.00 0.41 0.23 2480.00 0.25 134609 1.20 0.0 0.00 0.41 0.23 2488.00 0.24 134421 1.20 0.0 0.00 0.40 0.23 2496.00 0.24 134232 1.20 0.0 0.00 0.40 0.23 2504.00 0.24 134041 1.20 0.0 0.00 0.40 0.23 2512.00 0.23 133849 1.19 0.0 0.00 0.40 0.23 2520.00 0.23 133656 1.19 0.0 0.00 0.40 0.23 2528.00 0.23 133461 1.19 0.0 0.00 0.40 0.23 2536.00 0.22 133266 1.19 0.0 0.00 0.40 0.23 2544.00 0.22 133069 1.19 0.0 0.00 0.40 0.23 2552.00 0.22 132871 1.19 0.0 0.00 0.40 0.23 2560.00 0.22 132672 1.19 0.0 0.00 0.40 0.23 2568.00 0.21 132472 1.18 0.0 0.00 0.40 0.23 2576.00 0.21 132270 1.18 0.0 0.00 0.40 0.23 2584.00 0.21 132068 1.18 0.0 0.00 0.40 0.23 2592.00 0.21 131864 1.18 0.0 0.00 0.40 0.23 2600.00 0.20 131660 1.18 0.0 0.00 0.40 0.23 2608.00 0.20 131454 1.18 0.0 0.00 0.40 0.23 2616.00 0.20 131248 1.18 0.0 0.00 0.40 0.23 2624.00 0.19 131040 1.17 0.0 0.00 0.40 0.23 2632.00 0.19 130832 1.17 Q & J.00 0.40 0.23 printed: / 2011 615 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Page 16 of 19 2640.00 0.19 130622 1.17 0.0 0.00 0.40 0.23 2648.00 0.19 130412 1.17 0.0 0.00 0.40 0.23 2656.00 0.19 130200 1.17 0.0 0.00 0.40 0.23 2664.00 0.18 129988 1.17 0.0 0.00 0.40 0.23 2672.00 0.18 129775 1.16 0.0 0.00 0.40 0.23 2680.00 0.18 129561 1.16 0.0 0.00 0.40 0.23 2688.00 0.18 129346 1.16 0.0 0.00 0.40 0.23 2696.00 0.17 129130 1.16 0.0 0.00 0.40 0.23 2704.00 0.17 128914 1.16 0.0 0.00 0.40 0.23 2712.00 0.17 128696 1.16 0.0 0.00 0.40 0.23 2720.00 0.17 128478 1.15 0.0 0.00 0.40 0.23 2728.00 0.16 128259 1.15 0.0 0.00 0.40 0.23 2736.00 0.16 128039 1.15 0.0 0.00 0.39 0.23 2744.00 0.16 127819 1.15 0.0 0.00 0.39 0.23 2752.00 0.16 127598 1.15 0.0 0.00 0.39 0.23 2760.00 0.16 127376 1.15 0.0 0.00 0.39 0.23 2768.00 0.15 127153 1.15 0.0 0.00 0.39 0.23 2776.00 0.15 126930 1.14 0.0 0.00 0.39 0.23 2784.00 0.15 126706 1.14 0.0 0.00 0.39 0.23 2792.00 0.15 126481 1.14 0.0 0.00 0.39 0.23 2800.00 0.15 126256 1.14 0.0 0.00 0.39 0.23 2808.00 0.14 126030 1.14 0.0 0.00 0.39 0.23 2816.00 0.14 125803 1.14 0.0 0.00 0.39 0.23 2824.00 0.14 125576 1.13 0.0 0.00 0.39 0.22 2832.00 0.14 125348 1.13 0.0 0.00 0.39 0.22 2840.00 0.14 125120 1.13 0.0 0.00 0.39 0.22 2848.00 0.14 124891 1.13 0.0 0.00 0.39 0.22 2856.00 0.13 124661 1.13 0.0 0.00 0.39 0.22 2864.00 0.13 124431 1.13 0.0 0.00 0.39 0.22 287100 0.13 124200 1.12 0.0 0.00 0.39 0.22 2880.00 0.13 123969 1.12 0.0 0.00 0.39 0.22 2888.00 0.13 123737 1.12 0.0 0.00 0.39 0.22 2896.00 0.13 123505 1.12 0.0 0.00 0.39 0.22 2904.00 0.12 123273 1.12 0.0 0.00 0.39 0.22 2912.00 0.12 123039 1.12 0.0 0.00 0.39 0.22 2920.00 0.12 122806 1.11 0.0 0.00 0.39 0.22 2928.00 0.12 122571 1.11 0.0 0.00 0.39 0.22 2936.00 0.12 122337 1.11 0.0 0.00 0.39 0.22 2944.00 0.12 122102 1.11 0.0 0.00 0.38 0.22 2952.00 0.11 121866 1.11 0.0 0.00 0.38 0.22 2960.00 0.11 121630 1.10 0.0 0.00 0.38 0.22 2968.00 0.11 121394 1.10 0.0 0.00 0.38 0.22 2976.00 0.11 121157 1.10 0.0 0.00 0.38 0.22 2984.00 0.11 120920 1.10 0.0 0.00 0.38 0.22 2992.00 0.11 120683 1.10 0.0 0.00 0.38 0.22 3000.00 0.11 120445 1.10 0.0 0.00 0.38 0.22 3008.00 0.10 120207 1.09 0.0 0.00 0.38 0.22 3016.00 0.10 119968 1.09 0.0 0.00 0.38 0.22 3024.00 0.10 119729 1.09 0.0 0.00 0.38 0.22 3032.00 0.10 119490 1.09 0.0 0.00 0.38 0.22 3040.00 0.10 119250 1.09 0.0 0.00 0.38 0.22 3048.00 0.10 119010 1.09 0.0 0.00 0.38 0.22 3056.00 0.10 118770 1.08 0.0 0.00 0.38 0.22 3064.00 0.10 118530 1.08 0.0 0.00 0.38 0.22 3072.00 0.09 118289 1.08 0.0 0.00 0.38 022 3080.00 0.09 118048 1.08 0.0 0.00 0.38 0.22 3088.00 0.09 117806 1.08 0.0 0.00 0.38 0.22 3096.00 0.09 117565 1.07 0.0 0.00 0.38 0.22 3104.00 0.09 117323 1.07 0.0 0.00 0.38 0.22 3112.00 0.09 117081 1.07 0.0 0.00 0.38 0.22 3120.00 0.09 116838 1.07 0.0 0.00 0.38 0.22 3128.00 0.09 116596 1.07 0.0 0.00 0.38 0.22 3136.00 0.08 116353 1.07 0.0 0.00 0.37 0.22 3144.00 0.08 116110 1.06 0.0 0.00 0.37 0.22 3152.00 0.08 115867 1.06 0.0 0.00 0.37 0.22 3160.00 0.08 115623 1.06 0.0 0.00 037 0.22 3168.00 0.08 115380 1.06 J'00 0.37 0.22 printed: / 011 6:15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Page 17 of 19 3176.00 0.08 115136 1.06 3184.00 0.08 114892 1.05 3192.00 0.08 114648 1.05 3200.00 0.08 114403 1.05 3208.00 0.08 114159 1.05 3216.00 0.07 113914 1.05 3224.00 0.07 113669 1.05 3232.00 0.07 113424 1.04 3240.00 0.07 113179 1.04 3248.00 0.07 112934 1.04 3256.00 0.07 112689 1.04 3264.00 0.07 112443 1.04 3272.00 0.07 112198 1.03 3280.00 0.07 111952 1.03 3288.00 0.07 111706 1.03 3296.00 0.07 111460 1.03 3304.00 0.06 111214 1.03 3312.00 0.06 110968 1.03 3320.00 0.06 110722 1.02 3328.00 0.06 110476 1.02 3336.00 0.06 110230 1.02 3344.00 0.06 109984 1.02 3352.00 0.06 109737 1.02 3360.00 0.06 109491 1.01 3368.00 0.06 109245 1.01 3376.00 0.06 108998 1.01 3384.00 0.06 108752 1.01 3392.00 0.06 108506 1.01 3400.00 0.06 108259 1.00 3408.00 0.05 108013 1.00 3416.00 0.05 107766 1.00 3424.00 0.05 107520 1.00 3432.00 0.05 107273 1.00 3440.00 0.05 107027 1.00 3448.00 0.05 106780 0.99 3456.00 0.05 106534 0.99 3464.00 0.05 106287 0.99 3472.00 0.05 106041 0.99 3480.00 0.05 105795 0.99 3488.00 0.05 105548 0.98 3496.00 0.05 105302 0.98 3504.00 0.05 105056 0.98 3512.00 0.05 104810 0.98 3520.00 0.05 104564 0.98 3528.00 0.05 104318 0.98 3536.00 0.04 104072 0.97 3544.00 0.04 103826 0.97 3552.00 0.04 103580 0.97 3560.00 0.04 103334 0.97 3568.00 0.04 103088 0.97 3576.00 0.04 102843 0.96 3584.00 0.04 102597 0.96 3592.00 0.04 102352 0.96 3600.00 0.04 102106 0.96 3608.00 0.04 101861 0.96 3616.00 0.04 101616 0.95 3624.00 0.04 101371 0.95 3632.00 0.04 101126 0.95 3640.00 0.04 100881 0.95 3648.00 0.04 100637 0.95 3656.00 0.04 100392 0.95 3664.00 0.04 100148 0.94 3672.00 0.04 99903 0.94 3680.00 0.04 99659 0.94 3688.00 0.03 99415 0.94 3696.00 0.03 99171 0.94 3704.00 0.03 98927 0.93 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 printed: Y/i2/2011 6:15 j.00 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.34 0.34 0.34 0.34 0.34 0.22 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Page 18 of 19 3712.00 0.03 98684 0.93 0.0 0.00 0.34 0.20 3720.00 0.03 98440 0.93 0.0 0.00 0.34 0.20 3728.00 0.03 98197 0.93 0.0 0.00 0.34 0.20 3736.00 0.03 97954 0.93 0.0 0.00 0.34 0.20 3744.00 0.03 97711 0.92 0.0 0.00 034 0.20 3752.00 0.03 97468 0.92 0.0 0.00 0.34 0.20 3760.00 0.03 97225 0.92 0.0 0.00 0.34 0.20 3768.00 0.03 96982 0.92 0.0 0.00 0.34 0.20 3776.00 0.03 96740 0.92 0.0 0.00 0.34 0.20 3784.00 0.03 96498 0.92 0.0 0.00 0.34 0.20 3792.00 0.03 96256 0.91 0.0 0.00 0.34 0.20 3800.00 0.03 96014 0.91 0.0 0.00 0.34 0.20 3808.00 0.03 95772 0.91 0.0 0.00 0.34 0.20 3816.00 0.03 95531 0.91 0.0 0.00 0.34 0.20 3824.00 0.03 95290 0.91 0.0 0.00 0.34 0.19 3832.00 0.03 95048 0.90 0.0 0.00 0.33 0.19 3840.00 0.03 94808 0.90 0.0 0.00 033 0.19 3848.00 0.03 94567 0.90 0.0 0.00 0.33 0.19 3856.00 0.03 94326 0.90 0.0 0.00 0.33 0.19 3864.00 0.03 94086 0.90 0.0 0.00 0.33 0.19 3872.00 0.03 93846 0.89 0.0 0.00 0.33 0.19 3880.00 0.03 93606 0.89 0.0 0.00 0.33 0.19 3888.00 0.03 93366 0.89 0.0 0.00 0.33 0.19 3896.00 0.02 93127 0.89 0.0 0.00 0.33 0.19 3904.00 0.02 92887 0.89 0.0 0.00 0.33 0.19 3912.00 0.02 92648 0.89 0.0 0.00 0.33 0.19 3920.00 0.02 92409 0.88 0.0 0.00 0.33 0.19 3928.00 0.02 92171 0.88 0.0 0.00 0.33 0.19 3936.00 0.02 91932 0.88 0.0 0.00 0.33 0.19 3944.00 0.02 91694 0.88 0.0 0.00 0.33 0.19 3952.00 0.02 91456 0.88 0.0 0.00 0.33 0.19 3960.00 0.02 91218 0.87 0.0 0.00 0.33 0.19 3968.00 0.02 90981 0.87 0.0 0.00 0.33 0.19 3976.00 0.02 90743 0.87 0.0 0.00 0.33 0.19 3984.00 0.02 90506 0.87 0.0 0.00 0.33 0.19 3992.00 0.02 90269 0.87 0.0 0.00 0.33 0.19 4000.00 0.02 90033 0.87 0.0 0.00 0.32 0.19 4008.00 0.02 89796 0.86 0.0 0.00 0.32 0.19 4016.00 0.02 89560 0.86 0.0 0.00 0.32 0.19 4024.00 0.02 89324 0.86 0.0 0.00 0.32 0.19 4032.00 0.02 89089 0.86 0.0 0.00 0.32 0.19 4040.00 0.02 88853 0.86 0.0 0.00 0.32 0.19 4048.00 0.02 88618 0.85 0.0 0.00 0.32 0.19 4056.00 0.02 88383 0.85 0.0 0.00 0.32 0.19 4064.00 0.02 88149 0.85 0.0 0.00 0.32 0.19 4072.00 0.02 87914 0.85 0.0 0.00 0.32 0.19 4080.00 0.02 87680 0.85 0.0 0.00 0.32 0.19 4088.00 0.02 87446 0.84 0.0 0.00 0.32 0.19 4096.00 0.02 87213 0.84 0.0 0.00 0.32 0.19 4104.00 0.02 86979 0.84 0.0 0.00 0.32 0.19 4112.00 0.02 86746 0.84 0.0 0.00 0.32 0.18 4120.00 0.02 86514 0.84 0.0 0.00 0.32 0.18 4128.00 0.02 86281 0.84 0.0 0.00 0.32 0.18 4136.00 0.02 86049 0.83 0.0 0.00 0.32 0.18 4144.00 0.02 85817 0.83 0.0 0.00 0.32 0.18 4152.00 0.02 85585 0.83 0.0 0.00 0.31 0.18 4160.00 0.02 85354 0.83 0.0 0.00 0.31 0.18 4168.00 0.02 85122 0.83 0.0 0.00 0.31 0.18 4176.00 0.02 84892 0.82 0.0 0.00 0.31 0.18 4184.00 0.02 84661 0.82 0.0 0.00 0.31 0.18 4192.00 0.02 84431 0.82 0.0 0.00 0.31 0.18 4200.00 0.02 84201 0.82 0.0 0.00 0.31 0.18 4208.00 0.01 83971 0.82 0.0 0.00 0.31 0.18 4216.00 0.01 83741 0.82 0.0 0.00 0.31 0.18 4224.00 0.01 83512 0.81 0.0 0.00 0.31 0.18 4232.00 0.01 83283 0.81 0.0 0.00 0.31 0.18 printed: 1112/2011 615 AM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Page 19 of 19 DESIGN REQUIREMENTS: A. Pass the 10 yr storm Drainage Area, (DA) = 19.40 acres Intensity, (I) = 5.29 inches/hr Composite Runoff Coefficient, (C) _> 0.30 Maximum Release Rate, (Q10) _> 30.788 cfs The-A-storia-at Hope Mills - Detention Pond Post- Develop in en t Runo.ff - I 0-N11- Drainage Area, (DA) = 38.00 acres Intensity, (1) _ Composite Runoff Coefficient, (C) _> 5.29 inches/hr 0.64 Peak Release Rate, (Q 10) _> 128.65 cfs Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (sf) (cf) (cf) (ft) In (S) In (Z) Z est 199.4 - - - - - 199.5 115,664 5,783 5,783 0.10 8.66 -2.30 0.09 200.0 126,102 60,442 66,225 0.60 11.10 -0.51 0.67 200.5 129,296 63,850 130,074 1.10 € 11.78 0.10 1.17 201.0 132,517 65,453 195,527 1.60 € 12.18 0.47 1.62 201.5 135,766 67,071 262,598 2.10 12.48 0.74 2.06 202.0 139,044 68,703 331,301 2.60 € 12.71 0.96 2.49 202.5 146,993 71,509 402,810 3.10 12.91 1.13 2.92 Regression Output: b= 1.23 (X Variable Coeff) Ks= 107,601 (ey-inte`°ept) Stage - Storage Equation is of the form: S = (Ks)(Z) b printed: 1/12120116:07 AM Page 1 of 2 1 Site-Solutions, Inc. Primary Spillway Barrel Number of Barrels = Dia. of Barrel = Area of Barrel, (Ab) = Pipe Length, (L) = Friction Coeff., (Kp) = Inv. of Barrel = 1 24 inches 3.14 sf 65.0 feet 0.01058 199.40 feet Riser Elev. of Riser Crest Rectangular Length Weir= 24 inches Total Weir Length= Area of Riser = Width Weir- 200.75 feet 36 inches 10.00 feet 6.00 sq. ft. Orifice in Riser Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) Inv. of Orifice = Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) _ Inv. of Orifice = 4.000 inches 1 0.09 sf 0.60 199.50 feet 3.000 inches 1 0.05 sf 0.60 199.50 feet Emergency Spill-*NaN Width of Spillway (Approx.) = 40 feet Weir Coefficient = 3.3 Crest Elevation = 201.5 feet Maximum Release Rate, (Q10)= Release Rate, (Q10) = Normal Water Surface Elev. = Water Surface Elev. @a Outlet NO = primed: 1/1212011 6:07 AM 30.8 cfs 19.5 cfs 199.50 feet 201.43 feet Page 2 of 2 DESIGN REQUIREMENTS: A. Pass the 25 yr storm Drainage Area, (DA) = 21.84 acres Intensity, (1) _ Composite Runoff Coefficient, (C) _> 5.96 inches/hr 0.30 Maximum Release Rate, (Q25) _> 39.050 cfs ?The Astoria at Hope Mills - Detention Pond Post-Developinent Runoff- 25-vr Drainage Area, (DA) = 38.00 acres Intensity, (1) _ Composite Runoff Coefficient, (C) _> 5.96 inches/hr 0,64 Peak Release Rate, (Q25) _> 144.95 cfs Detention Pond Sta(je - Storage Function Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (so (cf) (ct) (ft) In (S) In (Z) Z est 199.4 - - - - . 199.5 115,664 5,783 5,783 0.10 8.66 -2.30 0.09 200.0 126,102 60,442 66,225 .. . 0.60 = ................. 11.10 .... ........................... -0.51 0.67 200.5 129,296 63,850 130,074 1.10 11.78 0.10 1.17 201.0 132,517 65,453 195,527 1.60 12.18 0.47 1.62 201.5 135,766 67,071 262,598 2.10 12.48 0.74 2.06 202.0 139,044 68,703 331,301 2.60 12.71 0.96 2.49 202.5 146,993 71,509 402,810 3.10 € 12.91 1.13 2.92 Regression Output: b= 1.23 (X Variable Coeff) Ks= 107,601 (e) -intercept) Stage - Storage Equation is of the form: S = (Ks)(Z) b printed: 1/12/2011 6:07 AM Page 1 of 2 Im Barrel Number of Barrels = 1 Dia. of Barrel = 24 inches Area of Barrel, (Ab) = 3.14 sf Pipe Length, (L) = 65.0 feet Friction CoefT, (Kp) = 0.01058 Inv. of Barrel = 199.40 feet Riser Elev. of Riser Crest = 200.75 feet Rectangular Length Weir= 24 inches Width Weir= 36 inches Total Weir Length= 10.00 feet Area of Riser = 6.00 sq. ft. Orifice in Riser Dia. of Orifice = 4.000 inches Number of Orifices = I Area of Orifice, (Ab) = 0.09 sf Orifice Coefficient (Cd) = 0.60 Inv. of Orifice = 199.50 feet Dia. of Orifice = 3.000 inches Number of Orifices = 1 Area of Orifice, (Ab) = 0.05 sf Orifice Coefficient (Cd) = 0.60 Inv. of Orifice = 199.50 feet Width of Spillway (Approx.) = 40 feet Weir Coefficient = 3.3 Crest Elevation = 201.5 feet Suminar,, of Results Maximum Release Rate, (Q25) = 39.0 cfs Release Rate, (Q25) = 41.8 cfs Normal Water Surface Elev. = 199.50 feet Water Surface Elev. @ Outlet (Q25) = 201.71 feet printed: 1112120116:07 AM Page 2 of 2 DESIGN REQUIREMENTS: A. Pass the 100 yr storm The Astoria at Hope Mills - Detention Pond Pre-Developinent Runoff- I 00-yr Drainage Area, (DA) = 21.84 acres Intensity, (1) = 6.86 inches/hr Composite Runofi'Coef Coefficient, (C) 0.43 Maximum Release Rate, (Q,()O) _> 64.42 cfs Drainage Area, (DA) _ Intensity, (I) _ Composite Runoff Coefficient, (C) _> 38.00 acres 6.86 inches/hr 0.64 Peak Release Rate, (QI(,0) _> Detention 166.84 cfs Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (SO (cf) (cf) (ft) In (S) In (Z) Z est 199.4 - - - - - 199.5 115,664 5,783 5,783 0.10 8.66 -2.30 0.09 200.0 126,102 60,442 66,225 0.60 ......................... .... 11.10 ...................... -0.51 0.67 200.5 129,296 63,850 130,074 1.10 € 11.78 0.10 1.17 201.0 132,517 65,453 195,527 1.60 12.18 € 0.47 1.62 201.5 135,766 67,071 262,598 2.10 12.48 0.74 2.06 202.0 139,044 68,703 331,301 160 12.71 0.96 2.49 202.5 146,993 71,509 402,810 3.10 12.91 1.13 2.92 Regression Output: b= 1.23 (X Variable CoefT) Ks= 107,601 (e) -intercept) Stage - Storage Equation is of the form: S = (Ks)(Z) b printed: 1/12/2011 6:08 AM Page 1 of 2 Barrel Number of Barrels = Dia. of Barrel = Area of Barrel, (Ab) = Pipe Length, (L) = Friction Coeff, (Kp) = Inv. of Barrel = Riser Elev. of Riser Crest = Rectangular Length Weir- Total Weir Length= Area of Riser = Orifice in Riser Dia. of Orifice = Number of Orifices = Area of Orifice, (Ab) _ Orifice Coefficient (Cd) _ Inv. of Orifice = 24 inches 1 24 inches 3.14 sf 65.0 feet 0.01058 199.40 feet 200.75 feet Width Weir= 36 inches 10.00 feet 6.00 sq. ft. 4.000 inches 1 0.09 sf 0.60 199.50 feet Dia. of Orifice = 3.000 inches Number of Orifices = 0 Area of Orifice, (Ab) = 0.05 sf Orifice Coefficient (Cd) = 0.60 Inv. of Orifice = 199.50 feet Width of Spillway (Approx.) = 40 feet Weir Coefficient = 3.3 Crest Elevation = 201.5 feet Suminarv of Results Maximum Release Rate, (Q700) = 64.4 cfs Release Rate, (Q7„o) = 80.0 cfs Normal Water Surface Elev. = 199.50 feet Water Surface Elev. (1a) Outlet 0100) = 201.99 feet primed: 1112/2011 8:08 AM Page 2 of 2 Channel Report Astoria - Wet Pond Concrete Channel Outfall T..,..?`.?erlal Bottom Width (ft) = 5.00 Side Siopes (z:,i) = 0.50, 0.50 Total Depth (ft) = 2.50 Invert Elev (ft) = 199.40 Slope (%) = 0.51 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 64.40 Hiahliohted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) = 1.41 = b4.4U = 8.04 = 8.01 = 8.15 = 1.64 = 6.41 = 2.41 Elev (ft) Section Depth (ft) 202.00 2.60 201.50 2.10 201.00 1.60 v 200.50 1.10 200.00 0.60 199.50 0.10 199.00 -0.40 198.50 -0.90 0 1 2 3 4 5 6 7 8 9 10 Reach (ft) Astoria Apartments Wet Pond Antiflotation Calculation Pond Riser Input Data Safety Factor: 1.25 Top Width of Riser (ft) 2.00 Top Length of Riser (ft) 6.00 Thickness of Riser (ft) 0.50 Thickness of Bottom of Riser (ft) 0.50 Top of Riser (ft) 200.75 Invert of Riser (ft) 199.40 Volume of Riser (cf) 15.45 Unit Weight Of Concrete Qb/cf) 150.00 Unit Weight of Water (lb/cf) 62.40 Block Height (ft) 0.00 Block Width (ft) 7.00 Block Length (ft) 7.00 Output Fw (Uplift Force, lb) 1010.88 Fc (Weight of Concrete,lb) 2317.50 Design Volume (cf) N/A Design Safety Factor 2.29 Volume OK Astoria pond outlet antiflotation.xls 1/28/2011 Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2011 by Autodesk, Inc. Astoria - Wet Pond Concrete Channel Outfall Trapezoidal Bottom Width (ft) = 5.00 Side Slopes (z:1) = 0.50, 0.50 Total Depth (ft) = 2.50 Invert Elev (ft) = 199.40 Slope (%) = 0.51 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 64.40 Elev (ft) 202.00 201.50 201.00 200.50 200.00 199.50 199.00 198.50 0 Section Sunday, Aug 22 2010 Highlighted Depth (ft) = 1.41 Q (cfs) = 64.40 Area (sqft) = 8.04 Velocity (ft/s) = 8.01 Wetted Perim (ft) = 8.15 Crit Depth, Yc (ft) = 1.64 Top Width (ft) = 6.41 EGL (ft) = 2.41 Depth (fi 2.60 2.10 1.60 1.10 0.60 0.10 -0.40 -0.90 8 9 10 1 2 3 4 5 6 7